HomeMy WebLinkAboutItem 4.08 Accept Work 97-04SUBJECT: CITY CLERK File # [--~ _~[--~1_~ I-~][~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 5, 1997 Acceptance of Work- Contract 97-04, Annual Street Slurry Seal Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: RECOMMENDATION: 1) 2) 1) 2) Street location list Budget Change Form Accept improvements under Contract 96-04; authorize payment of $138,535.57 (excluding 10% retention) to Valley Slurry Seal and release retention in the amount of $13,853.56 after 35 days if there are no subcontractor claims. Approve budget change. FINANCIAL STATEMENT: BUDGET ACTUAL ITEM OF WORK AMOUNT COST BUDGET FUND Remove/replace failed pavement in streets to be sealed $ 55,000 $ 62,826.00 Slxeet Repair (3020) Gas Tax (206) Slazry Seal Streets $ 40,000 $ 37,123.03 Street Repair (3020) Gas Tax (206) Striping of Slurried Streets $ 7,485* $ 9,505.25 Street Repair (3020) Gas Tax (206) Sub-totals $102,485 $109.454.28 Repair/Slurry/Stripe parking lots: Dublin Sports Grounds General Fund_ and Civic Center $21,950 $29,081.29 Park Maint. (8020) (001) TOTAL $124,435 $138,535.27 * $7,485 is the remaining an~ount budgeted in the Gas Tax Fund for this line item. g:kmm cproj~slurrykagstacpt COPIES TO: Valley Slurry Seal ITEM NO. DESCRIPTION: On May 20, 1997, the City Council awarded the annual slurrs, seal , contract to Valley Slurry Seal. This project is a preventive maintenance application used to prolong the life ora street. The material consists ora sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City streets are presently on a five- to seven-year cycle. Before seal coats are applied to the streets, oil spots are removed and asphalt failures are repaired. Asphalt repairs performed at the Dublin Sports Grounds parking lot exceeded the budgeted amount as the repair was more extensive than originally estimated. During repair operations, the Contractor encountered failures extending beyond the original marked areas and it was necessary to repair the pavement failures to ensure a lasting Slurry Seal. This year's project also experienced a cost overrun in the street repair. Cause of this overrun was due to the last-minute addition of Elk Court for street repair. The addition was a response to the residents' concern over the deteriorating condition of the street. Repairs at Serra Court also contributed to the higher costs because extensive damage to the subgrade caused by the subterranean springs made it necessary to repair more area than originally estimated. Slurry sealing and striping of the Dublin Sports Grounds and Civic Center parking lots were included in the Slurry Seal Street Program because of the similarity of work. Attached as Exl~bit 2 is a Budget Change Form, which will appropriate funds in accordance with the final project costs. The overrun on the Street portion of the project will be funded by an additional appropriation fi-om Gas Tax Reserves. The Par'king Lot overrun will be accounted for with a transfer fi.om the Budgeted Contingent Reserve. The City Engineer has reviewed the work on the project and determined that it is complete and in accordmnce with the approved specifications. Staffrecommends that the City Council accept the improvements under this contract and approve the budget change to cover all improvement costs. .. 1997 SLURRY SEAL PROGRAM Area 1 Juarez Lane Peppertree Road (Silvergate to Shannon) Castillian Road (Silvergate to Padre) Padre Way Fenwick Way Fenwick Place Fenwick Court Royston Court. Waterford Court Zapata Court TOTAL - AREA 1: Sq. Ft. 15,500 67,635 58,797 30,553 56,510 15,900 14,800 7,504 7,504 8,218 615,489 Los Ranchitos Court Marquita Court Hadan Road Via Zapata Bloomington Way (Marwick to Southwick) Bloomington Court Putnam Court Castillian Court Murietta Cour[ Marwick Drive Marwick Court Sq. Ft. 13,750 4,900 15,500 66,850 130,600 7,504 6,947 4,9O0 12,097 64,800 6,720 Area 2 Jade Circle Agate Way Sapphire Street Turquoise Street Sa. Ft. 39,000 15,000 18,000 27,000 Onyx Place Pearl Place Topaz Circle Quartz Circle Coral Way Sq Ft. 6,000 11,200 43,5OO 39,000 24,000 Dublin Sports Grounds Pa~ing Lot 65,118 Civic Center (parking lots, roads) 119,989 TOTAL SQUARE FEET 1997 SLURRY SEAL ~,023.296 CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM #. -~ New Appropriations (City Council Approval Required): Budget Trans~: _~.__ From Unappropriated Gas Tax Reserves X From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Nme: ,~ I Name: GAS TAX- S~eet Maintenance - ~ Impvts Account #: ADDITIONAL APPROPRIATION $ 6,969.00 FROM RESERVES Account#: 206-3020-750-050 Name: Name: Account #: Account #: Name: GENERAL FUND-Non-Deparanental Name: GENERAL FUND-Park Maintenance Budgeted Contingent Reserve Improvements <$ 7,131.00> TRANSFER FROM BUDGETED CONTINGENT RESERVE $ 7,131.00 Account #: 001~1080-799-000 Account #:001-8020-750-050 City Manager: Date: ;REASON FOR BUDGET CHANGE ENTRY: A single contract was used to perform the Annual Street Slurry Seal Program on City Streets and the sealing ofparklng lois at the Civic Center and Sports Grounds. Pavement Failure Repair for both surface streets and Dublin Sports Ground were more extensive than initially anticipated. In order to immediately address deteriorating conditions, Elk Court was added to the project. Additionally, S~ra Court required more repair because of damage to the subgrade caused by underground spring water. This Budget Change will appropriate an additional amount of-Gas Tax Funds from Reserves. When failure repair began on the Sports Grounds Parking Lot, areas beyond those originally outlined were found to be in need of repair. The cost overrun is proposed to be covered by a mmsfer from the General Fund Budgeted Contingent Reserve. Signature Mayor: Date: Signature Posted By: Signature Date: