Loading...
HomeMy WebLinkAboutItem 4.09 AdvertiseForBids 94-01 e e CITY OF DUBLIN AGENDA STATEMBNT city council Meeting Date: February 14, 1994 SUBJECT : Authorization to Solicit Bids - Village parkway Reconstruction, Contract No. 94-01 (Report by Public Works Director Lee Thompson) BXHIBITS: Plans and Specifications will be available at the meeting. RBCOMMIDIDATION: ~ Authorize staff to advertise for bids on this 1993-94 capital Improvement Project. FINANCIAL STATEMBNT: CONSTRUCTION BUDGET BY FUND BY BUDGET CATEGORY SB300 Measure B General Fund $ 33,602 100,598 202.000 CIP Budget Operating Budget $171,200 165.000 TOTAL $336,200 TOTAL $336,200 NOTE: An additional $28,800 has been budgeted from Measure B monies for design, inspection and project management in the CIP Budget. DBSCRIPTION: This year's Annual overlay Program consists of reconstructing Village parkway between Kimball Avenue and Amador Valley Blvd., both northbound and southbound lanes. In a normal overlay, failed areas are dug out and repaired and then pavement reinforcing fabric and 1 1/2 inches of asphalt paving are placed over the entire surface. Apparently, Alameda county performed at least two overlays on Village Parkway, which has resulted in a higher-than-usual crown. The street also needs extensive repair due to numerous failed asphalt areas which have reflected up through the previous overlays. Because of these existing conditions, the normal overlay process cannot effectively be used. Raising the crown another 1 1/2 inches as in a normal overlay would cause further drainage problems, and unrepaired deep asphalt failures would continue to deteriorate the surface. Therefore, Staff has prepared the contract to include the reconstruction of the road pavement by removing 4 inches of asphalt concrete from the outside lanes and a minimum of 6 inches from the center (crown) of the roadway. The entire surface will then be repaved with reinforcing fabric and 4 inches of asphalt, thereby lowering the crown a minimum of 2 inches. The project has been approved for grant funds from the State-Local Transportation Partnership Program (SB300 gas tax). The bid package has been set up for alternate bids as follows: 1) Reconstruction of Village Parkway from Amador Valley Blvd. to Kimball Avenue. (estimate $462,300) 2) Reconstruction of Village Parkway from Tamarack Drive to Kimball Avenue and the repair of failures between Amador Valley Blvd. and Tamarack Drive. (estimate $337,800) The bidding of alternates allows the City to easily reduce the scope of work if the bids come in over budget, or if the City Council elects to reduce the size of this project. - Notices will be sent out prior to the beginning of work in order to advise the businesses, churches, and Dublin High School of the approximate schedule of work. - - - - - - - - - - ITEM NO. g.9 COPIES TO: C/JO - 3S CITY CLERK FILE ~