HomeMy WebLinkAboutItem 4.03 Award of Bid 93-09 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 27, 1993 SUBJECT : Award of Bid - Dublin Swim Center Bathhouse Renovation, Contract 93-09 Report by Diane Lowart, Recreation Director EXHIBITS ATTACHED : 1 ) 2) RECOMMENDATION~'~: 2)1) FINANCIAL STATEMENT : Resolution of Award Summary of Bids Adopt resolution awarding bid to Skyline Construction Authorize Mayor to execute Agreement Construction Budget Community Development Block Grant $ 65,700 Park Dedication In-Lieu Fund $ 26,300 Total Construction Budget $ 92,000 Low Bid Base Bid $ 51,160 Alternate A - Resilient Flooring $ 14,340 Alternate B - Interior Painting $ 13,640 Alternate C - office Enclosure $ 4,280 Alternate D - Replace Plywood at Roof with Shingles $ 4,100 Total Low Bid $ 87,520 DESCRIPTION : At the August 9, 1993 meeting of the Dublin City Council, the Council Authorized Staff to advertise for bids for Contract No. 93-09, Dublin Swim Center Bathhouse Renovation. The proposed project as approved by the Council addresses modifications to the building which are required under the Americans with Disabilities Act (ADA). This includes renovation of the restrooms, showers, changing areas and entrances/exits to the building. Additional work includes floor resurfacing, construction of an additional office, interior painting and roof repairs. As directed by Staff, the Architect incorporated several alternates in the proposed bid so that if the bid was over the amount budgeted, the city Council could delete certain items. These bid items are as follows: Alternate A - Installation of resilient floor surfacing. Alternate B - Repainting of interior walls and ceiling. Alternate C - Construction of an additional office enclosure. Alternate D - Replacement of exposed plywood at roof with shingles. The city received a total of eight (8) bids for the project (see attached bid summary). The low bidder was Skyline Construction with a base bid of $51,160 and alternate bids as detailed on the bid summary, for a grand total of $87,520. Although the low bid of $87,520 is within the construction budget of $92,000, a 10% contingency for change orders is typically allowed for public works projects. If the project were to incur change orders totaling 10% of the bid, the project would exceed the construction budget by approximately $4,272. It is, however, possible to delete bid items once construction is started. Staff has reviewed the low bidder's proposal and recommends that the city Council (1) award the bid, including alternates, to the low bidder, Skyline Construction; (2) direct Staff to notify the bidder to delay starting work on Alternate D (replacement of exposed plywood at roof with shingles) as this alternate may be deleted from the contract if change orders for the balance of construction exceed the construction budget; (3) adopt the attached resolution awarding the bid; and (4) authorize the Mayor to execute the agreement. ITEM NO. ~ COPIES TO: Bidders RESOLUTION NO. - 93 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 93-09 DUBLIN SWIM CENTER BATHHOUSE RENOVATION TO SKYLINE CONSTRUCTION WHEREAS, the city of Dublin did, on September 14, 1993, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 93709 authorized by t~e.City Council on August 9, 1993, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted the to city Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the city Council of the City of Dublin does hereby award City of Dublin Contract 93-09 to the lowest responsible bidder therefor, to wit Skyline Construction, at a base bid of $51,160, and alternate items as follows: Alternate A: $14,340 Alternate B: $13,640 Alternate C: $ 4,280 Alternate D: $ 4,100 the particulars of Engineer. PASSED, which bid are on file in the office of the city APPROVED, AND ADOPTED this 27th day of September, 1993. AYES: NOES: ATTEST: Mayor city Clerk SWIH CENTER BATHHOUSE RENOVATION, CONTRACT 93-09 ENGR~S ESTIMATE ITEM UNIT TOTAL N°. DESCRIPTION MEAS OTY PRICE 1. CONCRETE LS 1 $ 2,300.00 2. ROUGH CARPENTRY LS I 1,900.00 3. FINISE CARPENTRY LS 1 9,100.00 4. DOORS, THRESHOLDS, NDWR LS I 2,600.00 ' 5. TILE LS I 3,200.00 6. LATH & PLASTER LS 1 300.00 7. RESTROOM ACCESSORIES LS 1 200.00 8. CABINETRY LS 1 1,000.00 9. ROUGH PLUMBING LS 1 3,800.00 10. FINISE PLUMBING LS I 16,300.00 11. CLEAN UP/TRASH REMOVAL LS 1 500.00 12. DEMOLITION LS 1 2,000.00 13. PAINTING LS i 2.000.00 SUBTOTAL $45,200.00 SKYLINE CONSTRUCTION pRIMECON RGM TOTAL TOTAL TOTAL PRICE PRICE PRIC~ $ 2,180.00 $ 4,752.00 $ 2,700.00 2,900.00 4,243.00 10,200.00 1,770.00 2,870.00 700.00 2,320.00 1,338.00 2,700.00 12,510.00 13,942.00 15,500.00 200.00 760.00 0.00 4,030.00 1,200.00 5,600.00 1,540.00 1,560.00 2,500.00 12,370.00 13,194.00 14,800.08 4,500.00 4,800.00 6,100.00 500.00 730.00 6,600.00 3,530.00 1,980.00 7,400.00 2.810.00 660.00 4,000~00 $51,160.00 $52,029.00* $78,800.00* GENERAL BLDG SVCS TOTAL PRICE 6,452.00 6,888.00 4,243.00 12,245.00 3,045.00 8,463.00 3,833.00 8,650.00 8,650.00 525.00 7,122.00 $ 80,892.00 14,340.00 19,440.00 14,000.00 18,254.00 13,640.00 9,000.00 21,400.00 18,134.00 4,280.00 5,004.00 8,900.00 7,062.00 4.100.00 $.400.00 6.980.00 ~.000.00 871520.00 $ 901873.00' $ 1~9~600-00' $ t42~342~00 *AMOUNT ADJUSTED DUE TO ADDITION ERROR FLOORING ITEM UNIT TOTAL H0. DESCRIPTION MEAS OT¥ PRICE 1. CONCRETE LS I $ 9,000.00 2. ROUGH CARPENTRY LS 1 13,000.00 3. FINISH CARPENTRY LS i 7,500.00 4. DOORS, THRESHOLDS, HDWR LS 1 2,900.00 5. TILE LS I 7,000.80 6. LATH & PLASTER LS i 4,000.00 7, RESTROOM ACCESSORIES LS I 3,000.00 8. CABINETRY L~ i 4,000.00 9. ROUGH PLUMBING LS i 11,000.00 10. FINISE PLUMBING LS i 4,000.00 ' 11. CLEAN DP/TRASH REMOVAL LS i 6,900.00 12. DEMOLITION LS i 10,900.00 13. PAINTING LS i 2.500.00 SUBTOTAL $84,900.00 CARL R. T.J.LYNCH PACIFIC 16,400.00 21,120.00 23,800.80 8,000.00 24,227.00 4,800.00 4,000.00 6,631.00 12,770.00