HomeMy WebLinkAboutItem 4.05 FinalAcceptance 90-6 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: August 13, 1990 SUBJECT: Final Acceptance of Contract 90-06 Street Slurry Seal Program Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: Dublin Sports Grounds Renovation Final Cost Report RECOMMENDATION: ~Accept improvements under Contract 90-06. FINANCIAL STATEMENT: Budget Construction: ~ Annual Slurry ~ $ 42,000.00 Dublin Sports Grounds Renovation ~"~h~- 3~50q.:~ $ 45,500.00 * See attached memo Actual $ 42,783.62 2~865.19 * $ 45,648.81 The design/inspection costs were $2,253.25 and budgeted in the General Engineering account. The construction cost for this Slurry Program is $783.62 over that indicated in the Street Maintenance Operating budget; however~ there are sufficient funds remaining in other line items of the 1989-90 Street Maintenance Operating Budget to offset this extra cost. DESCRIPTION: On May 14, 1990, the City Council awarded Contract 90-06, the Annual Slurry Seal Program, to Graham Contractors. The project consisted of applying a water/sand/oil mixture to the streets to seal cracks and provide a new wearing surface. The following streets were sealed this year: Ann Arbor Way Lancaster Court York Court Corinth Court Prince Drive King Way Hyde Court Tory Court Birch Court Hickory Lane Hemlock Street Ebensburg Lane Erie Court Hansen Drive Prow Way Dillon Way Tina Place Circle Way Reilly Court Shadow Drive Castle Drive Eden Street Oak Court Fir Court Portage Road Elk Court Lancaster Road Spencer Court Utica Court Tyne Court Post Road Avon Court Tory Way Duke Court Elm Court Spruce Lane Ash Court Sage Court Pitt Court Betlen Drive Cresta Lane Rampart Drive Manzanita Lane Kolb Place Kingston Place Shadow Court Castle Court Poplar Way Cedar Lane Pine Court Cedar Court Allegheny Drive Graham Contractors also applied a slurry seal to the parking lot of the Dublin Sports Grounds as part of the Dublin Sports Grounds Renovation Capital Improvement Project. The City Engineer has reviewed the work on the project and determined that it is complete and in accordance with the approved plans and specifications. Staff recommends that the City Council accept the improvements. ITEM NO.__~ COPIES TO: Graham Contractors CITY OF DUBLIN MEMORANDUM DATE: FROM: SUBJECT: August 7, 1990 Richard C. Ambrose, City Manager Lee S. Thompson, Public Works Director Completion of Dublin Sports Grounds Renovation for 1989-90 CIP Budget This Project has been completed. The construction is being accepted under the contracts with Granite Construction for the Pavement Repair and Graham Construction for the Slurry Seal. The cost report for the Capital Improvement Project is as follows: Budget Administration $ 1,500 Study 15,000 Pavement Repairs 13,500 TOTAL $30,000 Singer & Hodges Study Santina & Thompson Aerial Topo subtotal Replace AC Slurry Subtotal Actual $ 7,685.00 $ 7,434.15 11,638.26 2,865.19 $15,119.15 $14,503.45 $29,622.60 LST/mb