HomeMy WebLinkAboutReso 80-08 Zumwalt Eng Svcs Agmt RESOLUTION NO. 80 - 08 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********* APPROVING AMENDMENT TO AGREEMENT WITH ZUMW AL T ENGINEERING GROUP FOR GENERAL ENGINEERING SERVICES WHEREAS, the City of Dublin, State of California, entered into a two-year agreement with Zumwalt Engineering Group on July 20, 2004, to perform general engineering services; and WHEREAS, the Agreement was amended to extend the term of the Agreement an additional two years, terminating on June 30, 2008; and WHEREAS, the City desires to continue utilizing Consultant's services and extend the term until June 30, 2010, allowing Zumwalt Engineering Group to request an adjustment of rates for the second year of the term; and WHEREAS, Consultant is requesting an adjustment of rates for Fiscal Year 2008-2009 as allowed by Section 2 of the Agreement. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with Zumwalt Engineering Group, which is attached hereto as "Exhibit A. " BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment to the Agreement. PASSED, APPROVED AND ADOPTED this 3rd day of June, 2008, by the following vote: AYES: Councilmembers Hildenbrand, Oravetz, Sbranti and Scholz, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None AT~ tGA-ottw- Deputy City Clerk Reso No. 80-08, Adopted 6/3/08, Item 4.4 Page 1 of 1 EXHIBIT "A" OF RESOLUTION ~- 08 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND ZUMW AL T ENGINEERING GROUP FOR ENGINEERING SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Zumwalt Engineering Group (hereinafter referred to as "CONSULTANT") entered into a two-year agreement on July 20,2004, to provide geotechnical engineering services to CITY; and WHEREAS, the term of the agreement was extended an additional two years, terminating June 30, 2008; and WHEREAS, CONSULTANT has requested an adjustment of rates for Fiscal Year 2008-2009; NOW, THEREFORE, the parties hereto agree as follows: Section 1. Extension of Term The term of the agreement shall be extended from July 1,2008, to June 30, 2010. Should a new agreement or amendment to agreement to extend the contract not be entered into by June 30, 2010, then this agreement will automatically extend until a new agreement or amendment to agreement is entered into or CITY gives written notice of termination. Section 2. Adiustment of Rates The rate schedule attached hereto as Exhibit 1 shall be in effect for Fiscal Year 2008-2009. CITY OF DUBLIN ZUMW AL T ENGINEERING GROUP . \ ',,- /'1 /~l/f' / r " ./ ;-'J7'1' 'I '. "x ,(/.,oo"./ii ...( (/. "._J ., ,/.1:.. ,- ~ . -""_ " JanetLockhart,~ayor C ] / , . .:7 ,.. /.:. L /il/J let? k/ l~(IJJ/l/it~/'T )ames W. Zumw/;;t1t, P.E., Principal /" v ",,/" ATTEST: \, / f \ " j>/ ( I \, ~ ~ :j' i ,.;J--- ,I ./' t/'1.,.,.....\:_. #J'-'" Date: City Clerk I ',""Jl'.~<: >--L..( I '/ / {. .:....: , .. ~ C:\Documents and Settings\michelle\amendment 08-09 Zumwalt.doc ZUMWALT ENGINEERING GROUP 2008-2009 CHARGE RATE FEE SCHEDULE The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and will be the sum of all the items set forth below: A. PERSONNEL SERVICES PRINCIPAL SUPERVISING ENGINEER SENIOR ENGINEER ASSOCIATE ENGINEER ASSISTANT ENGINEER FIELD REPRESENTATIVE TECHNICIAN/CAD OPERATOR CLERICAL / OFFICE SUPPORT TWO-MAN SURVEY CREW $ 168 HR 162 HR 146 HR 130 HR 110 HR 102 HR 97 HR 60 HR 221 HR Rates for individuals may vary depending on the service performed. EFFECTIVE THROUGH JUNE 30, 2009 AND SUBJECT TO REVISION ANNUALLY B. TRANSPORTATION EXPENSES 1. Fifty cents (0.50) per mile for use of vehicles. A minimum of eight dollars ($8.00) per hour will be charged for use of vehicles used for field inspection and supervision. C. OUTSIDE SERVICES 1. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants, professional, or technical firms engaged in connection with the order, plus 15% handling charge. D. MISCELLANEOUS EXPENSES 1. The invoice cost of materials, supplies, reproduction work, and other services procured by Zumwalt Engineering Group from outside sources, plus a handling charge of 15%. All out-of-pocket expenses not included in Items A, Band C will be included in this category. ZUMWALT ENGINEERING GROUP MUNICIPAL STAFF AUGMENTATION 2008-2009 CHARGE RATE FEE SCHEDULE The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and will be the sum of all the items set forth below: A. MUNICIPAL STAFF AUGMENTATION SERVICES PRINCIPAL SUPERVISING ENGINEER SENIOR ENGINEER PROJECTENGThffiE~SURVEYOR ASSOCIATE ENGThffiER SENIOR DESIGNER PROJECT MANAGEMENT ANALYST STAFF ENGINEER FIELD REPRESENTATIVE CAD DESIGNER PROJECT MANAGEMENT ASSISTANT TECHNICIAN/CAD OPERA TOR CLERICAL / OFFICE SUPPORT $ 128 HR 128 HR 123 HR 116 HR 108 HR 108 HR 94 HR 94 HR 94 HR 94 HR 79 HR 69 HR 55 HR EFFECTIVE THROUGH JUNE 30, 2009 AND SUBJECT TO REVISION ANNUALLY B. TRANSPORTATION EXPENSES 1. Fifty cents (0.50) per mile for use of vehicles. A minimum of eight dollars ($8.00) per hour will be charged for use of vehicles used for field inspection and supervision. C. OUTSIDE SERVICES l. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants, professional or technical firms engaged in connection with the order, plus 15% handling charge. D.NUSCELLANEODSEXPENSES l. The invoice cost of materials, supplies, reproduction work, and other services procured by Zumwalt Engineering Group from outside sources, plus a handling charge of 15%. All out-of-pocket expenses not included in Items A, Band C will be included in this category.