HomeMy WebLinkAboutReso 021-98 Dub Bl Widen MTC $RESOLUTION NO. 21 - 98
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING THE DUBLIN BOULEVARD WIDENING PROJECT FROM
WEST OF VILLAGE PARKWAY TO EAST OF SIERRA COURT AND DIRECTING
STAFF TO APPLY TO THE METROPOLITAN TRANSPORTATION COMMISSION
FOR REGIONAL TRANSPORTATION IMPROV~EMENT PROGRAM FUNDING
WHEREAS, SB 45 (Chapter 622, Statutes 1997) substantially revised the process for estimating the
mount of State and Federal funds available for transportation projects in the State and for appropriating and
allocating the available funds to these projects; and
WHEREAS, as part of that new process, the Metropolitan Transportation Commission (MTC) is
responsible for programming projects eligible for Regional Improvement Program funds, pursuant to
Government Code Section 14527(b), for inclusion in the Regional Transportation Improvement Program,
and submission to the California Transportation Commission, for inclusion in the State Transportation
Improvement Program; and
WHEREAS, MTC has requested eligible transportation project sponsors to submit applications
nominating projects to be programmed for RegiOnal Improvement Program funds in the 1998 Regional
Transportation Improvement Program; and
WHEREAS, applications to MTC must be submitted consistent with procedures, conditions, and
forms it provides to transportation project sponsors; and
WHEREAS, the City of Dublin is a sponsor of transportation projects eligible for Regional
Improvement Program funds; and
WHEREAS, Attachment A to this resolution, attached hereto and incorporated herein as though set
forth at length, lists the projects, purposes, schedules and budgets for which the City of Dublin is requesting
the MTC program Regional Improvement Program funds for inclusion in the 1998 Regional Transportation
Improvement Program; and
WHEREAS, Attachment B to this resolution, attached hereto and incorporated herein as though set
forth at length, includes the certification by the City of Dublin of assurances required by SB 45, including the
commitment to the project scope and schedule with the programmed State funds, in order to qualify the
projects listed in Attachment A for programming by MTC;
NOW, THEREFORE, BE IT RESOLVED that the City of Dublin, City Council hereby authorizes
its City Manager to execute and file an application with MTC to program Improvement Program funds into
the 1998 Regional Transportation Improvement Program, for the projects, purposes and amounts included
in Attachment A o£this resolution;
BE IT FURTHER RESOLVED that the City of Dublin approves the assurances set forth in
Attachment B of this resolution and that a cOpy of this resolution shall be transmitted to MTC in
conjunction with the filing of the City of Dublin application referenced herein.
PASSED, APPROVED AND ADOPTED this 3rd day of March, 1998.
AYES:
NOES:
Councilmembers Barnes, BUrton, Howard Lockhart and Mayor HoUSton
None '
ABSENT: None
ABSTAIN: None
Mayor
K2/G/3-3~98/reso-mtc. doc
g; ~niscprojkibw2h-eso
ATTACHMENT A
PROJECT NOMINATION SHEET
SEE ATTACI~D
MAP 1: Location of project in region
MAP 2: Area Specific
Transportation Problem to be Addressed by the Proposed Proiect: Increase in traffic due to new
development, deteriorating existing roadway and sidewalk and inadequate bridge width.
project Description:
Expenditure Authorization #~ (To be assigned by Caltrans if not available before RTIP submittal)
Route - Location (Post Mile): Dublin Blvd. from Village Parkway to Sierra Court
Description of Project Limits: Dublin Blvd. from Village Parkway to Sierra Court
Description of Project Scope: The project will widen Dublin Blvd. from Village Parkway to Sierra Court
from a four-lane to six-lane roadway, install new sidewalk, bike lane and
right-mm lane. The bridge over Alamo Creek will be widened and all
traffic signals will be interconnected.
Description of Project Benefits: To widen Dublin Blvd. from four lanes to six lanes to accommodate
increased traffic flows due to new development.
Special Conditions (if any):
Project Component Costs:
STIP Funding (in millions of dollars)
Project Element FY 98/9 FY 99/0 FY 00/1 FY 01/2 FY 02/3 FY 03/4 TOTAL
Environmental .02 .02
Design Engineering .18 .18
Right of Way (R/W), .20 .23 .43
R/W, Caltrans support
Construction (Const) '1.87 1.87
Const, Caltrans support
TOTAL .40 2.1 2.5
Proiect Schedule:
Milestone
Fiscal Year
Project Completion (open for use)
Quarter
Start Environmental Studies FY 1998/99 3
Draft Enviromental Document FY 1998/99 3
Final Environmental Document FY 1998/99 4
Begin Design Engineering FY 1998/99 3
Plans, Specs, & Estimates FY 1998/99 4
Start R/W Acquisition FY 99/2000 4
R/W Certification FY 99/2000 2
Ready to Advertise FY 99/2000 3
Start Construction (award) FY 99/2000 3
FY 2000/2001 2
Responsible Agencv/Aeencies:
Contact Person: Mehran Sepehri
Mailing Address: 100 Civic Plaza, Dublin, CA 94568
E-Mail Address:: kseumalo~dublinca, org
Phone Number: (510) 833-6630
ATTACHMENT B
OTHER CERTIFICATIONS
The Project Sponsor also agrees to abide by all rules and regulations applying to the State
Transportation Improvement Program (STIP), and to follow, all requirements associated with the
funds programmed to the project in the STtp. '
These include, but are not limited to:
1. Environmental requirements: NEPA standards and procedures for all projects with Federal
funds; CEQA standards and procedures for all projects programmed with State funds.
California Transportation Commission (CTC) requirements for transit projects, formerly
associated with the Transit Capital Improvement (TCI) program. These include rules
governing right-of-way acquisition, hazardous materials testing, and timely use of funds.
3. Federal Transit Administration (FTA) requirements for transit projects as outlined in FTA
regulations and circulars.
4. Federal Highway Administration (FHWA) and Caltrans requirements for highway and other
roadway projects as outlined in the Caltrans Local Programs Manual.
o
Federal air quality conformity requirements, and local project review requirements, as
outlined in the adopted Bay Area Conformity Revision of the State Implementation Plan
(STP).
The Project Sponsor shall provide MTC with a current Opinion of Counsel stating that the
agency is an eligible sponsor of projects for the State Transportation Improvement Program; that
the agency is authorized to perform the project for which funds are requested; that there is no
legal impediment to the agency applying for funds; and that there is no pending or anticipated
litigation which might adversely affect the project or the ability of the agency to carry out the
project.