HomeMy WebLinkAboutItem 7.1 SB 343 In-Pavemt Light Crosswalk~a~~~~'
~~
~_ ~ _~.
~~
~-,_ .~
S B 343
Senate Bill 343 mandates supplemental materials that have been
received by the City Clerk's office that relate to an agenda item after
the agenda packets have been distributed to the City Council be
available to the public. This document is also available in the City
Clerk's office, the Dublin Library, and the City's Website.
The attached document was received in the City Clerk's office after
-distribution of the March 3, 2009 City Council meeting agenda packet.
G:\CC-MTGS\FORMS\SB 343 Form.doc
.---~
~~
3-3--0~
~~ f
~~
_i~~.
\~V/~
CITY CLERK
File # QOQQ-Q~
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: March 3, 2009
SUBJECT: Award of Bid - Contract No. 08-16, In-Pavement Lighted Crosswalk
- Amador Valley Boulevard at Wildwood Road
Report Prepared by: Melissa A. Morton, Public Works Director
ATTACHMENTS: 1) Location Map .
2) Bid Results
3) Resolution of Award
RECOMMENDATION: Adopt the resolution awarding Contract No. 08-16, In-Pavement
Lighted Crosswalk - Amador Valley Boulevard at Wildwood Road,
to Pleasanton Engineering, Inc.
FINANCIAL STATEMENT: There were 15 bids received, the lowest of which was for $42,950
submitted by Pleasanton Engineering, Inc.
Budgeted for
Construction Actual Low Bid
Phase I: In-Pavement Lighted Crosswalk $ 50,000 $ 42,950
Phase II: Bike Lanes and Pedestrian Improvements 50,000 Not yet bide
TOTAL: $100,000
REVISION: This project is funded by designated Developer
Deposits and Measure BBike/Pedestrian Funds.
DESCRIPTION: This Capital Improvement Project, "Bike Lane - Amador Valley
Boulevard Corridor" (CIP No. 96778), is being constructed in two phases. The first phase will construct
an in-pavement flashing light crosswalk across Amador Valley Boulevard at Wildwood Road (Attachment
1). The crosswalk will facilitate traffic awareness and improve safety for those pedestrians and bicyclists
who are traveling. north-south on the Alamo Creek Trail, and wish to cross Amador Valley Boulevard.
-------------------------------------------------------------------------------------------------------------
COPY TO: Bidders
Page 1 of 2
ITEM NO. '
G:\CIP\AVB Bike Lane -Crosswalk (CIP 96778)\agst Award of Bid.DOC
The second phase of the project will extend the on-street bicycle path along Amador Valley Boulevard
and modify the existing striping to conform to the latest Class 2 bicycle path codes.
A total of fifteen (15) bids were received for the Phase I project (Attachment 2). The low bid of $42,950
was submitted by Pleasanton Engineering, Inc.
RECOMMENDATION: Staff recommends that the City Council adopt the resolution awarding
Contract No. 08-16, In-Pavement Lighted Crosswalk - Amador Valley Boulevard at Wildwood Road, to
Pleasanton Engineering, Inc.
Page 2 of 2