HomeMy WebLinkAbout8.1 Attmt 4 Planning Commission Staff Rept 06-28-2005 w/ attmtsAGENDA STATEMENT
PLANNING COMMISSION MEETING DATE: June 28, 2005
SUBJECT: PUBLIC HEARING: Quasi Judicial - PA 05-022 The Well Christian
Community Church Conditional Use Permit to expand the existing Place
of Worship within the Light Industrial (A-1) zoning district and a parking
reduction for shared parking.
Report prepared by: Jeff Baker, Associai e Planner
ATTACHMENTS: 1. Resolution approving a Conditional Use Permit
2. Vicinity Map
3. Written Statement
4. Site Plan
5. Project Plans
6. Parking Study
7. Off-Site Parking Agreement
8. Planning Commission Staff Report Dated September 9, 2003
RECOMMENDATION: 1.
2. Open the Public Hearing;
Receive Staff Presentation and Take Testimony from the Applicant
and the Public;
3. Close the Public Hearing and Deliberate; and
4. Adopt a Resolution (Attachment'.) Approving a Conditional Use
Permit for The Well Christian Community Church Expansion.
PROJECT DESCRIPTION:
The project site is located at 6533 Sierra Lane within the Sierra Business Center. The Sierra Business
Center consists of three buildings, which total approximately 70,000 square feet of industrial/warehousing
space. The property is zoned Light Industrial (M-1) and has a General Plan Land Use Designation of
Business Park/Industrial.
The City of Dublin Zoning Ordinance classifies a church as a Community Facility (Chapter 8.08.020).
Approval of a Conditional Use Permit by the Planning Commission is required in order to operate a
Community Facility within the Light Industrial zoning district (Chapter 8.12.050 - Civic Use Types).
On September 9, 2003, the Planning Commission approved a request for a Conditional Use Permit to
allow The Well Christian Community to establish a new 10,800 square foot church at 6533 Sierra Lane
(PA 03-047, Attachment 8). That Conditional Use Permit allowed the church to operate within an
existing building in the Light Industrial zoning district.
The Applicant currently requests approval of a Conditional Use Permit to expand the existing church.
The expanded facility would have a total of 21,998 square feet. The expanded facility would include a
7,325 square foot sanctuary, three classrooms, and related improvements.
COPIES TO:
G:'TA#12005\05-022 The Well Expansion\pcsr 6--28-35.doc
Applicant
In-House Distribution
ITEM NO. 8 - /
Attachment 4
ANALYSIS:
A Conditional Use Permit is required in order to operate a Community Facility within the M-1 Zoning
District. The Conditional Use Permit process allows the City to place conditions of approval on the
project to ensure that the operation of the proposed use is compatible with the surrounding uses. The
proposed project has been reviewed for issues related to operating c:iaracteristics, parking, and project
design. Conditions of approval have been proposed where appropriate to ensure compatibility.
Operating Characteristics:
The Well Christian Community is a non-denominational non-sectarian church. The church will conduct
two Sunday morning services and mid-week activities as described in the Written Statement (Attachment
3) and Table 1 below. The church staff includes 5-7 full and part time employees with offices at this
location. The church offices are open Monday through Friday from Sam to 4pm. Worship/service
attendance is estimated to rise from the current level of approximately 400 adults and children to
approximately 700 over the next two to three years. Maximum occupancy for the building will be limited
to 600 persons. Therefore, the church will offer two services on Sunday mornings to accommodate their
growing service/worship attendance levels.
Table 1- Church Activities
Da 77me Activity
Sunda Between 8am & noon Two Sunda morning services
Sunda 6 m Pra erMorshi
Tuesday 6 m Mid-week services
Wednesday 6 m Mid-week services
Thursday 9:30am Women's Bible Stud
Thursday 12 m Women's Bible Stud
Frida 7 m Periodic evening activities
Saturday 6:30arn Prayer
The existing uses within the Sierra Business Center typically operate Monday through Friday from 8am to
5pm. Weekday church activities are limited to running the office anc. holding two women's bible study
groups that meet on Thursday. Approximately 10 people attend each of these bible study sessions. The
limited attendance at these weekday activities reduces the potential conflict with the other uses within the
center. The proposed church activities on weekday evenings and weekends will not conflict with the
other uses within the center because they occur when the other businesses are closed.
Parking Analysis:
The City of Dublin Zoning Ordinance contains off-street parking requirements by use type. A Place of
Worship is required to provide one parking space per 50 square feet for non-fixed seating in the assembly
area, plus 1 per classroom (Chapter 8.76.080.C). As previously stated, the proposed sanctuary is
approximately 7,325 s.f. and there will be three classrooms. Therefore, the Zoning Ordinance parking
requirement for the expanded facility is 150 parking spaces.
As previously mentioned, The Well is located within the Sierra Business Center. The center contains a
mix of existing use types. A multi.-use project, such as this center is required to provide the cumulative
total number of parking spaces required for each use type within the center (Chapter 8.76.040.G). A total
of 324 on-site parking spaces are required for this center based on the existing and proposed uses.
However, only 222 on-site parking, spaces are provided within the center - a shortage of 102 parking
spaces.
The Zoning Ordinance (Chapter 8.76.050.F) allows a parking reduction for shared parking by way of a
Conditional Use Permit. A reduction for shared parking may be granted if a report by a registered traffic
engineer shows that, 1) the Conditional Use Permit findings can be made; 2) a sufficient number of spaces
is provided to meet the greatest parking demands of the participating use types and to ensure that there
will not be a parking deficiency; 3) satisfactory evidence is provided that the use types, by their natures
and operating times, will not conflict with each other; and 4) overflow parking will not adversely effect
any adjacent use.
A Parking Study was prepared for the City by Omni Means Engineers to identify the existing parking
demand and average vehicle occupancy for the Sierra Business Center (Attachment 6). The peak
operating hours for the church occur during weekday service on Tue;;day and Wednesday evenings and
weekend services on Sunday mornings. Therefore, the parking study was conducted on a Wednesday
evening from 6:30pm-9pm and a Sunday morning from 9:30am-12:45 gym. The following table shows the
peak parking demand for the center as noted in the parking study.
Table 2 - Peak Parking Demand
Occupied Parking Average Vehicle
Peak Time Spaces occupest
Wednesday 7:15 pm - 8 pm 87+ 1.90
Sunda 11 am -12 m 151- 1.96
?T.,nl„/tAC Z ,•,,,,,,,an., and a Pmr?1nvPP vPh,APC that helong tc' tenants within the cent
' 111V1 FL?iVJ ? VVilat/wraJ wawa • vaaaj..vJ ?? ?-???-?- ?--^- - -----p - - - - --
* Includes 3 company vehicles that belong to tenants within -he center
er
The City's Traffic Engineer used the average vehicle occupancy identified in the parking study to estimate
the peak parking demand generated by the expanded facility to ensure that adequate parking is provided
for this use. The peak parking is anticipated to occur on Sunday mornings and generate the need for 309
parking spaces (600 people/1.96 people per vehicle + 3 spaces for company vehicles = 309). The
anticipated parking demand exceeds the Zoning Ordinance parking req airement of 150 spaces. Therefore,
Condition 5 has been included which requires the Applicant to provide a minimum of 309 parking spaces
on Sunday mornings. However, only 222 on-site parking spaces zre provided within the center - a
shortage of 87 parking spaces.
The Applicant has obtained an Off-Site Parking Agreement (Attachment 7) that grants the use of 150
parking spaces on Sunday mornings. These parking spaces are located at 6591 Sierra Lane and at the
Sierra Trinity Business Park located at 6723 and 6761 Sierra Court. The tenants at these locations do not
operate on Sundays and have consented to allowing use of this parking by the church. These off-site
parking spaces are located within 350 feet of The Well. Condition 24 has been included which requires
the off-site spaces to be ADA accessible to the project site and includes providing a pedestrian pathway
that joins the off-site parking with the project site. Access to the church will be through the doors located
on the east and west elevations of the building.
The combination of on and off -site parking spaces will make a total of 372 parking spaces available for
use by The Well Church on Sunday mornings. The available parking exceeds the anticipated parking
demand by 63 spaces (372-309=63). The peak operating hours for the church (i.e. Tuesday and
Wednesday evenings and Sunday mornings) occur when the other businesses within the center are closed.
Therefore, the availability of on and off-site parking spaces and the operating hours of the church should
limit the potential for overflow parking and impacts to surrounding user.
On March 9, 2004, the Planning Commission approved a Conditional Use Permit for the Cross Winds
Church (PA 03-054). Approval of this Conditional Use Permit allowed a place of worship to operate in
the M-1 zoning district with a parking reduction. The parking reduction included an Off-Site Parking
Agreement to utilize 150 spaces located on the parcel to the north of the project site. Staff has not
received any complaints regarding the parking at The Cross Winds Church since this Conditional Use
Permit was approved. The proposed Off-Site Parking Agreement proposed for The Well is similar in
nature to the agreement for the Cross Winds Church.
3
Project Design and Development:
The Applicant proposed to make tenant improvements to the interior of the building. These
improvements will include new exterior doors to meet exiting requirements. No further improvements to
the exterior of the building are proposed. The Applicant is required to obtain a building permit for the
proposed improvements.
Review by City Departments:
The proposed project has been reviewed by the Building Division, Public Works Department, Police
Services Department, the Alameda County Fire Department, and the Dublin San Ramon Services District.
Conditions of Approval have been included where applicable. The Applicant has reviewed the draft
Conditions of Approval and agreed to comply with the City's requirements.
Conditional Use Permit Required Findings:
To approve a Conditional Use Permit, the following findings must be made: the proposed use is
compatible with other land uses, transportation and service facilities in the vicinity; will not adversely
affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public
health, safety and welfare; will not be injurious to property or improvements in the neighborhood; will
have adequate provisions for public. access, water, sanitation, and public utilities and services to ensure
that it would not be detrimental to the public health, safety and welfare; and the site is physically suitable
for the type, density and intensity of the use and related structures beir.g proposed. Staff has prepared the
draft findings included in the proposed resolution (Attachment 1).
NOTICING:
In accordance with State law, a public notice regarding this hearing was mailed to all property owners and
occupants within 300 feet of the proposed project. A public notice was also published in the Valley
Times and posted at several locations throughout the City. To date, the City has not received comments
or objections from surrounding property owners or tenants regarding the current proposal.
ENVIRONMENTAL REVIEW:
This project is categorically exempt from the environmental review requirements of the California
Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities).
RECOMMENDATION:
Staff recommends that the Planning Commission open the public hearing; receive Staff presentation and
take testimony from the Applicant and the Public; close the Public Hearing and Deliberate; and adopt a
Resolution (Attachment 1) approving a Conditional Use Permit for The Well Christian Community
Church Expansion.
4
GENERAL INFORMATION:
Applicant: Evan Simmons
The Well Christian Community
6533 Sierra Lane
Dublin, CA 94568
Property Owner: Pat Rouse
Sleep}, Hollow Investment Co. II
18 Crow Canyon Court, Suite 100
San Ramon, CA 94583
Location: 6533 Sierra Lane
Existing Zoning: M-1 (Light Industrial)
Environmental Review: This .project is categorically exempt from the environmental review
requirements of the California Environmental Quality Act (CEQA) pursuant
to CEQA Guidelines Section 15301 (Exis:ing Facilities).
RESOLUTION NO. 05-
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING A REQUEST FOR A CONDITIONAL USE PERMIT TO EXPAND THE
EXISTING PLACE OF WORSHIP WITHIN THE LIGHT INDUSTRIAL (M-1) ZONING
DISTRICT AND A PARKING REDUCTION FOR SHARED PARKING AT THE PROPERTY
LOCATED AT 6533 SIERRA LANE (APN 941-0205-020)
PA 05-022
WHEREAS, Evan Simmons, the Applicant, has requested approval of a Conditional Use Permit to
allow a 11,198 square foot expansion of the existing Well Christian Community Church, and a parking
reduction for shared parking for property in the Light Industrial (M-1) zoning district at 6533 Sierra Lane;
and
WHEREAS, a complete application for the above noted entitlement request is available and on file
in the Community Development Department; and
WHEREAS, the Applicant has submitted project plans dated received April 20 and June 15, 2005;
and
WHEREAS, a Parking Study was prepared by Omni Means Engineers to evaluate the request for a
Parking Reduction for Shared Parking; and
WHEREAS, the California Environmental Quality Act (CEQA), together with the State guidelines
and City environmental regulations require that certain projects be reviewed for environmental impact and
that environmental documents be prepared; and
WHEREAS, This project is categorically exempt from the environmental review requirements of the
California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing
Facilities); and
WHEREAS, a Staff Report was submitted outlining the issues surrounding the request; and
WHEREAS the Planning Commission held a properly noticed public hearing on said application on
June 28, 2005; and
WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and
testimony herein above set forth and used their independent judgment to make a decision; and
WHEREAS, the Planning Commission has found that the proposed project is appropriate for the
subject site.
NOW, THEREFORE, BE IT RESOLVED THAT the Dublin City Council does hereby make the
following findings and determinations.
A. The proposed use and related structures are compatible with other land uses, transportation and
service facilities in the vicinity because it is located within an existing building and the existing on
and off-site parking is adequate to serve the existing, proposed and future uses.
G:1PA#12005105-022 The Well Expansionlpc 'reso 6-28-05.doc ATTAC H M ENT I
B. The proposed use, as conditioned, will not adversely affect the health or safety of persons residing or
working in the vicinity, or be detrimental to the public health, safety and welfare and will not be
injurious to property or improvements in the neighborhood because the proposed use will operate
during no peak hours for surrounding uses and will be adequately conditioned to ensure that the
operation has had no recognizable negative impacts.
C. The proposed use, under all circumstances and conditions of this permit, will not be injurious to
property or improvements in the neighborhood because the proposed use will be operated completely
within an existing and enclosed building.
D. There are adequate provisions for public access, water, sanitatior_, and public utilities and services to
ensure that the proposed use and related structures would not be 3etrimental to the public health,
safety, and welfare because the proposed use will be operated completely within an existing building
that is serviced by all appropriate utilities and infrastructure.
E. The subject site is physically suitable for the type, density and intensity of the use and related
structures being proposed because the existing roadway network leading to the site and the existing
on-site parking is adequate to serve the proposed use.
F. The proposed use will not be contrary to the specific intent clauses, development regulations, and
performance standards established for the Light Industrial (M-1) zoning district.
G. The approval of this Conditional Use Permit is consistent with tf a Dublin General Plan and will
provide a service to the community that is consistent with the intent of the Industrial/Business Park
General Plan Land Use designation.
BE IT FURTHERED RESOLVED THAT the Dublin Planning Commission does hereby find the
following requirements for a parking reduction for shared parking can be met:
A. The Conditional Use Permit findings can be made.
B. A sufficient number of on and off=site spaces are provided to meet the greatest parking demands of
the participating use types and to ensure that there will not be a parking deficiency. Satisfactory
evidence is provided that the use types, by their natures and operating times, will not conflict with
each other. Overflow parking will not adversely affect any Rdjacent use. A Parking Study was
prepared by Omni Means Engineers to identify the existing parking demand for the overall center and
for sub-areas within the center. The overall peak parking df:mand for the church will occur on
Tuesday and Wednesday evenings and Sunday mornings.
BE IT FURTHER RESOLVED THAT the Dublin Planning Commission does hereby approve a
Parking Reduction for Shared Parking for the Sierra Business Center.
BE IT FURTHER RESOLVED THAT the Dublin Planning Commission does hereby approve PA
05-022 The Well Christian Community Church Conditional Use Permit to expand the existing facility to
occupy a total of 21,998 square feet of tenant space located at 6533 Siena Lane, APN 941-0205-020. The
project approval shall be subject to compliance with the following conditions which supersede the previous
Conditions of Approval for a Conditional Use Permit contained in Resolution 03-46 (PA 03-047):
CONDITIONS OF APPROVAL:
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building
permits or establishment of use, and shall be subject to Planning De»artment review and approval. The
following codes represent those departments/agencies responsible for monitoring compliance of the
conditions of approval: [PL] Planning, FBI Building, rP01 Police fPWJ Public Works jADM1
2
Fire Department rDSRSD] Dublin San
ronmental Health.
iACX
ma`y'
T Trio M."
? w
GENE RAL CONDITIONS
I , Permit Validity. Approval of this Conditional Use Permit PL On-going Standard
shall be valid for one year from the effective date. This
approval shall be null and void in the event the approved use
fails to be established within one year, or ceases to operate
for a continuous one-year period.
Revocation. The Conditional Use Permit will be revocable PL On-going Standard
for cause in accordance with Section 8.96.020.1 of the Dublin
Zoning Ordinance. Any violation of the terms or conditions
of this approval shall be subject to citation and possible
3. revocation.
Compliance. The Applicant/Property Owner shall develop
PL
On-going
Standard
this project and operate all uses in compliance with the
Conditions of Approval of this Conditional Use Permit and
the regulations established in the Zoning Ordinance. Any
violation of the terms or conditions specified may be subject
to enforcement action.
4. Hours of Operation. Activities of the church shall be PL On-going CUP
limited to the activities listed on the Applicant's Written
Statement dated received on April 20, 2005 and the
following. Any other events and activities proposed by the
Church shall first be subject to review by the Community
Development Director.
Sunday: Two Sunday morning services (between 8:00am &
12pm) and Prayer/Worship (6pm)
Monday-Friday: Office hours (8am-4pm)
Tuesday: Mid-week services (6pm)
Wednesday: Mid-week services (6pm)
Thursday: Women's Bible Study (9:30am & 12pm)
Friday: Periodic evening activities (7pm)
5. Saturda : Prayer 6:30am
Outdoor Events. Any outside events shall be subject to the
PL
On-going
Standard
Temporary Use Permit requirements contained in the City of
6. Dublin Zonin Ordinance.
Parking. Applicant to provide a total of 309 on and off site
PL
On-going
CUP
parking spaces for Sunday services. Off site parking spaces
to be provided at 6591 Sierra Lane and 6723 and 6761 Sierra
Court. In the event that the adjacent property at 6591 Sierra
Lane and 6723 and 6761 Sierra Court are sold while this
Conditional Use Permit remains valid, the church will be
required to replace any off-site parking that is lost in kind, or
reduce the occupancy accordingly.
7. Noise/Nuisance. The Applicant shall control all activities on PL On-going CUP
the site so as not to create a nuisance to the surrounding
businesses and residents. No loudspeakers or amplified
music shall be permitted to project or be placed outside the
building.
?t?lVD N
TEXT
1 low SP d
MIL,
11L?t¦? ?? aY
£?:L UIIRC .
n? fit, ?,
8.
y gr, to the sign
Signs. An si ag e on site shall be subject
PL
On-going
Standard.
requirements contained in the City of Dublin Zoning
Ordinance.
9. Food Preparation. No cooking or other food preparation PL On-going CUP
that would require the approval of Alameda County
Environmental Health Services is hereby approved. In the
event that food preparation is desired, the Applicant shall
submit a written request, subject to review and approval by
the Community Development Director. The Applicant will
also be required to receive proper approval by Alameda
County Environmental Health Services prior to commencing
food preparation.
10. Minor amendments. Modifications or changes to this PL On-Going CUP
Conditional Use Permit approval may be considered and
approved by the Community Development Director, if the
modifications or changes proposed comply with Section
8.100.080 of the Zoning Ordinance.
11 Fees. The Applicant shall pay all applicable fees in effect at B Issuance of Standard
. the time of building permit. issuance, including, but not Building
limited to, Planning Fees, Building Fees, Dublin San Ramon Permits
Service District fees, Public Facilities fees, Tri Valley
Transportation fees, Downtown Traffic Impact Fee, Dublin
Unified School District impact fees, Alameda County Fire
Services fees, Noise Mitigation fees; Inclusionary Housing in
lieu fees, Alameda County Flood and Water Conservation
District (Zone 7) Drainage and Water connection fees. When
and if applicable and customary, credits shall be applied for
12. existing improvements.
Property Maintenance. The property shall be maintained
B
On-going
Standard
in accordance with Section 5.64, Property Maintenance of
the Dublin Municipal Code.
13 Building Codes and Ordinances. All project construction B Through UBC
. shall conform to all building codes and ordinances in effect Completion
at the time of building permit.
14 Building Permits. To apply for building permits, the B Issuance of Standard
. Applicant shall submit eight (8) sets of construction plans to Building
the Building Division for plan check. Each set of plans shall Permits
have attached an annotated copy of these Conditions of
Approval. The notations shall clearly indicate how all
Conditions of Approval will or have been complied with.
Construction plans will not be accepted without the
annotated resolutions attached to each set of plans.
15 Construction Drawings. Construction plans shall be fully B Issuance of Standard
. dimensioned (including building elevations) accurately Building
drawn (depicting existing and proposed conditions on site). Permits
16 Engineer Observation. The Engineer of record shall be B Issuance of Standard
. retained to provide observation services for all components of Building
the lateral and vertical desigm of the building, including Permits
nailing, hold downs, straps, shear, roof diaphragm and
structural frame of building. A written report shall be
submitted to the City Inspector prior to scheduling the final
frame inspection.
17.
oms have been reviewed and will be allowed
The restr o
B
On-going
CUP
without revision at this time. Due to the limited time usage
of the building.
18. The maximum occupancy of the sanctuary is restricted to 600 B On-going CUP
people.
19. The storage area in the assembly area shall be separated from F Issuance of CUP
the assembly area by a one hour occupancy separation. CBC Building
Chapter 3. Permits
20. Exit signs and emergency lighting shall be provided as F Issuance of CUP
required by the CBC Chapter 10. Building
Permits
21. If key locking hardware is used on the main door, provide a F On-going Standard
sign above the door stating, "THIS DOOR TO REMAIN
UNLOCKED DURING BUSINESS HOURS". Otherwise
the exit doors shall be openable from the inside without
special knowledge or effort and have lever or panic hardware
(panic hardware from the assembly area). CBC 1003.3.1.8.
22. The sprinkler system shall be modified as necessary to F Issuance of CUP
provide protection for the tenant improvement. Submit Building
Permits
detailed shop drawings to the Fire Department for approval
and permit prior to installation. A separate permit fee is
required. NFPA 13
23. Provide a fire alarm system in the space as required by CBC F Issuance of CUP
303.9. The system shall be tied into the existing sprinkler Building
monitoring/fire alarm system for the building. Submit Permits
detailed shop drawings to the. Fire Department for approval
and permit prior to installation. A separate permit fee is
required. NFPA 72
24. A Knox box shall be provided at the main entry door. The F On-going Standard
Knox box shall contain a key that provides access to the
tenant space. Order forms for the lock box are available at
the Fire Prevention office at the address above. The key can
be laced in the box during the Fire Department inspection.
25. Approved numbers or addresses shall be placed on the tenant F On-going Standard
space in such a position as to be plainly visible and legible
from the street or road fronting the property. Said numbers
shall be laced on a contrasting background. CFC 902.4
26. The project shall comply with Uniform Building and Fire F Final Standard
Codes as adopted b the City of Dublin.
27. Provide an accessible concrete walkway from the public PW Final Standard
sidewalk on Sierra Lane to the building entrance per
California Building Code requirements. Said walkway shall
be 4' minimum width with compliant curb ramps at
transitions between the walkway and the drive aisle
crossings. Note that minor adjustments to the existing
landscaping and irrigation systems will be necessary to install
the walkway.
i3 ? t y Y
28. Provide an accessible concrete walkway from the parking PW/PL Final CUP
area at 6591 Sierra Lane and 6723 and 6761 Siena Court to
the building entrance per California Building Code
requirements. Said walkway shall be 4' minimum width
with compliant ramps at transition between the walkway and
the drive aisle crossings.
29. Provide photometric calculations for the existing parking lot PW Issuance of Standard
and around the building that demonstrates a minimum foot- Building
candle lighting level of not less than 1.0 at the ground surface Permits
for the adjacent parking area; if this cannot be verified
provide additional lighting where necessary.
30. Applicant should repair any distressed areas of pavement PW Final Standard
within the existing parking field, then seal and re-stripe the
31. parking field.
The Applicant shall comply with all applicable City of
PO
On-going
CUP
Dublin Non Residential Security Ordinance requirements
32. The Developer and/or Property Owner shall keep the site PO On-going CUP
clear of graffiti vandalism on a regular and continuous basis
33. at all times.
Lighting used after daylight hours shall be adequate to
PO
On-going
CUP
provide for security needs (1.5 foot candles). Exterior
lighting shall be provided around the entire perimeter of the
34 building and in the parking area.
Prior to issuance of any building permit, complete
DSRSD
Issuance of
Standard
. improvement plans shall be submitted to DSRSD that Building
conform to the requirements of the Dublin San Ramon Permits
Services District Code, the DSRSD "Standard Procedures,
Specifications and Drawings for Design and Installation of
Water and Wastewater Facilities", all applicable DSRSD
Master Plans and all DSRSD policies
35 Prior to issuance by the City of any Building Permit or DSRSD Issuance of Standard
. Construction Permit by the Dublin San Ramon Services Building
District, whichever comes first, all utility connection fees Permits
including DSRSD and Zone 7, plan checking fees, inspection
fees, connection fees, and fees associated with a wastewater
discharge permit shall be paid to DSRSD in accordance with
the rates and schedules established in the DSRSD Code.
N ,A
jig
.s 44+ {{ }? y 1 t1., l fil
? y
JH
•`?f^IIF .y?y$'-Lr y.
LJY
f i _ -
36. Prior to issuance by the City of any Building Permit or DSRSD Issuance of Standard
Construction Permit by the Dublin San Ramon Services Building
District, whichever comes first, all improvement plans for Permits
DSRSD facilities shall be signed by the District Engineer.
Each drawing of improvement plans shall contain a signature
block for the District Engineer indicating approval of the
sanitary sewer or water facilities shown. Prior to approval by
the District Engineer, the Applicant shall pay all required
DSRSD fees, and provide an engineer's estimate of
construction costs for the sewer and water systems, a
performance bond, a one-year maintenance bond, and a
comprehensive general liability insurance policy in the
amounts and forms that are acceptable to DSRSD. The
Applicant shall allow at least 15 working days for final
improvement drawing review by DSRSD before signature by
the District Engineer.
37. No sewer line or waterline construction shall be permitted DSRSD Issuance of Standard
unless the proper utility construction permit has been issued Building
by DSRSD. A construction permit will only be issued after Permits
all of the items in Condition No. 9 have been satisfied.
38. The Applicant shall hold DSRSD, its Board of Directors, DSRSD On-going Standard
commissions, employees, and agents of DSRSD harmless
and indemnify and defend 1he same from any litigation,
claims, or fines resulting from the construction and
I completion of the project.
PASSED, APPROVED AND ADOPTED this 28 'day of June lUUJ.
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chairperson
ATTEST:
Planning Manager
m,cars? x,-11; !o77li l
001,
car
s?
?r
r?nu
stems (?J •
Z:
-4
c?
CITY OF DUBLIN
APPLICATION SUBMITTAL REQUIREMENTS FOR
CONDITIONAL USE PERMIT (CUP)
GENERAL INFORMATION
Project Street Address/Location: 6527 Sierra Lane, Dublin, 1CA. 94568
Note: This CUP is to cover the expansion of o it current facility located at
6533 Sierra Lane, Dublin, C.A. 94568. 6527 Sierra Lane is adjacent to, and will provide
the needed expansion for the existing Church location at 6533 Sierra Lane.
Project Name: The Well, A Christian Community
Project Description: Church, Worship Center and Staff Offices
Zoning District:
General Plan Designation:
APN:
Specific Plan Designation:
Applicant Name: Evan L. Simmons Phone: 925-479-1410
• Completed Application Form: Attached
• Completed Environmental Information Form;TBI)
• Application Fe and Processing Deposit: Included
• Environmental Filing Fees/Deposits: TBD
• Written Statement:
a. The Well Christian Community is a non-denominational non-sectarian
church, conducting Sunday morning services, and mid-week
meetings/activities during non-business, evening hours. The church staff
will also have their offices at this location, and will be conducting office
business during normal office hours.
b. The church staff will be comprised of 5-7 full/part time employees who
will conduct business during normal Monday through Friday business
hours. Corporate worship/service attendance i:. estimated to rise from the
current level of approximately 400 (adults and -,hildren attending two
services, 8:00am and 10:00am on Sundays), to approximately 700 (adults
and children attending a single Sunday morning; service). We estimate
that this increase will be noted gradually over fie next two - three years.
" ^FIVED
2 0 2005
2 ATTARMENT
??? <. 2
surrounding this facility number approximately 230. Using the City of
Dublin Zoning Ordinance document, amended November 1, 2002,
Chapter 8.76, Section C under "Place of Worship", the number of parking
spaces required, in a non-fixed seating area is: 182 (The assembly area of
the facility is approximately 8858 ft. sq., 1 space per 50 sq. ft. is 177
required spaces, plus 1 space per classroom (five classroom spaces are
anticipated), equaling 182 spaces). Thus, available parking spaces are
more than sufficient to handle the expected maximum occupancy load
during the Sunday morning service.
L The subject :facility is not located on a hazardous waste and substance site
(pursuant to Government Code Section 65962.:)).
Preliminary Title Report/Property Profile: Attached
• Public Notice Materials:
a. Reproduced copy of Alameda County Assessor's Parcel Map: Attached
b. Two sets of mailing labels: Attached
c. Plain envelopes with postage stamps: Attached
• Vicinity Map: Attached
• Site Map (10 copies): Attached
• Building Elevations (photos acceptable): Attached
• Floor Plans (10 copies, fully dimensioned, folded 9" by 11" maximum): Attached
• Reduced Copies (10 copies, 11" by 17"): Attached
• Traffic Data: To Be Determined
86/26/26?3 14:54 92583701611 SLEEPY HOLLOW INV CO PAGE 02
l3 1 I N'5'
SITE PLAN SIERRA
CEN'CER
T T ? PR 2 0 2005
I '' ' • Ila 1 LIN PLANNING
?'? q-L)22
i
i
I I I I I I I rF----- ------t------F-----?-_
i
i
i
- ----- ------- -----------------
- 3T u
a - I
i
i
--- ------------ ------------
'ffi' L rxu a .wc
ffi
AFrF•.
APR 2 0 2005
ATTACHMENTS p sP` °
022-
AREA AND OCCIPANCY CALCLLATX)M
r,
b
EC E?; VF,
dU?I I 'i 200.E
„'3L:N PL1NN:11,'
I T
6iCi111CK T.Y. ??
91 ®®T 79®
n
1
1
1
71
I
b
Wr"L bb. .. . UUMAJd '0 rrd '
O
3 1
Occ 52
0 53 78
--------------
-
- w
---------- ------J
--
-
-
19,081 A-2.1 OCCUANCY AREA _J `1,402 B OCCUANCY AREA w
w
-497/0 = 0 OCC -91/0 = 0 OCC T
]xou?Mrm MLL
-768/15 - 52 OCC -79/0 = 0 OCC
_ERED -240/0 = 0 OCC -805/0 = 0 OCC
-245/0 = 0 OCC -427/0 = 0 OCC
-530/0 = 0 OCC
- 52/0 = 0 OCC
1,402 = 0 OCC NOTen.
a ?"onr wxw MLL Ta aerw way "vea ro
ITIWT
A.L a."? ?M..IYI
, ?ECmm.
.
.
? IIIALL ] IR MTmpllNl YVIL FlMY1 TO IMTGM WR11Y 1
JUN 1 5 2a
- 78/0 = 0 O CC
6,618/7 = <145 OCC 489 SEATS SHOWN
ADA SEATING WILL BE INCLUDED IN THAT COLNT as sno,"n??nrenncK w.,vo rrnu+?,vn". ••.3L,N eL:N?,...
98 OCC
10
11
----13--?.-- 14 ----- 15
M
497 = 0 OCC
lj d. M7 1
r
uuo
bnn b ou-- r-?r?L= do r???
; L°b„ fybs•????_y-'Y?i ted drj nd'd`?? d d
!Opp
yb ^ ?n °'bd?d -000
no?Yid?t'd
1 bbb mbdeme'dddood r d _d
?
QQZ
?b? b f, ??r!"; Y?_b bbmbdb ddddt!'? nf?i? ?d?
1 bt^? ba''?1?'E ? ?^?+k..a^- de v??n ts? ?rf? rr'`? r9
b bb1.1 ti'byb ?Jbbbb bb ?-+o^- ?'-
-r,
bbhW fbldd bb UUdc?ad
r
b?'b be b nb b bBb^t+ fy?^?- ^?-- -0-l"r jb
'-'?f?m nn ddb r?-?!• r
A-21 - OGGUPAWY I
. 05/20/2005 11:55 9259352247 OMNIMEANSNICKE:LSON PAGE 01
omni-means
E N G I N E E R S . P L A N H E R S
May 20, 2005
Mr. Jeff Baker
Associate Planner
City of Dublin
100 Civic Plaza
Dublin, CA 94568
Subject: Parking Survey Data for "The Well" Church at #6527 Sierra Lane in
the Sierra Business Center Development
Dear Mr. Baker:
This letter report summarizes our parking survey data for The Well church at 6527 Sierra
Lane in Dublin. The parking surveys were conducted on Sunday May 15 from 9:30 AM
to 12:45 PM and Wednesday evening May 18 from 6:30 Plv.( to 9:00 PM. These survey
hours reflect the Sunday morning church worship services and the Wednesday evening
church activity. The attached data includes detailed parki:ag survey results (recorded
every 15 minutes), a sketch of the parking survey area and vehicle occupancy survey
results.
We counted a total of 222 marked parking spaces within the Sierra Business Center
development. It is noted that 17 of the marked spaces were: observed to be unavailable
due to materials storage and a shipping container. It is alsc noted that 6 church related
vehicles were observed parallel parking along the west sic a of the west parking aisle
leading to/from Sierra Lane, but there are no marked spaces along this aisle near Sierra
Lane. This road is only 26-28 feet wide, and the parallel parking substantially reduces the
width available for two-way traffic flow. At several other locations in the development, a
total of 5 additional chw•ch related vehicles were observed parking along unmarked
curbs.
As noted in the parking surveys, the Sunday morning church demand peaks between
11:00 AM and 12:00 noon at 150-151 vehicles. There is very limited background
parking (9 vehicles) that appears to reflect permanent vehicles related to the Sierra
Business Center tenants. This total demand includes the 11 church related vehicles
parked along unmarked curbs in the development. Based on our surveys, the average
occupancy was 1.96 persons per vehicle.
During the Wednesday evening surveys, the church related demand peaked between 7.15
and 8:00 PM at 84-87 vehicles. Again, background parking is very light at only 7
vehicles. No vehicles were observed parking along the west parking aisle or other
1901 Olympic Boulevard. Sulte 120 • Walnut Creek, CA 94506 • (925) 935-2230 fox: (925) 935-22x7
ROSEVILLE REDDING VISALIA WAWUT CREEK
ATTACH!"'w"" 6
05/20/2005 11:55 9259352247 OMNIMEANSNICK=LSON PAGE 02
May 20; 2005
Mr. Jeff Balser
Page 2 of 2
unmarked curbs during the Wednesday evening survey. Thf: average occupancy during
the Wednesday evening sluveys was 1.90 persons per vehicle.
Although not recorded on the attached survey sheets, we also observed parking demand
in the business developments west and north of the Sierra Business Center development'
d n
During both the Sunday morning and Wednesday evening periods, parking
those developments was very light.
I trust that this analysis responds to your data needs. Please call me with any further
questions or comments.
Sinc ely,
t'
George W. Nickelson, P.E.
Branch Manager
05/2,0/2005 11:55 9259352247 OMNIMEANSNICKE:LSON PACE 03
cop co m
a ~ co r ? r
7
5 m r v ti r- 4 O T V- - ACS
4 m to ? 0 %D
v r ti
Fp m m ti cm
O:l
O
? R
J N
of
d7 d) i
? m
IN O
O ?
` c
s
v
r fII
y v ? Q d v d v d ?t d
,Q +
c ?
O
N Q qw LO to III I'Z IA C O
LL p O r r
CS
0
m
o
0
0
0
0
0
0
0
0
0
<?
c+
o
r:'
3
6f
Q t
m V p N ? to tC3 I? N
N ?
N ?
N i.
<V N
N ? ti
N N N N N N N
U
m
47
1t7
1CJ
tq
[n
%n
if)
to
li7
[ 7
u7
LL") LO
c
Q
5 N rn ° 'r W aj CD ,A g o?
?
t r-
d o r 0) ?- r- ?- +-
U
E E E E E E E E E E E
E E ai e0 [a Id co Id ed z d Ci ci
10 N p rn o
? LO o
O to
? e? r cgi
l[7 C1
O r
O !
0 ?
O '
-
r
[V
N
cV
f
V
A 4 19 ?
.y
O
a
cd o
c a
O
C
O
06 _Q
?Ci
w
m ?
,? Y QI!
Q r
m d
CL
r
o
o
fli hN C
a 6?1
O N
C ?
N
a _% 3
qL?
W m ti
O t/1 r a
Q d a?
y F. cL
O
C c
C ?
m
C ?
? N C
v Q. 7D
?i ;t= 'vim :c
r°?w
e
r m G d
z?8a ?
05/20/2005 11:55 9259352247 OMNIMEANSNICKELSON PAGE 04
s c O ti ° o o to
co
LD
iv N
o Q
a? L
U C;
W M p .r
O cD
O d
Im s?
Of d t`-
~ U
M M m e? ch M en m c7 co N
N C
G t
O
li =
O
Cl
O
p
p
p
O
O
O
O
(D
L
U
-o
a)
0o
` m
? r
r
r
r
r
r
•-
r r.. p o
G
• ? }
C ?
W 1O V
m o o
O
C?
O
O
O
O
O
O
O d
c ? U
V
O ? a
J
c+>
ch
m
M
m
?
co
M
M
C
L W 7
? d
N Z
N g a v r-- m
s
v p E E f E E E E E E
d
- a d ci Q cL a d d d c.
C o U'j C) Un p
(Do LC> o u?
lw o
CD
d ?
a ?I(D t?
" f`- (? ti
m n
v GO
o m
i O
i CO
m U?
Er) c
a m Tc s s
v
E
m
CL
0
ai
Q.
0
a)
r
I I
C
t0
Q
7
U
v
O
05/20/2005 11:55 9259352247 OMNIMEANSNICKELSON PAGE 05
V3MV MOVS
Q.
r
V
0
Z
Q
w
a
Q
x
U
Q
cc
w
Q
w
a_
16
0
V32JV NOYS
? jm
? t
1
N
CV
n ,
n r u ??
m
?? u?
a d
o
a i
z x ?
U z
loll
ul
a
a
a
Q
W
Q
z
Q
i
SS300V NIVW
Q Z
W J
d'
Q
F-
z ui
O co
a
LL.
SS3?3b f1S3NU .tWQNpD3S
i
a
40 1
L-
N
C
U
N
N
a?
c
U)
t?
t0 ^
a? U
? c
.G .Q
C ?
J
cis
? V
U
N
Mco
N
s C
F-
40-
N
Q
m
c
L
CL
Q
C
C?
G
LJL-j
o
0
O
z
8
Jun 17 05 11:51a RREEF Management Company, 92.`S691898 p.2
June 16, 2005
City of Dublin
100 Civic Plaza
Dublin, CA 94568
Attn: Planning Division
We. the undersigned, do hereby agree that The %Alell Church has permission to use the approximately
150 parking spaces at the property located at the n591 Sierra. Lane and the back section of 6723 and
6761 Sierra Court located in the Sierra Trinity Business Park in Dublir. on Sunday mornings for the
duration of their Conditional Use Permit with the City of Dublin. In the event that the property
transfers ovrncrship during that time petiod, The Well Church will n?.ed to obtain approval from the
new property owner.
It is also agreed that The Well Church shall hold harmless RREEF Nfanagement Company and its
employees and tenants for any liability matte--s arising as a result of ;)ersonal injury or property damage
while parking on RREEF Management Company premises. The Well Church understands that it will
utilize the adjacent parkit;g area on this property at its own risk
PsB Management Company
0- ?
T e ' 11 Christian Community h rch
ATTACHMENT ?
AGENDA STATEMENT
PLANNING COMMISSION MEETING DATE: SEPTEMBER 9, 2003
SUBJECT: PUBLIC HEARING: PA 03-047 The Well Christian Community
Church Conditional Use Permit for a new church to be located within an
existing industrial building in a M-l (Light Industrial) zoning district
located at 6533 Sierra Lane.
Report prepared by: Andy Byde, Senior Planner
ATTACHMENTS: 1. Resolution approving a Conditional Use Permit;
2. Project Plans; and
3. Written Statement
RECOMMENDATION: 1. Open public hearing;
2. Receive Staff presentation and public testimony;
3. Close public hearing and deliberate; and
4. Adopt a Resolution (Attachment 1) approving a Conditional Use
Permit for The Well Christian Community
DESCRIPTION:
The Applicant is requesting a Conditional Use Permit to establish a new church located at 6533 Sierra
Lane. The proposed church would be located within an existing industrial building in a M-1 (Light
Industrial) zoning district. The proposed church would be 10,800 square feet in size and would be located
entirely within the existing building.
BACKGROUND:
The Sierra Business Center consists of three buildings, which total approximately 70,000 square feet of
industrial/warehousing space. The building the Well Church is proposed to be located within, totals
50,400 square feet and is located at the rear of the property. The center was constructed in the early
1980s as a light industrial building. Nearby businesses include Pacific Bell, Smart Auto Glass, and Onyx
Optics. This area is characterized by its concentration of light industrial, warehousing, and back office
type uses.
COPIES TO: Applicant
Project File
Project Planner
GAPA#0003103-047 The WelITC Staff Report.doc
X
?
ITEM NO.
ATTACHMENT
ANALYSIS:
Circulation and Parking:
The property has 228 parking spaces to serve the approximately 70,000 square feet of the Sierra Business
Center. The building that the proposed project is proposed to be located, totals 50,400 square feet.
_.1. 1___+_A tl,n 1»>ilrlina•
rollowin 15 a 11bL Vl 1GMUILJ cuiu uo %,a --
t
F
S --
Tenant
Address ee
quare
6501 8,000 Vacant
6509 7,816 Hill and Watson (Industrial)
6515 4,584 SBC Services Inc Office
6529 11,200 Pacific Bell (Warehousing)
6533 12,000 Vacant-(Portion of Proposed
Well Church
6549 2,400 Smart Auto Glass Auto Re airl
6551 4,400 On O tical (Industrial)
50,400
The current parking demand for the building is 50 parking spaces. The building has 152 parking spaces
assigned and immediately adjacent to the building. The proposed church would-be 10,800 square feet in
size and, according to the City of Dublin Zoning Ordinance, would require I parking space per 50 square
feet of non-fixed seating in the assembly area and 1 parking space per classroom. The assembly area is
4,800 square feet, which would require 96 parking spaces. The four proposed classrooms would require
an additional four parking spaces for total required parking of 100 stalls. The total required parking,
including the church, would be 150 parking stalls, based on the current and proposed tenant roster. The
site would have adequate parking because there are 152 parking stall s to serve the building. Additionally
the majority of the tenants within the building are industrial/warehouse type uses, which require 1 per 400
square feet and 1 per 1000 square :feet, respectively. Therefore as the building tenants turn over and the
vacant spaces are filled, the potential use types, which are permitted within the M-I zoning district, have a
low parking demand (between 1 parking space per 400 and 1000 square feet of floor area).
Moreover, the remaining square footage of the two buildings, total 19,600 square feet (70,000-50,400
=19,600) and 76 parking spaces remain to serve the two buildings. TI.e remaining parking ratio of the two
buildings is one parking space per 258 square feet, which is more than adequate to serve any allowed use,
as well as allow for vacant tenant spaces to be filled and still have adequate parking.
Improvements:
The proposed church would occupy the existing building located at 6533 Sierra Lane and the applicant has
not proposed any exterior modifications to the building. According to the Chief Building Official, any
change in occupancies requires the building to meet the code requirements of the proposed occupancy.
Use Permit Findin s:
The church will not be located in close proximity to any residential uses. It is not anticipated that the
church will have noise impacts on any adjacent uses. The church office will be open Monday through
Friday, 8:00 am-4:00 pm and the church services will be held Sunda} mornings at 8:00 a.m. to 1:00 p.m.
with a potential evening service from 6:00 p.m. to 9:00 p.m. Additionally, mid-week service and or bible
study occurs on Tuesday and/or Wednesday nights 6:00 to 9:30 p.m. The hours of operation of the
proposed church; generating the most parking demand, are during tie hours that other uses within the
2
Center are not functioning; therefore, Staff finds that the proposed use will not have any negative impacts
to those uses within the Center or surrounding properties.
Noticing:
In accordance with State law, a public notice was mailed to all property owners and occupants within 300
feet of the proposed project, to advertise the project and the upcoming public hearing. A public notice
was also published in the Tri-Valley Herald and posted at several locE.tions throughout the City. To date,
the City has received no contact or objections from surrounding property owners or tenants regarding the
current proposal.
Environmental Review:
This project has been found to be Categorically Exempt from CEQA under Section 15301, Class 1 of the
California Environmental Quality Act Guidelines. The project consists of minor modifications to an
existing building and is consistent with all General Plan and Zoning regulations and is currently served by
all required utilities and public services.
CONCLUSION:
Staff recommends that the Planning Commission adopt a Resolution (Attachment 1) approving the
Conditional Use Permit to establish a new church within the 10,800 square foot tenant space located at
6533 Sierra Lane.
3
GENERAL INFORMATION:
Property Owner: Pat Rouse
Sleepy Hollow Investment Co. R
18 Crow Canyon Court, Suite 100
San Ramon, CA 94583
Applicant: Evan Simmons
The Well Christian Community
3130 Crow Canyon Road, Suite B
San Ramon, CA 94583
Location: 6533 Sierra Lane
Existing Zoning: M-1 (Light Industrial)
4
RESOLUTION NO. 03-46
A RESOLUTION OF THE PLANNING CO MSSION
OF THE CITY OF DUBLIN
APPROVING PA 03-047 THE WELL CHRISTIAN COMMUNITY CHURCH
CONDITIONAL USE PERMIT REQUEST TO ESTABLISH A NEW CHURCH WITHIN A 10,800
SQUARE FOOT TENANT SPACE LOCATED AT (1533 SIERRA LANE
WHEREAS, the applicant, the Well Christian Community Church, has requested to establish a new
church within an existing 10,900 square foot tenant space located at 6533 Sierra Lane, in a M-I Light
Industrial Zoning District; and
WHEREAS the Planning Commission held a properly noticed Fublic hearing on said application on
September 9, 2003; and
WHEREAS, the California Environmental Quality Act (CEQA), together with the State guidelines
and City environmental regulations require that certain projects be reviewed for environmental impact and
that environmental documents be prepared; and
WHEREAS, the project has been found to be Categorically Exempt from the California
Environmental Quality Act (CEQA), according to Section 15301(x), Class 1; and
WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and
testimony herein above set forth and used his independent judgment to make a decision; and
WHEREAS, the Planning Commission has found that the proposed project is appropriate for the
subject site.
NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does find
that.
A. The proposed use is and related structures are compatible with other land uses, transportation and
service facilities in the vicinity because the existing on-site parking is adequate to serve the existing,
proposed, and future uses.
3. The use will not adversely affect the health or safety of persons residing or working in the vicinity, or
be detrimental to the public health, safety, and welfare because fie proposed church would operate
during non-peak hours
C. The use, under all circumstances and conditions of this permit, will not be injurious to property or
improvements in the neighborhood because the proposed use will be operated completely within an
existing and enclosed building.
D. There are adequate provisions for public access, water, sanitation, and public utilities and services to
ensure that the proposed use and related structures would not be detrimental to the public health,
safety and welfare proposed use will be operated completely witun an existing building.
E. The subject site is physically suitable for the type, density and intensity of the use and related
structures being proposed because the existing roadway network leading to the site and the existing
on-site parking is adequate to serve the proposed use.
F. The approval of this Conditional Use Permit is consistent with the Dublin General Plan.
BE IT FURTHER RESOLVED THAT THE Dublin Planning; Commission does hereby approve
PA 03-047 Conditional Use Permit to allow the Well Christian Community Church, to be located within an
existing 10,800 square foot tenant space located at 6533 Sierra Lane as generally depicted on Exhibit A,
stamped approved and on file. The project approval shall be subject to compliance with the following
conditions:
CONDITIONS OF APPROVAL:
Unless stated otherwise all Conditions of Approval shall be complied with prior to the issuance of buildin¢
permits or establishment of use and shall be subject to Planning Department review and appmov
following codes represent those departriients/aaencies responsible for monitoring compliance of the
Conditions of Approval- [PL j Planning, [B] Building, [POI Police. [P'M Public Works [ADM]
Administration/City Attorney fF]Nl Finance [F] Alameda Count?Fire Department. CDSR) Dublin San
Ramon Services District, NOI Alameda Courrty Dem=ent of Enviro:lrnental Health.
1. The activities associated with the church shall have the following operating hours: Church office,
Monday to Friday 8:00 a.m. to 4:00 p.m. The activities associated with Sunday services shall have
the following operating hours: 8:00 a.m. to 9:30 p.m. Evening Bible Study/Discipleship services
shall be Monday to Friday from 6:00 p.m. to 9:30 p.m. Saturday morning worship rehearsal/prayer
shall be from 6:30 a.m. to noon and Saturday evening services shall be from 6:00 p.m. to 9:30 p.m.
[PL]
2. Any signage on site shall be subject to the Sign Requirements omtained within the Dublin Zoning
Code. [PL]
3. The Applicant shall comply with all applicable Planning, Building, Alameda County Fire Authority,
and Police Department regulations and ordinances. [PL, B. F, PD]
4. A disabled access stall must be provided along the front of building.
5. Signs must be posted at the driveway entrance that read, "Unauthorized not displaying distinguishing
placards or license plates issued for physically handicapped persons will be towed away at owner's
expense. Towed vehicles may be reclaimed at Dublin Police or by telephoning 83376670". [PO]
6. The applicant shall comply with all applicable City of Dublin Non Residential Security Ordinance
requirements. [PO]
7. Lighting used after daylight hours shall be adequate to provide ,'or security needs (1.5 foot candles).
Exterior lighting shall be provided around the entire perimeter of the building and in the parking
areas. [PO] on a regular and
8. The Developer
uous basis t all timees GraOwner ffiti resistanttppainthe site clear of ts for the structures Land film for windows or glass
continuous
should be used. [PO]
9. An "Emergency Response Card" will be completed and submiti:ed to police services prior to
occupancy of the site. [PO]
2
10. No cooking or other food preparation that would require the approval of Alameda County
Environmental Health Services is hereby approved. In the event that food preparation is desired, the
applicant shall submit a written request, subject to review and approval by the Community
Development Director. The applicant will also be required to roxive proper approval by Alameda
County Environmental Health. Services prior to commencing fond preparation. [PL]
11. The Automatic fire sprinkler system shall be modified as required by any renovation, wall installation
or change in floor or room configuration. A permit for the system shall be completed an all fees paid
prior to installation, if applicable. [F]
12. Exiting from all areas of the building shall meet the minimum requirements of the California
Building Code. [F]
13. The project shall meet the requirements of the California Fire Cade. [F]
14. Approved numbers or addresses shall be placed on all existing buildings. The address shall be
positioned as to be plainly visible and legible from the Street or ]toad fronting the property. Said
numbers shall contrast the their background. [F]
15. All Plans and Calculations shall be prepared by a California licensed Architect or Engineer. [B]
16. This permit shall be revocable for cause in accordance with Section 8.96.020.1 of the Dublin Zoning
Ordinance. Any violation of the terms or conditions of this use Kermit shall be subject to citation.
[PL]
PASSED, APPROVED AND ADOPTED this 9a' day of September 2003.
AYES: Cm. Fasulkey, Jennings, King and Machtmes
NOES:
ABSENT:
ATTEST:
Planning M r
K
I
a
V
W
U
O
W
a
rx
m
7
r
c?
J
.iJ
;n
r
.J
W-- - ?1
11
n2 { f
1, .60 N
77
v! I.
17? 7i-l
G 1 .?1 ? T_-_ ; •-1.? t .- - ?_ - it
R .. , W
•`r I•idl 'J:
? Ir l
i_ I I r 1V J'N I f. i - 1. Y _
t= A
y
• fir- i / t 1--7?:?.? 1{ _ ,1 `?F d' .f. ? ? I ? r) // '? •?1"?9?;
T
)I'1' ? 'y .. - I? n Q r
I t
'ZI
A Z,
CITY OF DUBLIN
APPLICATION SUBMITTAL REQUIRENENTS FOR
CONI)ITIONAL USE PERMIT (CUP)
GENERAL INFORMATION
Project Street Addresvtocation: 6533 Sierra Lane. Dublin, 'CA. 94568
Project Name: The Well, A Christian Community
Project Description: Church. Worship Center and Staff Offices
Zoning District:
APN:
General Plan Designation:. Specific Plan Designation:
Applicant Name: Evan L. Simmons Phone: 925-277-3033
• Completed Application Form: Attached
• Completed Environmental Information Form: TBLI
• Application Fe and Processing Deposit: Included
• Environmental Filing Fees/Deyosits: TBD
• Written Statement:
a. The Well Christian Community is a non-denominational non-sectarian
church, conducting Sunday morning services, and mid-week
meetings/activities during non-business, evening hours. The church staff
will also have their offices at this location, and will be conducting office
business during normal office hours.
b. The church staff will be comprised of 5-7 full/lwt time employees who
will conduct business during normal Monday through Friday business
hours. Corporate worship/service attendance is estimated to rise from the
current level of approximately 150 (adults and children), to approximately
300 (adults and children). We estimate that this increase will be noted
gradually over the next two years. The maximinn occupancy load will be
experienced during the Sunday morning worship service (10:00 am
through 12:00 noon).
c. Church "office" hours will generally be conducted Monday through
Friday from 8:00 am through 4:00 pm. Sunday morning service will be
RECEIVED
..JUL 2 8 2003
IUBLIN PLANNING
conducted from 10:00 am to 12:00 noon. There will be two mid-week
evening services on Tuesday and Wednesday from 7:00 pm through 9:00
pm. Additionally, there will periodically be Friday evening activities
(7:00 pm), Saturday morning activities (6:30 arri - 8:30 am), and Sunday
evening activities (7:00 pm). These activities will in all probability be
somewhat less attended than the maximum projected attendance of 300 for
the Sunday morning worship service.
d. This business is not designed to target a specific; segment of the
community, excepting the fact that being a Biblically based, Christian
organization; the Church will inherently attract individuals and families
with similar Christian backgrounds, or those seeking to learn more about
the Church and the Gospel of Jesus Christ.
e. The Well does and will continue to preach and minister the Gospel of
Jesus Christ to individuals and families of mane cultural backgrounds.
We feel strongly that the message delivered by 1:he Holy Scriptures is for
all people regardless of ethnic origin and believe in the impact of these
teachings for positively effecting family relationships, individual
relationships within the neighborhood or community, and within the
workplace. The Gospel of Jesus Christ, when delivered in truth and love
carries with it the power to change people's lives. The benefits and results
of this teaching for the community of Dublin ar.d the surrounding area will
be positive for all those involved. Acknowledging that all are children of
the God we worship, The Well actively seeks to be an ethnically diverse,
multi-cultural church.
E Owing to the relatively small number of staff employees who will be
present during normal Monday through Friday business hours, there will
be no discernable impact on the current business (or residential)
environment. Any "high volume" attendance activities will be conducted
either on weekends or during the evening hours, as noted above. As such
these activities will have no significant negative: affect on other businesses
in this area. Further, as this is a zoned industrial area, there are no
"residential" disruption concerns for either weekday, or weekend times
and activities.
g. Excepting the normal "office and traffic" issues, there will be no
additional negative effects or impacts on the health or safety of individuals
either working or visiting this business or its immediate vicinity.
h. There will be no unusual effects or negative impacts on the facility or
surrounding property, transportation system, or any other neighborhood
function as a result of The Well occupying this business location. Parking
spaces surrounding this facility number approximately 230. Using the
City of Dublin Zoning Ordinance document, amended November 1, 2002,
Chapter 8.76, Section C under "Place of Worship", the number of parking
spaces required, in a non-fixed seating area is: 100 (The assembly area of
the facility is approximately 4800 ft, sq., i space per 50 sq. ft. is 96
required spaces, plus 1 space per classroom (fair classroom spaces are
anticipated), equaling 100 spaces). Thus, available parking spaces are
more than sufficient to handle the expected mwdmum occupancy load
during the Sunday morning service.
L The subject facility is not located on a hazardous waste and substance site
(pursuant to Govemment Code Section 65962.5).
• Preliminary Title RMrt/Property Profile Attached
• Public Notice Materials:
a. Reproduced copy of Alameda County Assessor's Parcel Map: Attached
b. Two sets of mailing labels: Attached
c. Plain envelopes with postage stamps: Attached
• Vicinity Map: Attached
• Site Mau (10 copies): Attached
• Building Elevations (photos acceptable): Attached
• Floor Plans (10 copies. fully dimensioned, folded 9" by 11" maximum): Attached
• Reduced Copies (10 conies. 11" by 17"): Attached
• Traffic Data: To Be Determined