HomeMy WebLinkAbout1.1 Attmt 4 PC Study Session Staff Rept 10-14-2008 w/out attmtsAGENDA STATEMENT
PLANNING COMMISSION MEETING DATE : October 14, 2008
SUBJECT: STUDY SESSION: PA 08-006,, Che Promenade at Dublin Ranch -
Site Development Review and Conditional Use Permits for a
fitness center, outdoor restaurant seating, and shared parking at
the northeast corner of Graft Dn Street and Dublin Blvd, also
known as Parcel s of Tentative Parcel Map 9717.
Report Prepared by Mike Porto, Consulting Planner
ATTACHMENTS: 1) Applicant's Proposal/Design Pack age
RECOMMEN N 1) Receive Staff presentation and prr,vide direction.
PROJECT DES PTION:
The Promenade is the commercial component, or 22-acre Villc.ge Center area, comprised of six
development parcels within Area G of the Eastern Dublin Specific P fan approved as a part of the Dublin
Ranch Master Plan. Area G covers approximately 86.9 acres aild identifies 13 development sites,
including the six Village Center parcels. The Dublin Ranch Maste r Plan is located within the Eastern
Dublin Specific Plan and'is subject to the goals, objectives, policies, procedures, and programs of that
plan. The proposed project is located on proposed Parcel 5 for Parcel Map 9717, a 3.72-acre site which
represents the first phase of the area commonly known as The Promenade.
Location
Generally Area G is bounded by Central
Parkway on the north, Keegan Street on the
east, Dublin Boulevard on the south, and
Brannigan Street on the west. The development
sites for Medium High and High Density
Residential uses along the easterly and westerly
segments of Area G have already been
developed. The Village Center, or The
Promenade, is proposed to be developed along
both sides of Grafton Street, the north-south
connection which bisects Area G between
Dublin Boulevard and Central Parkway and will
serve as the local Main Street for the
surrounding neighborhoods in Eastern Dublin.
The proposed project on Parcel 5 represents the
gateway to The Promenade at the northeast
corner of Grafton Street and Dublin Blvd.
DOPLIN
P! BASAIVMV
Map 1: Vicinity Map
COPIES TO: The Applicant
The Property Owner
Page 1 of 8
G:IPAHIdOWPA 08-M Club Sport PromenadelPCSR Sh*Sesson.doc
ITEM NO.
Attachment 4
Parcel 5 is located north of Dublin Boulevard, south of Finnian Way, east of Grafton Street, and west of
Dublin Ranch residential Site H2 within Area G currently developing as The Terraces, a residential
townhouse project.
w
f
X41, THE MOM NAD£
AREA G
GKAFms-rATION
w A!!#AH PROJE C 1 SITE
l
F.ristirrg Use MAP 2: Project Site
The x.72 acre project site is currently vacant and generally flat with a slight slope (1% average) from the
northwest to the southeast. There are no trees on site, and to date, some preliminary grading has occurred
to return the site to its original topographic condition. Recently Toll Brothers has used a portion of this
site for their Master Sales Facility, which has been removed. Much of'tlie Village Center area, including
Parcel 5, was being used for the staging and storage of materials and equipment for the many construction
projects currently in progress. These uses have all been eliminated and the site is now vacant.
Surrounding Uses
The project site is bounded: a) to the north by Parcel 2 of the Promenade which currently is vacant
property approved for Neighborhood Commercial uses; b) to the east by a multi-use trail system
separating the project site from the high-density residential Site developed as The Terraces, a residential
townhouse project; c) to the south across Dublin Boulevard by vacant property designated for Campus
Office Development; and d) to the southwest (across Dublin Blvd. at Grafton Street) by the Grafton
Station development site, which is currently under construction.
Background/Previous Approvals
In March of'2000, Areas F, G and H were subject to Stage 1 and Stage 2 Planned Development Rezoning
approved by Ordinance 06-00 (approved March 21, 2000). The PD zoning district was adopted as PD-
Village Center for Parcels l through 6 with the intent and purpose of creating a pedestrian-oriented
service, retail, commercial, and entertainment center serving the daily needs of the surrounding residential
neighborhoods and intermittent shopping, service, and entertainment opportunities for a wider community
base.
Page 2 of 8
Objectives of the Project
The Promenade is proposed to serve as the centerpiece for the com nercial area of Dublin Ranch. The
concept of the Village Center land use and zoning is to create a Ma: n Street within Dublin Ranch along
the north side of Dublin Boulevard. The objective is to create a pedestrian-friendly commercial area with
a small town character adjacent to high-density residential neighborhoods. The incorporation of retail,
office, and fitness/recreation uses will create opportunities for the rt sidents, and enhance the balance of
jobs and housing, as well as reduce or even eliminate vehicle trips ar.d traffic congestion due to the close
proximity of residential units.
PROPOSAL:
Proposed Uses
There are three structures proposed for the project including:
• ClubSport Athletic Club and Spa - Two-story building c f approximately 47,669 square feet
anchoring the southwest corner of the site at the intersection of Dublin Boulevard and Grafton
Street. This full-service private fitness center, spa, and recre: ttion facility would include a fitness
area (weight room and specialized workout areas) group (:xercise rooms, pool, spa, aerobics
rooms, spa treatment rooms, offices, locker rooms, and a caf % Administrative offices and a child
care area are also included.
The entrance to the building is
located off of an internal
pedestrian paseo that connects
Grafton Street with a multi-use
regional trail that runs along the
easterly boundary of the project
site. Entrance access is also
available from Grafton Street
which connects to the main lobby,
day spa and workout area on the
first floor. The fitness rooms and
associated facilities are located on
the second floor. The ClubSport
Cafe will be located on the ground
floor of the building along the
paseo in the section closest to
Grafton Street. The cafe will serve
as the focal social area and will be
open to the public, as well as to
club members. An outdoor dining
area is proposed as a part of the
cafe. The pool and deck are
situated in an interior courtyard at
a THf. r'R? W,,A'E -- rAgM 2
Y JAOE C?NrV
1: ..
t
F JNUW WAY
.
r
f ? r
P
L m
m
~ r- !
- o '
_. ------
the southerly portion of the facility
closest to Dublin Boulevard, and will Man .S: Froiect Site
include a lap pool, Jacuzzi, and deck space.
ClubSport would have up to 85 permanent staff members with a maximum of 35 individuals
working on the premises during any given shift. ClubSport would be open from 5:00 am to 11:00
pm Monday through Friday and from 6:00 am to 10:00 pm on weekends.
Page 3 of 8
• Mercantile Building - A three-story building of approximately 52,716 square feet would be
located at the northwest corner of the site facing Grafton Street south of Finnian Way. Retail and
restaurant uses are proposed for the ground floor totaling 18,000 square feet. The restaurant uses
are proposed at a maximum of 7,190 square feet of the 18.000 square feet near the corner of
Grafton Street and Finnian Way. Office space would occupy the second and third floors. The
hours and days of operation for the proposed retail uses cannot be determined at this time.
However, the office uses typically would be open from 8:00 am to 6:00 pm. The Applicant
anticipates that the hours and days of operation for The Promenade will be similar to uses in the
City of Dublin of comparable size and type.
• Parking Structure - The project provides for 477 spaces which includes on site spaces as well as
curbside parking along Grafton Street and Finnian Way. A four-level parking structure is located
in the northeast portion of the project site which includes 407 parking spaces and is accessed from
the surface parking lot area along the easterly side of the site. A 21-foot wide service alley
separates the parking structure from the Mercantile building. Access to this service corridor
would be through gates at each end and through the rear doors of the individual spaces in the
Mercantile building. !There is no pedestrian access from the parking structure to the service yard
in addition to the parking structure. A surface parking lot of 55 spaces is located along the
easterly property. There are also 15 on-street spaces on Grafton Street along the Project Frontage.
A Shared Parking study, dated September 3, 2008 was conducted by TJKM for ClubSport. The
study concluded that the parking provided would be sufficient to serve peak parking demand tor
the proposed mix of uses.
TABLE 1: PARKING
GARAGE S1JRFACT S'I'RED ! TOTAL
LEVEL 1 -
Standard Parking Spaces 94 5 3 15
Handicap Parkin Spaces -
- --
-
TOTAL f-
- 55 15 171
_
-
LEVEL 2 & 3
Spaces
Standard Park n
_
Parking Spaces
Handicap
-
TOTAL, 204 ! 204
LEVEL 4
Standard Parking Spaces 100
i
I landicap Parking Spaces '
TOTAL --
102 --
102
TOTAL PROVIDED SPACES 407 55 15 477
Conditional Use Permits
• Fitness Center - Based on the PD-Village Center zoning adopted with permitted and conditional
uses. private recreational facilities (both indoor and outdoor) are classified as a conditional use
requiring a Conditional Use Permit (CUP). Therefore the C1ubSport facility requires the
authorization of a CUP.
• Outdoor Seating - As part of the main street character, outdoor seating in the style of a sidewalk
cafe has been requested for the ClubSport Cafe along the paseo between the two buildings and for
the restaurant uses anticipated for the ground floor of the Mercantile Building along Grafton
Street. Dining areas are proposed to be partitioned with railings, hardscape, and potted plants that
will not interfere with pedestrian traffic.
Page 4of9
• Shared Parking - Reductions for shared parking are allowed by CUP according to Chapter 8.76
F. of the Zoning Ordinance. The shared parking study 1 or the proposed project by TJKM
concluded that the 477 spaces would satisfy sufficient peak h4 iur parking demand for the proposed
mix of uses.
All 3 of these activities require authorization of a CUP. The CUP findings will be a part of the Staff
Report for the Public Hearing at a future date.
Design Standards
The proposed project is consistent with the Stage 1 and 2 PD aF proved March 21, 2000. The Site
Development Review includes: site plan, architectural design, landscape plan, and streetscape
improvements. In accordance with the Design Standards, the buildings are sited; 1) close to the street,
and 2) include facades with architectural offsets. The circulation is pedestrian-friendly by featuring
paseos with the buildings oriented towards Grafton Street designed as the "main street." A mid-block
crossing and gateway entry plazas have also been incorporated in t ?e design. Parking is located at the
rear (easterly design of the site) so as not to disrupt the continuity of the streetscape. While the site is
currently visible from I-580 the ultimate view will be blocked by t irafton Station (project to the south
currently under construction). The project is not within a scenic corridor or designated view zone.
Subject to approval of the requested Conditional Use Permits for the Fitness Center, outdoor seating and
shared parking, the proposed project is consistent and compatible with the zoning and designated land
use.
The description of architecture for the 3 proposed buildings is below:
Architecture
• C1ubSport Athletic Club and Spa - The two-story structure is designed to represent an old Main
Street developed over time, incorporating varied design details found in many of the older
communities in Central California. Detailing includes stone wainscot, decorative stone bands, and
decorative trim at the cornice level, as well as stone inset elements reminiscent of an older
structure. At the ground level, large retail display windows -.ddress pedestrians and articulate the
sidewalk. Awnings are set at multiple levels to create a can%y and provide color and shade. The
corner of the building is set in a radial pattern to face the primary streets, frame the pedestrian
plaza, and create a possible location for public art.
The south building elevation adjacent to Dublin Boulevard, which conceals the pool area, has been
a concern to Staff. We have been working with the Applicant and his architect to create a more
dynamic elevation. Various proposals were made to revise the Dublin Boulevard elevation to
eliminate the wood product (See "Architecture" Tab, page A.1 of Attachment 1). A revised
elevation was presented which will meet the Planning Commission's objectives of high quality
sustainable materials. Unfortunately, there was not enough t.me to have the architect revise their
submittal documents. The revised elevation incorporates a glass store front motif which proposes
opaque glass for a portion of the glazing to provide privac !, to the pool area and to screen an
interior access corridor. Shapes, shadows and movement will be visible creating interest and
activity. Production times did not allow the "revised" elevation to be incorporated into the
Applicant's submittal package; therefore, the revision vill be presented to the Planning
Commission at the Study Session.
• Mercantile Building - The architecture of this 3-story building is typical of the older mercantile
buildings found in urban centers throughout the country an-:l in smaller California towns. The
detailing is-similar to C1ubSport, utilizing stone wainscots at the building base, large expanses of
storefront glass, lower awnings to provide color and scale at !:he pedestrian level, and articulation
Page 5 of 8
of cornice detailing and vertical stone insets. Signage is proposed as a combination of storefront
signage and wall hanging signage that evokes an older style :uid quality. (See "Architecture" Tab,
page A.3 of Attachment 1).
• Parking Structure - The 4-level parking structure has been designed in the style of an old
warehouse that would be found adjacent to an urban core of older mercantile buildings. It has an
open style, but designed to minimize the visual impact of tie decks while still accentuating the
warehouse look and form. The structure is detailed to comp ement the C1ubSport and Mercantile
buildings with the inclusion of elements such as an upper trel: is/blind, and vertical stone accents to
carry the contemporary Central California theme. An old packing crate graphic would be added to
the side of the building facing Finnian Way to further enhance the old warehouse look and feel.
The larger expanses of wall have been color blocked and detailed with reveals and stone insets to
create an interesting visual effect and reduce the mass of the structure.
Visual sight lines to the parking areas and lighting from the adjacent 4-story residential project to
the east and the proposed Mercantile Building to the west will be mitigated through the proposed
trellis details on the sides of the structure. (See "Architecture' Tab, page A.4 of Attachment 1).
Development Standards
The proposed project complies with the development standards as d .-fined in the Stage II PD, relating to
the building height, setbacks, -and coverage.
Access and Circulation
Access to the project site is taken from a driveway off of Dublin Bculevard which leads into the surface
parking lot. This lot also has driveway access through to Finnian W, y. Access to the parking structure is
from the surface parking lot. A pedestrian paseo traverses the si to connecting Grafton Street to the
north/south multi-use trail. A systemwide multi-use trail runs along the easterly boundary of the project
site connecting Dublin Boulevard with the multi-use trail along Finnan Way along the northerly
boundary. All streets and traffic iml-)rovement adjacent to the site wi 11 be completed as part of the overall
project.
Landscape/Streetscape
The project site has been designed to complement the Grafton ;.station retail project located to the
southwest utilizing similar materials in various patterns while providing for an upscale, yet traditional,
street scene. Similar plant materials are proposed for continuity. C;)ncrete pavers in varied patterns are
used to highlight the architecture and contribute towards the street :;cene. Accent pavers in wide bands
across the sidewalk will link to accent pavers at the building edge. A 14-foot wide sidewalk, which is
wider than the 12 feet required by the Planned Development design ; ;tandards, helps to accommodate the
proposed outdoor dining.
The Design Guidelines establish the corners of Grafton Street at both Dublin Boulevard and Finnian Way
as main street plazas. A water feature is proposed at the corner of Grafton Street and Finnian Way in
front of the Mercantile Building which incorporates a seat wall/water basin, colored pavement, and accent
landscape materials. Pedestrian areas, paseos, and spaces adjacent to the multi-use trail will be equipped
with benches, bicycle racks, trash receptacles, lighting, bollards, and potted plant materials to allow for
resting, utility, and enhancement of the pedestrian scale. The paseo ? connecting Grafton Street and the
multi-use trail to the east has a dramatic water fountain as its focal p pint which can be seen from Grafton
Street and the multi-use trail. The paseo extends as a mid-block crossing of Grafton Street. The street
improvements are consistent and comply with the adopted street sections and design standards for the
Village Center, as well continuity from block to block adjacent to the project site. Street trees are located
in grates at the curb line while specimen plants are placed in uniquel;, designed pots at columns along the
building edge.
Page 6 of 8
Proposed Parking
The project provides for 477 spaces. This total includes 407 spaces in the proposed parking structure, 55
spaces on site in a surface lot along the easterly boundary of the projo-ct site, and 15 curbside spaces along
Grafton Street and Finnian Way. Based on the proposed occupanci;;s and uses within each building, the
required parking would be 530 spaces. A Shared Parking study da ed September 3, 2008 conducted by
TJKM for ClubSport concluded that peak parking demand at 6:00 pr i would be 452 spaces, and therefore
concluded that 477 spaces would be sufficient. As described in a previous section of this Staff Report, a
CUP would be required for shared parking.
Public Art
The proposed project is subject to the public art requirements of the City's Zoning Ordinance. The
proposed public art compliance plan (See "Public Art" Tab, page C.8, Attachment .1) shows possible
locations for public art at the corner of Dublin Boulevard and Grafton Street and on Grafton Street just
north of the mid-block crossing and paseo.
Environmental
Based on previous environmental documents, no environmental review is required as the project does not
create additional environmental impact.
RECOMMENDATION:
Staff recommends the Planning Commission receive Staff presentatic n and. provide direction.
Page 7 of 8
GENERAL INFORMATION:
PROPERTY OWNER: James Tong
Charter Properties
4690 Chabot Drive, Suit; 100
Pleasanton, CA 94588
APPLICANT: James Tong
Charter Properties
4690 Chabot Drive, Suit;; 100
Pleasanton, CA 94588
LOCATION: North of Dublin Boulevard, east area of Grafton Street, south
of Finnian Way and east :,f the H2 Residential neighborhood
APN: 985-0009-009-0,' .
EXISTING ZONING: PD-Village Center
GENERAL PLAN DESIGNATION &
EASTERN DUBLIN SPECIFIC PLAN: NC Neighborhood Commercial
PUBLIC NOTIFICATION:
In accordance with State law, a public notice was mailed to all properly owners and occupants within 300
feet of the proposed project to advertise the project and the upcoming public hearing. A public notice was
also published in the Tri-Valley Herald and posted at several location t: throughout the City.
Page 8 of 8