Loading...
HomeMy WebLinkAbout4.04 Overlay BidCTTY CLERK #0600-35 AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 2, 2000 SUBJECT: ATTACHMENTS: RECOMMENDATION: Award of Bid - Contract No. 00-04, 1999-00 Annual Overlay Project, to E1 Camino Paving, Inc. Report Prepared By: Lee S. Thompson, Public Works Director 1) 2) 3) 4) Resolution of Award Budget Change Form Summary of Bid Results Map of Overlay Streets Adopt resolution awarding bid to E1 Camino Paving, Inc. and approve a net budget increase of $30,366 from unallocated Reserves. FINANCIAL STATEMENT: Budgeted Fund 1999-00 Annual Overlay Project: Overlay Improvements (CIP) 219 Overlay- AC Repair (Operating Budget) 219 Overlay- Striping (Operating Budget) 219 1999-00 Annual Slurry Seal Program: Slurry Seal- AC Repair (Operating Budget) 206 Budget Low Bid $298,000 $240,453.19 $120,000 $224,072.25 $ 17,000 $ 15,364.50 Engineering/Inspections/Misc. (CIP) 217 Modified Bid plus 5% contingency* $252,476' $208,666* $ 16,133 $ 57,500 $ 66,800.00 $ 45,591' Totals = $492,500 $546,689.94 $522,866 $ 8,600 * Actual identified asphalt concrete (AC) base repair quantities is less than the estimated bid quantities and the quantities will be reduced after the contract award. The project costs are budgeted in the Capital Improvement Program (CIP) budget and in the Street Maintenance Operating Budget. Funding comes from the State Transportation Improvements Program (219) ($435,000), Gas Tax (206), and Measure B (217). The total adopted project budget for this contract is $492,500.00 for improvements. COPIES TO: E1 Camino Paving, Inc. and all other bidders ITEM NO. g:\overlay\99-00 AS award The low bid received was $546,689.94. The bids were higher than previously estimated primarily due to the higher fuel cost. As a result of overestimating the quantities of AC repair, the bid has been modified to $497,967.69 to reflect the actual amount of AC repair that will be performed under this contract. The City will be implementing crack sealing in the Annual Slurry Seal Program as a cost savings alternative to AC repair, and thus, reducing the amount of slurry seal AC repair. Therefore, a budget change of $30,366.00 (including a 5% contingency) from unallocated Reserves is necessary to complete this project. DESCRIPTION: On March 21, 2000, the City Council authorized Staff to solicit bids for Contract No. 00-04, 1999-00 Annual Overlay Project. This contract consists of the Capital Improvement Program's Annual Overlay Project, as well as the AC base repair for the overlay streets and for the Annual Slurry Seal Program. The 1999-00 Annual Overlay Project consists of removing and replacing failed asphalt concrete to a depth of 4-inches and resurfacing the street with a 1-1/2-inch overlay of asphalt concrete. Reinforcing fabric will be used prior to the overlay in order to prevent cracks from reflecting through the new overlay and causing further deterioration to the base. Streets to be repaired and overlaid as part of the 1999-00 Annual Overlay Project are: West Vomac Road Sierra Court San Sabana Court Utica Court Pitt Court Erie Court Pine Court Fir Court Oak Court Tory Court Doreen Street Cranford Lane Tyne Court Ironwood Court Conter Court Pike Court Lancaster Court Corinth Court Elk Court Cedar Court Ash Court Elm Court Duke Court Doreen Court Southwick Drive Elba Court Elba Way A total of 9 bids were received (see Attachment 3). The low bidder is E1 Camino Paving with a bid of $546,689.94. Notices have been sent out advising residents and business owners of the work to be performed. Staff has reviewed the bids, determined that the low bid contractor has satisfactorily performed similar projects for other cities, and recommends that the City Council adopt the resolution awarding Contract No. 00-04 to E1 Camino Paving, Inc. and approve budget change of $30,366.00 from unallocated Reserves. Page 2 RESOLUTION NO. -00 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 00-04 1999-00 ANNUAL OVERLAY PROJECT TO EL CAMINO PAVING, INC. WHEREAS, the City of Dublin did, on April 20, 2000, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 00-04, 1999-00 Annual Overlay Project, authorized by the City Council on March 21, 2000, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 00-04 to the lowest responsible bidder therefor, to wit, E1 Camino Paving, Inc., at a bid of Five Hundred Forty-Six Thousand, Six Hundred Eighty-Nine Dollars and Ninety-Four Cents ($546,689.94), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 2nd day of May, 2000. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g: Ioverlay~projectlresoawrd cITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): Budget Transfers: CHANGE FORM # From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) (If Other than General Fund, Fund No - 217) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other :~ecae~.semmae'r:AC~(mNx ^MOUrn' ,:~. INCa~AS~6~Gerl''n.ccouNx Name: Annual (')vcrlay }'roject Name: Annual Overlay Project Gas Tax $11,909 Measure B $42,275 Account#: 206-30200-740-020 Account#: 217-30200-740-020 Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Acc6unt #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ASD/Fin Mgr Date: Signature REASON FOR BUDGET CHANGE ENTRY: Low bid for work plus contingency is higher than budgeted amount for the overlay portion of the work and lower for the slurry seal portion of the work. Signature Posted By: Date: H.'ICC-FORMS~FORM-budget change, doc Signature SUMMARY OF BID RESULTS CONT~RACT 00-04 ANNUAL STREET REPAIR AND OVERLAY ~Page 1. ITEM DESCRIPTION Plane AC Pvmt. 6' Wide Failure Repairs 4" (Overlay) Failure Repairs 4" (Slurry) Pavement Reinf. Fabric Install 1 1/2" Overlay Adjust Monuments Signal Detector Loops Striping Removal 12" VVhite/Yellow Thermo Line 12" VVhite/Yellow Painted Line D 4, Markers 21, Paint D 22, Paint D 23, Markers 27B, Thermoplastic D 29, Paint 30, Markers D 38, Thermoplastic : ' Legend, Thermoplastic S ~: ' Legend, Paint IV, Thermo. Arrows, Type II & Ill, Thermo. "25" Legend, Thermoplastic Concrete Blocks (12 x 8 x 1 1/2 Reflective Markers (Blue) TOTAL: ENGINEER'S ESTIMATE UNIT PRICE TOTAL PRICE $ 0.94 $ 24,744.56 $ 1.39 $ 186,503.25 1.39 $ 55,600.00 $ 0.85 $ 27,819.65 $ 0.35 $ 159,112.10 $ 226.00 $ 11,526.00 $ 349.00 $ 7,329.00 $ 10,000.00 $ 10,000.00 $ 1.72 $ 849.68 $ 0.90 $ 170.10 $ 0.40 $ 687.20 $ 0.30 $ 1,089.00 $ 0.65 $ 58.50 $ 0.90 $ 65.70 $ 0.34 $ 2,271.20 $ 0.97 $ 116.40 1.80 $ 277.20 1.10 $ 180.40 75.00 $ 525:00 31.00 $ 155.00 44.00 $ 88.00 93.00 $ 186.00 39.00 $ 78.00 40.00 $ 720,00 16.00 $ 448.00 EL CAMINO PAVING O'GRADY PAVING, INC, TOP GRADE C.F. ARCHIBALD PAVING UNIT PlaICE $ 6 $ 7 $ 0 $ 0 $ : ' 0 $ 4,~ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 5 TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE $ 30,535.84 $ 0.90 $ 23,691.60 $ 1.11 $ 29,219.64 $ 1.20 $ 31,588.80 $ 224,072.25 $ 1.65 $ 221,388.75 $ 1.58 $ 211,996.50 $ 1.60 $ 214,680.00 $ 66,800.00 $ 1.50 $ 60,000.00 $ 1.93 $ 77,200.00 $ 1.60 $ 64,000.00 $ 29,456.10 $ 1.00 $ 32,729.00 $ 1.00 $ 32,729.00 $ 1.00 $ 32,729.00 $ 170,477.25 $ 0.40 $ 181,842.40 $ 0.39 $ 177,296.34 $ 0.44 $ 200,026.64 $ 2,550.00 $ 170.00 $ 8,670.00 $ 173.40 $ 8,843.40 $ 150.00 $ 7,650.00 $ 7,434.00 $ 400.00 $ 8,400.00 $ 357.00 $ 7,497.00 $ 325.00 $ 6,825.00 $ 4,856.00 $ 5,000.00 $ 5,000.00 $ 4,590.00 $ 4,590.00 5,000.00 $ 5,000.00 $ 1,235.00 $ 3.00 $ 1,482.00 $ 2.55 $ 1,259.70 $ 2.50 $ 1,235.00 $ 283.50 $ 2.00 $ 378.00 $ 1.53 $ 289.17 $ 2.50 $ 472.50 $ 859.00 $ 0.55 $ 944.90 $ 0.51 $ 876.18 $ 0.50 $ 859.00 $ 2,178.00 $ 0.65 $ 2,359.50 $ 0.61 $ 2,214.30 $ 0.25 $ 907.50 $ 180.00 $ 2.20 $ 198.00 $ 2.04 $ 183.60 $ 0.25 $ 22.50 $ 146.00 $ 2.20 $ 160.60 $ 2.04 $ 148.92 $ 1.65 $ 120.45 $ 2,338.00 $ 0.40 $ 2,672.00 $ 0.36 $ 2,404.80 $ 0.40 $ 2,672.00 $ 360.00 $ 3.30 $ 396.00 $ 3.06 $ 367.20 $ 2.50 $ 300.00 385.00 $ 4.00 616.00 4.50 $ 693.00 4.08 $ 628.32 $ 2.50 $ $ 2.00 $ 328.00 $ 2.50 $ 410.00 $ 2.04 $ 334.56 $ 1.00 $ 164.00 $ 75.00 $ 525.00 $ 85.00 $ 595.00 $ 76.50 $ 535.50 80.00 $ 560.00 $ $ 50.00 $ 250.00 $ 55.00 $ 275.00 $ 51.00 $ 255.00 $ 60.00 $ 300.00 $ 65.00 $ 130.00 $ 75.00 $ 150.00 $ 66.30 $ 132.60 $ 80.00 $ 160.00 $ $ 100.00 $ 200.00 $ 110.00 $ 220.00 $ 102.00 $ 204.00 $ 110.00 $ 220.00 $ $ 50.00 $ 100.00 $ 55.00 $ 110.00 $ 51.00 $ 102.00 $ 80.00 $ 160.00 $ $ 20.00 $ 360.00 $ 22.00 $ 396.00 $ 20.40 $ 367.20 $ 20.00 $ 360.00 $ $ 15.00 $ 420.00 $ 16.50 $ 462.00 $ 15.30 $ $ 6.00 $ 168.00 $ 490,599.94 $ 546,689.94 $ 553,623.75 $ 560,103.33 $ 571,565.39 Total corrected after tabulation IPage ~. ITEM DESCRIPTION Plane AC Pvmt. 6' Wide Failure Repairs 4" (Overlay) Failure Repairs 4" (Slurry) Pavement Reinf. Fabric Install 1 1/2" Overlay Adjust Monuments Signal Detector Loops Striping Removal 12" VVhite/Yellow Thermo Line 12" White/Yellow Painted Line Detail 4, Markers Detail 21, Paint Detail 22, Paint Detail 23, Markers Detail 27B, Thermoplastic Detail 29, Paint Detail 30, Markers Detail 38, Thermoplastic STOP Legend, Thermoplastic STOP Legend, Paint Arrows, Type IV, Thermo. Arrows, Type II & III, Thermo. "25" Legend, Thermoplastic Concrete Blocks (12 x 8 x 1 1/2 Reflective Markers (Blue) TOTAL: RGW CONSTRUCTION UNIT P:~ICi ~ $ $ $ - $ $ $ $ 3' $ 25,0( $ $ - $ $ $ $ $ $ $ 4.00 $ 2.00 TOTAL PRICE $ 32,905.00 $ 203,946.00 $ 80,000.00 $ 34,365.45 $ 172,750.28 $ 10,200.00 $ 7,875.00 $ 25,000.00 $ 1,235.00 $ 378.00 $ 859.00 $ 2,178.00 $ 180.00 $ 146.00 $ 2,672.00 $ 360.00 $ 616.00 $ 328.00 $ 75.00 $ 525.00 $ 50.00 $ 250.00 AMERICAN ASPHALT UNIT PRICE $ 0.58 $ 1.65 $ 1,65 $ 0.945 $ 0.4711 178.50 $ 272.00 TOTAL PRICE $ 0.52 $ 15,267.92 $ 221,388.75 $ 66,000.00 $ 30,928.91 $ 214,164.89 $ 9,103.50 $ 5,712.00 $ 4,725;00 REDGWlCK CONSTR. UNIT PRICE $ 1.20 $ 1.83 $ 1.83 $ 0.90 $ 0.42 $ 170.00 $ 893.36 $ 300.00 $ 5,000.00 McGUIRE & HESTER TOTAL PRICE UNIT PRICE TOTAL PRICE $ 31,588.80 $ 1.70 $ 44,750,80 $ 245,540.25 1.95 $ 261,641.25 $ 73,200.00 $ 1.95 $ 78,000.00 $ 29,456.10 $ 1.20 $ 39,274.80 $ 190,934.52 $ 0.46 $ 209,118.76 $ 8,670.00 $ 170.00 $ 8,670.00 $ 6,300.00 $ 275.00 $ 5,775.00 $ 5,000.00 $ 3,166.39 $ 3,166.39 MCK ~ UNIT PRICE $ 1.34 $ 2.30 $ 2.30 $ 0.90 0.38 $ 215.00 $ 300.00 $ 0.45 $ 5,700.00 ~ERVICES TOTAL PRICE $ 35,274.16 $ 308,602.50 $ 92,000.00 $ 29,456.10 $ 172,750.28 $ 10,965.00 $ 6,300.00 $ 5,700.00 $ 4,725.00 $ 2.63 $ 1,299.22 $ 2.25 $ 1,111.50 $ 2.50 $ 1,235.00 $ 3.00 $ 1,482.00 $ 1.60 $ 302.40 $ 2.00 $ 378.00 $ 2.00 $ 378.00 $ 1.50 $ 283.50 $ 0.65 $ 2,286.90 $ 184.50 $ 149.65 $ 2,471.60 $ 366.00 $ 0.63 $ 2.05 $ 773.10 $ 0.50 $ 859.00 $ 726.00 $ 0.60 $ 2,178.00 $ 18.00 $ 2.00 $ 180.00 $ 109.50 $ 2.00 146.00 $ 2,338.00 $ 0.35 2,338.00 $ 240.00 $ 3.00 $ 360.00 $ 308.00 $ 4.00 $ 616.00 $ 164.00 $ 2.00 $ 328.00 $ 525.00 $ 75.00 $ 525.00 $ 250.00 $ 50.00 $ 250.00 $ 2.05 $ 150.00 $ 65.00 $ 130.00 $ 0.37 $ 0.36 $ 3.05 $ 4.10 $ 2.05 $ 80.00 $ 55.00 $ 631.40 $ 336.20 $ 560.00 $ 0.20 $ 0.20 $ 1.50 $ 1.00 $ 1.75 $ 0.50 $ 1.50 $ 3.30 $ 1.50 $ 66.00 $ 33.00 $ 45,00 $ 1,116.70 $ 1,306.80 $ 0.35 $ 2.00 $ 2.00 $ 1.00 $ 75.00 $ 50.00 $ 75.00 $ 275.00 $ 140.00 $ 65.00 $ 130.00 $ 70.00 $ 100.00 $ 200.00 $ 110.00 $ 220.00 $ 100.00 $ 200.00 $ 100.00 50.00 $ 100.00 $ 55.00 $ 110:00 $ 70.00 $ 140.00 $ 50.00 $ 90.00 $ 127.75 $ 3,340.00 $ 180.00 $ 508.20 $ 246.00 $ 462.00 $ 165.00 $ 90.00 $ 200.00 $ 126.00 $ 252.00 $ 54.00 $ 108.00 $ $ 100.00 $ 20.00 $ 360.00 $ 25.00 $ 450.00 $ 15.00 $ 270.00 $ 20.00 $ 360.00 $ 20.00 $ 360.00 $ 15.00 $ 420.00 $ 20.00 $ 560.00 $ 5.00 $ 140.00 $ 15.00 $ 420.00 $ 4.50 $ 126.00 $ 578,527.19 $ 661,000.00 * $ 598,530.77 $ 577,978.73 Total corrected after tabulation $ 671,291.99 1999-00 ANNUAL OVERLAY PROJECT LOCATION MAP OF STREETS TO BE OVERLAID Map 1 of 3 N 1999-00 ANNUAL OVERLAY PROJECT LOCATION MAP OF STREETS TO BE OVERLAID Map 2 of 3 N 1999-00 ANNUAL OVERLAY PROJECT LOCATION MAP OF STREETS TO BE OVERLAID Map 3 of 3