HomeMy WebLinkAboutReso 069-84 TentMap5131Barratt RESOLUTION NO. 69-84
A RESOLUTION OF THE [CITY COUNCIL OF THE CITY OF DUBLIN
APPROVING TENTATIVE MAP 5131 CONCERNING
PA 82-033 BARRATT SAN JOSE
WHEREAS, the State of California Subdivision Map
Act and the adopted City of Dublin Subdivision Regulations
require that no real property may be divided into two or more
parcels for the purpose of sale, lease or financing unless a
tentative map is acted upon and a final map is approved
consistent with the Subdivision Map Act and City of Dublin
subdivision regulations; and,
WHEREAS, the Planning Commission did review and approve
the Tentative Map #5131 at a public hearing on February 6, 1984;
and,
WHEREAS, the Tentative'Map for Tract 5131 was appealed
to the City Council who heard the appeal on May 23, 1983; and
WHEREAS, the City Council continued review of the
Tentative Map until after the San Ramon Road Specific Plan, as it
applied to the subject site, was adopted and the site was rezoned
accordingly; and
WHEREAS, the City Council rezoned the subject property
Planned Development (PD) for 84 residential units on April 23,
1984; and
WHEREAS, pursuant to State and City environmental
regulations, a Negative Declaration has been prepared for the
proposed associated rezoning and tentative map and the City
Council has reviewed and considered the information in the
Negative Declaration;
NOW THEREFORE, be it resolved that the City Council
finds:
1. Tentative Map ~5131 is consistent with the intent of
applicable subdivision regulations and City Zoning and related
ordinances.
2. The City of Dublin is in the process of preparing and
adopting a general plan.
3. There is a reasonable probability that ~the proposed
Tentative Map will be c~nsistent with the future general plan.
4. There is little or no probability that the Tentative
Map will be a detriment to, or interfere with the future general
plan, should the related Planned Development rezoning ultimately
be inconsistent with the future general plan.
5. The Tentative Map will not have a significant
environmental impact.
6. The Tentative Map will not have substantial adverse
effects on health or safety or be substantially detrimental to
the public welfare, or be injurious to property or public
improvements.
7. The site is physically suitable for the proposed
development in that the site is indicated to be geologically
satisfactory for the type of development proposed in locations as
shown, provided geological consultants' recommendations are
followed; and the site is in a good location regarding public
services and facilities.
8. The site is physically suitable for the proposed
density of development in that the design and improvements are
consistent with those of similar existing residential
developments which have proven to be satisfactory.
9. This project will not cause serious public health
problems in that all necessary utilities are or will be required
to be available and Zoning, Building, and Plumbing Ordinances
control the type of development and the operation of the uses to
prevent health problems after development.
NOW, THEREFORE, be it resolved that Tentative Map ~5131
is an integral part of the Planned Development zoning of the
subject property; and
BE IT FURTHER RESOLVED that the City Council approves
Tentative Map #5131 subject to the conditions listed below:
Conditions of Approval for Tentative Map ~5131 as recommended by
the City Engineer:
1. Prior to filing the Final Map, or grading approval being
given, the City-owned property shown within the proposed project
shall be acquired from the City.
2. Site Development Review approval shall be gained from the
City prior to filing the Final Map. Any modification of the
project design approved by the Site Development Review shall
supercede design on Tentative Map #5131 and shall be considered
as an approved modification of the Tentative Map.
3. As part of the submittal for subdivision improvement plan,
grading plan and Final Map, the developer's engineer shall field
survey Martin Canyon Creek and perform hydrologic calculations
indicating the capacity of the Creek. Should the Creek not handle
the 100-year storm flow, improvements shall be designed so that
this capacity is met, with an effort to maintain the natural
appearance of the Creek. In addition, finished floor elevations
of the units along the Creek shall be set so that if the Creek
becomes blocked, the storm waters will flow onto San Ramon Road
before water would enter the residential units.
4. The following Creek setbacks shall be adhered to:
a. For existing banks of 2:1 slope (horizontal over
vertical) or steeper, the setback is established by drawing a
line at 2:1 slope from the toe of the existing bank to a
point where it intercepts the ground surface and then adding
20 feet.
b. Where the existing bank is 2:1 or flatter, the setback
shall be 20 feet from the top of the bank.
The following information shall be provided to determine an
adequate setback from the creek and for the required hydrologic
calculations:
a. The precise location, both horizontal and vertical, of the
Creek centerline and toes and tops of both sides of the
creek.
b. Cross sections of the Creek at intervals acceptable to
the City. Sections at 100' intervals are typical; more
frequent sections'may be required.
5. Grading and drainage shall be designed so as not to block and
to accept drainage overflow from the south end of the adjacent
Silvertree subdivision.
6. An erosion and sediment control plan shall be required as part
of the grading plan submittal.
7. The habitable building set back shall be 25 feet from the
fault zone based upon geologic studies conducted by Berlogar, Long
and Associates, Jan. 28, 1983, and March 4, 1983. Garages shall
be located at least 6 feet outside of the fault zone and be
constructed on "floating slab" foundations heavily reinforced
and/or prestressed, or utilize other appropriate construction
techniques as acceptable to the Building Inspection Department and
the City's Consultant Geologist.
8. Underground utilities shall be designed so as to minimize
crossings of the fault, stay out of the area within 25 feet either
side of the fault, and where practical, provide flexible conduits
and joints for underground utilities in the fault zone as
acceptable to the City Engineer and the Dublin San Ramon Service
District.
9. Based on the major traffic impact on the Silvergate Drive leg
of the Silvergate Drive/San Ramon Road intersection, the developer
be required to pay 1/4 the cost of a future traffic signal at that
intersection ($25,000). A bond shall be established with the
City, prior to filing of the Final Map, to cover the expected
improvement and design costs.
10. The following acoustical treatments shall be followed to
mitigate the potential noise impacts. Units within 80 feet of the
eastern property line shall have:
a) doors and windows with a sound transmission (STC)
rating of 30 or higher in all walls facing or siding
to San Ramon Road.
b) wall construction to assure that interior noise
level will not exceed 45 dba with an expected
traffic volumn along San Ramon Road of 40,000 ADT
c) mechanical air conditioning in living and sleeping
rooms.
11. The private roadway entrance to the project on Silvergate
shall be directly opposite Dublin Green Drive. The entrance off
of San Ramon Road shall be designed to be acceptable to the City
Engineer and City Traffic Engineer.
12. Sidewalk shall be completed along the Silvergate frontage.
13. The developer shall be responsible for the following frontage
improvements along San Ramon Road:
a. One lane of traffic and 8 feet of shoulder (20 feet
pavement) or equivalent.
b. Curb gutter and a 6 foot sidewalk.
c. Replacement of the bike path where necessary for ultimate
improvements.
d. Necessary drainage improvements.
e. Related signing and striping.
f. Street lights on one side of street.
14. The developer's engineer shall develop the expected truck
length and turning radius criteria to use the private streets
(delivery, garbage moving trucks, etc.) and design the curb radius
accordingly and submit this data and design criteria with the
improvement plans.
15. Wheel stops within the project shall be the curb at the end
of the parking stalls wherever possible. Where freestanding wheel
stops are necessary, concrete stops shall be used.
16. On-site circulation shall be constructed to private vehicle
accessway standards as acceptable to the City Engineer and include
street lighting.
17. Prior to final preparation of the subgrade and placement of
base materials, all underground utility mains shall be installed
and service connections stubbed out beyond curb lines. Public
utilities and sanitary sewers shall be installed in a manner which
will not disturb the street pavement, curb, and gutter when future
service connections or extensions are made.
18. Prior to filing the Final Map, precise plans and
specifications for street improvements, grading, drainage
(including size, type and location of drainage facilities both on-
and off-site) and erosion and sedimentation control shall be
subject to the approval of the City Engineer.
19. Where soil or geologic conditions encountered in grading
operations are different from that anticipated in the soil and
geologic investigation report, or where such conditions warrant
changes to the recommendations contained in the original soil
investigation, a revised soil or geologic report shall be
submitted for approval and shall be accompanied by an engineering
and geological opinion as to the safety of the site from hazards
of erosion, settlement and seismic activity.
20. The subdivider shall furnish and install street name signs,
bearing such names as are approved by the Planning Director, and
traffic safety signs in accordance with the standards of the City
of Dublin.
21. Roof drains shall empty onto paved areas, concrete swales,
other approved dissipating devices, or tied into the storm drain
system.
22. Dust control measures, as approved by the City Engineer,
shall be followed at all times during grading and construction
operations.
23. Construction and grading operations shall be limited to
weekdays (Monday through Friday) and the hours from 7:30 a.m. to
6:00 p.m., except as approved in writing by the City Engineer.
24. Developer shall keep adjoining public streets and driveways
free and clean of project dirt, mud, materials and debris and
clean up shall be made during the construction period, as
determined by the City Engineer.
25. Prior to issuance of Building Permits:
a) Grading must conform with the recommendations of the
soils engineer to the satisfaction of the City Engineer.
A declaration by the soils engineer that he has
supervised grading and that such conformance has
occurred shall be submitted.
b) The following shall have been submitted to the City
Engineer:
1) An as-built grading plan prepared by a registered
Civil Engineer, including original ground surface
elevations, as-graded ground surface elevations, lot
drainage, and locations of all surface and subsurface
drainage facilities.
2) A comPlete record, including location and
elevation of all field density tests, and a summary
of all field and laboratory tests.
3) A declaration by the Project Civil Engineer and
Project Geologist that all work was done in
accordance with the recommendations contained in the
soil and geologic investigation reports and the
approved plans and specifications.
26. Prior to any grading of the site, and in any case prior to
filing a Final Map, a detailed construction grading plan
(including phasing), drainage, water quality, erosion and
sedimentation control plans for construction and the post-
construction period shall be prepared by the Project Civil
Engineer and/or Engineering Geologist, and shall be approved by
the City Engineer. Performance guarantees related to these plans
shall be provided to the City as required by the City Engineer.
Said plans shall include detailed design, location, and
maintenance criteria of all erosion and sediment control measures.
The plans shall attempt to insure that no increase in sediment or
pollutants from the site will occur. The plan shall provide for
long-term maintenance of all permanent erosion and sediment
control measures such as creek slope vegetation. All erosion and
sediment control measures shall be maintained by the developer
until responsibility is turned over to the project Homeowners'
Association at the time the City accepts final improvements and
releases the performance guarantee as required by the City
Engineer.
27. Grading shall be completed in compliance with the
construction grading plans and recommendations of the Project
Soils Engineer and/or Engineering Geologist, and the approved
erosion and sedimentation control plan, and shall be done under
the supervision of the Project Soils Engineer and/or Engineering
Geologist. Inspections that will satisfy final subdivision map
requirements shall be arranged with the City Engineer if grading
is undertaken prior to filing the Final Map.
28. If grading is commenced prior to filing the Final Map, a
surety or guarantee, as determined suitable by the City Engineer
shall be filed with the City of Dublin to insure restoration of
the site to a stable and erosion resistant state if the project is
terminated prematurely.
29. Maintenance of common areas including ornamental landscaping,
graded slopes, erosion control plantings and drainage, erosion and
sediment control improvements, shall be the responsibility of the
developer during construction stages and until final improvements
are accepted by the City and the performance guarantee required
under Condition 26 is released; thereafter, maintenance shall be
the reponsibility of a Homeowners' Association which automatically
collects maintenance assessments from each owner and makes the
assessments a personal obligation of each owner and a lien against
the assessed property.
30. The subdivider shall grade the tract, install landscaping,
soil erosion, sedimentation and drainage control measures, and
improve all streets and easements, as shown or indicated on
Exhibit A and these conditions. Performance bonds shall be
provided to the satisfaction of the City Engineer that are of
sufficient value to assure complete installation of said
improvements.
31. Measures shall be taken to contain all trash, construction
debris, and materials on site until disposal off-site can be
arranged. Subdivider shall be responsible for corrective measures
at no expense to the City.
32. Install fire hydrants at the locations approved by the Dublin
San Ramon Services District in accordance with present standards.
Provide raised blue reflectorized pavement markers in private
vehicle accessways at each fire hydrant.
33. If during construction, archaeological remains are
encountered, construction in the vicinity shall be halted, an
archaeologist consulted, and the Planning Department notified.
If, in the opinion of the archaeologist, the remains are
significant, measures, as may be required by the Planning
Director, shall be taken to protect them.
34. Parkland dedication fees shall be paid as determined by the
City Engineer in accordance with City Subdivision regulations.
For in lieu fee calculation purposes the preliminary park
dedication land required is 29,678 sq. ft. Final calculations
shall be made at the time of approval of the Final Map.
35. Sidewalks shall be installed to assure that pedestrians can
walk within the project without having to walk down the private
vehicle accessways, as acceptable to the City Engineer.
36. Copies of the Final Map and improvement plans, indicating all
lots, streets, and drainage facilities within the subdivision
shall be submitted to the City Engineer, at 1"= 400 ft. scale, and
1"- 200 ft. scale for City mapping purposes.
37. The minimum distance between the San Ramon Road curb line and
the Arbor Creek property lines and fences shall be 22 feet.
38. Phasing plans shall be submitted as part of the Site
Development Review application. They shall indicate how roads,
drains, grades and the like will be installed and how they will
function if installed incrementally.
39. The project is responsible for the design, installation and
maintenance of all landscape and related improvements, that are
approved by the City Council as part of the Site Development
Review approval, between San Ramon Road curbing and the projects
property line.
40. Comply with all conditions of City Council Resolution 27-84
regarding the Planned Development Rezoning. The public access
easement called for in Condition l(f) of Resolution 27-84 shall be
shown on the Final Map.
PASSED, APPROVED AND ADOPTED this 23rd day of July, 1984.
AYES: Councilmembers: Hegarty, Jeffery, Moffatt,
Vonheeder and Mayor Snyder
NOES: None
ABSENT:None ~.~.
ATTEST:
~-' ' City