Loading...
HomeMy WebLinkAboutItem 4.04 Slurry Seal Programti~ -~-~ \~:~ CITY CLERK File # ^~~~- 3^a `1GIFOIZ~`' AGENDA STATEMENT CITY COUNCIL MEETING DATE: -June 2, 2009 SUBJECT: Acceptance of Work -Contract No. 08-13, 2008 Annual Slurry Seal Program Report Prepared by: Melissa Morton, Public Works Direct//o^rj~_]Yf ATTACHMENTS: None RECOMMENDATION: Accept improvements under Contract No. 08-13, 2008 Annual Slurry Seal Program, and release of retention if there are no subcontractor claims FINANCIAL STATEMENT: Improvements are funded through Gas Tax monies (Fund 206) for street resurfacing improvements and Measure B Bike & Pedestrian Funds (Fund 227) for bike lane striping and signing. The following are the improvements costs for this capital project: y. ~ yy~~ `T NENTa pus- CON'S' ~ ASS A ED '~~ ,~: ~ = :~ ~ ~~ f f. ~~~ ESTI~^ ~'' U ,~ `. ~ T GAS TAX: Contract Improvements $ 543,041 $ 550,580 (Sl Seal; Stri in Construction Contin enc Allowance $ 54,304 Sub-Total Gas Taz $ 597,345 $ 550,580 $ 46,765 MEASURE B -BIKE / PED: Bike $ 38,447 $ 33,195 Lane Stri in and Si nin Sub-Total Measure B Funds $ 38,447 $ 33,195 $ 5,252 GRAND TOTAL IMPROVEMENTS $ 635,792 $ 583,775 $ 52,017 DESCRIPTION: On September 16, 2008, the City Council awarded Contract 08-13, Annual Slurry Seal Program, to Graham Contractors, Inc. Slurry seal is a preventative maintenance technique used to prolong the life of asphalt concrete surfacing. As streets begin showing wear and stress cracking, it is important to seal the cracks to keep water from ------------------------------------------------------------------------------------------------------------- COPY TO: Graham Contractors Page 1 of 2 / L ITEM NO. ~ "'~" G:\CIP\SLURRY SEAL\2008\AS acceptance.doc getting into the roadway subgrade. Slurry consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The following streets were slurry sealed as part of the 2008 Program: Street Dublin Boulevard San Ramon Road Tassajara Road Bloomington Way Fenwick Way Marwick Drive Marwick Court Bloomington Court Fenwick Court Fenwick Place Waterford Court Royston Court Putnum Court Project Limits Dougherty Road to Hacienda Drive Silvergate Drive to Dublin Boulevard I-580 to North Dublin Ranch Drive Marwick Drive to Augusta Court Bloomington Way (south) to Bloomington Way (north) Fenwick Way to end Marwick Drive to end Bloomington Way to end Fenwick Way to end Fenwick Way to end Bloomington Way to end Bloomington Way to end Bloomington Way to end The total slurry seal area in the 2008 Program is approximately 1.6 million square feet. This project also included bicycle lane striping on San Ramon Road, Dublin Boulevard and Tassajara Road as proposed by the Citywide Bikeways Master Plan. The bicycle lane striping and signing is funded through Alameda County Measure B Bicycle & Pedestrian funds. RECOMMENDATION: Staff has inspected the work and recommends that the City Council accept the improvements under Contract No. 08-13, Annual Slurry Seal Program, and release of retention if there are no subcontractor claims. Page 2 of 2