Loading...
HomeMy WebLinkAboutItem 4.12 Award of Bid 92-2 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: March 9, 1992 SUBJECT: Award of Bid - Contract 92-02 Annual Street Overlay, Dougherty Road Bike Path Phase III, and Street Subdrains Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: l) 2) Resolution of Award Summary of Bids ~ECOMMENDATION: 1) Adopt resolution awarding bid to Les McDonald Construction. Authorize Mayor to execute agreement. Authorize a change in funding sources for the Annual Overlay as indicated below. FINANCIAL STATEMENT: BID RESULTS Engineer's Estimate $427,905.50 [ 74,975.00] 95,979.00 21,405.00 ~545,289.50 Low Bid Received Construction Budget $441,200.00 56,000.00 * 22,000.00 $519,200.00 Overlay/Repair Bike Path Alternate 1 Alternate 2 Street Subdrains TOTAL (not including Alternate #1) $413,415.74 [ 50,592.00] 66,685.00 15,697.00 $495,797.74 * The budget is $146,000 including, engineering and inspection. The mid-year review indicated that the savings could be made by reducing this project to $22,000 construction plus $8,000 engineering and inspection. Street Overlay Project: Budgeted Expenditures BUDGETS Budget By Fund Source *Fund Source Revised (add'l SB140) Legal $ 300 General Fund (CIP) $ 30,500 0 Survey 5,000 Measure B 120,000 $ 58,298 Design 3,500 SB 140 49,500 141,702 Inspection 20,000. General Fund 270,000 270,000 Const. Overlay 171,200 (Op. Budget) Const. Repair 250,000 Striping 20,000 TOTAL $470,000 $470,000 $470,000 * (NOTE: Revision is due to a much higher SB140 match available OITY CLERK Dou~herty Road Bike Path Phase III Budgeted Expenditures Budget By Fund Source Preliminary Engineering Design Inspection Improvements $ 7,000 7,000 5,000 56,000 TDA (Article 3) $75,000 TOTAL $75,000 $75,000 Street Subdrains Budgeted Budget By * Fund Expenditures Fund Source Revised General Fund $146,000 $30,000 Gas Tax 128,000 0 Design $ 12,000 Inspection 12,000 Improvements .250,000 TOTAL $274,000 $274,000 $30,000 * This project was scaled back as a result of the City Council's mid-year budget review. The only subdrains that are proposed to be installed will be in Stagecoach Road, which is proposed to be overlaid. No budget revisions are recommended until the City actually awards the bids. DESCRIPTION: At its meeting of January 27, 1992, the City Council authorized Staff to advertise for bids for Contract 92-02, the Annual Street Overlay, Dougherty Road Bike Path Phase III, and Street Subdrains. The annual overlay program consists of placing at least a 1 1/2" asphalt overlay on streets that are in a deteriorated condition. A special pavement fabric will also be placed over the travelway prior to the asphalt overlay. This fabric helps bridge the existing minor pavement cracks and prevents the reflection of cracks through the new asphalt. Before installing the overlay, the pavement failures are dug out to the base rock and replaced with a new section of asphalt. Repair is also done to the streets scheduled for the spring slurry seal program. The overlay program will receive funds from the State-Local Transportation Partnership Program (SB140 Gas Tax). Included in this annual project is the installation of subdrains in the medians on Stagecoach Road. The subdrains project was reduced this year during the mid-year budget review to provide drains in the street overlay area only. The other subdrains will be deferred to future year projects. The third and final phase of the Dougherty Road Bike Path is also included in the overlay Project because of the cost savings generated by doing two asphalt-related programs together. This phase will complete the bike path from opposite Willow Creek Road to the City limits. The bike path is funded by a grant from the Transportation Development Act (TDA). Streets to be overlaid are: Bandon Drive (between Kimball Avenue and Davona Drive) Lucania Street (between Davona Drive and Brighton Drive) Bristol Road (between Brighton Drive and Tamarack Drive) Amador Plaza Road (between Amador Valley Blvd. and Dublin Blvd.) Golden Gate Drive (Dublin Blvd. to end) Stagecoach Road (Turquoise Street to Amador Valley Blvd.) Dublin Blvd. (south side, Alamo Canal to Dougherty Road) Dublin Court (Dublin Blvd. to end) Notices will be sent out prior to the beginning of work in order to advise the residents and businesses that construction will take place on their street. The City received a total of eleven (11) bids (see attached summary) for this project. The low bidder was Les McDonald Construction with a bid of $495,797.74. In preparing the engineer's estimate for the Bike Path, Staff was concerned that the bids would come in over budget, so a scaled back alternate was included (Alternate #1) which reduced some of the related storm drain work. Because of the low bid on Alternate #2 of the Bike Path and the fact that engineering and inspection costs are projected to be much lower than budgeted, Staff recommends awarding the bid on the basis of Alternate #2. Alternate #2 includes the construction of the storm drain and headwalls necessary for the future widening of Dougherty Road. Award based on Alternate #2 will still allow the overall project cost to be below the $75,000 TDA grant. Staff recommends that the City Council adopt the resolution awarding the bid to Les McDonald Construction and authorize the Mayor to execute the agreement. a: ( projects ) \overlay\agstawrd RESOLUTION NO. 26-92 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 92-02 ANNUAL STREET OVERLAY, DOUGHERTY ROAD BIKE PATH PHASE III, ~ STREET SUBDRAINS TO LES MCDONALD CONSTRUCTION. WHEREAS, the City of Dublin did on March 3, 1992, publicly open examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 92-02 Annual Street Overlay, Dougherty Road Bike Path Phase III, and Street Subdrains, authorized by the City Council on January 27, 1992, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 92-02 to the lowest responsible bidder therefor, to wit, Les McDonald Construction, at a bid of Four Hundred Ninety Five Thousand Seven Hundred Ninety Seven Dollars and Seventy-Four Cents ($495,797.74), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 9th day of March, AYES: NOES: None ABSENT: None 1992. Councilmembers Burton, Howard, Jeffery, Moffatt and Mayor Snyder - ! Cfty Clerk a: ( proJects ) \over lay\resoawrd DOUGHERTY ROAD BIKE PAT}{-ALT 1 £NGR'S ESTIMATE iTEM UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION ~IEAS QTY PRICE pRICE PRICE PRICE PRICE PRICE pRICE PRICE pRICE pRICE PRICE PRICE 1-19 CLEAR AND GRU~ LS 1 2,200.00 2,500.00 500,00 500.00 6,760.00 6,760.00 2,000.00 2,000.00 9,847.0O 9,B47.00 10,000.00 1-20 EART}IWORK CY 10,575 3.20 33,840.00 2.00 21,150.00 3.34 35,320.50 3.00 31,755.00 3.O1 31,B30.75 2.50 26,437.50 1-21 RECOMPACT EXISTING FILL CY 523 5.00 2,615.00 4~00 2,092.00 3.34 1,746.82 3.00 1,569.00 3.60 1,882.80 4.00 2,092.00 1-22 F/ELD STAKING LS I 2,800.00 2,800.00 1,400.00 1,400.00 3,100.00 3,100.O0 3.00 1,470.00 2,300.00 2,3OO.00 2,000.00 2,000.00 1-23 12" RCp LF 80 15.00 1,200.00 10.00 800.00 47.50 3,800.00 40.00 3,200.00 47.00 3,760,00 60.00 4,800.00 1-24 AC & A8 BIKE PATH SECTION SF 12,240 1.00 12,240.00 .70 8,568.00 1.075 13,158.00 1.05 12,852.00 1.40 17,136.00 1.00 12,240.00 1-25 RELOCATION OF SIGNS LS 1 300.00 300.00 85.00 85.00 120.00 120.00 1,050.00 1,050.00 575.00 575.00 120.00 120.00 1-26 8IKE pATH SIGNS EA 2 120.00 240.00 95,00 190.00 160.00 320.00 2~0.00 420.00 175.00 ~50.00 168.00 320.00 1-27 BIKE X-ING SIGNS (W79 & WB0) EA 2 120.00 240.00 170.00 340.00 240.00 480.00 210.00 420.00 230.00 460.00 240.00 480.00 1-28 BIKE PATH STRIPING LS 1 1,000.00 1,000.00 527.00 5~7.00 1,200.00 1,200.00 1,260.00 1,260.00 2,300.00 2,300.00 1,200.00 1,200.00 1-29 6' CHAIN LINK FENCE LF 2,000 9.00 18,000.00 7.47 14.940.00 7.46 14,920.00' 7.70 15,400.00 10.00 20,O00.00 7.50 15,000.00 SUBTOTAL $ 74,975.00 $50,592.00 $ 801925.32' $ 71,366.00 $ 90,441,55 $ 741689.50 ~TEM UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION SEAS QTY PRICE PRICE PRICE pRICE PRICE ['RICE pRICE PRICE PRICE PRICE PRICE PRICE 2-19 CLEAR AND GRUB LS 1 2,500.00 2,500.00 500.00 500.00 8,450.00 8,450.00 4,000.00 4,000.00 8,250.00 8,250.00 lO,D00.00 10,000.00 !-20 EARTHWORK CY 12,645 3.20 40,464.00 1.80 22,761.00 2.70 34,141.50 3.00 37,935.00 1.25 15,806.25' 2.25 28,451.25 2-21 RECOMPACT EXISTING FILL CY 523 5.00 2,615.00 4.00 2,092.00 3.34 1,746.82 3.00 1,569.00 3.00 1,569.00 4.00 2,092.00 2-22 FIELD STAKING LS 1 2,800'00 2,800'00 2'000'00 2'000'00 3'500'00 3'500'00 2'100'00 2'100'00 6'000'00 6'000'00 2'600'00 2'600'00 2-23 24" RCP LF 24 45.00 1,080.00 69.00 1,656.00 83.54 2,004.96 75.00 1,800.00 155.00 3,720,00 50.00 1,200.00 2-24 54" RCp LF 56 90.00 5,040.00 135.00 7,560.00 163.55 9,158.80 163.OO 9,128.00 105.00 5,880,00 120.00 6,720.00 2-~6 RELOCATION OF SIGNS LS 1 300.00 300.00 85.00 85.00 1,720.00 1,720.00 1,050.00 1,050.00 575.00 575,00 120.00 120.00 2-27 BIKE PATH SIGNS EA 2 120.00 240.00 95.00 190.00 160.00 320.00 210.00 490.00 300.00 600.00 160.00 320.00 2-28 BIKE X-ING SIGNS (W79 & W80) EA 2 120.00 240.00 170.00 340.00 240.00 480.00 210.00 420.00 250.00 500.00 240.00 480.00 2-29 BIKE PATI{ STRIPING LS i 1,0OO.OO 1,000.OO 527.00 527.00 1,200.O0 1,200.00 1,260.00 1,260.00 1,150.00 1,150.00 1,200.00 1,200.00 2-30 6' CIIAIN LINK ~ENCE LF 2,000 9.00 10,O00.O0 7.47 14,940.00 7.46 14,920.00' 7.70 15,400.OO 18.00 36,000.00 7.50 15,000.00 2-31 TYPE A HEADWALL, SD500 EA 1 2,000.00 2,000.00 1,240.00 1,240.00 3,900.00 3,900.00 2,750.00 2,750.00 5,0OO.O0 5,OO0.00 4,000.00 4,000.00 2-32 L TYPE HEADWALL EA 1 5,000.00 5,000.00 3,092.00 3,092.00 6,800.D0 6,800.00 5,770.00 5,770.00 5,500.00 5,500,00 7,000.00 7,000.00 2-33 90' X 24' DRIVEWAY LS I 3,000.00 3,000.00 1,512.00 1,512.00 1,350.00 1,350.00 3,~24.0D 3,724.00 4,200.00 4,200.00 2,800.00 2,800.00 SUBTOTAL: $ 95,979.00 $66,685.00 $102,562.08' $ 99,611.00 $108,790.25 $ 93,683.25 TOTAL W/ALTERNATE ~1: TOTAL W/ALTERNATE ~2: * AMOUNTS REVISED AFTER VERIFICATION STREET OVERLAy AND REPAIR BAY CITIES CALLACHER & BORK G. BORTOLOTTO & CO. O'GRADY PAVING JOE FOSTER EXC. EMSCO 1. pLANE AC P~IT 6' WIDE .45 9,908.55 .70 15,413.30 .79 17,395.01 .70 15,413.30 .85 18,716.15 .80 17,615.20 2. pAVEMENT FAILURE REPAIR 1.15 285~775.00 1.23 305,655,00 1.35 335,475,00 1.45 360,325.00 1.59 395,115.0[) 1.50 372,750.00 3. p~q~T REINGFORCING FABRIC .70 22,544.20 .70 22,544.20 .835 26,892.01 .75 24,154.50 .85 2;,375.10 .71 22,866.26 4. INSTALL 1 1/2" AC OVERLAY .25 119,129.75 .25 119,129.75 .29 138,190.51 .30 142,955.70 .32 152,406.O8 .40 190,607.60 5. ADJ MONUMENTS TO GRADE 159.50 4,147.00 180.00 4.6B0.00 150.00 3,900.00 250.oo 3,900.00 155.00 4,030.00 150.00 3,900.00 6. ADJ STORM DRAIN HANBOLES 300.00 1,800.00 3]0.00 1,860.00 200.00 1,200.00 300.00 1,800.O0 315.00 1,890.OO 200.00 1,200.00 7. INSTALL SGNL DETECTOR LP$ 368.50 1,842.50 600.00 3,O00.00 600.00 3,000.DO 600.00 3,000.00 390.00 1,950.00 350.00 1,750.00 8. SUBSURFACE DRAIN 6.75 9,632.25 1B.00 25,686.00 17.95 25,614.65 14.00 19,978.00 11.50 16,410.50 11.00 15~697.00 9. 4" BROKEN LINE .33 1,214.40 .41 1,508.80 .39 1,435.20 .33 1,214.40 .40 1,472.00 .35 1,288.00 10. 4" SOLID LINE .33 940.50 .BB 2,50B.00 .B5 2,422.50 .44 ],254.00 .BO 2,2BU~00 .35 997.50 ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAl, UNIT TOTAL UNiT TOTAL UNIT TOTAL NO. DESCRIPTION pRICE PRICE PRICE PRICE PlaICE PRICE PRICE PRICE pRICE PRICE PRICE PRICE 1-19 CLEAR AND GRUB 1,690.001,690.00 4,500.00 4,500.00 3,750.00 3,750.00 4,000.00 4,000.00 3,200.00 3,200.00 3,355.00 3,355.00 1-20 EARTHWORK 2.45 25,908.75 1.95 20,621.25 3.45 36,403.75 4.O0 42,300.00 1.90 20,092.50 3.50 37,012.50 1-21 RECOMPACT EXISTING FILL 6.78 3,545.94 7.30 3,817.90 4.59 2,400.57 4.00 2,092.00 6.80 3,556.40 5.00 2,615.00 1-22 FIELD STAKIIIG 1,540.00 1,540.00 3,000.00 3,000.00 2,500.00 2,500.00 3,000.00 3,000.00 1,5OO.00 1,500.00 3,000.00 3,000.00 1-23 12" RCP 33.22 2,657.60 55.00 4,400.00 34.70 2,776.00 50.00 4,000.00 35.00 2,800.00 35.00 2,800,00 1-24 AC & AB BIKE pAT}{ SECTION 1.07 13,096.80 1.00 12,240.00 1.50 18,360.00 .90 11,016.00 .95 11,628.00 1.30 15,912.00 1-25 RELOCATION OF SIGNS 1,100.00 1,]O0.OO 95.00 95.00 90.00 90.00 130.00 130.00 90.00 90.00 1,000.OO l,O0O.O0 1-26 BIKE PATH SIGNS 220.00 440.00 305.00 210.00 lO0.O0 200.00 175.{)0 350.00 100.00 200.00 200.00 400.00 1-27 BiKE X-ING SIGNS (W79 & WB0) 220.00 440.00 190.00 380.00 181.00 362.00 265.00 530.00 175.00 350.00 200.00 400.00 1-28 BIKE PATH STRIPING 1,320.00 1,320.00 600.00 600.00 564.00 564.00 1,300.00 1,300.00 550.00 550.00 1,200.00 1,200.00 1-29 6' CHAIN LINK FENCE 7.98 15,960.00 8.00 16,000.00 9.59 19,180.00 8.00 16,000.00 7.75 15,500.00 B.00 16,000.00 SUBTOTAL $ 67,699.O9 $65,864.I5 $ 86,666.32 $ 84,718.00 $ 59,466.90 $ 83,694-50 DOUG}IERTY ROAD BIKE PATH-ALT 2 ITEM UNIT TOTAL UNIT TOTAl, UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION PRICE PRICE PRICE pRICE PRICE PRICE PRICE PRICE ['RICE PRICE PRICE PRICE -19 CLEAR AND GRUB 1,800.001,800.00 2,500.00 2,500.00 3,750.00 3,750.00 4,000.00 4,000.00 3,200.00 3,200.00 3,354.00 3,354,00 20 EARTHWORK 2.01 25,416.45 1.65 20,864.25 3.45 43,625.25 4.00 50,580.00 1.35 17,G70.75 3.50 44,257.50 -21 RECOMPACT EXISTING FILL 6.78 3,545.94 7.30 3,817.90 4.59 2,400.57 4.00 2,092.00 8.00 4,184.00 5.00 2,615.00 2-22 FIELD STAKING 2,200.00 2,200.00 2,000.00 2,000.00 700.00 700.00' 3,000.00 3,000.00 2,150.00 2,150.00 4,000.00 4,000.00 2-23 24" RCp 49.14 1,179.36 83.00 1,992.00 57.00 1,368.00 88.00 2~]12.00 50.00 1~200.00 35,00 2-24 54" RCP 75.33 4,218.48 2OO.O0 11,200.00 i81.00 10,136.00 160.00 B,960.00 8B.OO 4,928.00 160.00 8,960.00 2-25 AC & AB BrKE PAT1[ SECTION 1.11 12,987.00 1.20 14,040.00 1.50 17,550.00 .90 10,530.00 1.20 14,040.00 3.35 15~795.OO 2-26 RELOCATION OF SIGNS 1,100.DO 1,100.00 95.00 95.00 90.00 90.00 130.00 130.00 90.00 90.00 1,O00.00 1,000.00 2-27 BIKE PATH SIGNS 220.00 440.00 105.00 210.00 100.00 200.00 175.00 350.00 ]00.00 200.00 200.00 400.00 2-28 BIKE X-lNG SIGNS (W79 & WBO) 220.00 440.00 190.00 380.00 181.00 362.00 265.00 530.00 175.00 350.00 200.00 400.00 2-29 BIKE pATH STRIPING 1,320.00 1,320.OO 600.EG 600.00 564.00 564.00 1,300.00 1,300.00 55U.00 550.00 1,200.00 2-30 6' CHAIN LINK FENCE 7.98 15,960.00 8.00 16,000.00 9.59 i9,180.00 8.00 16,0OO.00 7.75 15,500.00 B.O0 16,000.00 2-31 TYPE A }{EADWALL, SDS00 5,670.72 5,670.72 1,760.00 1,760.00 5,000.00 5,000.00 1,650.00 1,650.O0 2,600.00 2,600.00 1,400.00 1,400.00 2-32 L TYPE HEADWALL 2.065.36 2,065.36 5,060.00 5,060.00 7,000.00 7,000.00 5,000.00 5,000.00 6,500.00 6,500.00 4,000.00 4,000.00 2-33 90' X 24' DRIVEWAY 1,144.76 1,144.76 3,250.00 3,250.00 5,470.00 5,470.00 3,000.00 3,000,00 4,700.00 4,700.00 4,000.00 4,000.00 SUBTOTAL: $ 79,488.07 $ 83,769.15 $117,395.82' $109,234.O0 $ 77,262.75 $108,2~1.50