HomeMy WebLinkAboutItem 4.05 Award of Bid 97-03CITY CLERK File AGENDA STATEMENT CITY COUNCIL MEETING DATE: April 1, 1997 SUBJECT: Award of Bid - Conlxact 9%03, San Ramon Road Landscape Repair and Silvergate Drive Median Landscaping Report Prepared by: Public Works Director Lee Thompson EXHIBITS ATTACHED: 1) 2) 3) 4) Resolution of Award Summary of Bids Budget Change Form Location Map RECOMMENDATION: ) Adopt resolution awarding bid to Herzer Landscaping, Inc. Approve the transfer of funds in the mount of $25,825 from Unallocated Gas Tax Reserves to these projects FINANCIAL STATEMENT: Construction Budget Low Bid Low Bid Plus 10% Contingency $ 92,700 107,750 118,525 As the low bid plus contingency is over the approved budget, a budget appropriation from the Gas Tax Fund Reserves in the mount of $25,825 is needed to complete the two projects. DESCRIPTION: At the City Council meeting of March 4, 1997, City Council authorized Staffto solicit bids for Contract 97-03, San Ramon Road Landscape Repair and Silvergate Drive Median Landscaping. This project is comprised of two roadway landscaping improvement projects previously approved by City Council. The San Ramon Road Landscaping Repair will replace roadside ground cover on the west side of San Ramon Road between West Vomac Road and Silvergate Drive. The Silvergate Drive Median Landscaping will install new landscaping in the medians at the east end of Silvergate Driv-e between Peppertree Road and San Ramon Road. A total of three (3) bids were received with the Iow bid being submitted by Herzer Landscaping, Inc., in the amount of $107,750. COPIES TO: Bidders ITEM NO. 4_~ g:~miscproj~erract\agstawrd An additional budget appropriation from the Gas Tax Fund Reserves is necessary in the amount of $25,825 as the Iow bid, plus 10% contingency, is over the amount initially budgeted. Staff has reviewed the low bidder's proposal, checked with references and recommends that the City Council approve the additional appropriation and adopt the resolution awarding Contract 97-03 to Herzer Landscaping, Inc. Page 2 RESOLUTION NO. -97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 97-03 SAN RAMON ROAD LANDSCAPE REPAIR AND SILVERGATE DRIVE MEDIAN LANDSCAPING TO HERZER LANDSCAPING, INC. WHEREAS, the City of Dublin did, on March 25, 1997, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 97-03, SAN RAMON ROAD LANDSCAPE REPAIR AND SILVERGATE DRIVE MEDIAN LANDSCAPING authorized by the City Council on March 4, 1997, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City o£ Dubtin Contract 97-03 to the lowest responsible bidder therefor, to wit Herzer LandScaping, Inc. with a bid of One Hundred Seven Thousand Seven Hundred Fifty Dollars and No Cents ($107,750.00), the particulars of which bid are on file in the Office of the City Engineer PASSED, APPROVED AND ADOPTED this 1st day of April, 1997. AYES: NOES: ABSENT: ABSTAINING: ATTEST: City Clerk Mayor ~ r~:o~,,~ ~ o - o.0,~'~ m~r~,.,,,m ~.',J.~l~ LAr, IL~t.A;-'I= I'(~P'AIH/;51LVEI~GATE MEDIAN LANDSCAPING, CONTRACT NO. 97-03 BID OPENING DATE I MARCH 25, 1997 -- ENGINEER'S ESTIMATE HERZER LANDSCAPING GOODLAND LANDSCAPE PACHECO BROS. BID UNIT TOTAL ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICF 1 Amend Soil LS 1 $ 5'000 00 ~ $ 5,000'00 $ 41451.00 $ 4,461.00 $ 6,176.00 $ 6,176.00 $ 5,730.00 $ 5,730.00 2 Irrigation LS I $15,000.--~- $ 15,000.00 $18,0~0.00 $ 18,000.00 $42,296.00 $ 42,296.00- $17,286.00 $ 17,286.00 3 Insiall header Boards LF 840- $ 4.76 $ 3,998.~- $ 3.56- $ 2,940.00. $ 2.2~- $ 1,890.00 $ 4.15 $ 3,486.00 4 Remove Soil LS 1 $10,900.00 $ 10,900.0~- $16,585.00 $ 16,585.00 $ 7,875.00 $ 7,875.00 ' $15,400.00 $ 15,400.00 5 Supply/Place Topsoil LS I $12,455.00 $ 12,455.00 $18,360.00 $ 18,360.00 $11,532.00 $ 11,532.00 $15,200.00 $ 15,200.00 6 !Trees EA 24 : $ 95.83 $ 2,299.92 $ 86.00 $ 2,064.00 $ 62.00 $ 1,488.00 , $ 110.00 $ 2,640.00 7 Shrubs EA 310 $ 19.35 $ 5,998.50 $ 7.00 $ 2,~70.00 $ 4.60 $ 1,426__:_00__ $ 12.00 $ 3,720.00 8 Ground Cover SF 24,150 $ 0.19 $ 4,588.5~- $ 0.60 $ 14,490.00 $ 0.40 $ 9,660.00 $ 0.3~- $ 9,~7.00 9 Remove Olive Tree EA 1 $ 500.00 $ 500.00 $ 550.00 $ 550.00 $ 900.00 $ 900.00 $ 250.00 $ 250.00 10 Deve_!o~p__W. at~er Service LS 1 $ 7,000.00 $ 7,000.00 $ 6,000.00 $ 6,000.00 $ 3,800.00 $ 3,800.0~- $13,000.00 $ 13,000.00 11 Brick Pavers SF 3,500 $ 5.14 $ 17,990.00 $ ,4.70 $ 16,450.00 $ 6.17 $ 21,595~30 $ 6.75 $ 23,625.00 12 WaterConlrol B~rrier LF 250 $ 14.28 $ 3,570.00 $ 15.00 $ 3,750.00 $ 5.50 $ 1,375.0~- $ 5.25 $ 1,312.50 13 Aggregate Base Access Road SF 9~- $ 4.17 $ 400.32 $ 3.00 ~ $ 288.~0 $ 2.00 ; $ 192.0~- $ 5.00 $ 480.0( 14 _Con~nect Subdrain to 36" Storm Drain LS I $ 3,000.00 $ 3,000.00 -~ 1,643.00 $ 1,642.00 ~' 3,795.00 $ 3,795.0~- $ 51200.0~ $ 5,200.00 TOTALBID: $ 92,700.64 $ 107,750.00 $ 114,000.00 $ 116,506.50 * ADJUSTED TOTALS AFTER AMOUNTS CORRECTED CITY OF DUBLIN BUDGET CHANGE FORM CHANGEFORM # New Appropriations (City Council Approval Required): X From Unappropriated Reserves From New Revenues Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (CID' Council Approval Required) Other Name: Name: Silvergate Drive Median Landscaping $ 7,570 San Ramon Road Landscape Repair $ 33,395 Accoum#: 9461-750~050-206 Account#: 9462-750-050-206 Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ~ASON FOR BUDGET CHANGE ENTRY: The contract bid plus 10% contingency allowance is $25,825 over the budgeted amount for the combined two projects. Mayor: Date: Signature Posted By: Date: Signature CIFY UF BUBLIN PUBLIC N4DRKS DEPARTMENT SAN RAMON RD, LANDSCAP[ REPAIR APPRDV^L Cf'FY UF BIJBLllq PUBLIC ~/OP, KS lJEPARIM£NT