HomeMy WebLinkAbout8.1 AdvertiseForBids 89-12 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: November 27, 1989 SUBJECT: Contract 89-12 Swim Center Renovation Report by Public Works Director Lee Thompson EXHIBITS ATTAGHED: Plans and specifications will be available at the City Council meeting. RECOMMENDATION: 21) ) Authorize Staff to advertise for bids for Contract 89-12 Swim Center Renovation. Establish special City Council meeting prior to December 21, 1989, to award bid. FINANCIAL STATEMENT: Budget Estimated Costs 1988-89 $ 39,615 $ 23,203 1989-90 158,630 12,775 3,000 150,000 15,000 (Mechanical repairs to date) (Additional mechanical repairs) (Estimated contract for pool surface and deck) (Estimated design/inspection) Subtotal 1989-90 $158,630 $180,775 Grand Total $198,245 $203,978 It appears from current estimates that the total work will exceed the total budget by $5,733. Since anticipated work for 1988-89 was delayed until 1989-90, $16,412 in expenditures will have carried over into the 1989-90 Fiscal Year. A budget transfer in the amount of $22,145 may be needed to restore the total original budget of $198,245, as well as provide the additional $5,733 needed to do the work. Action on any budget transfer should be deferred until the bid is awarded. DESCRIPTION: The Swim Center Renovation project consists of several phases which have been and are to be performed by different, specialized contractors. In the 1988-89 Fiscal Year, the main pumps were replaced and the heating system repaired. Additional mechanical work was performed as needed during the 1989-90 Fiscal Year in order to keep the pool operational ($12,775 as indicated above), and Staff is soliciting informal bids to repair valves and plumbing (estimated $3,000 as indicated above). Contract 89-12 provides for relining the pool, repairing the gutters and leaks both in the pool itself and in the skimmers, and repairing and resurfacing the pool deck. With the adoption of the Joint Use Facility Improvement Agreement with the Dublin Unified School District, the City agreed to allow the School District Swim Team to use the Swim Center commencing February 1, 1990. ITEM NO. ~ COPIES TO: As a result of delays in completing the design and tests which preceded design, the City must proceed with a tight bidding and construction schedule to meet its commitment to the School District. The proposed project schedule is shown below. Project out to bid: Bid opening: Bid award: Work begins: Complete pool lining: Project complete: November 28, 1989 December 19, 1989 December 20, 1989 December 26, 1989 January 31, 1989 February 28, 1989 It is anticipated that the Swim Team could begin swimming in the pool once the pool lining work is complete. The remaining work could be completed without interfering with the use of the pool by the Swim Team.