Loading...
HomeMy WebLinkAboutItem 4.09 AdvertiseForBids 90-6 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: April 9, 1990 SUBJECT: Contract 90-06 Annual Slurry Seal Program EXHIBITS ATTACHED: Specifications will be available at the City Council meeting. RECOMMENDATION: ~thorize Staff to advertise for bids FINANCIAL STATEMENT: Budgeted funds are as follows: Street Slurry Seal (Street Maintenance Operating Budget): Design/Inspection $ 8,000 Construction 42~000 $50,000 Estimated Construction Cost: $42,000 Dublin Sports Ground Parking Lot (Capital Improvement Budget): Available Funds: $ 6,000 (after pavement repair) Estimated Construction Cost: $ 3,000 Shannon Center Parking Lot (Capital Improvement Budget~: Bid item deleted from Shannon Park contract: Estimated Construction Cost: $11,700 $ 1,400 Striping of both parking lots will be performed through the MCE contract. Funds for striping are included in the Park Maintenance Budget. DESCRIPTION: Slurry seal is a preventive maintenance technique used to prolong the life of a street. It consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City streets are presently on a five- to seven-year cycle depending upon the level of wear. The patching which was required prior to the slurry seal installation is being done as part of the annual street overlay contract. This year's program includes the following streets: Ann Arbor Way Lancaster Court York Court Corinth Court Prince Drive King Way Hyde Court Tory Court Birch Court Hickory Lane Hemlock Street Ebensburg Lane Erie Court Hansen Drive Prow Way Dillon Way Tina Place Circle Way Reilly Court Shadow Drive Castle Drive Eden Street Oak Court Fir Court Portage Road Elk Court Lancaster Road Spencer Court Utica Court Tyne Court Post Road Avon Court Tory Way Duke Court Elm Court Spruce Lane Ash Court Sage Court Pitt Court Betlen Drive Cresta Lane Rampart Drive Manzanita Lane Kolb Place Kingston Place Shadow Court Castle Court Poplar Way Cedar Lane Pine Court Cedar Court Allegheny Drive ITEM NO.~__ COPIES TO: In addition to the street slurry seal, this project is proposed to include slurry seal of the Dublin Sports Grounds parking lot. The repair of failed areas of the parking lot will be accomplished as part of the Overlay/Repair project prior to the slurry seal being applied. The 1989-90 Capital Improvement budget includes funds for this werk. Staff estimates the cost of slurry sealing the Dublin Sports Grounds parking lot to be $3,000. Slurry seal of the Shannon Center parking lot is also proposed to be included in this project. The slurry seal bid item (bid price $11,700) was deleted from the Shannon Park Renovation contract. Staff felt that a better bid price could be obtained by including this work in the slurry seal project. It is Staff's recommendation that the City Council authorize Staff to advertise Contract 90-06 for bids.