Loading...
HomeMy WebLinkAboutItem 7.1 AwardOfBid 91-10 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: December 9, 1991 91-10 SUBJECT: Award of Bid - Nielsen and Cronin School Play Area Improvements Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: 1) Resolution of Award 2) Bid Results RECOMMENDATION: Adopt resolution awarding bid to A-1 Fencing and Playgrounds, including Alternates 1 and 2, and authorize Mayor to execute agreement. FINANCIAL STATEMENT: Low Bid Received (including alternates) Engineer's Estimate (including alternates) Budget: Design and Inspection: Improvements: $ 48,421.37 $ 90,312.00 $ 27,600.00 90,000.00 $117,600.00 The low bid is within funds budgeted for construction. DESCRIPTION: At the November 13, 1991, meeting, the City Council authorized Staff to solicit bids for construction of play area improvements at Nielsen School and Cronin School. This project includes installation of modular play equipment at both schools and related improvements such as drainage, concrete curbing, and benches. The low bid received, $48,421.37, is considerably below the second lowest bid of $71,436.00; however, A-1 Fencing and Playground feels that no errors were made and that the work can be completed for the price bid. Staff has reviewed the bids, checked with references, and recommends that the City Council adopt the resolution awarding the bid to A-1 Fencing and Playground. a:(projects2)~nielsen~agstawrd ITEM NO. ~ COPIES TO: Bidders (11) RESOLUTION NO. -91 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 91-10 NIELSEN/CRONIN SCHOOL PLAY AREA IMPROVEMENTS TO A-1 FENCING AND PLAYGROUND WHEREAS, the City of Dublin did, on December 4, 1991, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans and Specifications for Contract 91-10 authorized by the City Council on November 13, 1991, which Plans and Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 91-10 to the lowest responsible bidder therefor, to wit, A-1 Fencing and Playground, at a bid of Forty-Eight Thousand Four Hundred Twenty-One Dollars and Thirty-Seven Cents ($48,421.37), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 9th day of December, 1991. AYES: NOES: ABSENT: Mayor ATTEST: City Clerk a:(projects2)~nielsen~resoawrd NIELSEN SCHOOL AND WELLS-CRONIN SCHOOL PLAY AREA IMPROVEMENTS - CONTRACT 91-10 BID RESULTS ITEM UNIT ENGR'S ESTIMATE A-1 FENCING UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY CLEARING & GRADING SF 2,100 SAW CUTTING, A.C. REMOVAL, AND DEMOLITION LS 1 CONCRETE PLAY AREA CURB LF 150 PLAY EQUIPMENT LS 1 FIBAR CY 64 CONCRETE RAMP SF 135 METAL HAND RAIL LF 38 SUBTOTAL: 1 3 4 5 6 7 ADD ALT 1 RIBBON SLIDE LS SUBTOTAL NIELSEN SCHOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUBDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTALWELLS/CRONIN TOTAL PRICE PRICE $ .57 $ 1,197.00 800.00 800.00 54.00 8,100.00 20,766.00 20,766.00 130.00 8,320.00 10.60 1,431.00 50.00 1,900.00 1,250.00 PRICE PRICE $ .75 $ 1,575.00 $42,514.00 1,250.00 $43,764.00 5,847 $ .85 $ 4,969.00 5,850 .28 1,638.00 40 60.00 2,400.00 12 11.50 138.00 58 16.00 928.00 102 20.00 2,040.00 2 475.00 950.00 2 400.00 800.00 1 21,250.00 21,250.00 200 48.00 9,600.00 525.OO 525.00 15.00 2,250.00 9,873.45 9,873.45 40.50 2,592.00 5.00 675.00 35.00 1,330.00 1,022.93 $18,820.45 1,022.93 $19,843.38 1,835.00 $44,713.00 1,835.00 $46,548.00 $90,312.00 $ .25 $ 1,461.75 .75 4,387.50 20.00 800.00 10.00 120.00 20.00 1,160.00 10.00 1,020.00 100.00 200.00 100.00 200.00 12,432.84 12,432.84 27.00 5,400.00 1,395.90 %27,182.09 1,395.90 $28,577.99 $48,421.37 CUNNINGHAM & SONS GOLDEN BAY ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1 CLEARING & GRADING SF 2,100 $ 1.50 $ 3,150.00 $ .50 $ 1,050.00 2 SAW CUTTING, A.C. REMOVAL, AND DEMOLITION LS 1 800.00 800.00 250.00 CONCRETE PLAY AREA CURB LF 150 80.00 12,000.00 40.00 PLAY EQUIPMENT LS 1 10,500.00 10,500.00 17,950.00 FIBAR CY 64 122.00 7,808.00 110.00 CONCRETE RAMp SF 135 15.00 2,025.00 11.00 METAL HAND RAIL LF 38 60.00 2,280.00 75.00 SUBTOTAL: 3 4 5 6 7 ADD ALT 1 RIBBON SLIDE 250.00 6,000.00 17,950.00 7,040.00 1,485.00 2,850.00 SUBTOTAL NIELSEN SCHOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUBDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTAL WELLS/CRONIN TOTAL $38,563.00 $36,625.00 LS 1 1,000.00 1,000.00 775.00 775.00 $39,563.00 $37,400.00 5,847 $ .50 $ 2,923.50* $ .50 $ 2,923.50 5,850 .20 1,170.00 .25 1,462.50 40 80.00 3,200.00 100.00 4,000.00 12 15.00 180.00 25.00 300.00 58 15.00 870.00 20.00 1,160.00 102 15.00 1,530.00 19.00 1,938.00 2 500.00 1,000.00 150.00 300.00 2 300.00 600.00 200.00 400.00 1 15,000.00 15,000.00 16,000.00 16,000.00 200 22.00 4,400.00 38.00 7,600.00 $30,873.50* %36,084.00 1 1,000.00 1,000.00 2,100.00 2,100.00 $31,873.50' $38,184.00 $71,436.50' $75,584.00 * FIGURE CORRECTED AFTER TABULATION COLLISHAW CONST. B & B CONCRETE ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1 CLEARING & GRADING SF 2,100 $ 1.00 $ 2,100.00 $ 1.00 $ 2,100.00 2 SAW CUTTING, A.C. REMOVAL, AND DEMOLITION LS 1 4,260.00 4,260.00 420.00 CONCRETE PLAY AREA CURB LF 150 25.00 3,750.00 36.00 PLAY EQUIPMENT LS 1 14,000.00 14,000.00 18,107.00 FIBAR CY 64 125.00 8,000.00 105.00 CONCRETE RAMP SF 135 7.00 945.00 20.00 METAL HAND RAIL LF 38 40.00 1,520.00 45.00 SUBTOTAL: 3 4 5 6 7 ADD ALT 1 RIBBON SLIDE 420.00 5,400.00 18,107.00 6,720.00 2,700.00 1,710.00 SUBTOTAL NIELSEN SCNOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUHDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTAL WELLS/CRONIN TOTAL 5,847 $ 1.00 $ 5,847.00 $ .75 $ 4,385.25 5,850 1.00 5,850.00 .10 585.00 40 150.00 6,000.00 90.00 3,600.00 12 20.00 240.00 20.00 240.00 58 30.00 1,740.00 18.50 1,073.00 102 20.00 2,040.00 13.00 1,326.00 2 150.00 300.00 118.00 236.00 2 250.00 500.00 100.00 200.00 1 14,593.00 14,593.00 22,274.00 22,274.00 200 25.00 5,000.00 42.50 8,500.00 $42,110.00 $42,419.25 1 1,480.00 1,480.00 1,589.00 1,589.00 $43,590.00 $44,008.25 $78,980.00 $82,015.25 $34,575.00 $37,157.00 LS 1 815.00 815.00 850.00 850.00 $35,390.00 $38,007.00 WHITE OAK LDSCP BMB UNDERGROUND ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1 CLEARING & GRADING SF 2,100 $ .50 $ 1,050.00 $ 2.50 $ 5,250.00 2 SAW CUTTING, A.C. REMOVAL, AND DEMOLI~,ION LS 1 5,942.50 5,942.50 500.00 CONCRETE PLAY AREA CURB LF 150 19.00 2,850.00 17.50 PLAY EQUIPMENT LS 1 16,164.00 16,164.00 14,000.00 FIBAR CY 64 95.00 6,080.00 79.45 CONCRETE RAMP SF 135 7.50 1,012.50 24.75 METAL HAND RAIL LF 38 60.00 2,280.00 54.00 SUBTOTAL: 3 4 5 6 7 ADD ALT 1 RIBBON SLIDE LS SUBTOTA/~ NIELSEN SCHOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUBDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTAL WELLS/CRONIN TOTAL 500.00 2,625.00 14,000.00 5,084.80* 3,341.25 2,052.00 $35,379.00 $32,853.25* 1 816.00 816.00 1,100.00 1,100.00 $36,195.00 $33,953.05* 5,847 $ 1.17 $ 6,840.99 $ 1.50 $ 8,770.50 5,850 1.00 5,850.00 1.00 5,850.00 40 120.00 4,800.00 115.00 4,600.00 12 10.00 120.00 20.00 240.00 58 12.00 696.00 20.00 1,160.00 102 10.00 1,020.00 20.00 2,040.00 2 100.00 200.00 200.00 400.00 2 100.00 200.00 200.00 400.00 1 16,749.01 16,749.01 16,000.00 16,000.00 2O0 39.00 7,800.00 38.00 7,600.00 $44,276.00 ~47,060.50 1 1,735.00 1,735.00 2,300.00 . 2,300.00 $46,011.00 $49,360.50 $82,206.0.____~0 $83,313.55' * FIGURE CORRECTED AFTER TABULATION E & D SYSTEMS MUNKDALE BROS. ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1 CLEARING & GRADING SF 2,100 $ 1.00 $ 2,100.00 $ 3.43 $ 7,203.00 2 SAW CUTTING, A.C. REMOVAL, AND DEMOLIT, ION LS 1 700.00 700.00 2,000.00 3 CONCRETE PLAY AREA CURB LF 150 25.00 3,750.00 17.00 4 PLAY EQUIPMENT LS 1 19,243.75 19,243.75 16,996.00 5 FIBAR CY 64 115.25 7,376.00 91.00 6 CONCRETE RAMP SF 135 15.00 2,025.00 10.00 7 METAL HAND RAIL LF 38 49.00 1,862.00 92.00 SUBTOTAL: ADD ALT 1 RIBBON SLIDE LS 1 887.25 825.00 SUBTOTAL NIELSEN SCHOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUBDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTAL WELLS/CRONIN TOTAL $37,056.75 887.25 $37,944.00 2,000.00 2,550.00 16,996.00 5,824.00 1,350.00 3,496.00 $39,419.00 825.00 $40,244.00 $48,864.25 $47,007.40 1 1,686.75 1,686.75 1,550.00 1,550.00 $50,551.00 $48,557.40 $88,495.00 $88,801.40 2 300.00 600.00 500.00 1,000.00 1 23,568.75 23,568.75 21,000.00 21,000.00 200 38.12 7,624.00 7,000.00 7,000.00 5,847 $ 1.50 $ 8,770.50 $ 1.70 $ 9,939.90 5,850 .50 2,925.00 .35 2,047.50 40 30.00 1,200.00 95.00 3,800.00 12 20.00 240.00 10.00 120.00 58 24.00 1,392.00 10.00 580.00 102 22.00 2,244.00 10.00 1,020.00 2 150.00 300.00 250.00 500.00 JOHN CLAY LDSCP TALINI LANDSCAPING ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1 CLEARING & GRADING SF 2,100 $ 1.78 $ 3,738.00 2 SAW CUTTING, A.C. REMOVAL, AND DEMOLITION LS CONCRETE PLAY AREA CURB LF PLAY EQUIPMENT LS FIBAR CY CONCRETE RAMP SF METAL HAND RAIL LF SUBTOTAL: 3 4 5 6 7 ADD ALT 1 RIBBON SLIDE i 1,261.20 1,261.20 150 20.25 3,037.50 1 17,969.00 17,969.00 64 110.00 7,040.00 135 7.38 996.30 38 75.00 2,850.00 LS 1 1,475.00 SUBTOTAL NIELSEN SCHOOL WELLS/CRONIN SCHOOL PLAY AREA 8 REMOVE EXISTING A.C. SUBGRADE MATERIAL & GENERAL DEMOLITION SF 9 GRADING SF 10 CONC PLAY WALL LF 11 6" PVC DRAIN LINE LF 12 8" PVC DRAIN LINE LF 13 6" PERF PVC SUBDRAIN PIPE LF 14 CLEANOUTS EA 15 CONNECTION TO EXISTING DRAIN INLETS EA 16 PLAY EQUIPMENT LS 17 SAND CY SUBTOTAL: ADD ALT 2 PLAY EQUIP LS SUBTOTAL WELLS/CRONIN TOTAL $36,892.00 1,475.00 $38,367.00 5,847 $ .95 $ 5,554.65 5,850 .30 1,755.00 40 138.00 5,520.00 12 28.00 336.00 58 30.00 1,740.00 102 28.00 2,856.00 2 650.00 1,300.00 2 690.00 1,380.00 1 24,881.10 24,881.10 200 20.00 4,000.00 1 2,308.25 $49,322.75 2,308.25 $51,631.00 $89,998.00 $92,625.95** ** BIDDER FAILED TO USE REVISED PROPOSAL SHEETS FROM ADDENDUM NO. 1, BID DISQUALIFIED a:\nielsen\bidreslt