Loading...
HomeMy WebLinkAbout8.1 07-010 Mountain of Fire & Miracles Ministries CUPAGENDA STATEMENT PLANNING COMMISSION MEETING DA7CE: August 26, 2008 SUBJECT: PUBLIC HEARING - PA 07-010 (Adjudicatory Action), Mountain of Fire and Miracles Ministries Conditional Use Permit to legalize a church located within an existing multi-tenant commercial office building at 1 1501 Dublin Boulevard, Suite 202. Report prepared by Laura KarGboghosian, Associate Planner ATTACHMENTS: 1;1 Resolution approving a Conditional Use Permit to legalize the establishment of a church (Mountain of Fire and Miracles Ministries) at 11501 Dublin Boulevard, Suite 202. 2 i Applicant's Written Statement. 3;i Project Plans. RECOMMENDATION: 1) Receive Staff presentation; ~~ ~ 2) Open the public hearing; I n' ~~ 3) Take testimony from the Applicant and the public; UV. ~~ 4) Close the public hearing and. deliberate; and 5) Adopt Resolution (Attachment 1) approving a Conditional Use Permit to legalize the establishment of a church (Mountain of Fire and Miracles Ministries) at 11501 Dublin Boulevard, Suite 202. PROJECT DESCRIPTION: Background: The Applicant is requesting approval of a Conditional Use Permit (C'UP) to legalize the establishment of an existing church within a 1,949 square foot suite located on a triangular shaped lot at 11501 Dublin Boulevard. The property consists of an existing multi-tenant commercial office building with access from Dublin Boulevard. The property is zoned Planned Development with a General Plan Land Use Designation of Retail/Office which allows a church facility with the approval of a Conditional Use Permit. The church is surrounded by single family residential homes to the north, commercial office uses to the east, Interstate 580 to the south and Dublin Boulevard to the west. COPIES TO: Mountain of Fire and Miracles IV[inistries .Kevin Ring .File ITEM NO. ~ Page 1 of 5 G:\PA#\2007\07-0l0 Mountain of Fire Church\Materials for 082608 PC Meeting\Agenda Statement.doc ~~-.--~5&'CI'~X~t3---- ~i~f30=478---- ~-..~i5`f3~=, ~ Ufa" ~~ ~ ANALYSIS: A Conditional Use Permit is required in order to operate a Comm unity Facility, which include church facilities within the PD (Planned Development) Zoning District for the site. The Conditional Use Permit process allows the City to place Conditions of Approval on the projf~ct to ensure that the operation of the proposed use is compatible with the surrounding uses. The proposed project has been reviewed for issues related to operating characteristics. parking, and project design. Conditions of Approval have been proposed where appropriate to ensure compatibility with adjacent uses. The commercial office building is approximately 41,000 square feet in size. The church is located within an existing 1,949 square foot suite. 'the suite consists of a 938 squan; foot sanctuary with alter, children's sanctuary (classroom), two offices, a retreat room and storage room. Operating C{a!~rracteristics: The church conducts Sunday morning services and regularly scheduled activities as provided in Table 1 below. The .Applicant has indicated that there are no full-time staf ~ members at this location, since the church's principle office is located in Pleasanton. The worship/servic ~ attendance is estimated at 20 adults and 15 children. The following table describes the worship times. 2 of 5 Table 1 -Church Activities day Time ~1ct~v~ty Sunda s gam to 9 m Sunda services Wednesdays 7pm to 9pm Inter-denominational Revival Service ls` Saturday of the month gam to 12 noon Power Mu;;t Change Hands Service 3r Friday of the month l Opm to Sam Friday Night Vigil As described above, all of the services are at times that are outside of normal business hours for an office building. The majority of existing; uses within this multi-tenant commercial office building operate Monday through Friday from 8:30 a.m. to 5 p.m. Because church activities occur on weekday evenings and weekends, when the other businesses are typically closed, the p~~tential for conflict to occur with the other uses in the building is minimal. A Condition of Approval has been added restricting the operation of the church to these times. If the church expands the hours of operation, such modification would need to be reviewed and approved by the City. Parking Analysis: The City of Dublin Zoning Ordinance contains off-street parking requirements by use type. A Place of Worship (church) is required to provide one parking space per 50 square feet for non-fixed seating in the assembly area, plus 1 per classroom (Chapter 8.76.080.C). As previously stated, the sanctuary is approximately 938 square feet with one classroom. Therefore, the Zoning Ordinance parking requirement for the church is 20 parking spaces. Table 2 -Parkin Church Uses Required Parking ~ aces Larking Provided Sanctuary 19 s aces 19 s aces Children's Sanctua /Classroom 1 s ace 1 s ace Total 20 s aces 20 s aces Although the church is located within amulti-tenant commercial of face building a parking analysis has not been performed because the church's days and hours of operations are not during typical office hours; therefore the existing 123 on-site parking spaces are sufficient to ;support the church and its activities during the hours proposed for the church and will not impact the office parking demand. Conditional Use Permit Required Findings: In order for the Planning Commission to approve a request for a Conditional Use Permit, the Planning Commission must make all finding; (Section 8.100.060 of the Dublin Zoning Ordinance) as shown on pages 1-2 of the Resolution (Attachment 1). 3 of 5 ENVIRONMENTAL REVIEW: The project has been reviewed under the California Environmental Quality Act (CEQA), CEQA Guidelines and the Dublin Environmental Guidelines and has been found to be categorically exempt from the environmental review requirements of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities). NOTICING: In accordance with State law, a public notice regarding this hearing v~~as mailed to all property owners and occupants within 300 feet of the proposed project. A public notice was also published in the Valley Times and posted at several locations throughout the City. To date, the City has not received any comments or objections from surrounding property owners or tenants regarding the current proposal. REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES: The proposed project has been reviewed by the Building Division, Public Works Department, Police Services Department, and the Alameda County Fire Department. Conditions of Approval have been included where applicable. CONSISTENCY WITH THE GENERAL PLAN, SPECIFIC PLAN AND ZONING ORDINANCE: The proposed project is consistent with the General Plan Land Use designation of Retail/Office. Community Facilities, which include church facilities, are allowed n the Planned Development Zoning District with approval of a Conditional Use Permit from the Planning Commission. CONCLUSION: This application has been reviewed by the applicable City departments and agencies, and their comments have. been incorporated into the Conditions of Approval for the project. The proposed church, as conditioned, is consistent with the Dublin General Plan and Zoning District in which the project site is located and represents an appropriate: project for the site. RECOMMENDATION: Staff recommends that the Planning Commission: 1) Receive Staff presentation; 2) Open the public hearing; 3) Take testimony from the Applicant and the public; 4) Close the public hearing and deliberate; and 5) Adopt Resolution (Attachment 1) approving a Conditional Usf; Permit to legalize the establishment of a church (Mountain of Fire and Miracles Ministries) 11501 Dublin Boulevard, Suite 202. 4of5 GENERAL INFORMATION: PROPERTY OWNER: APPLICANT: LOCATION: ASSESSOR PARCEL NUMBER: GENERAL PLAN LAND USE DESIGNATION: SPECIFIC PLAN/ LAND USE DESIGNATION: ZONING: SURROUNDING USES: Kevin Ring, Ring Properties,, 11671 Stanton Road, Grass Valley, CA 95949 Pastor Samuel Y Adeyerr_i, MFM Ministries, 5890 Hansen Drive, Pleasanton, CA 94566 11501 Dublin Boulevard, Suite 202 941-1570-004-02 Retail/Commercial N/A Planned Development Location Zonin General Plan Land Use Current Use of Pro ert Site Planned Development Retail/Office _ Commercial Office North Single Family Residential Single Family Residential Residential South N/A N/A Interstate 580 East Planned Development Retail/Office Commercial Office West Public Right of Way Public Right of Way Dublin Boulevard 5 of 5 RESOLUTION N0.08-XX A RESOLUTION OF THE PLANNING CQ~MMISSION OF THE CITY OF DUBLIN APPROVING A REQUEST FOR A CONDITIONAL USE PERMIT TO LEGALIZE THE ESTABLISHMENT OF AN EXISTING PLACE OF WORSHIP WITHIN THE PLANNED DEVELOPMENT (PD) ZONING DISTRICT LOCATED AT 1]_501 DUBLIN BOULEVARD, SUITE 202 (APN 941-1570-004-02) PA 07-010 WHEREAS, Samuel Y. Adeyemi, the Applicant, has requested approval of a Conditional Use Permit to legalize the establishment of the existing Mountain of Fire and Miracles Ministries to be located within a 1,949 square foot suite in the Planned Development (PD) zoning district at 11501 Dublin Boulevard, Suite 202; and WHEREAS, a complete application for the above noted entitl ~ment request is available and on file in the Community Development Depa~~tment; and WHEREAS, the Applicant has submitted project plans dated received April 3, 2008; and WHEREAS, the application has been reviewed in accordance with the provisions of the California Environmental Quality Act (CEQA) and this project was found to be exempt under the CEQA Guidelines Section 15301; and WHEREAS, a Staff Report was submitted outlining the issues surrounding the request; and WHEREAS the Planning Commission held a properly noticed public hearing on said application on August 26, 2008; and WHEREAS, the Planning Commission did hear and consider a l said reports, recommendations and testimony herein above set forth and u:;ed their independent judgment tc~ make a decision; and WHEREAS, the Planning Commission has found that the proposed project is appropriate for the subject site. NOW, THEREFORE, BE IT RESOLVED THAT the Dublin Planning Commission does hereby make the following findings and determinations. A. The proposed use and related structures is compatible with other land uses, transportation and service facilities in the vicinity because it is located within an existing building and the existing on and off- site parking is adequate to seri~e the existing uses. B. The proposed use, as conditioned, will not adversely affect the 1 _ealth or safety of persons residing or working in the vicinity, or be detrimental to the public health, s~.fety and welfare and will not be injurious to property or improvements in the neighborhood becGUSe the proposed use will operate during non peak hours from surrounding uses and will be adequately conditioned to ensure that the operation is conducive with adjacent uses. ATTACHMENT 1 C. The proposed use will not be injurious to property or improvem~;nts in the neighborhood because the proposed use will be operated <~ompletely within an existing anG' enclosed building. D. There are adequate provisions for public access, water, sanitation, and public utilities and services to ensure that the proposed use and related structures would not be detrimental to the public health, safety, and welfare because the proposed use will be operated c~~mpletely within an existing building that is serviced by all appropriate utilities and infrastructure. F,. The subject site is physically suitable for the type, density and intensity of the use and related structures being proposed because the existing roadway networl- leading to the site and the existing on-site parking is adequate to serve the use. F. The use will not be contrary to the specific intent clauses, devel<-pment regulations, and performance standards established for the Planned Development (PD) zoning district in which it is located because a church is allowed by Conditi~~nal Use Permit as defined in the Planned Development. G. The approval of this Conditional Use Permit is consistent with fie Dublin General Plan and will provide a service to the community that is consistent with the intent of the Retail/Office General Plan Land Use designation because it will provide a place of worship for the community. BE IT FURTHER RESOLVED THAT the Dublin Planning Commission does hereby approve PA 07-010 Mountain of Fire and Miracles Ministries Conditional Use Perrr~it to establish a 1,949 square foot church located at 11501 Dublin Boulevard, Suite 202, APN 941-1570-C04-02. The project approval shall be subject to compliance with the following conditions: NO CONDITION TEXT RESPON. WHEN SOURCE AGENCY/ REQUIRED DEPART. PLAN NING CONDITIONS 1. Approval. This Conditional Use Permit approval for PA PL On-going Standard 07-010 is to allow Mountain oi~ Fire and Miracles Ministries to establish a churcl- at 11501 Dublin Boulevard, Suite 202. This approval shall generally conform to the project plans stamped approved, consisting of a site plan and floor plans (stamped received by the Plannin De artment on A ril 3, 2008). 2. Permit Expiration. Construction or use shall commence PL One year from DMC within one (1) year of Permit approval or the Permit shall permit approval 8.96.020.D lapse and become null and void. Commencement of construction or use means the actual construction or use pursuant to the Permit approval or demonstrating substantial progress toward commencing such construction or use. If there is a dispute as to whether the Permit has ex fired, the City may hold a noticed ublic 2 NO CONDITION TEXT RESPON. WHEN SOURCE AGENCY/ REQUIRED DEPART. hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a Permit expires, a new application must be made and processed accordin to the re uirements of this Ordinance. 3. Time Extension. The original approving decision-maker PL One year from DMC may, upon the Applicant's written request for an permit approval 8.96.020.E extension of approval prior to expiration, and upon the determination that any Conditions of Approval remain adequate to assure that applicable findings of approval will continue to be met, grant ~~ time extension of approval for a period not to exceed six (6) months. All time extension requests shall be ~ioticed and a public hearing or public meeting shall be held as required by the articular Permit 4. Effective Date. This Conditional Use Permit approval PL 10 days from the Planning shall become effective 10 days after the date of approval date of approval b the Plannin Commission. 5. Fees. Applicant/Developer shall pay all applicable fees Various At building permit Various in effect at the time of building permit issuance, issuance including, but not limited to, Planning fees, Building fees, Traffic Impact Fees, TVTC fees, Dublin San Ramon Services District fees, Public Facilities fees, Dublin Unified School District School Impact fees, Fire Facilities Impact fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees; or any other fee th~it may be adopted and a licable. 6. Annual Review. On an annual basis, this Conditional Use PL, P() On-going Planning Permit approval may be subject to a review by the Planning Manager to determine compliance with the Conditions of A royal. 7. Revocation of Permit. This permit shall be revocable for PL On-going DMC cause in accordance with Dublin Zoning Ordinance 8.96.020.I Section 8.96.020.I, Revocation. Any violation of the terms and conditions of this permit may be subject to the issuance of a citation. 8. Minor amendments. Modifications or changes to this PL On-going DMC Conditional Use Permit approval may be considered and 8.100.080 approved by the Community Development Director, if the modifications or changes proposed comply with Section 8.100.080, of the Zonin Ordinance. 9. Clarification to the Conditions of Approval. In the Various On-going Standard event that there needs to be clarification to the Conditions of Approval, the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public heari~ig. The Director of Community Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Develo er to fulfill needed im rovements or NO CONDITION TEXT RESPON. WHEN SOURCE AGENCY/ REQUIItED DEPART. miti ations resultin from im acts to this ro'ect. 11. Requirements and Standard Conditions. The Various Building Permit Standard Applicant/ Developer shall comply with applicable City Issuance of Dublin Fire Prevention Bureau, Dublin Public Works Department, Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all a licable conditions re uired have been or will be met. 12. Required Permits. Developer shell obtain all permits Various Building Permit Standard required by other agencies including, but not limited to Issuance Alameda County Flood Control and Water Conservation District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans and provide copies of the permits to the Public Works De artment. 13. Compliance. Failure to comply with these conditions PL On-going Chapter 8.144 may result in enforcement by the Community of the Dublin Development Department in accordance with Chapter Zoning 8.144 of the Dublin Zonin Ordinance. Ordinance 14. Indemnification. The Developer shall defend, Various On-going Administration indemnify, and hold harmless the City of Dublin and its /City Attorney agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City related to this project to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full coo eration in the defense of such actions or roceedin s. 15. Hours of Operation. Activities. of the church shall be PL On-going Planning limited to the activities listed as a part of the Applicant's written statement. Wednesday Revival Service: 7:00 p. m. to 9:00 p. m. Sunday Worship Service: 9:00 a.m. to 12:00 p.m. First Saturday of the month the Power Must Change Hands Service: 9:00 a.m. to 12 p.m. Third Friday of the month Friday Night Vigils: 10:00 p.m. to 5:00 a.m. Any other events and activities proposed by the Church shall be reviewed and a roved b the Communi NO CONDITION TEXT RESPO~T. WHEN SOURCE AGENCY/ REQUIRED DEPART. Develo ment Director. 16. Outdoor Events. Any outside events shall be subject to PL On-going Planning the Temporary Use Permit requirements contained in the Ci of Dublin Zonin Ordinance. 17. Noise/Nuisance. The Applicant shall control all activities PL On-going Planning on the site so as not to create a nuisance to the surrounding businesses and residents. No loudspeakers or amplified music shall be permitted to project or be placed outside the buildin . 18. Signs. Any signage on site shall be subject to the sign PL On-going Planning requirements contained in the City of Dublin Zoning Ordinance. BUILDING `CONDITIONS 19. Building Codes and Ordinances. All project BL Through Building construction shall conform to all building codes and Completion ordinances in effect at the time of buildin ermit. 20. Building Permits. To apply for building permits, BL Issuance of Building Applicant/Developer shall submit eight (8) sets of Building Permits construction plans to the Building Division for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant~Developer will be responsible for obtaining the approv,rls of all participation non-City agencies prior to the issuance of building ermits. 21. Construction Drawings. Construction plans shall be BL Prior to Issuance of Building fully dimensioned (including building elevations) Building Permits accurately drawn (depicting all existing and proposed conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape lan and details shall be consistent with each other. 22. Addressing. Address will be required on all doors BL Prior to Occupancy Building leading to the exterior of the building. Addresses shall be illuminated and be able to be seen from the street, 5 inches in hei ht minimum. 23. Engineer Observation. The Engineer of record shall be BL Prior to Frame Building retained to provide observation services for all Inspection components of the lateral and vertical design of the building, including nailing, holddowns, straps, shear, roof diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to schedulin the final frame ins ectiori. 24. Air Conditioning Units. Air conditioning units and BL Occupancy of Unit Building ventilation ducts shall be screened from public view with materials compatible to the main building. Units shall be permanently installed on concrete pads or other non- movable materials approved by the Building Official and Director of Communi Develo ment. NO CONDITION TEXT RESPON. WHEN SOURCE AGENCY/ REQUIRED DEPART. 25. Temporary Fencing. Temporary construction fencing BL Through Building shall be installed along perimeter of all work under Completion construction. POLICE CONDITIONS 26. Office Door Signage. Interior office doors shall be P On-going Police identified with si ns on or adjacent to doors. 27. Exit Doors. All exit doors shall be identified from the P On-going Police outside, indicating the rooms or parts of buildings they access e. ., stairwell, office . 28. Exterior Doors. Exterior doors must have a light source. P On-going Police 29. Restrooms. If remodeling the lower level bathrooms, P On-going Police a licant must ensure that the li hts have motion-sensors. PUBL IC WORKS CONDITUNS _. 30. Disabled Parking. Applicant shall provide disabled PW Prior to Occupancy Public Works parking stall to meet current ADA/Title 24 standards. Please assure that the pavement slopes does not exceed 2% in any direction. Said stall shall be close to the main entrance. Minimum of 5 disabled parking stalls are necessary for this site as per the total number of parking shown on the lan. 31. Path of Travel. Provide a path of travel from the public PW Prior to Occupancy Public Works sidewalk to the main entrance. 32. Photometric Calculation. Provide a photometric PW Prior to Occupancy Public Works calculation for the existing parkin; lot and around the building that demonstrates a n-inimum foot-candle lighting level of not less than 1.0 at the ground surface for the adjacent parking area; if this cannot be verified rovide additional li htin where necessa 33. Site Entrance Signage. Signs (R100B) must be posted at PW Prior to Occupancy Public Works each driveway entrance that read, "Unauthorized not displaying distinguishing placards or license plates issued for physically handicapped persons will be towed away at owner's expense. Towed vehicles may be reclaimed at Dublin Police or by telephoning 83306670". Show the locations for each sign on the site plan with references to a licable construction details and notes. DSRS D CONDITIONS 34. Prior to issuance of any building permit, complete DSRSD Prior to Issuance of DSRSD improvement plans shall be submitted to DSRSD that Building Permits conform to the requirements of the Dublin San Ramon Services District Code, the DSRSD "Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities", all applicable DSRSD Master Plans and all DSRSD olicies. 35. Prior to issuance by the City of any Building Permit or DSRSD Prior to Issuance of DSRSD Construction Permit by the Dublin San Ramon Services Building Permits District, whichever comes first, all utility connection fees including DSRSD and Zone 7, plan checking fees, inspection fees, connection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules established in the DSRSD Code. PASSED, APPROVED AND ADOP'T'ED this 26th day of August 200,3. AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chairperson ATTEST: Planning Manager G: IPA#12007107-010 Mountain of Fire ChurchlMateriaL for 082608 PC Meetinglpc reso 8-2ti-08.doc I MFM l~lountain of Fire and Mir;~.cles Ministries Dublin -Bay Area Branch 11501 Dublin Blvd. Suit 202 Dublin C.A 99~ a 4s 6 a November 7~' 2006 City of Dublin Ref: Application for Conditional Use Permit Item_ a. The building; space on this application is inte~ided to be used for a church fellowship /congregation. Item b. This is a non profit organization and as such There are no direct employee Item c. Hours of opf;ration /church service will be v~~riable as noted Wednesdays 6:30 pm - 10:00pm Fridays 6:30 pm -10:00 pm (optional) Saturdays 9:00 am - 12 noon Sundays 9: 00 am - 1:00 pm, 7:00 fm - 9:00 pm Item d. No particular segment of the community will be targeted for this Congregation. However, the house of the Lord is welcome to all. Item e. The commwiity would be benefited by our congregation through our prayers for all and future community involvements and fund raisings Item f. No we do not see any ways our church activi~ ies may disrupt the surrounding residence or businesses. Item g. No we do not see how the church activities would have any negative effect on the health or safety of the people within the vicinity. Item h. No will not lie creating any negative impact c n the property Item i. No the property is not located on a hazardous waste and substance site ~ec~iv~a~ FE8 2 6 2007 Att,~chment 2 DUBLIN PLw-v~v~NG Set yo,~rself fre from the G,,ndage of ear an er, a~ ression, anxie , Y ur ~i e ll ne~r be the same a ain f "Is not my word like as a fire? saitj~ the Lora and like a hammer that breaketh the rock in pieces?': (Jeremiah 23:29) Mountain of Fire and Miracles inistries 11501 Dublin i31vd. Suite 202 Dublin, CA 94568 ~~~=~~~' ` General Overseer (tiYjorlu~wide) ` r ~ ~ ~ 2°°~ Dr Daniel Olukc~yd ~JB~lN PL1~~ei~l+~ Invites you to come and wors~yip with us and receive the truth as it had never been told to you before Wrednesdays Inter-de zonal Revival Service 7.00 p. m - 9:00 p. m ~~~ Worship Service 9:00 a. m - 12: 00 p. m Power ~ E;~i~~g'~Hands 1st Saturday of the month~~ 9:00 a. m - 12:00 p. m T~ • • t~ ,~rd Friday of every month 10:00 p.m -S:nn ~x.~ Your Host Pastor Samuel Adeyemi Come acnd experience the power of God Mountain of Fire and Miracles Ministries 11501 Dublin Blvd. Suite 202 - D22ublin CA 94~5n63 -925) 551-3714 June 18`x, 2008 D L5 ~ ~ a v ~ ~E ;;~iUE~ JUN 2 3 2008 JUN = 9 2008 Laura Karaboghosian ,-,,,,,~a ,,,, ,~! ,~;~~~„~,, ~' City of Dublin ' `'-"f° - 100 Civic Plaza. CITY OF DUBLIN FIRE PREVENTION Dublin, CA 94568 Plannin;; Application #:- PA# 07-010 Re: Permit to Operate a Church (Mountain of Fire and Miracles Ministry) @ 11501 Dublin Blvd. Suite 202 Dear Laura: In response to the planning division comments indicated in your letter dated May 2, 2008 and the attached Dublin Fire Department requirements of November 7, 2007, please be advised as follows: Item 1 The letter dated 10/17/07 states an anticipated occupant load over 49 persons, a change of occupancy will need to be approved by the Building Department: - Response - Please be advised that our church is a very small group that cun~ently consists of 18 to 20 adult and about 15 children for a total of 35 individual on a typical d:iy of worship. This means that our congregation is under the current approved maximum occupant load of 49 or less. Therefore, the current approved occupant load does not need to be revised by the Building Department. Item #2 General Comments: - This is a general comment and as such no response is required from us Item #3 Deferred Submittals: -- Provide on the title or Cover Sheet under the heading; Deferred Submittal all of the deferred submitted items: • Fire Sprinkler modifications • Fire monitoring s vstem install or modifications. Response -There is no modification / TI of the current space of worship as the current sprinkler system is deemed to be adequ~rte as provided within the current bi~.ilding requirements Item #4 Existing Fire Sprinkla~r Systems -Modification: - a. Sprinkler Plans b. S year Certfftcation Response - As indicated in item #3 above, the current sprinkler plan by the building Owner is adequate, while the 5-year certification is being processed by the property Owner. Item #6 Fire Extinguishers- Response -Fire Extinguishers are currently located in visible ar d unobstructed locations within the building main floor as necessary. ~.. ,: ® Mountain of Fire and Miracles Ministries 11501 Dublin Blvd. Suite 202 -Dublin CA 94568 (925) 551-3714 Item #7 FD Building Key Box Response - A Knox box is already installed in front of the buildvig entrance Once again, we have addressed the all The City of Dublin's raised issues along with the Alameda Fire Department comments. We strongly believe that most ofd these questions are life safety requirement that's applicable for an occupancy load of +49, whi~;h is not applicable to our group as of this time. We therefore look forward to your favorable review and issuance of the permit to operate a Church at the above referenced address. Should you have any questions regarding these submitted documents, please contact me on my cell phone @ 925/719-0805 cc: Mr. S.O Adeyemi Mr. Kevin Ring (Ring Properties) Permit File (City of Dublin) ~IS i ~~„ ~, ;~ ~ ~~p~y19 y/1 v~~~~.~.t~~,t._..: 1~'^`.`.~ ; v' ' ~\ aV' G'Y1.!~- -l, ~ (~7"~ ~? ~i ~` "= c,: ~ ~ I.. Q~I'?1.. ~~ ~~ ~...) . For Pastor Yemi Adeyemi Mountain of Fire and Miracles 510.396.1922 VICINITY MAP rrrs ~ ~~ ~' ,~ _.._ -. ~i ~1~i~C ~r n+ o g~ t BUILDING DATA ~,a.~,~. m.a~ aaewa moi uecvnicLCm uncrm uv.crn NLCSBL CQW1gL',Tp~iMS i1R N19GM1Lib¢iR1A M1~1111 ~L.OCIZ PLI.~I~ 'is=~b" ~EC~IVE~ ~ .. ~ ~ ~i ~ -- _-AFB U ;; 2008 ,~ _ J ~I~dF~OJE~ ~~iU~~H I I~YOL'I~ ~~n?~r! °~~~R~ ¢ r`h~,~i~ ~ll17E ?~ ~ 11501 DI~~iLfN t3LVl7 ~C~LII~.~.~ X_q I/~ ^ C L ~ f-'~ 1 Attachment 3 ~ tiea h. _ `~~ ~• ~N F S Ib /' G_-~ INTER5TATE 580 / ,. i I ~-- ~" ~• ~~ b ~` i . ~ ~~_ ,_ . /;, /~ ~~~- ~ ~~~~ . ~~ --- _~ _ --- - ~ r~ -- _. _I~~T~-r' S71_T~ - - ~ ~ I ~JN ~1>1Fl' I ~E~ ' L' --SU1ZEL~~ "~ li~i D IgLfF~'~tVD j2LC~1.l _r '~ 9~~+ -`~',~> .~ ,, ~~ ~`~. . ,