HomeMy WebLinkAboutAttachmt 5 Village Action Plan
VILLAGE ACTION PLAN
Fallon Village Center
1. Continue working with the Eastern Dublin Property Owners on the Specific Plan
Amendment and the development of a Stage 1 Development Plan that includes the
proposed Fallon Village Center.
2. Incorporate the concepts from the Village Policy Statement into the Eastern Dublin
Specific Plan Amendment for the Eastern Dublin Property Owner's Stage 1
Development Plan.
Camp Parks
1. Work with the United States Army to incorporate the village characteristics identified
in the Village Policy Statement into the formal land use plan application for the future
development at Camp Parks. The Village Policy Statenent would supplement the
results of the Strategic Visioning Process and City Council's subsequent direction to
Staff and the Army regarding the formal land use plan application.
2. Create a strong pedestrian linkage between the Transit Center and the future
development at Camp Parks.
Transit Center
1. Work with the individual property owners to implement the eXlstmg Stage 1
Development Plan and incorporate the concepts from the Village Policy Statement
into the Stage 2 Development Plan.
Area G - Dublin Ranch Town Center
1. Ensure that development conforms to the Stage 1 and 2 Development Plans to create
a cohesive village.
Downtown Village
1. Evaluate land use changes for the Downtown area once the BART station has been
constructed. This includes a review of the existing Specific Plans to determine what
changes/updates should be considered. This may include revising the existing
Specific Plans, or repealing these Specific Plans and creating a new Specific Plan for
the entire Downtown.
2. Evaluate the future potential for a Downtown Village when the Specific Plan
documents are updated.
Attachment 5