CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: November 8, 1993
SUBJECT:
Acceptance of Work - Contract 93-10, Street Slurry Seal
Report by: Public Works Director Lee Thompson
EXHIBITS ATTACHED:
None
RECOMMENDATION: ~AccePt improvements constructed under Contract 93-06
FINANCIAL STATEMENT:
BUDGET
ACTUAL COST
Slurry
Repair Bid (budgeted
in Operating Budget)
S 45,000.00
42.000.00
S 35,510.50
44.998.40
TOTAL (all gas tax)
S 87,000.00
S 80,508.90
NOTE: The cost of design and inspection is budgeted in the Engineering Operating
Budget as part of the General Engineering cost.
DESCRIPTION: On August 23, 1993, the city Council awarded Contract 93-10,
the Annual Slurry Seal Program, to American Asphalt Repair & Resurfacing Co., Inc..
Slurry seal is a preventive maintenance technique used to prolong the life of a
street. It consists of a sand/oil mixture which seals cracks and provides a new
uniform wearing surface. The City streets are presently on a seven-year cycle.
Before streets are seal coated, oil spots are removed and asphalt failures are
repaired.
Streets which were slurry sealed for this contract are as follows:
Rothschild Court
Champagne Place
Brittany Lane
Rolling Hills Drive
Longford Drive
Wicklow Lane
Edenberry Place
Sovereign Court
Newry Place
Rothschild Place
Martin Canyon Road
Seine Court
Ashford Way
Edenberry Street
Ardmore Place
Beverly Court
Glenoaks Way
Shamrock Place
Champagne Court
Brittany Drive (loop
s/o Rolling Hills)
Carlow Way
Wicklow Court
Bluebell Way
Beverly Lane
Briarwood Lane
Stagecoach Frontage Road
The City Engineer has reviewed the work on the project and determined that it is
complete and in accordance with the approved specifications. Stafr recommends that
the City Council accept the improvements under this contract as being complete.