Loading...
HomeMy WebLinkAboutItem 4.04 Accept Work 96-08CITY CLERK File # [~J-~[~J~ J-L-~J~--1 AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 2, 1997 SUBJECT: Acceptance of Work- Contract 96-08 Mape Memorial Park Renovation Project Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: Budget Change Form RECOMMENDATION: Accept improvements under Contract 96-08; authorize payment of $720.00 to Valley Crest Landscape, Inc. for their final invoice and release retention in the amount of $41,340.11 after 35 days if there are no subcontractor claims. 2) Approve Budget Change Form. FINANCIAL STATEMENT: .-Total Project Budget .............................................................................................................. $ 465,575.00 .ctual Costs of the Project by Fund. Contract Actual Costs Items Design Improvement Inspection Miscellaneous Total General Fund $ 16,988.31 $ $ $ 11.69 $ 17,000.00 CDBG Fund $ $ 68,474.OO $ $ $ 68,474.00 Park Dedication Fund $ 11,526.69 $ 335,923.16 $ 14,068.64 $ 9,207.68 $ 370,726.17 Measure 'D' Fund $ $ 12,655.00 $ $ $ 12,655.00 Total $ 28,515.00 $ 417,052.16 $ 14,068.64 $ 9,219.37 $ 468,855.17 The total project costs exceeded the budget by $3,280.17, however the costs for this fiscal year exceeded the fiscal budget by $6,672.90. Increase in costs for this year is due to the carry over costs from the 1996- 97 fiscal year. The previous year's costs were less than budgeted and that difference carried over to this fiscal year. New appropriations from Park Land Dedication Funds are required to match the budget for this fiscal year. DESCRIPTION: On November 4, 1996, the City Council awarded the Mape Memorial Park Renovation Contract to Valley Crest Landscape, Incorporated. This project renovated the existing park landscaping and upgraded play facilities. COPIES TO: Valley Crest Landscape, Inc. ITEM NO. 4_~ g:\ratncproj\mape\agstacpt As approved for bid in September of 1996, this project implemented the following improvements: 1) Separate younger and older play areas with handicapped accessible equipment and surfacing; 2) Installetl~ new park furniture including benches, trash receptacles and picnic tables; 3) Constructed two small picnic areas; 4) Constructed a concrete walkway encircling'the park; 5) Upgraded park lighting; 6) Constructed a sand volleyball court; 7) Constructed restroom building; 8) Enhanced shrub and tree planting. The original contract included an optional pedestrian bridge as a part of the bid. This option was taken out due to fmancial limitations of the project, however, bridge construction is slated for fiscal year '97/'98. Ail work has been completed as per City plans and specifications. Staffrecommends Council accept improvements under contract 96-08 and authorize payment to Valley Crest Landscape, Inc. CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): X From Unappropriated Reserves From New Revenues Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: I Name: In-Lieu Parkland Dedication Fund $ 6,672.90 Account#: Account#: 9576-750-050 Fund 215 Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Signature Date: REASON FOR BUDGET CHANGE ENTRY: The total project is overbudget by $3,280.17 and the expenditures in 1996-97 were $3,392.73 below budget, resulting in an equal amount of unbudgeted expenditures in 1997-98. Mayor: Posted By: g:miscprojlmapelbudgchng Signature Signature Date: Date: