Loading...
HomeMy WebLinkAbout8.1 Attmt 6 Traffic Assessment by J. Bourgeois 04-01-2009Page 1 of 1 Jamie Rojo From: Jaimee Bourgeois Serit: Wednesday, April 01, 2009 6:20 PM To: Jamie Rojo Cc: Jeff Baker Subject: Bright Horizons Jamie, Based on information already available, I assessed the need for a traffic study for this project. First, I estimated project trip generation using ITE rates; specifically, I calculated net new trips to the roadway network above what the existing use is generating. I estimated that the project will generate about 63 net new peak hour trips. This is below the threshold of 100 peak hour trips that would trigger a CMA-required analysis. As for City requirements, the need for a traffic study for projects generating less than 100 peak hour trips is determined on a case-by-case basis based on project location and characteristics. Using a traffic operations technical analysis conducted last year at several key intersections in the vicinity of the project, I was able to determine that the contribution of the project traffic to the roadway network would not result in any impacts. Also, there appears to be adequate stacking space in the eastbound left-turn pocket. As such, a traffic study to assess off-site impacts will not be required. I will attend tomorrow's meeting to discuss on-site issues. Jaimee Jaimee Bourgeois, P.E. Senior Civil Engineer (Traffic) City Traffic Engineer City of Dublin 100 Civic Plaza Dublin, CA 94568 (925) 833-6630 5/8/2009 Attachment 6