HomeMy WebLinkAbout8.2 Attmt 3 AgStmt 10-14-2008 SSAGENDA STATEMENT
PLANNING COMMISSION MEETING DATE: October 14, 2008
SUBJECT: STUDY SESSION: PA 08-006,'I'he Promenade at Dublin Ranch-
Site Development Review and Conditional Use Permits for a
fitness center, outdoor restaurant seating, and shared parking at
the northeast corner of Grafton Street and Dublin Blvd, also
known as Parcel 5 of Tentative Parcel Map 9717.
Keport Prepared by Mike Porto, ('onsulting Planner
ATTACHMENTS: t) Applicant's Proposal/Design Package
RECOMMEN ~l 1) Receive Staff presentation and provide direction.
PROJECT DES~PTION:
The Promenade is the commercial component, or 22-acre Village Center area, comprised of six
development parcels within Area G of the Eastern Dublin Specific Plan approved as a part of the Dublin
Ranch Master Plan. Area G covers approximately 86.9 acres and identifies 13 development sites,
including the six Village Center parcels. The Dublin Ranch Master Plan is located within the Eastern
Dublin Specific Plan and is subject to the goals, objectives, policies, procedures, and programs of that
plan. The proposed project is located on proposed Parcel 5 for Parcel Map 97]7, a 3.72-acre site which
represents the first phase of the area commonly known as The Promel lade.
Location
Generally Area G is bounded by Central
Parkway on the north, Keegan Street on the
east, Dublin Boulevard on the south, and
Brannigan Street on the west. The development
sites for Medium High and High Density
Residential uses along the easterly and westerly
segments of Area G have ah•eady been
developed. The Village Center, or The
Promenade, is proposed to be developed along
both sides of Grafton Street, the north-south
connection which bisects Area G between
Dublin Boulevazd and Central Parkway and will
serve as the local Main Street for the
surrounding neighborhoods in Eastern Dublin.
The proposed project on Parcel 5 represents the
gateway to The Promenade at the northeast
corner of Grafton Street and Dublin Blvd.
DUBLIN
r.eeurwruv
.v.,....~.1 avuiwo
Map 1: Vicinity Map
COPIES TO; The Applicant
The Property Owner
Page 1 of 8
G:IPAMITlXI81PA M-0(M Club Spore PromerurdelPCSli SludySesson.doc
ITEM NO.
Attachment 3
Parcel 5 is located north of Dublin Boulevard, south of Finnian Way, east of Grafton Street, and west .of
Dublin Ranch residential Site H2 within Area G currently developing as The Terraces, a residential
townhouse project.
MAP 2: Project Site
F..risting U.se
The 3.72 acre project site is currently vacant and generally flat with a slight slope (I% average) from the
northwest to the southeast. There arc no trees on site, and to date, some preliminary grading has occurred
to return the site to its original topographic condition. Recently Tol'. Brothers has used a portion of [his
site for their Master Sales Facility, which has been removed. Much ~f the Village Center area, including
Parcel 5. was being used for the staging and storage of materials and _quipment for the many construction
projects currently in progress. These uses have all been eliminated and the site is now vacant.
Snrrourrding Uses
The project site is bounded: a) to the north by Parcel 2 of the Promenade which currently is vacant
property approved for Neighborhood Commercial uses; b) to the east by a multi-use trail system
separating the project site from the high-density residential Site developed as The Terraces, a residential
townhouse project: c) to the south across Dublin Boulevard by vacant property designated for Campus
Office Development; and d) to the southwest (across Dublin Blvd. at Grafton Street) by the Grafton
Station development site. which is currently under construction.
Bnckgrorurd/Previorrs Approvals
In March of 2000, Areas F, G and 1 [were subject to Stage 1 and Stafe 2 Planned Development Rezoning
approved by Ordinance 06-00 (approved March 2l, 2000). The PD zoning district was adopted as PD-
Village Center for Parcels 1 through 6 with the intent and purpo~.e of creating apedestrian-oriented
service, retail, commercial and entertainment center serving the daily needs of the surrounding residential
neighborhoods and intermittent shopping, service, and entertainment opportunities for a wider community
base.
Page 2 of 8
Objectives of the Project
The Promenade is proposed to serve; as the centerpiece for the commercial azea of Dublin Ranch. The
concept of the Village Center land t~se and zoning is to create a Ma n Street within Dublin Ranch along
the north side of Dublin Boulevard. The objective is to create apedestrian-friendly commercial area with
a small town character adjacent to high-density residential neighborhoods. The incorporation. of retail,
office, and fitness/recreation uses will create opportunities for the residents, and enhance the balance of
jobs and housing, as well as reduce ~>r even eliminate vehicle trips azcd traffic congestion due to the close
proximity of residential units.
PROPOSAL:
Proposed Uses
There are three structures proposed for the project including:
• ClubSport Athletic Club and Spa -Two-story building cf approximately 47,669 square feet
anchoring the southwest corner of the site at the intersection of Dublin Boulevazd and Grafton
Street. This full-service private fitness center, spa, and recreation facility would include a fitness
area (weight room and specialized workout areas) group rxen;ise rooms, pool, spa, aerobics
rooms, spa treatment rooms, offices, locker rooms, and a cafi;. Administrative offices and a child
care azea are also included.
The entrance to the building is
located off of an internal
pedestrian paseo that coimects
Grafton Street with a multi-use
regional trail that nms along the
easterly boundary of the project
site. Entrance access is also
available from Grafton Street
which connects to the main lobby,
day spa and workout area on the
first floor. The fitness rooms and
associated facilities aze located on
the second floor. The ClubSport
Cafe will be located on the ground
floor of the building along the
paseo in the section closest to
Grafton Street. The cafe will serve
as the focal social area and will be
open to the public, as well as to
club members. An outdoor dining
azea is proposed as a part of the
cafe. The pool and deck are
situated in an interior courtyard at
'1'
k` IAIhLL'C -~ YAi~ 2
1M Yi
Y
IIAR [YAIEx
_
$ ~.
F NNW/ WAY
y :
~ °'-~ _ _ c t
_ _
y r ,
~ k
°r'-r
I~
`
1
y
„~ ,_
~~ S..
~ r- - ~.
,`. J ~~
~ r I -
r
a
~~
- __.
--
-
~, ~
_ _ --
- F - --
_
~
I. .. _OUBLB. 0411LEV/M _-_. ___.-
_..-. _ __. __. .._... -- ..._- -__
the southerly portron of the f~rcr rty
closest to Dublin Boulevard, and will Mao 3: Proieet Site
include a lap pool, Jacuzzi, and deck space.
ClubSport would have up to 85 permanent staff members with a maximum of 35 individuals
working on the premises dunng any given shift. ClubSport would be open from 5:00 am to 11:00
pm Monday through Friday and from 6:00 am to 10:00 pm on weekends.
Page 3 of 8
• Mercantile Building - A three-story building of approximately 52,71( square feet would be
located at the northwest corner of the site facing Grafon Street south of Finnian Way. Retail and
restaurant uses arc proposed for the ground floor totaling 18,00 square feet. The restaurant uses
arc proposed at a maximum of 7,190 square feet of the 1F.000 square feet near the comer of
Grafton Street and Finnian Way. Office space would occupy the second and third floors. The
hours and days of operation for the proposed retail uses cannot be determined at this time.
}towevcr, the office uses typically would be open from 8: )0 am to 6:00 pm. The Applicant
anticipates that the hours and days of operation for The Pronenadc will be similar to uses in the
City of Dublin of comparable size and type.
• Parking Structure -The project provides for 477 spaces wh~.ch includes on site spaces as well as
curbside parking along Grafton Street and Finnian Way. A four-level parking structure is located
in the northeast portion of the project site which includes 407 parking spaces and is accessed from
the surface parking lot area along the easterly side of the site. A 21-foot wide service alley
separates the parking structure from the Mercantile buildirg. Access to this service corridor
would he through gates at each end and through the rear doors of the individual spaces in the
Mercantile building. There is no pedestrian access from the parking structure to the service yard
in addition to the parking structure. A surface parking lo: of 55 spaces is located along the
easterly property. Thcrc are also 15 on-street spaces on Grafton Street along [he Project frontage.
A Shared Parking study; dated September 3, 2008 was conducted by T.iKM for ClubSport. The
study concluded that the parking provided would be sufficient to serve peak parking demand for
the proposed mix of uses.
TABLE 1: PARKING
LEVEL 1 ~~~~~ li,i
Standard Parking Spaces 53 t~~f
'TOTAL 55 4" ~'' 171
LEVEL 2 & 3
TOTAL "' i ~' 204
I LEVEL4 ~~ lyki
TO L VIDED SPACES 55 ~~~ ~ ~ ~ ~~~ ~. 477 ~
Conditionnl Use Permits
• Fitness Center -Based on the PD-Village Center zoning adopted with permitted and conditional
uses, private recreational facilities (both indoor and outdoor) are classified as a conditional use
requiring a Conditional Use Permit (CUP). Therefore tie ClubSport facility requires the
authorization of a CUP.
• Outdoor Seating - As part of the main street character, outdoor seating in the style of a sidewalk
cafe has been requested for the ClubSport Cafe along the paseo between the two buildings and for
the restaurant uses anticipated for the ground floor of the Mercantile Building along Grafton
Street. Dining areas are proposed to be partitioned with railings, hardscape, and potted plants that
will not interfere with pedestrian traffic.
Page 4 of R
• Shared Parking - Reductio~rs for shazed pazking aze allowed by CUP according to Chapter 8.76
F. of the Zoning Ordinance:. The shared parking study 1br the proposed project by TJKM
concluded that the 477 spaces would satisfy sufficient peak h~~ur parking demand for the proposed
mix of uses.
All 3 of these activities require authorization of a CUP. The CUP findings will be a part of the Staff
Report for the Public Hearing at a future date.
Design Standards
The proposed project is consistent with the Stage 1 and 2 PD aFproved March 21, 2000. The Site
Development Review includes: site plan, architectural design, landscape plan, and streetscape
improvements. In accordance with the Design Standazds, the buildings aze sited; i) close to the street,
and 2) include facades with azchitectural offsets. The circulation is pedestrian-friendly by featuring
paseos with the buildings oriented towards Grafton Street designed as the "main street " Amid-block
crossing and gateway entry plazas have also been incorporated in t re design. Pazking is located at the
reaz (easterly design of the site) so as not to dismpt the continuity of the streetscape. While the site is
currently visible from I-580 the ultimate view will be blocked by Grafton Station (project to the south
currently under constmction). The project is not within a scenic corridor or designated view zone.
Subject to approval of the requested Conditional Use Permits for the Fitness Center, outdoor seating and
shazed parking, the proposed project is consistent and compatible with the zoning and designated land
use.
The description of architecture for the 3 proposed buildings is below:
Architecture
• ClubSport Athletic Club and Spa -The two-story structure is designed to represent an old Main
Street developed over time, incorporating varied design details found in many of the older
communities in Central Califomia. Detailing includes stone v Wainscot, decorative stone bands, and
decorative trim at the cornice level, as well as stone inset elements reminiscent of an older
stmcture. At the ground level, lazge retail display windows a ddress pedestrians and articulate the
sidewalk. Awnings are set at multiple levels to create a canol.y and provide color and shade. The
comer of the building is set in a radial pattern to face the Primary streets, frame the pedestrian
plaza, and create a possible location for public art.
The south building elevation adjacent to Dublin Boulevard, w rich conceals the pool area, has been
a concern to Staff. We have been working with the Applicant and his azchitect to create a more
dynamic elevation. Various proposals were made to revise the Dublin Boulevard elevation to
eliminate the wood product (See "Architecture" Tab, page A.1 of Attachment 1). A revised
elevation was presented which will meet the Planning Commission's objectives of high quality
sustainable materials. Unfortunately, there was not enough t me to have the architect revise their
submittal documents. The revised elevation incorporates a gl ass store front motif which proposes
opaque glass for a portion of the glazing to provide privac ~ to the pool azea and to screen an
interior access corridor. Shapes, shadows and movement will be visible creating interest and
activity. Production times did not allow the "revised" el~:vation to be incorporated into the
Applicant's submittal package; therefore, the revision v ill be presented to the Planning
Commission at the Study Session.
• Mercantile Building -The :architecture of this 3-story building is typical of the older mercantile
buildings found in urban centers throughout the country an•:1 in smaller Califomia towns. The
detailing is similar to ClubSport, utilizing stone wainscots at the building base, lazge expanses of
storefront glass, lower awnings to provide color and scale at :he pedestrian level, and articulation
Page 5 of 8
of cornice detailing and vertical stone insets. signage is proposed as a combination of storefront
signage and wall hanging signage that evokes an older style :md quality. (See "Architecture" Tab,
page A.3 of Attachment 1).
• Parking Structure -The 4-level parking structure has been designed in the style of an old
wazehouse that would be found adjacent to an urban core of older mercantile buildings. It has an
open style, but designed to minimize the visual impact of fte decks while still accentuating the
warehouse look and form. 7'he structure is detailed to comp ement the ClubSport and Mercantile
buildings with the inclusion of elements such as an upper trel; is/blind, and vertical stone accents to
carry the contemporary Central California theme. An old packing crate graphic would be added to
the side of the building facing Finnian Way to further enhance the old warehouse look and feel.
The lazger expanses of wall have been color blocked and detailed with reveals and stone insets to
create an interesting visual effect and reduce the mass ofthe structure.
Visual sight lines to the parking areas and lighting from the :adjacent 4-story residential project to
the east and the proposed Mercantile Building to the west will be mitigated through the proposed
trellis details on the sides of the structure. (See "Architecture' Tab, page A.4 of Attachment 1).
Deve%pment Standards
The proposed project complies with the development standards as d;fined in the Stage II PD, relating to
the building height, setbacks, and coverage.
Access and Circulation
Access to the project site is taken from a driveway off of Dublin Bc ulevazd which leads into the surface
pazking lot. This lot also has driveway access through to Finnian W~ y. Access to the pazking structure is
from the surface parking lot. A pedestrian paseo traverses the site connecting Grafton Street to the
north/south multi-use trail. A systemwide multi-use trail runs along the easterly boundary of the project
site connecting Dublin Boulevazd with the multi-use trail along Finnian Way along the northerly
boundary. All streets and traffic improvement adjacent to the site will be completed as part of the overall
project
Landscape/Streetscape
The project site has been designed to complement the Grafton :station retail project located to the
southwest utilizing similaz materials in various patterns while prow ding for an upscale, yet traditional,
street scene. Similar plant materials are proposed for continuity. C mcrete pavers in varied patterns are
used to highlight the architecture and contribute towazds the street : cene. Accent pavers in wide bands
across the sidewalk will link to accent pavers at the building edge. A 14-foot wide sidewalk, which is
wider than the 12 feet required by the Planned Development design ,tandazds, helps to accommodate the
proposed outdoor dining.
The Design Guidelines establish the corners of Grafton Street at both Dublin Boulevard and Finnian Way
as main street plazas. A water feature is proposed at the corner of Grafton Street and Finnian Way in
front of the Mercantile Building which incorporates a seat wall/water basin, colored pavement, and accent
landscape materials. Pedestrian areas, paseos, and spaces adjacent to the multi-use trail will be equipped
with benches, bicycle racks, trash receptacles, lighting, bollards, anc f potted plant materials to allow for
resting, utility, and enhancement of the pedestrian scale. The pase~, connecting Grafton Street and the
multi-use trail to the east has a dramatic water fountain as its focal p~ pint which can be seen from Grafton
Street and the multi-use trail The paseo extends as amid-block cn ~ssing of Grafton Street. The street
improvements are consistent and comply with the adopted street sc coons and design standards for the
Village Center, as well continuity from block to block adjacent to the project site. Street trees are located
in grates at the curb line while specimen plants are placed in uniquel; designed pots at columns along the
building edge.
Page 6 of 8
Proposed Parking
The project provides for 477 spaces. This total includes 407 spaces in the proposed parking structure, 55
spaces on site in a surface lot along the easterly boundary of the proj :ct site, and 15 curbside spaces along
Grafton Street and Finnian Way. Based on the proposed occupancies and uses within each building, the
required parking would be 530 spaces. A Shared Pazking study dared September 3, 2008 conducted by
TJKM for C1ubSport concluded that peak parking demand at 6:00 pr i would be 452 spaces, and therefore
concluded that 477 spaces would be sufficient. As described in a p~ evious section of this Staff Report, a
CUP would be required for shared pazking.
Public Art
The proposed project is subject to the public art requirements
proposed public art compliance plan (See "Public Art" Tab, p.
locations for public art at the corner of Dublin Boulevazd and C
north of the mid-block crossing and paseo.
Envrronmenaa/
of the City's Zoning Ordinance. The'
ge C.8, Attachment 1) shows possible
raf:on Street and on Grafton Street just
Based on previous environmental documents, no environmental review is required as the project does not
create additional environmental imp;xct.
RECOMMENDATION:
Staff recommends the Planning Commission receive Staff presentaticn and provide direction.
Page 7 of 8
GENERAL INFORMATION:
PROPERTY OWNER:
APPLICANT:
LOCATION:
EXISTING ZONING:
GENERAL PLAN DESIGNATION &
EASTERN DUBLIN SPECIFIC P1.,AN:
PUBLIC NOTIFICATION:
James Tong
Charter Properties
4690 Chabot Drive, Suite 100
Pleasanton, CA 94588
James Tong
Charter Properties
4690 Chabot Drive, Suite 100
Pleasanton, CA 94588.
North of Dublin Boulevard, east area of Grafton Street, south
of Finnian Way and east ~~f the H2 Residential neighborhood
APN: 985-0009-009-0:
PD-Village Center
NC Neighborhood Commercial
In accordance with State law, a public notice was mailed to all property owners and occupants within 300
feet of the proposed project to advertise the project and the upcoming public hearing. A public notice was
also published in the Tri-Valley Herald and posted at several location.: throughout the City.
Page 8 of 8