Loading...
HomeMy WebLinkAbout4.16 Iron Horse TrailCi'TY CLERK File # 600-40 # 1060-90 AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 6, 2000 SUBJECT: Capital Improvement Budget Revisions for the Iron Horse Trail (Amador Valley Boulevard To Northerly City Limit) and the Pavement Management System Update Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Budget Change Form - Iron Horse Trail 2) Budget Change Form - Pavement Management System Update RECOMMENDATI~ FINANCIAL STATEMENT: Approve Budget Changes for the Iron Horse Trail and Pavement Management System Update iRON HORSE TRAIL PROJECT BUDGET FINAL COST 1998-1999 1998-1999 1999-2000 TOTAL Salaries/Inspection/Misc. Design Survey Improvements $4,000.00 $4,652.00 $6,565.00 $11,217.00 $17,733.00 $21,651.00 $0.00 $21,651.00 $5,000.00 $846.00 $8,612.00 $9,458.00 $88,229.00 $75,106.00 $19,428.00 $94,534.00 TOTAL: $114,962.00 $102,255.00 $34,605.00 $136,860.00 This project was administered by City of Pleasanton as a joint project. These budgeted numbers do not reflect the various grants that were paid directly to Pleasanton. The Dublin project, including all grant funding, cost $317,324. The additional cost represents 6.9% of the total project. PAVEMENT MANAGEMENT SYSTEM UPDATE BUDGET 1999-2000 ACTUAL COST Salaries/Misc. (Gas Tax) COnsultant (Gas Tax) Consultant (Tea 21) $ 1,000 1,917 14,333 $17,250 $ 7,342 1,915 0 $ 9,257 (Grant paid directly to Consultant through MTC) g:~niscproj\pms\agst budg chng COPIES TO: ITEM NO. DESCRIPTION: The Iron Horse Trail north of Amador Valley Boulevard and the Pavement Management System Study Update are now complete and require budget changes. The Iron Horse Trail project was originally scheduled to be completed in FY 1998-1999; however, due to channel repairs in Pleasanton, this project was extended into FY 1999-2000. The total project cost was $317,324 and the additional cost to the City is $21,898. The increase (6:9%) is due to change orders to stabilize unsuitable soil and increase in drainage pipe. Since there were no monies budgeted in FY 1999- 2000, a budget change is required. The Pavement Management Update changed from the original proposal. The MTC grant in the amount of $14,320 was originally anticipated to be paid to Dublin to hire the consultant, but MTC actually paid the consultant directly. Also, the grant was not large enough to cover the survey of all of Dublin's streets, and Staff performed about half of the street condition surveys. This necessitates a budget change. Staff recommends that the City Council approve these .budget changes. CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From New Revenues From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other l~lame: Name: General Engineering (Salaries) $ 6,565 Iron Horse Trail (Salaries) $ 6,565 Account #: 001-90300-701-001 Account #: 001-96050-701-001 Name: Name: Iron Horse Trail (Survey) $ 8,612 Account #: Account #: 001-96050-740-080 Name: Name: Iron Horse Trail (Improvements) $19,428 Account #: Account #: 001-96050-750-050 Name: Name: ~ Account #: Account #: "hame: Name: Account #: Account #: Signature REASON FOR BUDGET CHANGE ENTRY: This Iron Horse Trail project-was anticipated to be completed in FY 1998-99, but extended into FY 1999-00 without a budget. City Manager: Mayor: Date: Signature ' As Approved al the City Council Meeting on: Date: Date: Signature CITY OF DUBLIN, BUDGET CHANGE FORM cHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From New Revenues From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: General Engineering (Salaries) $ 6,270 Pavement Management System Update $ 6,270 (Salaries) Account #: 001-90300-701-001 Account #: 206-96291-701-001 Name: Name: Pavement Management System Update ' $14,333 Pavement Management System Update $ 72 (Expenditure - Consultant) (Mileage) Account #: 210-96291-740-000 Account #: 206-96291-7222000 Name: Name: Pavement Management System Update $14,333 (Revenue - TEA21) Account #: 210-559-003 Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: I Fin Mgr/ASD: f""~-"~.CL g~'r..,..~x/'~ Date: Signature REASON FOR BUDGET CHANGE ENTRY: This project required additional Staff time to analyze' roadway conditions, and the Tea21 Grant was paid directly to the contractor through MTC and did not go through the City's accounting system. City Manager: Date: Signature As.A~roVe'dat the city Counc[l Meeting on: Date: Mayor: Date: Posted By: G:miscproj~pms~budgchng 060600 Signature Signature