HomeMy WebLinkAboutItem 4.08 Accept Work 97-04SUBJECT:
CITY CLERK
File # [--~ _~[--~1_~ I-~][~
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: August 5, 1997
Acceptance of Work- Contract 97-04, Annual Street Slurry Seal
Report Prepared by: Lee S. Thompson, Public Works Director
EXHIBITS ATTACHED:
RECOMMENDATION:
1)
2)
1)
2)
Street location list
Budget Change Form
Accept improvements under Contract 96-04; authorize
payment of $138,535.57 (excluding 10% retention) to Valley
Slurry Seal and release retention in the amount of $13,853.56
after 35 days if there are no subcontractor claims.
Approve budget change.
FINANCIAL STATEMENT:
BUDGET ACTUAL
ITEM OF WORK AMOUNT COST BUDGET FUND
Remove/replace failed pavement
in streets to be sealed $ 55,000 $ 62,826.00 Slxeet Repair (3020) Gas Tax (206)
Slazry Seal Streets $ 40,000 $ 37,123.03 Street Repair (3020) Gas Tax (206)
Striping of Slurried Streets $ 7,485* $ 9,505.25 Street Repair (3020) Gas Tax (206)
Sub-totals $102,485 $109.454.28
Repair/Slurry/Stripe parking lots:
Dublin Sports Grounds General Fund_
and Civic Center $21,950 $29,081.29 Park Maint. (8020) (001)
TOTAL $124,435 $138,535.27
* $7,485 is the remaining an~ount budgeted in the Gas Tax Fund for this line item.
g:kmm cproj~slurrykagstacpt
COPIES TO: Valley Slurry Seal
ITEM NO.
DESCRIPTION: On May 20, 1997, the City Council awarded the annual slurrs, seal ,
contract to Valley Slurry Seal. This project is a preventive maintenance application used to prolong the
life ora street. The material consists ora sand/oil mixture which seals cracks and provides a new uniform
wearing surface. The City streets are presently on a five- to seven-year cycle. Before seal coats are
applied to the streets, oil spots are removed and asphalt failures are repaired.
Asphalt repairs performed at the Dublin Sports Grounds parking lot exceeded the budgeted amount as the
repair was more extensive than originally estimated. During repair operations, the Contractor encountered
failures extending beyond the original marked areas and it was necessary to repair the pavement failures
to ensure a lasting Slurry Seal.
This year's project also experienced a cost overrun in the street repair. Cause of this overrun was due
to the last-minute addition of Elk Court for street repair. The addition was a response to the residents'
concern over the deteriorating condition of the street. Repairs at Serra Court also contributed to the higher
costs because extensive damage to the subgrade caused by the subterranean springs made it necessary to
repair more area than originally estimated.
Slurry sealing and striping of the Dublin Sports Grounds and Civic Center parking lots were included in
the Slurry Seal Street Program because of the similarity of work.
Attached as Exl~bit 2 is a Budget Change Form, which will appropriate funds in accordance with the
final project costs. The overrun on the Street portion of the project will be funded by an additional
appropriation fi-om Gas Tax Reserves. The Par'king Lot overrun will be accounted for with a transfer
fi.om the Budgeted Contingent Reserve.
The City Engineer has reviewed the work on the project and determined that it is complete and in
accordmnce with the approved specifications. Staffrecommends that the City Council accept the
improvements under this contract and approve the budget change to cover all improvement costs.
.. 1997 SLURRY SEAL PROGRAM
Area 1
Juarez Lane
Peppertree Road
(Silvergate to Shannon)
Castillian Road
(Silvergate to Padre)
Padre Way
Fenwick Way
Fenwick Place
Fenwick Court
Royston Court.
Waterford Court
Zapata Court
TOTAL - AREA 1:
Sq. Ft.
15,500
67,635
58,797
30,553
56,510
15,900
14,800
7,504
7,504
8,218
615,489
Los Ranchitos Court
Marquita Court
Hadan Road
Via Zapata
Bloomington Way
(Marwick to Southwick)
Bloomington Court
Putnam Court
Castillian Court
Murietta Cour[
Marwick Drive
Marwick Court
Sq. Ft.
13,750
4,900
15,500
66,850
130,600
7,504
6,947
4,9O0
12,097
64,800
6,720
Area 2
Jade Circle
Agate Way
Sapphire Street
Turquoise Street
Sa. Ft.
39,000
15,000
18,000
27,000
Onyx Place
Pearl Place
Topaz Circle
Quartz Circle
Coral Way
Sq Ft.
6,000
11,200
43,5OO
39,000
24,000
Dublin Sports Grounds
Pa~ing Lot
65,118
Civic Center
(parking lots, roads)
119,989
TOTAL SQUARE FEET 1997 SLURRY SEAL
~,023.296
CITY OF DUBLIN
BUDGET CHANGE FORM
CHANGE FORM #. -~
New Appropriations (City Council Approval Required):
Budget Trans~:
_~.__ From Unappropriated Gas Tax Reserves X From Budgeted Contingent Reserve (1080-799.000)
Within Same Department Activity
From New Revenues Between Departments (City Council Approval Required)
Nme: ,~ I Name: GAS TAX- S~eet Maintenance -
~ Impvts
Account #: ADDITIONAL APPROPRIATION $ 6,969.00
FROM RESERVES
Account#: 206-3020-750-050
Name: Name:
Account #: Account #:
Name: GENERAL FUND-Non-Deparanental Name: GENERAL FUND-Park Maintenance
Budgeted Contingent Reserve Improvements
<$ 7,131.00> TRANSFER FROM BUDGETED
CONTINGENT RESERVE $ 7,131.00
Account #: 001~1080-799-000 Account #:001-8020-750-050
City Manager: Date:
;REASON FOR BUDGET CHANGE ENTRY: A single contract was used to perform the Annual Street Slurry
Seal Program on City Streets and the sealing ofparklng lois at the Civic Center and Sports Grounds. Pavement
Failure Repair for both surface streets and Dublin Sports Ground were more extensive than initially anticipated.
In order to immediately address deteriorating conditions, Elk Court was added to the project. Additionally,
S~ra Court required more repair because of damage to the subgrade caused by underground spring water. This
Budget Change will appropriate an additional amount of-Gas Tax Funds from Reserves.
When failure repair began on the Sports Grounds Parking Lot, areas beyond those originally outlined were
found to be in need of repair. The cost overrun is proposed to be covered by a mmsfer from the General Fund
Budgeted Contingent Reserve.
Signature
Mayor: Date:
Signature
Posted By:
Signature
Date: