HomeMy WebLinkAboutReso 046-98 Geotech/EarthSystemRESOLUTION NO. 46 - 98
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT
FOR GEOTECHNICAL SERVICES WITH EARTH SYSTEMS CONSULTANTS
WHEREAS, the City Council of the City of Dublin approved an agreement for geotechrdcal
services with Earth Systems Consultants, on May 20, 1997; and
WHEREAS, Consultant has requested an adjustmem of rates to become effective July 31, 1998;
and
WHEREAS, the term of the agreemem is proposed to be extended until June 30, 1999;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve the amendment to the agreement with Earth Systems Consultants, which is attached hereto as
"Exhibit A."
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendmem.
PASSED, APPROVED AND ADOPTED this 5th day of May, 1998.
AYES:
Councilmembers Barnes, Burton, Lockhart and Mayor Houston
NOES: None
ABSENT: Councilmember Howard
ABSTAIN: None
- ~CitO Clerk ~-
K2/G/5-5-98/resoerth. doc
g:\engr\esc~resoarrmd
EXHIBIT "A" OF RESOLUTION ~f,~ -98
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND EARTH SYSTEMS CONSULTANTS
FOR GEOTECHNICAL SERVICES
WHlr~REAS, the City of Dublin (hereinafter referred to as "CITY") and Earth Systems
Consultants (hereinafter referred to as "CONSULTANT"), entered into a one-year agreement on May 20,
1997, to provide engineering services to CITY; and
WHEREAS, Consultant and the City of Dublin wish to extend the term of said agreement
for an additional one-year period (terminating June 30, 1999); and
WHEREAS, Consultant proposes a rate adjustment which is attached hereto as Exhibit
"A" and which will remain effective until July 31, 1999;
NOW, THEREFORE, the parties hereto agree as follows:
Increase in Rates
The fee schedule attached hereto as "Exhibit A" will become effective July 31, 1998 and remain in
effect until July 31, 1999.
Extension of Term
The term of the agreement shall be extended to coincide with the end of the 1998-99 Fiscal Year;
i.e., until June 30, 1999.
CITY OF DUBLIN
Mayor
EARTH SYSTEMS CONSULTANTS
Date:
EXHIBIT "A" OF AMENDMENT
Eart h Consultants
Northern California
47853 Warm Springs Blvd,
Fremont, CA 94539-7400
(51 O) $53-0320
FAX (510) 353-0344
The Following schedule presents typical rates for profc~sion',d and tochnlcal
services in thc i%lds of
gcotechnical engineering, cng{neering geology and cnv[ronmcn~ consulting. ~ d~cd, so, ices can L~
con~acted on a ne~otiami fixed-fee basis.
2. Lister gc ~ypica] cha-ges for the se~'ices most ~uenfly p~ffo~ed by ~ Systems Consul Lams
Noahem Californiz. Prices for unlisted se~ccs, a~ well as special quotaL[ons for pro~s ia~olving
volume work, will be given upon r~q~est,
3. Minimum ?~e for professional services/no~ ~esting) is $450.00.
4. Field so. ices for Engineers, Geologistf. Scientists ~d Technicians ~c billed po~al-m-por~, in ~o~c~
with ~ followi~[ minimum ch~ges. Nuc]~ &nsity $au$~ ch~gM at $4.00 per hour.
--2 hours minimum charge for inspections, consultationS, s~pling, or show up time;
--4 hours ~nimdm char~ for so.ices in excess of 2 ho~ in on~ clay;
--8 houm minimum ch~gc for sc~ice~ in excess or 4 hours in one flay.
5. Saturday ~d premium hours (in excess of 8 hours in one day) for personnel ~c at dmc ~d one-half:
Stmdays and holidays ar~ at double time. Night shifts arc at 12-1/2~ premium pay.
6. Invoices will be submlucd at thc completion of work or at bye-week intervals. Invoices ~e p~yable opm)
presentation. Invoices tM~' days p~t duc will be subjuct to a se~ice ch~ge of one ~d one-~alf ~ent
per month.
~ Vo~rl>' ~me
Non-Technical ~s~st~t ......................................................................................................... S45,00
Word Processor ..................................................................................................................... $45.00
Technicfl Assistant ............................................................................................................... $55.00
D~terff~hnicfl Aide ............................................................................................................ $60.00
To~ici~ ........................................................................................................................... S68.00
Se~or Technician ................................................................................................................. $76.00
Tec~ci~ Supe~sor ............................................................................................................ ~0.00
AssistaQt EnginoedGeologls~Scien~st ...................................................................................... $ 80.00
.5t~EngineeffG~logisffScienfist, .... ~ ...................................................................................... S86.00
Project Engmeer/Geol %xs~Sc~cnust ......................................................................................... S93.00
Senior Project Engineer/Oeologis~Scienfist ...............................................................................· S98.00
Scnlor EngineedGoologisffScientist ......................................................................................... S 105.00
Project Manager ....................................................................................... : ............................ S 120.00
Senior Project Manager. ......................................................................................................... S 130.00
Principfl EngineedGeologis~Sciendst ......................................................................................$135.00
Consultant ........................................................................................................................... S 150.00
S~ior ConsultanL '
.................................................................................................................. $160.00
~_I, FB_CONTR ACT sERVICES
Subcontract sc~ice~ are charged at cost plus 20~. These i~clud~, bu~ are not limited lo, consultants' fees.
equipment rental (such as drilling, bulldozing, trenching and specia] access equipment), freight, outside laboratoK~
~est~, aerial photographs, permit fees and i~cidenta] expenses.
.0~R CHARGES
1. Mileage is billed au the rav: of 50.40 per mile for cars and light vehicles (minimum d~ly charge SS.00 for
work).
2. , Deposition. Heating and Court Appearances (a.~ Expert Witness) ~re lL~ted on a supplemental fee schedule.
3. Out of town travel and expenses will be charged at cost plus 20%..
4. Report copies $50.00 per copy (nfinimum).
SPECIAL FIELD SE.R_ VICES
Geophysical work. pile load tests, vane shear tests, piezometcr installafior~s, slope indicator insutllations and other
special tests will be quoted at standard engineering rates, plus ~-ost of equipment.
EN¥IR O1'~ ..~_ _E_ _1~ AL SERVICES
l~_ates for environmental sampling, safety. Md Iesting equipment am ]isu~d on a suppl~mcnmI fee schedule.
renta/s or purchases of mquked equipment and supplies, as well as subcontracted services, wilI be invoiced at
plus 20%.
L A B O R ATO R Y. T_F._ _ST__S.
All prices are based on California ~md Modified California s-ample sizes (2'-2,5" diameter) unless noted othenvise.
Preparation of 3" diameter samples add $15,00. Te-~fing or' contaminated soil add 20~. Samples will be reafi'ned to
sender for proper disposal.
Attcrbe~ Limits: a. Liquid Limit or Plastic Limit ..................................................................
b. Plasticity Index .................................................................................... ~145.00
C.B,.R, and Expansion, cohesionless soil (3 points) ........................................................................... Se30.00
C,B.R., and Expansion. cohesive (3 points) ...................................................................................... S495,00
Compaction Curves: a, ~" Mold .............................................................................................. $~50.00
b, 6" Mold .................................................................................... ., ......... 5200.00
c. California Impact ................................................................................. S 155.00
d. Ch~ck Point (one) ................................................................................. SP0.00
ConsolidatiOn. per load increment ¢fimed) ........................................................................................ $4?.06
Consolidation, per load inerernent ~untimed) ...................................................................................... 525.00
Corrosion Tests .............................................................................................................. Pricex on Request
C.T.B. (Cement Treated Base) Compressive Strength Test. (per poinu ................................................... 560.00
Direct Shear (consolidated), per point ............................................................................................... 590.00
Direct Shear (quiclQ. per point ........................................................................................................ $50..00
Direct Shear (residual) ................................................................................................................... Hourly
Durability per fraction .................................................................................................................. $130.00
Dynamic Testing ................... ~ ......................................................................................... Prices on Request
Expansion Index Test Cdniform Building Code Standard 29-2) .............................................................. $1~0.00
Laborato~ Technician (Sample Preparation) ................................... .' ................................................. $68.00
Lime (pH) .................................................................................................................................. $162.00
Long Hydrometer Analysis (Assumed Sp. Gr.) with 200 wash ............................................................. $177.00
Long Hydrometer Analysis (Assumed 5p. Gr.) without 200 wash ..................... : ................................... $132.00
Moisture Determination and Unit Weight .......................................................................................... $~ 7,00
Moisture Only ............................................................................................................................. $11.00
Permeability Tests ........................................................................................................................ Hourly
R-¥alue, California State Highwa>qSet of 3. (no additives) ................................................................. $235.00
R-Value, California State Highway/Set of 3, cement, lime or other additives .......................................... $255.00
Sand Equivalent ........................................................................................................................... $87.00
Short Hydrometer Analysis (without Sp. Gr.) .................................................................................... S82.00
Sieve Analysis with 200 wash ........................................................................................................ $85.00
Sieve Anal~,sis withot~t 200 wash .................................................................................................... S62.00
Spectfic Gravity (Clax,~ .................................... · $90.00
Specific Gravity ($an~t and Graveb .............. i .................................................................................... $?5.00
$~,'ell Test. 3-point with plot ........................................................................................................ $140.'00
Swell Test, per point .................................................................................................................... S65.00
Tria.xial Shear ................................................................................................................. Prices on Request
Unconfinec[ Compression (unu'eated~ ................................................................................................ $75,00
Unconfined Compression (time treated material) Caltrans Test 373 ....................................................... 5295.00
.C. ONCRE~E, ASpI~,a,.L.T, MASONRy a S.717.~_g_L~ ................................... See Expanded Fee Scht~dul¢ ~