Loading...
HomeMy WebLinkAboutPC Reso 98-01 PA97-037 Dublin Ranch Tr 6925 VTMap RESOLUTION NO. 98-01 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING THE MASTER VESTING TENTATIVE MAP FOR DUBLIN RANCH PHASE I (Tract No. 6925) PA 97-037 WHEREAS, Ted Fairfield, on behalf of Jennifer Lin, has requested approval of a Master Vesting Tentative Map (Exhibit A) to divide a 220 + acre parcel into 24 parcels for the following uses: Future Residential Subdivisions (10 parcels for eventual development of up to 847 residential units), a school site, a park site, and various other parcels for public and private open space, stream corridors, and street right-of- way, in the Eastern Dublin Specific Plan area; and WHEREAS, a complete application for a Master Vesting Tentative Map is available and on file in the Department of Community Development; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA), CEQA Guidelines Section 15182, the Planning Commission finds that the proposed project is within the scope of the Final Environmental Impact Report for the Eastern Dublin General Plan Amendment and Specific Plan which was certified by the City Council by Resolution No. 51-93, and the Addenda dated May 4, 1993, and August 22, 1994 (the "EIR"), and further finds that the proposed project is consistent with the adopted Eastern Dublin Specific Plan; and WHEREAS, the Planning Commission did hold a public hearing on said application on January 13, 1998; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted recommending that the Planning Commission approve the Master Vesting Tentative Map, subject to conditions; and WHEREAS, a development agreement will be approved prior to recordation of Final Subdivision Maps for the project as required by the conditions of approval of the Eastern Dublin Specific Plan; and WHEREAS, the Planning Commission did hear and use their independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby make the following findings and determinations regarding said proposed Master Vesting Tentative Map: The Master Vesting Tentative Map is consistent with the intent of applicable subdivision regulations and related ordinances, with respect to creating interim lots for future development through subsequent tentative maps. The Master Tentative Map is conditioned to require subsequent tentative maps as necessary to comply with the applicable subdivision regulations and the PD Ordinance. The design and improvements of the Master Vesting Tentative Map are consistent with and conform to the City's General Plan and Eastern Dublin Specific Plan policies as they apply to the subject property, in that it is a subdivision for implementation of a residential project in an area designated for Low Density and Medium Density Residential development. With the approval of the anticipated future individual subdivision maps which will be required in order to create individual residential lots, the project will be consistent with the Planned Development Rezone proposed for this project and is, therefore, consistent with the City of Dublin Zoning Ordinance. The project site is located adjacent to Tassajara Road, and involves construction of new roadways and other improvements, on topography that is physically suitable for the type and density of development planned for the Phase I development. With the incorporation of mitigation measures from the EIR, action programs and policies of the Eastern Dublin Specific Plan, and Conditions of Approval, the design of the interim parcels in the subdivision will not cause significant environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns. The design of the subdivision will not conflict with easements acquired by the public at large or access through or use of property within the proposed subdivision. The City Engineer has reviewed the map and title report and has not found any conflicting easements of this nature. Required public services will be provided to the subdivision, and verification of these services will be provided prior to issuance of any building permits, as required by the Eastern Dublin Specific Plan. NOW THEREFORE BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby approve the Master Vesting Tentative Map for PA 97-037 subject to the following Conditions of Approval: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subiect to Department of Community Development review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL.] Planning. lB] Building, [PO] Police, [PW] Public Works [ADM] Administration/City Attorney, [FIN} Finance, IF] Alameda County Fire Department, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health. TENTATIVE MAP # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: 1.1 PA 97-037, Dublin Ranch Phase I Master PL, PW Approval of N/A Vesting Tentative Map Tract 6925 is approved Any Plan to subdivide the Phase I area (220 _+ acres) into 24 parcels for the following uses: Future Residential Subdivisions (10 parcels for eventual development of up to 847 residential units), a school site, a park site, and various other parcels for public and private open space, stream corridors, and street right-of-way. Approval of this map includes the vested right to develop these parcels with these general uses (no specific unit type or number is vested). The Final Master Vesting Tentative Map shall substantially comply with Exhibit A, the Master Vesting Tentative Map prepared by MacKay & Somps Engineers, dated October, 1997 and received by the Department of Community Development on January 7, 1998, unless modified by the Conditions of Approval contained herein. 1.2 The approval of this Tentative Map shall be PW, PL ~ On-going Standard/ predicated upon and pursuant to the terms set Municipal forth in the Development Agreement to be Code approved by the City of Dublin. The Master Vesting Tentative Map shall expire at the standard time of two and one half(2 1/2) years as set forth in the Dublin Municipal Code and in the regulations of Section 66452.6 of the Subdivision Map Act unless the Development Agreement is terminated at another date. In the event of conflict between the terms of the Development Agreement and thc Conditions of Approval contained herein, the terms of the Development Agreement shall prevail. 1.3 All project construction shall conform to all B Through Standard building codes and ordinances in effect at the Completion time of building perm it. 1.4 Applicant/Developer shall comply with all PL Approval of Standard applicable action programs and mitigation Improvement measures of the Eastern Dublin General Plan Plans through Amendment/Specific Plan and companion Final completion # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: Environmental Impact Report (EIR) that have not been made specific Conditions of Approval of this or previous projects. The City shall determine which of the requirements from these prior approvals are applied at this stage of approval, and which are applicable upon approval of subsequent individual tentative subdivision maps creating residential lots. 1.5 Applicant/Developer shall meet or perform all PW Approval of Standard/ of the requirements of the Subdivision Map Final Map PW Act, and the City's Subdivision Ordinance prior to City Council acceptance of the Master Final Map and/or offers of dedication. The Developer shall comply with the City of Dublin Standard Conditions of Approval, revised September 1997, City of Dublin Zoning Ordinance adopted September 1997, and City of Dublin General Plan, and Eastern Dublin's Specific Plan - Public Works Policies and City Grading Ordinance. In the event of a conflict between the Public Works Typical Conditions of Approval and these Conditions, these Conditions shall prevail 1.6 Approval of this Tentative Map is subject to PW, PL Prior to Standard/ Applicant/Developer securing approval from Issuance of PW the City Council of the proposed Development Building Agreement as required by the Eastern Dublin Permits Specific Plan. The Development Agreement will address such issues as described in the Eastern Dublin Specific Plan, including the specific design, ownership and maintenance of certain open space areas, shall include an infrastructure sequencing program, and shall be recorded. 1.7 Applicant/Developer shall enter into an PW Approval of Standard/ Improvement Agreement with the City for all Improvement PW subdivision improvements. Complete Plans improvement plans, specifications, and calculations shall be submitted to, and approved by, the Director of Public Works/City Engineer and other affected agencies having jurisdiction over public improvements prior to execution of the Improvement Agreement. Improvement plans shall show the existing on-site and off-site subdivision improvements and proposed 4 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: improvements along the adjacent public street and property that relate to the proposed improvements. 1.8 Approval of Master Vesting Tentative Map PW Issuance of Standard/ 6925 is conditioned upon the requirement that Building State Law development be consistent with the approved Permit within Planned Development (PD), including the Land each specific Use & Development Plan, and General project area Provisions, Standards, and Conditions. Subsequent Tentative Subdivision Maps creating individual residential lots shall be required prior to any development occurring, as well as a Development Agreement for the project. Tentative Subdivision Maps creating individual lots must be consistent with the approved PD, and final detailed layout and design of individual residential lots, drive aisles, and streets must be approved by the Alameda County Fire Dept. and Director of Public Works through review of subsequent subdivision maps creating individual residential lots. 1.9 ApplicanliDeveloper shall be responsible for PW, PL Finaling 31-33, payment of: public facilities fees, school impact Building 47, 266 i fees, fire impact fees, affordable housing in-lieu Permits MM fees, specific plan implementation fees, Matrix regional transportation fees, noise mitigation fees, and any other fees adopted by the City and/or noted in Development Agreement. Unissued building permits subsequent to new or revised TIFs shall be subject to recalculation and assessment of the fair share of the new or revised fees. 1.10 All grading, landscaping, and improvements PW, PL Prior to Site Standard within the open space and common areas, Development including the neighborhood park and the Review intermittent stream and open space corridor approval shall be subject to Site Development Review approval. The proposed landscape plans to be submitted with the Site Development Review application shall take into consideration Dublin Ranch Phase I PD Rezone comments prepared by Singer, Hodges, Evans, dated received October 10, 1995. The landscape improvements for separate park, open space, 5 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: and stream corridor parcels shall be installed concurrently with the development of the adjacent residential parcel (i.e.: Parcels A, B, C, D, F, G, H, I, Q, and R), unless otherwise specified by the City Manager or the Dublin Ranch Phase I Development Agreement. 1.11 Except where specified otherwise, references in PW, PL Prior to Standard these conditions to Final Map are meant to refer approval of to the approval and/or recording ora Final Map Final Map for for this Master Vesting Tentative Map, and not this Master the Final Map for subsequent Tentative Map(s) Vesting creating individual lots. At the time of Tentative Map recordation of the Final Master Vesting Tentative Map, any question regarding the applicability of the conditions contained herein, or in the Eastern Dublin Specific Plan, or EIR Mitigation Monitoring Program, which refer to a tentative map shall be determined by the City. 1.12 The Developer shall prepare a subdivision Tract PW, PL Prior to Standard Final map subdividing the existing property approval of into the configuration, size and number of lots Final Map for shown on the submitted Vesting Tentative Map this Master 6925, dated October 1997, in accordance with Vesting the requirements of the Subdivision Map Act Tentative Map and City of Dublin standards. The map shall be reviewed and approved by the City Public Works Director. All land area not designated on the Tentative Map with in a parcel and not designated with a future use shall be designated as "remainder" on the Final Map. Any improvements in designated remainder area shall be reviewed and approved by the Director of Public Works before constructed. 2.1 The Developer shall dedicate for street purposes PW Prior to PW and improve Parcel S and the looped road approval of 12/19/97 parcel labeled as "North Dublin Ranch Drive" Final Map and and "South Dublin Ranch Drive" shown on 1/7/98 Master Vesting Tentative Tract Map 6925, dated October 1997, prepared by MacKay and Somps, and submitted to the City of Dublin. Each street parcel shall have a 72' right-of-way and improvements, including a 40' wide pavement width (curb to curb), 10' landscaped parkway, and 6' sidewalk on each side of the 6 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: pavement. Final road alignment and grade shall be reviewed and approved by the Director of Public Works. The roadway and frontage improvements for the road designated as Parcel S (East / west collector street) shall be dedicated and secured with this final map. Parcel S street Improvements are to be completed within 24 months of recording the Master Final Tract Map 6925 or prior to occupancy of the first building using the street for access, which ever comes first. Street improvements within parcel S shall include all underground utility improvements. All other street improvements of the tract shall be completed within one year of approval of Master Final Map. 2.2 The Developer shall dedicate to the City an 8' PW Prior to PW wide Public Services Easement behind the approval of 12/19/97 right-of-way on both sides of all proposed street Final Map parcels. 2.3 In conjunction with filing the final map, the PW Prior to PW Developer shall provide a bond or other occupancy of 1/7/98 security for the cost of widening Tassajara first building Road to four travel lanes and a two way left turn median, from the northerly intersection of North Dublin Ranch Drive, to Gleason Road. The Developer shall construct and complete these improvements prior to occupancy of the first 25 residential lots. Tassajara Road shall be dedicated as a part of the Final Map. Dedication of right of way along Tassajara Road shall conform to the City's plan alignment for the entire frontage of the project as determined by the Director of Public Works. 2.4 The Developer shall reserve for future PW Prior to PW dedication to a Homeowners Associations approval of 12/19/97 Parcels M, N, P, T, W, and U for open space, Final Map Parcel L for Recreation Facility, and Parcel X for a pedestrian trail. The Developer shall set aside for future dedication to the City of Dublin Parcels K and V for creek improvements, and Parcel J for a park. The Developer shall reserve for future dedication to the Dublin Unified School District Parcels E and O for possible school sims. Parcels L, M, N, P and W will be 7 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE AGENCY REQ'D Prior to: owned and maintained by the Homeowners Association. Thc Master Final map shall contain a note regarding all open space and other common lot parcels, specifying that these areas will be permanently restricted to the designated use. 2.$ The Developer shall obtain an abandonment PW Prior to PW from the City of Pleasanton for their tank approval of 12/19/97 ~ access and Utility Easement from Tassajara Final Map Road to their tank site. A new tank access and utility easement shall be from proposed looped road street dedication labeled "Dublin Ranch parkway" to thc tank site property 2.6 The Developer shall dedicate and improve a = PW Prior to PW paved temporary (Hammerhead) turnaround at approval of 12/19/97 the eastern end of Parcel S for fire and other Street emergency vehicles to turn around, per Improvement Alameda County Fire Department (ACFD) work standard requirements and as approved by the Director of Public Works. 2.7 The Developer shall determine and construct PW Prior to PW survey monuments in all dedicated public approval of 12/19/97 streets and also establish benchmarks in each Street major development area that is shown on the Improvement East Dublin Specific Plan in accordance with work the Subdivision Map Act and to the satisfaction of the Director of Public Works 2.8 North Dublin Ranch Drive, South Dublin Ranch PW Prior to PW Drive and the east-west collector street in approval of 1/7/98 Parcel "S" (as shown on the Tentative Map) Final Map shall be dedicated and improved to residential collector street standards as described in the East Dublin Specific Plan. All access rights along South Dublin Ranch Drive" and Tassajara ! Road will require further analysis for traffic impacts prior to approval of the first Tentative Map for lots in Parcel C. All access rights ! along thc east-west collector street (parcel S) shall be abandoned with the Final Map except along the park and school parcels and at proposed intersections. Relinquishment of access rights shall be shown on the final map. Improvements must be secured prior to filing the final map and completed prior to occupancy 2.9 The Developer shall submit improvement plans PW Prior to PW of the looped road, Street S, and Tassajara Road approval of 12/19/97 for construction improvements for review and Final Map approval by the Director of Public Works. 2.10 The Developer shall offer for dedication all PW Prior to PW property required for the proposed park along approval of 12/19/97 Parcel S with the Final Map. The City may Final Map choose to defer acceptance of the dedication. Improvements in the park shall be constructed as required by the City of Dublin Parks and Community Services Department. 2.11 The Developer shall provide any additional PW Prior to PW Public Utility Easements per requirements of approval of 12/19/97 the Director of Public Works and/or public Final Map utility companies as necessary to serve this area with utility services and allow for vehicular and utility service access 2.12 All public sidewalks, handicap ramps, or other PW Prior to PW street improvements in the curb return area approval of 12/19/97 shall be located within the public right-of-way. Final Map The Developer shall show on the Final Map that the right-of-way at all public street curb returns is a straight line starting from the beginning of the curb return extending to the end of the curb return. The location of improvements and configuration right-of-way shall be approved by the Public Works Director prior to construction. 2.13 Dedication of Land for Park and Recreation PW, PL Recording of PA 95- Purposes shall be offered, as required by the Development 030 approved PD (#95-030) and the Dublin Agreement Ordinance, including the intermittent stream/open space and trail corridors. If the City accepts this dedication of improvements, no credit for these areas and improvements shall be given towards parkland dedication requirements. Land dedications & improvements to public park may be given credit towards parkland dedication requirements. Maintenance of the intermittent stream/open space and trail corridor areas shall be determined by the Development Agreement. 2.14 Driveway accesses, roadways and other ~ PW, PL Issuance of Standard improvements to parkland, stream corridors, Grading Open Space areas, and fire buffer zones Permit and/or between the development areas and open space approval of areas are subject to the approval of the City. Individual Plans showing the improvements, grading, and Tentative 9 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: landscaping in these areas shall be submitted Maps with the applications for Tentative Maps creating individual residential lots and/or the grading permits for such developments, whichever comes first. 2.15 A current title report and copies of the recorded PW Approval of Standard deed of all parties having any recorded title Final Map interest in the property to be divided, copies of the deeds, and the Final Maps for adjoining properties and easements shall be submitted as deemed necessary by Director of Public Works. 2.16 Unless otherwise stated, all dedications shall be PW Approval of Standard done as part of the Final Map and Final Map Improvements must be secured prior to Final Map and constructed prior to initial occupancy. If the developer constructs any portion of the Eastern Dublin TIF in its ultimate location, the Developer shall receive TIF credit for that work. 3.1 The Developer shall submit a Master Drainage PW Prior to PW Study of the Phase I development area and all approval of 12/19/97 other contributory drainage areas (including Final Map areas A, B-E) surrounding the project to the storm drain structures located south of the project along 1-580. This Study shall include an analysis of impacts of the increase of storm water flows due to development of this project and surrounding Dublin Ranch projects on the existing drainage and describe the improvements that will need be constructed to mediate such impacts. The Study shall include hydrology and conceptual hydraulics calculations of existing and proposed final storm drain lines and channels to 1-580 and/or Tassajara Creek. The Study shall be completed before the Final Map approval to the satisfaction of the Director of Public Works and Alameda County Flood Control and Water Conservation District Zone 7. 3.2 The Developer shall design and construct all PW Prior to PW needed storm drain lines and structures in approval of 12/19/97 public right-o£-ways in order to properly handle Final Map the drainage flows of this project to designated creeks or channels to the satisfaction of the 10 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: Director of Public Works. The Developer shall obtain any drainage easements needed to construct drainage improvements prior to filing of the Final Map. 3.3 Drainage entering thc creek should enter PW Prior to PW through reinforced concrete pipes and be approval of 12/19/97 protected with outfall structures, as shown on Final Map Alameda County Flood Control and Water Conservation District (ACFC&WCD) Standard Drawing SF-605. 3.4 Known water wells without a documented PW Prior to PW intent of future use, filed with Zone 7, are to be approval of 12/19/97 destroyed prior to any demolition or Final Map construction activity in accordance with a well destruction permit obtained from Zone 7. 3.5 The Developer shall comply with all PW Prior to PW ACFC&WCD (Zone 7) requirements and approval of ! 2/19/97 applicable fees, unless otherwise approved by Final Map Zone 7 and/or Director of Public Works. 3.6 Applicant/Developer shall ensure that areas PW On-going 267 undergoing grading and all other construction MM activity are watered or other dust control Matrix measures are used to prevent dust problems as conditions warrant or as directed by the Director of Public Works. ApplicanffDeveloper shall keep adjoining public streets and driveways free and clean of project dirt, mud, materials and debris, and clean-up shall be made during the construction period as determined by the Director of Public Works. 3.7 The Applicant/Developer shall prepare plans PW Issuance of 199 for the periodic inspection and maintenance of Grading MM subsurface drainage features, and the removal Permit Matrix and disposal of materials deposited in surface drains and catch basins. 3.8 If required, Applicant/Developer shall obtain PW, Issuance of PW permits from Alameda County, Zone 7 (Zone CO, Building 12/19/97 7), and California Department of Fish & Game Zone 7 Permit or as to discharge/construct drainage improvements stipulated by within creek/intermittent stream areas. Zone 7 3.9 This project is subject to the payment of PW, Issuance of PW drainage fees through the City of Dublin to Zone 7 Grading 12/19/97 Zone 7. Permit 3.10 The project shall comply with all applicable PW, PL Issuance of EDSP grading guidelines as indicated on page 103 of Grading 11 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE AGENCY REQ'D Prior to: the Eastern Dublin Specific Plan. Permit 3.11 Grading Plans and subsequent individual PW, PL Issuance of EDSP tentative maps for the project shall demonstrate Grading compliance with the Eastern Dublin Specific Permit Plan's scenic corridor, development standards and grading policies and action programs through a detailed visual analysis submitted with each Grading Permit and/or subsequent Tentative Map application creating individual residential lots (whichever comes first). 4.1 Concurrent with Final Map approval, the PW Approval of Standard Developer shall submit and obtain approval Final Map from the City of Dublin Director of Public Works all Improvement Plans and Grading Plans of the project. The improvement plans for this Master Vesting Tentative Map (including Improvement Plans, Grading Plans, and subdivision maps) shall be prepared, designed, and signed by a registered civil engineer to the satisfaction of the Director of Public Works in accordance with the Ordinances, standards, specifications, policies, and requirements of the City of Dublin using standard City title block and formats. 4.2 The developer shall prepare a mass grading PW Prior to PW plan, Erosion Control Plan, and Storm Water approval of 12/19/97 Pollution Prevention Plan for review and Final Map approval by the Director of Public Works. This mass grading plan will show all cut and fill slopes, rough grade contours, benching, keyways, slide repair, subdrains, cut/fill daylight lines and depths of the cut and fills of soil in and around the development in order to show the City how each lot subdivision can achieve as close as possible a dirt balance condition. This grading will show all open area parcels and major slopes graded as close as possible to final grades defined by the East Dublin Specific plan for this phase of the project. The erosion control plan will show best management practices for controlling erosion and sediment in accordance the State Regional Water Quality Control Board 4.3 Mass grading of the site, if not accomplished PW Prior to PW 12 # CONDITION TEXT ~t£SPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: prior to filing of the Map, shall be bonded prior approval of 12/19/97 to filing the Map and completed under the Final Map terms of a Tract Development Agreement. Mass grading of the school and park shall be included in the Tract Development Agreement 4.4 The Developer shall design and construct North PW Prior to PW i and South Dublin Drive for a safe sight distance approval of memos and design speed consistent with the Specific Final Map 12/19/97 Plan for Eastern Dublin, the City's General and Plan, Caltrans Design Manual and to the 1/7/98 satisfaction of the City Engineer/Public Works Director. 4.5 The Developer shall prepare a Storm Water PW ' Prior to PW Pollution Prevention Plan with the grading approval of 12/19/97 plans for review by the Director of Public Final Map Works. This plan shall address the post construction impacts of erosion control and sediment generated by subdivisions inside the Master Tentative Map 4.6 In conjunction with filing of subsequent Final PW Prior to PW Maps, which create in excess of 620 residential approval of 1/7/98 lots or causes the ADT of Tassajara Road to subsequent exceed 15,000, the Developer shall provide a Final Maps bond or other security for the cost of widening of Tassajara Road to four lanes from Gleason Road south to 1-580. These improvements shall be constructed by the Developer in conjunction with subsequent final maps that create in excess of 620 residential lots or causes the ADT of Tassajara Road to exceed 15,000. (Required by TJKM traffic study, October 1995). 4.7 The Developer shall install a traffic signal at the PW Prior to PW intersection of Tassajara Road and South approval of 1/7/98 Dublin Ranch Drive to the satisfaction of the Final Map Director of Public Works. Traffic signal conduit and pull boxes shall be installed at the intersections of Tassajara road and North and South Dublin Ranch Drives prior to final occupancy of the first residential unit. Interconnect conduit shall be installed along Tassajara Road connecting the intersections of North and South Dublin Ranch Drives with the intersection of Gleason Drive and Tassajara Road. The signal and conduit shall be designed and construction guaranteed through a bond 13 # CONDITION TEXT RESrON- WHEN SOURCE S1BLE REQ'D AGENCY Prior to: prior to filing thc final map. 4.8 In conformance with Alameda County Fire PW Prior to PW Department (ACFD) requirements, for all approval of 1/7/98 phases of development in excess of 25 Final Map residential lots, the Developer shall provide a secondary emergency vehicle access route, into all proposed residential developments. In all phases of development in excess of 75 lots The Developer shall provide a second street access into all proposed developments. All subsequent Tentative Maps shall demonstrate to the City and Alameda County Fire Department how the access requirements will be met. 4.9 Upon each residential development adjacent to PW Prior to PW creek parcels or when needed by proposed approval of 12/19/97 upstream development, The Developer shall Final Map improve the creek parcels to provide adequate hydraulic capacity, erosion control, and landscaping as defined by the Dublin Ranch Phase I Specific Plan, including any mitigation requirements of the Corps of Engineers or Department of Fish and Game permits. 4.10 Upon each residential development adjacent to PW Prior to PW a designated pedestrian pathways as shown in approval of 12/19/97 the Dublin Ranch Specific Plan, a pedestrian- Final Map and bicycle path shall be constructed in accordance 1/7/98 with the Dublin Ranch Phase I Specific Plan design guidelines. The Pedestrian circulation plan shows pathways connecting the proposed park (parcel J), Recreational Facility (parcel L), open space (parcel N), creek (parcels K and V), and proposed school (parcels O and E) to Fallon Road, and the multi-purpose trail located as parcel X on the Tentative Map 6925. Another pedestrian-bicycle path shall be provided along the northerly boundary of Parcel Q, connecting the park and school parcels to proposed Fallon Road. Improvements shall include at-grade crossing connecting to Fallon Road. An access easement shall be dedicated to the City over the pathway. This bicycle path shall provide a connection to the park and schools via surface streets or other means as approved by the Director of Public Works. (8) The multi-use trail along the northerly portion of the project in 14 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: parcel X shall be improved with an all-weather surface and constructed as shown in the conditions of the approved Planned Developments (PA 95-030 and PA 96-038). This trail shall be designed to the satisfaction of the City Public Works Director and the Alameda County Fire Department. Emergency Vehicle Access easements shall be dedicated to the City for access to the open space parcels M, N and P to the satisfaction of ACFD and the Director of Public Works. Improvement plans showing these improvements shall be submitted and approved prior to approval of Final Master Tentative Map. A phasing plan delineating the timing of construction of these improvements shall be prepared prior to approval of the Development Agreement. 4.11 Drainage and utility lines in North and South PW Prior to PW Dublin Ranch Drive and in parcel S shall be approval of 12/19/97 installed in the public street right of way and improvement PUE and stubbed to each parcel at a location work and depth allowing the parcel to develop i without construction of additional off-site storm drain or utility lines 4.12 Prior to final map approval, the Developer shall PW Prior to PW prepare a master covenants conditions and approval of 12/19/97 restrictions (CC&R) document specifying that a Final Map and master Homeowner's association covering all 1/7/98 parcels within the tentative map shall be formed, covering maintenance of the private open space parcels, pedestrian trails, creeks, and recreational facility. Recording of the master CC&R document shall take place prior to approval of the first subsequent final map. 4.13 The Developer shall enter into an Improvement PW Prior to PW Agreement with the City for all subdivision approval of 12/19/97 improvements prior to issuance of improvement Final Map permit. Complete improvement plans, specifications, and calculations shall be submitted to, and approved by, the Director of Public Works and other affected agencies having jurisdiction over public improvements prior to construction of the improvements. Improvement plans shall show the existing on- site and off-site subdivision improvements an 15 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: proposed improvements along the adjacent public street and property that relate to the proposed improvements. 4.14 All handicap ramps shall comply with all PW Prior to State current State ADA requirements and City or Approval of Law Dublin Standards. improvement plans 4.15 The Developer shall submit a Line and Striping PW Prior to PW Plan for North and South Dublin Ranch Drive, approval of 12/19/97 Tassajara Road widening and the Public Street Final Map in Parcel S to the Director of Public Works for review and approval. The Plan shall show interim lane configurations and transitions, and shall provide adequate street width to allow two-way left-turn lanes. 4.16 The Developer shall consult with the PL, PW Prior to Standard Livermore-Amador Valley Transit Authority approval of (LAVTA) on the bus route, location, and size of Individual proposed bus stops within and on the periphery Tentative of the proposed project. The location and Maps configuration of all the bus stops and shelters shall be constructed under direction of the City's Director of Public Works. 4.17 The Applicant/Developer shall remove all trees PW Issuance of Standard including major root systems and other Grading obstructions from building sites as necessary Permit ~ for public improvements or for public safety as directed by the Director of Public Works. 4.18 Any relocation of existing improvements or PW Completion of Standard public utilities shall be accomplished under the Improvement direction of the governing agency, at no expense to the City. 4.19 The location and siting of project specific PL, PW Approval of 39, 40 wastewater, storm drain, recycled water, and Improvement MM potable water system infrastructure shall be Plans Matrix consistent with the resource management policies of the Eastern Dublin Specific Plan. 4.20 ApplicanlJDeveloper shall maintain landscaping PL, PW Completion of Standard for not less than 90 days after City-approved Improvements / installation. This maintenance shall include Improve weeding and the application of pre-emergent ments chemicals. No. 13 4.21 The Developer shall establish a subdivision PW HOA to be PW Homeowners Association for each subsequent formed prior 12/19/97 map that will monitor and oversee the to occupancy 16 # CONDITION TEXT RESPON- WHEN SOURCE StoLE REQ'D AGENCY Prior to: maintenance of owner-maintained City street of first unit landscape areas and common areas in each neighborhood. In the event that any such landscape area falls into a state of disrepair, the City will have the right, but not the obligation, to take corrective measures and bill the appropriate homeowner and/or the homeowner's association for the cost of such repair and corrective maintenance work plus City overhead. These requirements shall be included in the project Conditions, Covenants and Restrictions documents (CC&R). The Developer shall submit the project CC&Rs for review and approval by the Director of Public Works and the Director of Community Development prior to issuance of the first building permit for the first subsequent map. 4.22 The Applicant/Developer waives any right to PL, Finaling 17 protest the inclusion of the property or any ADM Building MM portion of it in a Landscape and Lighting Permits Matrix Assessment District or similar assessment district, and further waives any right to protest the annual assessment for that District. Applicant/Developer shall prepare a plan for dissemination of information relating to the possible formation of a Landscape and Lighting Assessment District to prospective homebuyars. Said information shall be included in model home sales literature and as part of required Department of Real Estate disclosure documents. The plan for dissemination of information shall be approved by the Director of Community Development and City Attorney prior to final inspection. 4.23 Permits shall be required for oversized and/or PW Issuance of Standard overweight construction loads coming to and Grading / PW leaving from the site on City Streets. If soil is Permit to be imported or exported from the site, a haul route plan shall be submitted to the City for review and approval. 4.24 An encroachment permit shall be secured from PW Issuance of Standard the Director of Public Works for any work done Grading within the public right-of-way where this work Permits is not covered under the public improvement plans. 17 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: 4.25 The Developer shall not construct decorative PW Completion of PW pavement within City right of way unless Improvements memo approved by the Director of Public Works and 1/8/98 only at major project entrances as specifically shown on the East Dublin Specific Plan. The type of decorative pavers and pavement section shall be subject to review and approval of the Director of Public Works. The Developer shall construct decorative pavement across entrances to all private street to the satisfaction of the Director of Public Works. Where decorative pavement is installed in public streets, a Decorative Paving Plan shall be prepared, with locations of pre-formed traffic signal loops specifically designed for decorative paving, which shall be used at intersections with traffic signals. Where possible, irrigation and all utility lines shall not be placed under the decorative paving. Maintenance costs of the decorative paving shall be included in the Homeowners Association, or landscape and lighting maintenance assessment district or other funding mechanism acceptable to the Director of Public Works. 5.1 The applicant shall submit updates of the traffic PW, PL Occupancy of Standard study with the subsequent Tentative Map Any Building applications creating individual residential lots, and the study shall be subject to review and approval by the Public Works Director. Appropriate traffic mitigation measures will be identified and included as conditions of subsequent Tentative Map approval 5.2 Tassajara Road. from 1-580 to north of PW Occupancy of PW/ Dublin Boulevard. The Applicant/Developer the Last Traffic shall construct street improvements as follows: Building Study Four 12-foot through lanes with two northbound lanes, two southbound lanes, two northbound left-turn lanes and two 8 foot wide shoulders as shown in the project traffic study prepared by TJKM or as directed by the Director of Public Works. The widening shall extend north of Dublin Boulevard with smooth transitions to existing conditions, to the satisfaction of the Director of Public Works and 18 # CONDITION TEXT RES~'ON- WHEN SOURCE SIBLE AGENCY REQ'D Prior to: shall include the relocation of existing signals at Dublin Boulevard. 5.3 Applicant/Developer shall be responsible for PW Issuance of Ord. payment of traffic impact fees (TIFs) adopted Building by the City Council at the time of issuance of Permits building permits including, but not limited to, the Eastern Dublin TIF, Interchange TIF (reimbursements to the City of Pleasanton for freeway interchanges), and Regional (Tri- Valley) TIF. 5.4 All construction traffic may be subject to PW Issuance of 268 specific routing, as determined by the Director Grading MM of Public Works, in order to minimize Permit Matrix construction interference with regional non- project traffic movement. 5.5 Traffic safety signs or "red-curbing" shall be PW, Approval of Standard provided in accordance with the standards of PO Improvement the City of Dublin subject to plan approval by Plans the Director of Public Works. 5.6 A street sign/naming plan for the internal street PL Approval of Standard system shall be submitted and shall be subject Improvement to approval of the Community Director. No Plans single street may intersect any other street more than once. No continuous street may change direction by 90 degrees more than once without change a street name change for subsequent changes in direction. 5.7 Street name signs shall display the name of the PW Approval of Standard street together with a City standard shamrock Improvement logo. Posts shall be galvanized steel pipe, Plans unless otherwise approved by the Director of Public Works. 5.8 The Developer shall dedicate with a subsequent PW Approval of PW final map of parcel D, a residential collector Final Map for 1/7/98 street through Parcel D, from the east-west Parcel D collector street to the south boundary of the project for eventual connection to Gleason Drive. The street shall be improved in conjunction with the development of Parcel D to the satisfaction of the Public Works Director. 5.9 The Developer is responsible for construction PW As required by PW of improvements in Caltrans right-of-way at the LOS 1/7/98 intersection of the 1-580 eastbound off-ramp at Santa Rita Road and Pimlico Drive. At the westbound approach on Pimlico Drive to Santa 19 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: Rita Road, the Developer shall construct a second left-turn lane on to southbound Santa Rita Road. At thc eastbound off-ramp to Santa Rita Road, The Developer shall install one exclusive left-turn lane to northbound Santa Rita Road, one exclusive through-lane to Pimlico Drive, and one free right-mm lane to southbound Santa Rita Road. In conjunction with these improvements, the traffic signal shall be modified to replace the existing split phase operation with left-turn phase which will allow concurrent eastbound and westbound left-turn movements, unless already constructed by others. These Improvements shall be constructed by the Developer prior to the intersection reaching level of service "E" as determined by the Director of Public Works. Within one year of notification by the Public Works Director, Developer shall design and construct these improvements to the satisfaction of the Public Works Director with input from the City of Plcasanton where applicable. 5.10 The intersections of Tassajara Road and North PW Approval of PW and South Dublin Ranch Drives, and the Final Map memo proposed intersection of Parcel "S" and North 1/7/98 and South Dublin Ranch Drives (shown as a Looped Road) will require more extensive design efforts prior to approving the Final Map. Sufficient right of way will be dedicated to the City to assure that the final design can be constructed within the dedications. The improvements at these three intersections must be designed and constructed to the satisfaction of the Public Works Director. The intersections must provide for adequate stacking of vehicles exiting the subdivision on to Tassajara Road. This shall not interfere with traffic flowing to future subdivisions north and south of North and South of the "Loop" Road. A Signing and Striping Plan will be required to assure that safe transitions can be provided within the proposed right of way. A new or updated traffic report may be required if deemed necessary by thc City Public Works Director. 5.11 The school site should provide adequate on-site PW CUP: PA # 97- PW 20 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: vehicle storage area for vehicles dropping off 004 1/7/98 and picking up students. If providing adequate on-site vehicle storage area is not possible, the Developer shall mitigate impacts to the public street system by widening the roadway or using other means subject to approval of the City Engineer. The locations of driveways for the school site shall be subject to approval of the Director of Public Works. 6.1 The Developer shall submit a plan showing all PW, PL Approval of Standard proposed utilities services in public streets, Improvement 110 along with documentation that domestic fresh Plans MM water, electricity, gas, telephone, and cable Matrix television service can be provided to each residence within the project and when such service will be available. 6.2 All utilities within the project and to each lot PW Approval of 108, shall be underground in accordance with the Final Map 109, 228 City policies and existing ordinances, unless MM otherwise approved by the Director of Public Matrix Works. All utilities shall be located and Standard provided within public utility easements and sized to meet utility company standards. 6.3 All transmission lines shall be away from PW Completion of 109 sensitive areas unless otherwise approved by Improvements MM the Director of Public Works. Matrix 6.4 The Developer shall construct all joint utility PW, PL Approval of PW trenches (such as electric, telephone, cable TV, Improvement 12/19/97 and gas) in accordance with the appropriate Plans utility jurisdiction. All communication vaults, electric transformers, and cable TV boxes shall be underground in designated landscape areas between the proposed sidewalk and back of curb. Utility plans, showing the location of all proposed utilities (including electrical vaults and underground transformers) shall be reviewed and approved by the Director of Public Works and Community Development Director. Contractor shall install 2-3" conduits in joint trench located in North and South Dublin Ranch Drives and parcel S.. 6.5 Applicant/Developer shall provide Public PW Approval of Standard Utility Easements per requirements of the Final Map Director of Public Works and/or public utility 21 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: companies as necessary to serve this area with utility services and allow for vehicular and utility service access. 6.6 All water, gas, sewer, underground electric PW Approval of PW power, cable television or telephone lines, and Improvement 12/19/97 storm drain facilities shall be installed before Plans any paving, curb, gutter, or sidewalk is installed or as approved by the Director of Public Works. Utility stub connections to property boundaries shall be required unless waived by the Director of Public Works in writing. 6.7 The Developer is responsible for establishing PL, PW Recordation of PW continual landscape and lighting maintenance Final Map. 12/19/97 through Lighting and Landscaping Maintenance Assessment Districts or any other method of maintaining the landscaping and lighting approved by the Director of Public Works 7.1 The Developer shall comply with the City's F, PL, Recording of 17, 75, Wildfire Management Plan for covering long- PW Final Map 77 term maintenance of the urban/open-space MM interface. The Plan requirements shall be Matrix incorporated into the CC&Rs for the project. 7.2 The Applicant/Developer shall comply with all F Issuance of 74 Alameda County Fire Services (ACFD) rules, Building MM regulations and standards, including minimum Permits Matrix standards for emergency access roads and payment of applicable fees, including a City of Dublin Fire Capital Impact Fee. 7.3 The Developer shall comply with all conditions F Issuance of Letter of the Alameda County Fire Department Grading dated 8- (ACFD) (letter dated August 14, 1997) Permits 14-97 including: 7.4 a Prior to the issuance of grading permits, a site plan indicating the location of Letter fuel storage for grading equipment as well as construction office trailer shall dated be submitted to the Fire Prevention Bureau for approval. 8-14-97 b An all-weather surfaced access road to the fuel and constructton area shall Letter be installed and maintained to allow emergency vehicle access, dated 8-14-97 c Emergency Vehicle Access roadways shall be designed and installed to Standard support the imposed loads of fire equipment. Design shall be approved by ACFD prior to installation. e A permit for the storage and dispensing of fuel shall be obtained from the Letter Alameda County Fire Department. The storage, use and dispensing of fuel dated shall be in accordance with Uniform Fire Code Article 79. 8-14-97 22 # CONDITION TEXT RESPON- WHEN SOURCE StoLE REQ'D AGENCY Prior to: f A means of contacting emergency services other than cellular phone shall be Letter available on the site. dated 8-14-97 8.1 The Applicant/Developer shall demonstrate to PW Issuance of 171 the Director of Public Works that the project Building MM development meets the requirements of the Permits Matrix State Regional Water Quality Control Board's "Best Management Practices" to mitigate storm water pollution. 9.1 A Faithful Performance Bond or securities that PW, Issuance of PW are 100% of Improvement costs, and a Labor ADM Grading Standard and Materials Bond or securities that are 50% Permits of Improvement costs, must be provided prior to issuing any grading and/or improvement permits. Improvement costs will include street, drainage, grading, backfill of utilities, and landscaping costs to the satisfaction of the Director of Public Works. 9.2 Labor and materials bond will be released after PW, Completion of Standard City's acceptance of improvements. The ADM Improvements Performance bond will be released one year after acceptance of improvements and after all defects have been repaired. The Applicant/Developer, with the approval of the Director of Public Works, has the option of providing a Maintenance Bond after acceptance of improvements by the City in the amount of 25% of Improvement costs. This bond will serve instead of the Faithful Performance Bond. Prior to release of the Faithful Performance Bond or the Maintenance Bond, all improvements and landscaping shall be installed and established per approved plans and a declaration by the project civil engineer that the finished graded building pads are within 0.5 feet in elevation of those shown on approved plans. 9.3 Applicant/Developer, and any parties or PL, Through Standard individuals granted rights-of-entry by ADM completion of Applicant/Developer, shall defend, indemnify, Improvements and hold harmless the City of Dublin and its and agents, officers, and employees from any claim, Occupancy of action, or proceeding against the City of Dublin the Last 23 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: or its agents, officers, or employees to attack, Building set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Director of Community Development, Zoning Administrator, or any other department, committee, or agency of the City concerning a subdivision or other development which actions are brought within the time period provided for in Government Code Section 66499.37; provided, however, that the Applicant/Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Applicant/Developer of any said claim, action, or proceeding and the City's full actions or proceedings. 10.1 Should any prehistoric or historic artifacts be PL, Final PW exposed during excavation and construction PW, B Inspection of Standard operations, the Department of Community Grading and 25l Development shall be notified and work shall - 253 cease immediately until an archaeologist, who MM is certified by the Society of California Matrix Archaeology (SCA) or the Society of Professional Archaeology (SOPA), is consulted to evaluate the significance of the find and suggest appropriate mitigation measures, if deemed necessary, prior to resuming ground breaking construction activities. Standardized procedures for evaluating accidental finds and discovery of human remains shall be followed as prescribed in Sections 15064.5 and 15126.4 of the California Environmental Quality Act Guidelines. 10.2 Applicant/Developer shall comply with all PW, PL Issuance of 217 Eastern Dublin Specific Plan EIR mitigation Grading MM measures for mitigating potentially significant Permit Matrix plant and animal species impacts. Within 60 days prior to any habitat modification, Applicant/Developer shall submit a preconstmction survey, prepared by a biologist (to be approved and hired by the City prior to commencement of the survey.) Said survey shall examine whether any sensitive species 24 # CONDITION TEXT REStOre- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: exist on or adjacent to the site and, if any exist, shall include recommended protection plans, including any modifications to site design, for those sensitive species that may be discovered as a result of the survey. Applicant/Developer shall be responsible for the cost of the survey i and staff review of the survey. The significance ] of any discoveries and adequacy of recommended protection measures shall be subject to the discretion of the Director of Community Development. Said protection I plans and measures shall occur at least 21 days I prior to anticipated habitat modification. Any updated surveys and/or studies that may be completed subsequently shall be submitted to the Department of Community Development. 10.3 Applicant/Developer shall submit a PL, PW Issuance of 269, 270 Construction Impact Reduction Plan. Said Plan Grading MM shall include those items addressed as a concern Permit Matrix in the EIR, in particular, Mitigation Measures 3.11/1 through 3.11/4 and 3.11/7. 10.4 Copies of the Hazardous Materials report (for PW, PL Issuance of Standard each SWPPP phase) shall be submitted and any Grading materials identified shall be removed or Permit (for adequately contained, each phase) 10.5 Applicant/Developer shall ensure that PL Issuance of 269, 278 stationary source emissions associated with Grading MM project development are minimized. The Permit Matrix requirements of Mitigation Measure 3. l 1/12.0 of the Eastern Dublin EIR shall be accomplished by preparation of a written program to the satisfaction of the Director of Community Development. 10.6 The use of rodenticides and herbicides within PL Issuance of 221 the project area shall be performed in Grading MM cooperation with and under the supervision of Permit Matrix the Alameda County Department of Agriculture and will be restricted, to the satisfaction of the Director of Community Development, to reduce potential impacts to wildlife. 10.7 Should any Kit Foxes be discovered on the site PL, PW ~ Issuance of 219 either during the Preconstruction Survey or I Grading MM during project construction, the Permit Matrix Applicant/Developer shall be responsible for complying with the Kit Fox Protection Plan. 25 # CONDITION TEXT RESPON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: 10.8 Applicant/Developer shall prepare and submit a PL Issuance of 263,264 Construction Noise Management Program, to Grading MM the satisfaction of the Director of Community Perm it Matrix Development, that identifies measures proposed to minimize construction noise impacts on existing residents, and shall ensure that construction or grading on the site complies with that program. 10.9 Construction and grading operations shall be PW Ongoing PW limited to weekdays, Monday through Friday, Standard and non-City holidays, between the hours of 7:30 a.m. and 5:00 p.m. The Director of Public Works may approve work on Saturday and hours beyond the above mentioned days and hours with the understanding that the developer is responsible for the additional cost of the Public Works inspectors' overtime. 10.10 i A noise study shall be submitted with the PL, PW Issuance of 289 subsequent Tentative Maps along Tassajara Grading MM Road creating individual residential lots, to Permit Matrix show how the subdivision design addresses the requirements for interior and exterior noise levels to be controlled to acceptable limits (for example, pad elevations, height of berms, and space for soundwalls must be accommodated). 10.11 The applicant shall comply with all applicable PL i As specified in MM action programs and mitigation measures of the ' MM Matrix Matrix Eastern Dublin General Plan Amendment/ Specific Plan and companion Final Environmental Impact Report (FEIR), respectively, that have not been made specific conditions of approval of this PD Rezone. 11.1 In submitting subsequent plans for review and B Issuance of PW approval, each set of plans shall have attached Building Standard an annotated copy of these Conditions of Permits. Approval. The notations shall clearly indicate how all Conditions of Approval will be complied with. Construction plans will not be accepted without the annotated conditions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participating non- City agencies. 11.2 Applicant/Developer shall comply with the ADM On-going 103, 26 # CONDITION TEXT RESeON- WHEN SOURCE SIBLE REQ'D AGENCY Prior to: City's solid waste management and recycling 104, requirements. 105, 279 MM Matrix 11.3 Temporary fencing shall be installed along PL, Issuance of , property lines throughout thc construction PW, B Grading process, or around perimeter of a particular Permit construction phase, upon review and approval of Public Works Director. PASSED, APPROVED AND ADOPTED this 13th day of January, 1998. AYES: Cm. Johnson, Hughes, Musser, and Oravetz NOES: ABSENT: Cm. Jennings Community Development Director g:\97037\pcreso. 27