Loading...
HomeMy WebLinkAboutItem 4.05 Accept Work 91-01 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: May 28, 1991 SUBJECT: Acceptance of Work - Contract No. 91-01 Annual Sidewalk Safety Repair Program Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: None. RECOMMENDATION: 1) Accept improvements under Contract 91-01. 2) Authorize final progress payment in the amount of $4,039.56 to E and D Systems. FINANCIAL STATEMENT: Design/Inspection Legal/Supplies Construction BUDGET ACTUAL $ 6,000.00 $ 7,627.70 0.00 175.94 441000.00 40,395.59 TOTAL $50~000.00 $48,199.23 DESCRIPTION: On March 11, 1991, the City Council awarded Contract 91-01 to E and D Systems. The Annual Sidewalk Program replaces offset sidewalks which may become tripping hazards. During construction, Staff contained replacement to Maintenance Zones III and V, the neighborhoods approximately within the boundaries of Alcosta Boulevard, San Ramon Road, Amador Valley Boulevard, and Village Parkway. This was due to the extremely expansive nature of the ground in those areas and the resulting number of offsets. Since most of these offsets were caused by ground expansion instead of tree root damage, the bid item for Root Shield was eliminated, thereby reducing the actual cost of construction. Sidewalk offsets remaining in the City will be temporarily patched by the City's maintenance crews~ and included in next year's annual program. The Contractor also installed a handicap ramp at Davona Drive and Wicklow which was made necessary by the relocation of the mid-block crosswwalk at Murray School. The City Engineer has reviewed the work on the project and determined that it is complete and in accordance with the approved plans and specifications. Staff recommends that the City Council accept the improvements and authorize final payment to E and D Systems in the amount of $4,039.56~