Loading...
HomeMy WebLinkAbout4.09 Advertise ForBids 89-3 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: February 13, 1989 SUBJECT: Contract 89-3 Annual Street Overlay and Repair Program EXHIBITS ATTACHED: Plans and Specifications will be available at the City Council meeting. RECOMMENDATION: ~/~~A~uthorize Staff to advertise for bids. FINANCIAL STATEMENT: Budgeted costs are as follows: Design and Inspection (from CIP Budget) Overlay (from CIP Budget) Repair of overlay and slurry streets (from Street Maintenance Budget, which includes $5,000 for striping and $295,000 for street repair) $ 30,000 174,000 300,000 $ 504,000 Engineer's Estimate for Construction: 474,000 DESCRIPTION: The annual overlay program consists of placing at least a 1 1/2" asphalt overlay on streets that are in a deteriorated condition. A special pavement fabric will also be placed over the travelway prior to the asphalt overlay. This fabric helps bridge the existing minor pavement cracks and prevent the reflection of cracks through the new asphalt. Before installing the overlay, the pavement failures are dug out to the base rock and replaced with a section of asphalt. The contract also includes repair on the streets which will be slurry sealed in late spring. The repair will also include replacing 63 signal loop detectors which are in failed areas. This year's overlay project will complete the rehabilitation of the Brighton/Tamarack loop, begun in last year's project, and the downtown loop (Village Parkway/Dublin Blvd./Amador Valley Blvd.) begun in 1984. This last section of Amador Valley Boulevard was held off until the traffic signal and median work could be completed between Amador Plaza' and Village Parkway. The streets to be overlaid this year are Amador Valley Boulevard between Starward and Village Parkway, Regional Street between Dublin Boulevard and Amador Valley Blvd., Sierra Court from Dublin Boulevard 2000' north, Tamarack Drive between Village Parkway and Elgin Lane, and Emerald Ave. The following list identifies the streets which are to be repaired under this contract. Burnham Way Newcastle Lane Langmuir Lane Dover Lane Elba Way Thames Ct. Emerald Ave. Sierra Ct. Regional Street Mansfield Ave. Darian Ct. Brookdale Ct. Newport Ct. Elba Ct. Amanda Lane Stagecoach Rd. Village Parkway Ione Way Ca]lan Street Dover Ct. Frederiksen Ct. Burton Street Tamarack Drive Sierra Lane Amador Valley Blvd. ITEM NO. ~__ COPIES TO: