Loading...
HomeMy WebLinkAbout7.2 AwardOfBid 89-8 CITY OF DUBLIN 89-8 AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 30, 1989 SUBJECT EXHIBITS ATTACHED /Civic Center Courtyard Fountain (Report Prepared by Paul Rankin, Assistant City Manager) o Resolution Amending the Capital Improvement Program and Approving a Supplemental Appropriation o Resolution Awarding Bid o Copy of Bidder's Certification of Experience o Bid Results RECOMMENDATION : Determine whether to proceed with project. If the fountain is to be constructed, adopt the Resolution approving the Appropriation and Resolution awarding the Bid. FINANCIAL STATEMENT: If the project is pursued, the recommended Budget amount is $131,300 (see Project Cost below). DESCRIPTION : The first major project undertaken by the Dublin Fine Arts Foundation has been the selection of a recognized artist to complete a -- work of art for the Dublin Civic Center. The Arts Foundation is raising money to commission the sculpture and have offered the artwork to the City of Dublin. The artist worked with the building and landscape architects to develop a concept which would fit into the project. The location focused on the courtyard fountain and the fountain was redesigned to accommodate the art design. Options The cost of the fountain project is significantly more than the estimate previously identified. Therefore, the City Council should consider the options available in continuing to support the efforts of the Dublin Fine Arts Foundation in locating a sculpture in the courtyard fountain area. The concept of requesting that the Dublin Fine Arts Foundation attempt to raise additional funds to construct the fountain has been discussed previously. At the City Council meeting on August 14, 1989, Mr. Ron Nahas, President of the Foundation, indicated that he did not feel that the Foundation could raise the funds to modify the fountain, in addition to their major effort to commission the artwork. As noted by Mr. Nahas, the revised design is significantly different than the original fountain included as part of the Civic Center project. The new design will feature additional lighting and increase the sound of running water within the courtyard. In addition, the fountain and the piece of artwork have been designed to integrate with the public area. The City Council could elect to delete the fountain in its entirety and continue to allow the Arts Foundation to place the sculpture in the courtyard with a different less expensive base. As discussed above, the two elements were designed to work together. The fountain was considered as a method of masking traffic noise and creating a "garden atmosphere". In addition, the artist had incorporated certain imagery of the fountain pool with his design concept. Therefore, this option would require further discussion between the Foundation and the Artist to determine whether the Artist would continue the project without the water element. The Civic Center Advisory Committee consisting of Mayor Moffatt and Councilmember Jeffery have supported the option of proceeding with the fountain project. Staff has identified a method of financing the construction in the,event that the City Council concurs. COPIES TO: Bidders  ~ Ron Nahas, Dublin Fine Arts Foundation ITEM NO. · BID RESULTS At the regular City Council meeting on August 14, 1989, the City Council authorized the City Engineer to advertise the project for competitive bid. The design plans were completed by David Gates & Associates. The project includes: excavation of the fountain bowl and equipment vault; installation of mechanical and electrical equipment, placement of stone in pool basin, and installation of the artwork support. The physical delivery and installation of the sculpture will be the responsibility of the Dublin Fine Arts Foundation. The City received two bids by the September 20, 1989 bid deadline. The bids received were as follows: Ambo Engineering $111,290 Golden Bay Construction $113,770 Both bids were substantially greater than the Architect's estimate of $61,700. However, given the closeness of the two bids, it would appear that they are competitive. Also, given the costs and time lags associated with rebidding the project, the City's Consultants do not believe substantial savings could be obtained in rebidding the same design. The time of year and difficult access to the area may have impacted the overall bid. BID DISCREPANCY In reviewing the two bids, Staff noted that Ambo Engineering had failed to - respond to Section 00320 "Certification of Bidder's Experience and Qualifications." This form was included upon the advise of the City's Architect and Construction Manager. Given the complexity of a fountain, it was their opinion that prior experience would be an appropriate qualification. Copies of the documents submitted by both firms are attached. Ambo did not complete the form and merely noted "See Attached" on page one and completed the signature block on page two. On October 4, 1989, City Staff had a telephone conversation with Mr. Sam Sposeto of Ambo. City Staff attempted to ascertain whether any of the projects on the referenced attachment involved the construction of a fountain. The only project which the company could identify was the Murphy Station project for the City of Sunnyvale. Mr. Sposeto verbally informed City Staff that in his opinion whether the firm has worked on a completed fountain before did not have any bearing on the award of the bid. The City's legal counsel has reviewed the matter and believes that the bid by AMBO Engineering is non-responsive. The City may legally reject a bid for failing to submit required information which is intended to assist the City in analyzing the bidder's qualifications. Furthermore, the City's legal counsel is of the opinion that bidders must respond to the invitation and that a bidder may not provide substituted information. Based on the circumstances, it is Staff's recommendation that the City Council reject the bid submitted by Ambo Engineering as being non-responsive. References of Golden Bay Staff has reviewed the references submitted by Golden Bay Construction. All of the references were projects completed with a team consisting of Golden Bay Construction and Baer Brothers. Baer Brothers is a firm which specializes in the design and construction of fountains. Golden Bay has listed Baer Brothers as the subcontractor for the mechanical and electrical scope of work. Ail of the references were favorable. Based on the review, Staff is recommending that if the project is pursued that the City Council award the bid to Golden Bay Construction, Inc. Financing In preparing the 1989-90 Fiscal Year Budget, Staff estimated the interest earnings for the funds associated with the construction of the Civic Center. The Civic Center is financed through a combination of General Fund contributions and Certificate of Participation lease financing issued through Dublin Information Inc. (DII). In the past, any interest earnings on DII funds have been applied to the project. This has resulted in a reduction of the General Fund contribution required to complete the project. Page 2 For example, the Capital Improvement Program (CIP) adopted in June of 1988 - showed the following Civic Center Project Financing: DII General Fund Total $16,906,129 2~582,283 $19,488,412 The CIP update adopted in June of 1989 showed the following financing: DII General Fund Total $16,925,524 2,562~888 $19,488,412 As shown above, the General Fund contribution decreased by $19,395 and DII's contribution increased by a similar amount. This was due to the application of estimated interest earnings on the DII fund for Fiscal Year 1988-89. Staff has had an opportunity to review preliminary audit figures for the fiscal year ending June 30, 1989 and to compare these figures to budget estimates. The reports indicate that the DII fund will receive approximately $254,113 in interest earnings. In preparing the 1989-90 CIP, Staff had used interest earnings of $129,000 in calculating the General Fund's contribution to the project. The higher interest earnings resulted from delays in the construction payment schedule. Due to the fact that interest earnings exceeded the CIP estimate by approximately $125,000, these funds could be used to finance this project. Project Cost The total recommended budget to complete this project is as follows: Construction Cost Construction Contingency Architect's Construction Serv City Inspection Total Project $113,770 10,000 3,000 4~500 $131,300 These costs exclude any monies expended to date. Approximately $10,000 was incurred under the current Civic Center project to install underground utilities and empty conduit to serve the future fountain. In addition, the City expended approximately $4,440 to prepare plans and specifications. If the City Council proceeds with the project, Staff recommends that the Capital Improvement Program be amended to include the Civic Center Courtyard Fountain as a new project. It is recommended that the City Council appropriate a total of $131,300 for the project. A total of $125,000 would be tranferred from the City's unallocated reserve for future projects. This amount represents the unanticipated DII interest income. The City Council should also approve a budget transfer in the amount of $6,300 from the Civic Center project to the Courtyard Fountain Project. Recommendation Staff recommends that the City Council determine whether they wish to proceed with the construction. If the City Council approves proceeding with the project, it would be appropriate to adopt the attached resolutions. Page 3 -- RESOLUTION NO. - 89 -- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AMENDING THE 1989-90 UPDATE TO THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM AND APPROVING A SUPPLEMENTAL APPROPRIATION FOR THE DUBLIN CIVIC CENTER COURTYARD FOUNTAIN WHEREAS, the Dublin Fine Arts Foundation has offered to commission a sculpture for the Civic Center Courtyard; and WHEREAS, the sculpture is designed to be placed within a sunken fountain; and WHEREAS, the City Council has adopted Resolution No. 84-89, which adopted a Budget for Fiscal Year 1989-90; and WHEREAS, the City Council has adopted Resolution No. 83-89, which adopted the 1989-90 update to the Five Year Capital Improvement Program; and WHEREAS, the Civic Center Courtyard Fountain was not identified as funded project within either Resolution No. 84-89 or Resolution No. 83-89; and WHEREAS, the City Council has received bids for the construction of the fountain; and WHEREAS, the City Council desires to proceed with the fountain project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby amend Resolution No. 83-89, updating the Five Year Capital Improvement Program by including the Civic Center Courtyard Fountain Project. BE IT FURTHER RESOLVED, that the City Council shall appropriate $125,000 from Dublin Information, Inc., 1988-89 Interest Earnings, to the funding of the Civic Center Courtyard Fountain. In addition, the City Council shall authorize a transfer of $6,300 from the Civic Center project to the Civic Center Courtyard Fountain Project. PASSED, APPROVED AND ADOPTED this 30th day of October, 1989. AYES: NOES: ABSENT: ATTEST: Mayor City Clerk RESOLUTION NO. -89 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 89-8 CIVIC CENTER COURTYARD FOUNTAIN TO GOLDEN BAY CONSTRUCTION, INC. WHEREAS, the City of Dublin did, on September 20, 1989, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 89-8 Civic Center Courtyard Fountain, authorized by the City Council on August 14, 1989, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bidder which was responsive to the requirements of the bid documents; and WHEREAS, the bid hereinafter mentioned is responsive to the bid documents, including, but not limited to, the completion of Section 00320 "Certification of Bidder's Experience and Qualifications"; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby and award City of Dublin Contract 89-8 to the lowest responsible bidder therefor, to wit Golden Bay Construction, Inc., at a bid of One Hundred Thirteen Thousand Seven Hundred Seventy Dollars ($113,770), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED, AND ADOPTED this 30th day of October, 1989. AYES: NOES: ABSENT: ATTEST: Mayor City Clerk AGREEMENT CIVIC CENTER COURTYARD FOUNTAIN CITY OF DUBLIN CONTRACT 89-8 THIS AGREEMENT, dated for identification as of October 31, 1989, between the CITY OF DUBLIN, a Municipal Corporation (hereinafter called "CITY"), and Golden Bay Construction, Inc., (hereinafter called "CONTRACTOR"). The parties hereto mutually agree to the terms and conditions set forth herein. 1.01 CONTRACT DOCUMENTS. Each of the items hereinafter referred to are incorporated herein by this reference as if set forth in full herein. Work called for in any one Contract Document and not mentioned in another is to be performed and executed as if mentioned in all Contract Documents. The table of contents, titles, and headings contained herein and in said documents are solely to facilitate reference to various provisions of the Contract Documents and in no way affect or limit the interpretations of the provisions to which they refer. The Contract Documents, sometimes also referred to as "the Contract," consist of the Notice to Contractors, the completed Proposal Form submitted by the Contractor to whom the Contract is awarded, the Instructions to Bidders insofar as they relate to events which will occur or actions to be taken after the submission of the Proposal, this Agreement, the Standard Specifications, the Special Provisions, Plans, Drawings, Detail Book, and Technical Specifications, the Standard Drawings, Details, and other such data and all versions thereof prepared by City pursuant to Contract, and any modifications of any of the foregoing in the form of Addenda or executed Change Order or otherwise effected in accordance with the terms of the Contract, the surety bonds, bid bond, and Contractor's list of subcontractors. 1.02 DEFINITIONS. Unless otherwise specifically provided herein, all words and phrases defined in the Standard Specifications shall have the same meaning and intent in this Agreement. 1.03 AGREEMENT CONTROLS. In the event of a conflict between the terms and conditions as set forth in this Agreement and the terms and conditions set forth in other Contract Documents, the terms and conditions set forth in this Agreement shall prevail. 1.04 SCOPE OF CONTRACT. Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor, and material and transportation necessary to perform and complete in a good and workmanlike manner to the satisfaction of City, all the work called for, and in Page 1 the manner designated in, and in strict conformity with the Contract Documents for the project entitled: Civic Center Courtyard Fountain. 1.05 CONTRACT AMOUNT AND PAYMENTS. City agrees to pay, and Contractor agrees to accept, in full payment for the above work, the sum of ONE HUNDRED THIRTEEN THOUSAND SEVEN HUNDRED SEVENTY DOLLARS ($113,770), which sum is to be paid according to the schedule and in the manner set forth herein and subject to additions, deductions, and withholding as provided in the Contract Documents. When it is provided in the Notice to Bidders, Instructions to Bidders, or Proposal Form that Contractor is to be paid on the basis of the unit prices shown in his bid, instead of a lump sum price, the Contractor agrees to accept, in full payment for the above work, the sum computed in accordance with the actual amount of each item of work performed or material furnished, at the unit price which Contractor bid for each such item in his Proposal Form, said unit price to be determined as provided in the Standard Specifications and Special Provisions. 1.06 PROGRESS AND FINAL PAYMENTS. Subject to the terms and conditions of the Contract Documents, City shall cause payments to be made upon demand of Contractor in the manner set forth in the Standard Specifications. 1.07 RETENTION OF SUMS CHARGED AGAINST CONTRACTOR. When, under the provisions of this Contract, City shall charge any sum of money against Contractor, City shall deduct and retain the amount of such charge from the amount of the next succeeding progress estimate, or from any other moneys due or that may become due Contractor from City. If, on completion or termination of the Contract, sums due Contractor are insufficient to pay City's charges against him, City shall have the right to recover the balance from Contractor or his sureties. 1.08 COMMENCEMENT AND PROSECUTION OF WORK. Contractor shall commence the work on or before ten (10) calendar days from and after receipt of written Notice to Proceed from City to Contractor and will diligently prosecute the work to final completion. The phrase "commence the work" means to engage in a continuous program on-site including, but not limited to, site clearance, grading, dredging, land filling and the fabrication, erection, or installation of the work. Said Notice to Proceed shall be issued following execution of the Agreement and the filing by Contractor of the required bonds and proof of insurance. The continuous prosecution of work by Contractor shall be subject only to Excusable Delays as defined in this Agreement. 1.09 TIME OF COMPLETION. The entire work shall be brought to completion in the manner provided for in the Contract Documents on or before the 90th calendar day (hereinafter called the "Completion Date") from and after the receipt by Contractor of the Notice to Proceed unless extensions of time are granted in accordance with the Contract Documents. Page 2 1.10 PAYMENTS DO NOT IMPLY ACCEPTANCE OF WORK. The payment of any progress payment, or the acceptance thereof by Contractor, shall not constitute acceptance of the work or any portion thereof and shall in no way reduce the liability of Contractor to replace unsatisfactory work or material, though the unsatisfactory character of such work or material may not have been apparent or detected at the time such payment was made. 1.11 ACCEPTANCE NOT RELEASE. Contractor shall correct immediately any defective or imperfect work which may be discovered before final acceptance of the entire work. Any unsatisfactory materials shall be rejected, notwithstanding that they may have been overlooked by the proper inspector. The inspection of the work, or any part thereof, shall not relieve Contractor of any of his obligations to perform satisfactory work as herein prescribed. Failure or neglect on the part of the City or any of its authorized agents to condemn or reject bad or inferior work or materials shall not be construed to imply an acceptance of such work or materials if such becomes evident at any time prior to final acceptance of the entire work or all materials, nor shall such failure be construed as barring City at any subsequent time from recovering damages or of such a sum of money as may be rquired to build anew all portions of the work in which fraud was practiced or improper materials used whenever City may discover the same. 1.12 RELEASE UPON FINAL PAYMENT. If requested to do so by City, at the time of final payment, as a condition precedent to final payment, Contractor and each assignee under any assignment in effect at the time of final payment shall execute and deliver a release in form and substance satisfactory to the City and containing such exceptions as provided in Section 7100 of the Public Contract Code which shall discharge City, its officers, agents, and employees of and from all liability, obligations, and claims arising under this contract. 1.13 CITY'S RIGHT TO TAKE POSSESSION OF THE WORK IN WHOLE OR IN PART. Without limitation of Paragraph 1.19 whatsoever, the City of Dublin shall have the right at any time to enter upon the work and perform work not covered by this Contract, or to occupy and use a portion of the work, prior to the date of the final acceptance of the work as a whole, without in any way relieving Contractor of any obligations under this Contract. Such use or occupation of the work shall not be construed as an acceptance of any portion of the work under this Contract, nor shall it affect the dates and times when payments shall become due nor prejudice City's rights, guarantees, or sureties. 1.14 NO WAIVER OF REMEDIES. Neither the inspection by City or its agents, nor any order or certificate for the payment of money, nor any payment for, nor acceptance of the whole or any Page 3 part of the work by City, nor any extensions of time, nor any position taken by City or its agents shall operate as a waiver of any provision of this Agreement or of any power herein reserved to City or any right to damages herein provided, nor shall any waiver of any breach of this Agreement be held to be a waiver of any other or subsequent breach. All remedies provided in this Agreement shall be taken and construed as cumulative; that is, in addition to each and every other remedy herein provided, and City shall have any and all equitable and legal remedies which it would in any case have. 1.15 DETERMINATION OF DAMAGES. The actual fact of the occurrence of damages and the actual amount of the damages which City would suffer if the work were not completed within the specified times set forth are dependent upon many circumstances and conditions which could prevail in various combinations, and from the nature of the project, it is impracticable and extremely difficult to fix the actual damages. Damages which City would suffer in the event of delay include loss of the use of the Project, and in addition expenses of prolonged employment of an architectural and engineering staff; costs of administration, inspection, and supervision; and the loss suffered by the public within the City of Dublin by reasons of the delay in the completion of the project to serve the public at the earliest possible time. Accordingly, the parties hereto agree, and by execution of this Agreement, Contractor acknowledges that he understands, has ascertained and agrees, that the amounts set forth herein as liquidated damages shall be presumed to be the amount of damages sustained by the failure of Contractor to complete the entire work within the times specified~ 1.16 LIQUIDATED DAMAGES. The amount of the liquidated damages to be paid by Contractor to City for failure to complete the entire work by the Completion Date (as extended, if applicable) will be Two Hundred and Fifty Dollars ($250.00) for each calendar day, continuing to the time at which the work is completed. Such amount is the actual cash value agreed upon as the loss to City resulting from Contractor's default. 1.17 PAYMENT OF DAMAGES. In the event Contractor shall become liable for liquidated damages, City, in addition to all other remedies provided by law, shall have the right to withhold any and all payments which would otherwise be or become due Contractor until the liability of Contractor under this section is finally determined. City shall have the right to use and apply such payments, in whole or in part, to reimburse City for all liquidated damages due or to become due to City. Any remaining balance of such payments shall be paid to Contractor only after discharge in full of all liability incurred by Contractor under this section or otherwise. If the sum so retained by City is not sufficient to discharge all such liabilities of Contractor, Contractor and his sureties shall continue to remain liable to City until all such liabilities are satisfied in full. No failure by City to withhold any payment as hereinbefore specified shall in any manner be construed to constitute a waiver of any right to liquidated damages or any right to any such sum. Page 4 1.18 INDEMNITY AND HOLD HARMLESS. Contractor shall assume the defense of, and indemnify and save harmless, the City, its officers, employees, and agents, and each and every one of them, from and against all actions, damages, claims, losses or expenses of every type and description to which they may be subjected or put, by reason of, or resulting from, the performance of the work, provided that such action, damage, claim, loss, or expense is attributable to bodily injury, sickness, disease or death, or injury to, or destruction of property, whether upon or off the work, including the loss of use thereof, and is caused in whole or in part by any negligent act or omission of the Contractor, and subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, whether or not it is caused in part by a party indemnified hereunder. 1.19 CONTRACTOR SHALL ASSUME RISKS. Until the completion and final acceptance by City of all work under this Contract, the work shall be under Contractor's responsibility, care, and charge, including any period of time work is suspended for any cause whatsoever. Contractor shall rebuild, repair, restore, and make good all injuries, damages, re-erections, and repairs occasioned or rendered necessary by accidental causes of any nature, to all or any portions of the work, except as otherwise agreed. It is specifically contemplated that the City, its officers, employees, and invitees, will occupy and use portions of the work prior to final acceptance. Such occupancy shall not relieve Contractor of responsibility provided herein nor exonerate any surety or insurer of Contractor save and except for items of routine maintenance and repair. 1.20 GENERAL LIABILITY OF CONTRACTOR. Except as otherwise herein expressly agreed, Contractor shall do all the work and furnish all the labor, materials, tools, power and light, and appliances, necessary or proper for performing and completing the work herein required in the manner within the time herein specified. The mention of any specific duty or liability of Contractor shall not be construed as limitation or restriction of any general liability or duty of Contractor and, any reference to any specific duty or liability shall be construed to be for the purpose of explanation. 1.21 FAILURE TO MAINTAIN INSURANCE. During the term of this Agreement, and until final completion and acceptance of the work by the City, the Contractor shall maintain in full force and effect insurance coverage in the forms and amounts specified in the Standard Specifications. If, at any time during the performance of this Contract, Contractor fails to maintain any item of required insurance in full force and effect, Contractor shall immediately discontinue all work under the Contract and City will withhold all Contract Payments due or that become due until notice is received by City that such insurance has been restored in full force and effect and that the premiums therefor have been paid for a period satisfactory to the City Manager. Page 5 1.22 EXTENSIONS OF TIME. In the event City deems it necessary, in its sole discretion, to extend the time of completion of work to be done under this Contract beyond the required Completion Date herein specified, such extensions shall in no way release any guarantee given by Contractor pursuant to the provisions of the Contract Documents, nor shall such extension of time relieve or release the sureties on the bonds executed pursuant to said provisions. By executing such bonds, the sureties shall be deemed to have expressly agreed to any such extension of time. The amount of time allowed in any extension of time shall be limited to the period of excusable delay as defined herein giving rise to the same as determined by City Engineer. 1.23 EXCUSABLE DELAYS. For the purpose of these Contract Documents, the term "Excusable Delays" shall mean, and is limited to, delays caused directly by acts of God, acts of the public enemy, fires, riots, insurrections, epidemics, quarantine restrictions, strikes, lockouts, sitdowns, acts of a governmental agency, priorities or privileges established for the manufacture, assembly, or allotment of materials necessary in the work by order, decree, or otherwise of the United States or by any department, bureau, commission, committee, agent, or administrator of any legally constituted public authority; changes in the work ordered by City insofar as they necessarily require additional time in which to complete the work; the prevention by City of Contractor from commencing or prosecuting the work because of the acts of others, excepting Contractor's subcontractors; or the prevention of Contractor from commencing or prosecuting the work because of a city-wide failure of public utility service. Inclement weather shall not be a reason for granting an extension of time. City may, however, grant an extension of time for unavoidable delay as a result of extraordinary inclement weather which shall then be classified Excusable Delay. The term "Excusable Delay" shall specifically not include: (1) any delay which could have been avoided by the exercise of case, prudence, foresight, and diligence on the part of Contractor; (2) any delay in the prosecution of parts of the work, which may in itself be unavoidable but which does not necessarily prevent or delay the prosecution of other parts of the work, nor the completion of the whole work within the time specified; (3) any reasonable delay resulting from time required by City for review of plans and submittals required of Contractor and for the making of surveys, measurements and inspections; (4) any delay arising from an interruption in the prosecution of the work on account of the reasonable interference from other Contractors employed by City, which does not necessarily prevent the completion of the work within the time specified; and (5) any delay resulting from ordinary inclement weather. Excusable Delays, if any, shall operate only to extend the Completion Date (not in excess of the period of such delay as determined by the City) but shall not under any circumstances increase the sum City is to pay Contractor as provided in these Contract Documents. 1.24 CONTRACTOR TO SERVE NOTICE OF DELAYS. Whenever Contractor foresees any delay in the prosecution of the work, and in any event immediately upon the occurrence of any delay which Contractor regards as Page 6 an excusable delay, he shall notify the City Engineer in writing of the probability of such delay and its cause, in order that the City Engineer may take immediate steps to prevent if possible the occurrence or continuance of the delay, or if this cannot be done, may determine whether the delay is to be considered excusable, how long it continues, and to what extent the prosecution and completion of the work are delayed thereby. Said notice shall constitute an application for an extension of time only if the notice requests such an extension and sets forth Contractor's estimate of the additional time required together with a full description of the cause of the delay relied upon. After the completion of any part or whole of the work, the City Engineer, in estimating the amount due Contractor, will assume that any and all delays which may have occurred in its prosecution and completion have been avoidable delays, except such delays as shall have been called to the attention of the City Engineer at the time of their occurrence and found by him to have been excusable. Contractor shall make no claim that any delay not called to the attention of the City Engineer at the time of its occurrence has been an excusable delay. 1.25 EXTENSION OF TIME - EXCUSABLE DELAY. Should any delays occur which the City Engineer may consider excusable, as herein defined, Contractor shall, pursuant to his application, be allowed an extension of time beyond the time herein set forth proportional to said delay or delays in which to complete this Contract; and, during an extension which may have been granted because of an excusable delay or delays, City shall not charge liquidated damages against Contractor for such delay. 1.26 EXTENSION OF TIME DOES NOT WAIVE CITY'S RIGHTS. The granting of any extension of time on account of delays which in the judgment of the City Engineer are excusable delays shall in no way operate as a waiver on the part of City of its rights under this Contract excepting only the extension of the Completion Date. 1.27 NO PAYMENT FOR DELAYS. No damages or compensation of any kind shall be paid to Contractor or any subcontractor because of delays in the progress of the work whether such delays qualify for extension of time under this Agreement or not. Contractor waives all claims against City, its officials and employees, for any loss or damage sustained by reason of delays beyond the Completion Date arising out of modifications of this Agreement, including modifications deemed necessary or desirable by City for the correction of errors or omissions in the Contract Documents. 1.28 CHANGES IN THE WORK. Changes in the work made pursuant to changes issued in accordance with the Standard Specifications and extensions of time of completion made necessary by reason thereof (beyond the Completion Date) shall not in any way release any guarantee given by Contractor pursuant to the provisions of the Contract Documents, Page 7 or the Contract let hereunder, nor shall such changes in the work relieve or release the sureties on bonds executed pursuant to the said provisions. By executing such bonds, the sureties shall be deemed to have expressly agreed to any such change in the work and to any extension of time made by reason thereof. 1.29 TERMINATION AFTER COMPLETION DATE. In addition to any other rights it may have, City may terminate this Contract at any time after the Completion Date as adjusted by any extensions of time for excusable delays that may have been granted. Upon such termination Contractor shall not be entitled to receive any compensation for services rendered by him before or after such termination, and he shall be liable to City for liquidated damages for all periods of time beyond such termination date until the work is completed. 1.30 CONTRACTOR BANKRUPT. If Contractor should commence any proceeding under the Bankruptcy Act, or if Contractor be adjudged a bankrupt, or if Contractor should make any assignment for the benefit of creditors, or if a receiver should be appointed on account of Contractor's insolvency, then the City Council may, without prejudice to any other right or remedy, terminate the Contract and complete the work by giving notice to Contractor and his surety according to the provisions of Section 1.31. Contractor's Surety shall have the right to complete the work by commencing thirty (30) days as specified in Section 1.31; and, in the event Contractor's Surety fails to commence work within thirty (30) days, City shall have the right to complete, or cause completion of the work, all as specified in Section 1.31. 1.31 TERMINATION FOR BREACH OF CONTRACT. If Contractor should abandon the work under this Contract, or if the Contract or any portion of the Contract should be sublet or assigned without the consent of the City Council, or if the City Engineer should be of the opinion that the conditions of the Contract in respect to the rate of progress of the work are not being fulfilled or any part thereof is unnecessarily delayed, or if Contractor should wilfully violate or breach, or fail to execute in good faith, any of the terms or conditions of the Contract, or if Contract should persistently refuse or fail to supply enough properly skilled labor or materials, or fail to make prompt payment to subcontractors for material or labor, or persistently disregard laws, ordinances, or proper instruction or orders of the Engineer, then, notwithstanding any provision to the contrary herein, the City Council may give Contractor and his Surety written notification to immediately correct the situation or the Contract shall be terminated. In the event that such notice is given, and, in the event such situation is not corrected, or satisfactory arrangement for correction is not made, within ten (10) calendar days from the date of such notice, the Contract shall upon expiration of said ten (10) calendar days cease and terminate. In the event of any such termination, City shall immediately serve notice therof upon the Surety and Contractor; and the Surety shall have the right to take over and perform the Contract, provided, however, that if the Surety does not commence performance thereof within thirty (30) days from the date of the mailing to such Surety of Page 8 netice of termination, City may take over the work and prosecute the same to completion by Contract, or otherwise, for the account and at the expense of Contractor, and his Surety shall be liable to City for any excess cost occasioned City thereby, as hereinafter set forth. In the event City completes the work, or causes the work to be completed, as aforesaid, no payment of any sum shall be made to Contractor until the work is complete. The cost of completing the we~k, including but not limited to, extra contract costs, the costs of City forces, extra costs of administration and management incurred by City, either direct or indirect, shall be deducted from any sum then due, or which becomes due, to Contractor from City. If no sum sufficient to pay the difference between sums due to Contractor from City and the cost of completing work, and there is a sum remaining due to Contractor after City deducts the aforementioned costs of completing the work, then City shall thereupon pay such sum to Contractor and his Surety. No act by City before the work is finally accepted including, but not limited to, exercise of other rights under the Contract, actions at law or in equity, extensions of time, payments, claims of liquidated damages, occupation or acceptance of any part of the work, waiver of any prior breach of the Contract or failure to take action pursuant to this section upon the happening of any prior default or breach by Contractor shall be construed to be a waiver, or to estop, City from acting pursuant to this paragraph upon any subsequent event, occurrence or failure by Contractor to fulfill the terms and conditions of the Contract. The rights of City pursuant to this paragraph are cumulative and in addition to all other rights of City pursuant to this Agreement and at law or in equity. IN WITNESS WHEREOF, the parties hereto have signed this Agreement on the date set forth opposite their names. Date: CONTRACTOR By Date: ATTEST: Title CITY OF DUBLIN, A Municipal Corporation By Mayor City Clerk ORIGINAL APPROVED AS TO FORM City Attorney - 9 - 00320 ~TIFICATION OF BIDDER'S EXPERIENCE AND QUALIFICATIONS Page 1 SECTION 00320 CERTIFICATION OF BIDDER'S EXPERIENCE AND QUALIFICATIONS The undersigned Bidder certifies that he is, at the time of bidding, end shall be, throughout the period of the contract, licensed under the provisions of Chapter 9, Division 8, of the Business and Professions Code of the State of California, to do the type of work contemplated in the Contract Documents. Bidder shall further certify that he is skilled end regularly engaged in the general class end type of work called for in the Contract Documents. The Bidder represents that he is competent, knowledgeable, and has special skills on the nature, extent and inherent conditions of the work to be performed. Bidder further acknowledges that there are certain peculiar and inherent conditions existent in the construction of the particular facilities which may create, during the construction program, unusual or peculiar unsafe conditions hazardous to persons and property. Bidder expressly acknowledges that he is aware of such peculiar risks and that he has the skill end experience to foresee and to adopt protective measures to adequately and safely perform the construction work with respect to such hazards. The Contractor shall have the following qualifications: Ao Have successfully completed not less than six (6) fountain projects, each of a scope equal to or greater than this project, within the last three (3) years. Submit with his formal bid, a llst of at least three (3) projects complete with names, addresses and telephone numbers of the Lendscape Architect and the Owner's Representative and a brief description of the fountain facilities including size, scope of the mechanical system. Project Name: Owner: Construction Cost: $ Construction Time: Calendar Days Owner's Representative: Owner's Telephone No.: (__) Date of Substential Completion: Brief Description: 00320 CERTIFICATION OF BIDDF~'S ~PERIENCE AND QUALIFICATIONS Page 2 Project Name: Owner: Construction Cost: $ Construction Time: Owner's ~epresentative:' Owner's Telephone NO.: Date of substantial Completion: Brief Description: Calendar Days Project Name: Owner: Construction Cost: $ Construction Time: Owner's Representative: Owner's Telephone No.: Date of Substantial Completion: Brief Description: Calendar Days Signed this ~O~day of , 1989. ~---"Signa t~ -6f' Bidder Title of Signator END OF SECTION Byron WI: Liams 87&-9414 Univ~ Cmlif Car Leon Berkeley Vic l'ay lot &42-048~ Univ. Calif (same as above) Kaiser Co~struc.tion i?80-.2nd Berkekey, CA Ron Mello 428.-6475 City of Union Ci.ty Alvarado Niles Rd Union Ci.ty, CA Jim Ghemet.ti 4'?i-J2~2 Por.t of Oakland 66 Jack London Oakland, Ca Rufino Olay '444-3i88 Safeway S'tore~ Madison Ave. Oakland, CA Inland Container Z?tl~3---Ced a r BLvd Newark, Ca Fred Landsber~ 797--2021 $.;:'. In.tnL Airpor.t $ l'?O,O00.O0 Loading Dock Modif. Havi land Hall I.tandicm~ Modifications S i.te Improvemen~ 50,000.00 iZO,O00.O0 L.I.D. 20 Im;u-ovemen't s of Deco'to Di~tr ic.t 700,000.00 Air-BART Bum SheL.ters Oakland In.t' [ Airpor.t 450,000.00 Hoffman Freeway Dev. Richmond Dis'h"ibution Ce;]ter t,300,000,00 Various Contraci'-~ Site grading, engineer- ing, a.spha [ t ~ concl-st8 800,000.00 480,000.00 275,000.00 34151 ZWISSIG WAY ' UNION CITY, CA 94587 ' (415) 487-2424 · LICENSE NO. 310292 Bmyhi LL Drive San Bruno, CA Byron WILtimm~ 8"76 -94 J. 4 City of' Sunnyva Le 456 We~t OLive Ave 5'unnyva Le, CA Erni e Yo~h i (408) 730-7429 Co. of Santa CLara l'r an~spor t m t i on 1555 Berger Drive ~'mn Jo_se, CA Hugh Hancock (408) 299.-.'259i City of' 5'uT~nyva Le 456 We.st OLive Ave Sur, nyva re, CA Roger Jenkin.s~, (408) '7:30--'7429 Washington I..lo~p i t a: 2000 Mowry Ave Fremont, CA Vern Gu~'t a f.son 7?7-iiii L. i4. uid Air Corp. 2i2i N. [:mtifornim Walnut [;reek, Ca Geerge NubLe 977-'652 i Santa CLara Co;~nty 'l'rmn~portation Agency 1555 Berger Drive San Jo.se, CA Hugh Hancock 408/299-...2591 City of Watnul Creek i666 North Main Zt Wa[nu~ Creek, CA Vic ~'t'ei t 94~--5800 Ci~-' of' Wa [nu~ Creek (~ame a~ abeve) City of Waknut Creek ,vehie'n t $ tO Evans Ave. Mai t Fac i t i ty 286,000.00 Ma~hi tda Ave Median I~land 400,000.00 Var iou-~ Cor, tract-~' Bu.s :.~'to~ Pavemen',~ 360,000.00 Murphy 5'tat ion 885,000.00 Parking Lot/ Box Culvert Construction 603,000.00 I..leLi~m *l'ran~fiLt Depot 265,000~00 Eastridge Transit Cerd'er'-'Dr J vets Bui Lding/Pa-~$e~;ger ~th e L 'l' e',- ~ 984~900~00 North Main Street ]l~p r ovehlei'i t N 205,500.00 Ca t i 'lorn i a/Newe L t/ 5'or;th Main Street · Creek Beaut i ficat ic.n i92,100.00 48~,650.00 34151 ZWISSIG, WAY · UNION CITY, CA 94587 · (415) 487-2424 · LICENSE NO. 310292 . _ 00320 ERTIFICATION OF BIDDER'S EXPERIENCE AND QUALIFICATIONS Page 1 SECTION 00320 CERTIFICATION OF BIDDER'S EXPERIENCE AND QUALIFICATIONS The undersigned Bidder certifies that he is, at the time of bidding, and shall be, throughout the period of the contract, licensed under the provisions of Chapter 9, Division 8, of the Business and Professions Code of the State of California, to do the type of work contemplated in the Contract Documents. Bidder shall further certify that he is skilled and regularly engaged in the general class and type of work called for in the Contract Documents. The Bidder represents that he is competent, knowledgeable, and has special skills on the nature, extent and inherent conditions of the work to be performed. Bidder further acknowledges that there are certain peculiar and inherent conditions existent in the construction of the particular facilities which may create, during the construction program, unusual or peculiar unsafe conditions hazardous to persons and property. Bidder expressly acknowledges that he is aware of such peculiar risks and that he has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the construction work with respect to such hazards. The Contractor shall have the following qualifications: Have successfully completed not less than six (6) fountain projects, each of a scope equal to or greater than this project, within the last three (3) years. Submit with his formal bid, a list of at least three (3) projects complete with names, addresses and telephone numbers of the Landscape Architect and the Owner's Representative and a brief description of the fountain facilities including size, scope of the mechanical system. Project Name: Fn~n~n 0 ¥~rbs R~n~ Owner: M~rrott C~r?~rat ~ ~n Construction Cost: $ 128,550.00 Construction Time: ( 90 ) Ninety Owner's Representative: Owner's Telephone No.: Date of Substantial Completion: May 1989 Brief Description: Constructed Fountain Marriott Corporation (415.) 957-1555 Calendar Days (Concrete) " 00~20 CERTIFICATION oF BIDDER'S EXPERIENCE AND QUALIFICATIONS Page 2 Project Name: Owner: Construction Cost: Construction Time: Owner's Representative: Owner's Telephone No.: Date of Substantial Completion: Brief Description: Fountain @, Business Park, San Ramon Valley public Storaae Inc. $ 42.350.00 (~20) Public Storage Inc. (~ 828-4805 4-89 Calendar Days Constructed Fountain (Concrete) Project Name: Owner: Construction Cost: Construction Time: Owner's Representative: Owner's Telephone No.: Date Of Substantial Completion: Brief Description: Bramalea Pacific. I~c. $ 18.933.00 (4Q) Forty Bramalea Pacific (415) 464-8200 Calendar Days 9-88 Constructed Fountain (Concrete) Signed this 20th day of September , 1989. Golden Bay Construction, Inc. Name of Bidder 45] 403 California Signature~f Bidder Title of Signator END OF SECTION CONTRACT 89-8 CIVIC CENTER COURTYARD FOUNTAIN ITEMIZATION OF WORK ENGINa'~W ' S ESTIMATE A~4BO ENGINEERING GOLDEN BAY CONSTR. BID ITEM UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION MEAS. QTY. PRICE PRICE PRICE PRICE PRICE PRICE 1 DEMOLITION OF CONC PAVING LS 1 300.00 300.00 6,350.00 6,350.00 2,200.00 2,200.00 2 LS I 2,000.00 2,000.00 5,800.00 5,800.00 10,081.00 10,081.00 3 LS I 8,000.00 8,000.00 5,200.00 5,200.00 7,600.00 7,600.00 4 LS I 1,000.00 1,000.00 2,200.00 2,200.00 2,100.00 2,100.00 5 LS 1 12,000.00 12,000.00 21,400.00 21,400.00 24,600.00 24,600.00 6 LS 1 4,900.00 4,900.00 9,050.00 9,050.00 7,150.00 7,150.00 7 LS 1 15,000.00 15,000.00 31,320.00 31,320.00 33,449.00 33,449.00 8 LS 1 14,250.00 14,250.00 17,150.00 17,150.00 17,233.00 17,233.00 9 LS 1 1,500.00 1,500.00 1,300.00 1,300.00 2,807.00 2,807.00 10 LS 1 950.00 950.00 3,800.00 3,800.00 1,800.00 1,800.00 11 12 EXCAVATION & DISPOSAL CONC PUMP VAULT & ~4DDER SIDEWALK DOOR CONCRETE FOUNTAIN STONEWORK FOUNTAIN MECHANICAL FOUNTAIN ELECTRICAL WATERPROOFING CONCRETE PAVING INCID IMPVMTS: INSTALL TRENCH DRAIN; STAIR RAIL; GLOBE SUPPORT REPAIRS TO EXIS IMPVMTS TOTAL: LS 1 1,000.00 1,000.00 2,020.00 2,020.00 4,250.00 4,250.00 LS 1 800.00 800.00 5,700.00 5,700.00 500.00 500.00 61,700.00 111,290.00 113,770.00