HomeMy WebLinkAbout4.07 Traffic Signal V PkwyCTTY CLERK # 0600-35
AG EN DA STATE M E NT
C'rTY COUNC'rL MEETTNG DATE: May 16~ 2000
SUBJECT:
Authorization to Solicit Bids - Contract No. 00-08,
Traffic Signals - Village Parkway at Tamarack Drive,
Brighton Drive and Davona Drive
Report Prepared by: Lee S. Thompson, Public Works Director
ATTACHMENTS:
Plans and Specifications will be available at the City Council
meeting
RECOMMENDATION~[~.~ Authorize Staff to advertise for bids.
FINANCIAL STATEMENT: Budgeted for this project:
Design/Inspection/Misc:
Improvements:
TOTAL:
FY 99-00
$ 51,000
$399,000
$450,000
The cost of this project will be paid from Transportation Equity Act for the 21st Century
(TEA 21) funds (210), Measure B funds (217) and Traffic Impact Fee funds (300).
DESCRIPTION: This project will install three traffic signals on Village Parkway at
Tamarack Drive, Brighton Drive and Davona Drive. The new traffic signals will be interconnected to the
other existing traffic signals on Village Parkway south of this project.
A traffic study was conducted in 1999 by TJKM, the City's traffic engineering consultant, which found
that these signals were warranted. To properly coordinate traffic flow, the consultant recommended that
all three signals be installed at the same time.
Staff recommends that the City Council authorize solicitation of bids for Contract No. 00-08, Traffic
Signals - Village Parkway at Tamarack Drive, Brighton Drive and Davona Drive.
COPIES TO:
gSmiscproj\VPW~agstauth
ITEM NO.