Loading...
HomeMy WebLinkAboutItem 4.05 Award of Bid 93-03 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: April 26, 1993 SUBJECT: Award of Bid - 1992-93 Annual Sidewalk Safety Repair Program, Contract NO. 93-03 Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: l) 2) Resolution of Award Summary of Bids RECOMMENDATION: 1 ) Adopt resolution awarding bid to Ambo Engineering Authorize Staff to increase the scope of work to level of budgeted funds. Authorize Mayor to execute. Agreement. FINANCIAL STATEMENT: Sidewalk Safety Proqram Design/Survey/Inspection Construction TOTAL BUDGETED BUDGETED THIS CONTRACT FUTURE CONTRACT TOTAL (REMOVE/REPLACE) (GRINDING) AMOUNT BUDGETED $ 7,000 $ 3,000 $10,000 30,000 10,000 40,000 $37,000 $13,000 $50,000 (General Fund) ESTIMATED COSTS Swim Center Entrance Walk Replacement for ADA $ 1,800 Pad for Bike Rack 1,200 TOTAL $ 3,000 (CDBG Funds) (Parkland Dedi- cation Fees) BID COSTS $1,023.12 1,450.00 $2,473.12 DESCRIPTION: Funds are scheduled for the Annual Sidewalk Program for each year of the Five-Year Capital Improvement Program. For Fiscal Year 1992-93, $50,000 has been budgeted from the General Fund. The City Council, at its meeting of April 12, 1993, directed Staff to go ahead with this project with the City paying the cost of repairs for the current fiscal year. In Fiscal Year 1993-94, the responsibility for the cost of repairs would be the frontage owner's responsibility. This Sidewalk, Curb and Gutter Removal and Repair Project is estimated to cost $37,000, including engineering and inspection work. This contract will repair the larger offsets and necessary curb and gutter work. Staff anticipates using the remaining $13,000 of the sidewalk Repair budget for a secondary.repair program which will involve grinding smaller sidewalk offsets. This project was initiated last year and has proven to be effective in cost per location, and the number of locations corrected has therefore been able to be increased. Ambo Engineering, Inc., is the low bidder for the Sidewalk Repair Project with a total bid of $24,831.66 ($2,473.12 for the Swim Center and $22,358.54 for the sidewalk repair). The breakdown of the estimated budget for repairs is $30,000. Staff recommends that the quantities of repair be extended as necessary to the level of the budgeted amount provided that the grinding contract bids are within budget, particularly since this will be the last year that the City will provide full funding for the Program. As part of the Dublin Swim Center Renovation, and due to requirements of the Americans with Disabilities Act, a handicap accessible walkway to the poolhouse entrance and a bicycle rack concrete pad will be installed with this sidewalk contract for the economies of scale and the dissimilarities of this work to the other pool remodeling work. Staff recommends that the City Council adopt the Resolution awarding the bid to Ambo Engineering, Inc. a:(93)sidewalk~agstawrd ITEM NO. 4' ,~ COPIES TO: ~i~erEsngineering [ FiLE~ ,,~61~~ RESOLUTION NO. 41-93 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 93-03, 1992-93 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM TO AMBO ENGINEERING, INC. WHEREAS, the City of Dublin did on April 19, 1993, publicly open examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for contract 93-03 1992-93 Annual Sidewalk Safety Repair Program, authorized by the City Council on March 8, 1993, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 93-03 to the lowest responsible bidder therefor, to wit, Ambo Engineering, Inc., at a bid of Twenty-Four Thousand Eight Hundred Thirty-One Dollars and Sixty-Six Cents ($24,831.66), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 26th day of April, 1993. Councilmembers Burton, Houston, Howard, Moffatt, and Mayor Snyder AYES: NOES: None ABSENT: None a:(projects)~sidewalk%resoawrd 1992--93 SIDEWALK PROGRAM, CONTRACT 93-03 BID RESULTS ITEM UNIT NO. DESCRIPTION MEAS QTY 1. SAWCUT SIDEWALK LF 610 2. SDWK REMOVE/REPLaCE SF 3,200 3. C/G REMOVE/REPLACE LF 194 4. ROOT SHIELD LF 130 5. COMMUNITY POOL SDWK SF 294 6. POOL BIKE PAD SF 250 7. A.C. PAVING SF 300 ENGR'S ESTIMAT~ AMBO ENGINEERING UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE RALPII Q. & SON STRANGE & CHALMERS UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE 1.90 1,159.00 2.55 1,555.50 5.50 17,600.00' 5.30 16,960.00 21.00 4,074.00 20.00 3,880.00 7.00 910.00 22.40 2,912.00 5.10 1,499.40 3.95 1,161.30 5.10 1,275.00 3.95 987.50 5.10 1,650.00 8.65 2,595.00 $ 28 167.40' TOTAL $ 30 051.30 2.00 1,220.00 6.00 19,200.00 19.00 4,500.00 10.00 1,300.00 6.00 1,764.00 4.50 1,125.00 4.00 1,200.00 TOTAL $ 301309.00 1.85 1,128.50 4.96 15,872.00 16.56 3,212.64 9.00 1,170.00 3.48 1,023.12 5.80 1,450.00 3.25 975.00 $ 24.831.26 * AMOUNTS REVISED AFTER VERIFICATION RICH ItIMENEZ CONC. UNIT TOTAL PRICE pRICE 2.50 1,525.00 6.00 19,200.00 20.00 3,880.00 10.00 1,300.00 5.50 1,617.00 5.50 1,375.00 5.00 1,500.00 $ 301397.00 ITEM --NO. D~SCRIPTION 1. SAWCUT SIDEWALK 2. SDWK REMOVE/REPLACE 3. C/G REMOVE/REPLACE 4. ROOT SHIELD 5. COMMUNITY POOL SDWK 6. POOL BIKE PAD 7. A.C. PAVING P & F CONSTRUCTION PHILLIPS CONST? UNIT UNIT TOTAL UNIT 'TOTAL MEAS OTY PRICE PRICE PRICE PRICE LF 610 2.75 1,677.50 1.00 610.00 SF 3,200 6.00 19,200.00 8.00 25,600.00 LP 194 18.00 3,492.00 30.00 5,820.00 LF 130 6.00 780.00 5.00 650.00 SF 294 7.00 2,058.00 4100 1,176.00 SF 250 7.00 1,750.00 4.00 1,000.00 SF 300 6.25 1,875.00 3.00 900.00 $ 30 832.50 TOTAL $ 35~756.00 CUNNINGRAM & SONS RILEY & SONS UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE 4.50 2,745.00 2.00 1,220.00 7.00 22,400.00 6.25 20,000.00 17.00 3,298.00 23.75 4,607.50 20.00 2,600.00 12.00 1,560.00 5.00 1,470.00 10.00 2,940.00 5.25 1,312.50 11.00 2,750.00 7.00 2,100.00 10.00 3,000.00 $ 35 925.50 $ 361077.50 PLEASANTON ENG~ RAMIREZ CONST. UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE 2.00 1,220.00 2.20 1,342.00 8.00 25,600.00 9.45 30,240.00 30.00 5,820.00 28.00 5,432.D0 15.00 1,950.00 11.00 1,430.00 9.00 2,646.00 7.75 2,278.50 9.00 2,250.00 7.75 1,937.50 6.00 1,800.00 6.70 2,010.00 TOTAL $ 41 286.00 $ 44 670.00