HomeMy WebLinkAboutPC Reso 98-22 PA98-010 Park Sierra SDR RESOLUTION NO. 98-22
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING SITE DEVELOPMENT REVIEW FOR PA 98-010,
PARK SIERRA PHASE II APARTMENT PROJECT, SHEA PROPERTIES
WHEREAS, Shea Properties has requested approval of a Site Development Review
consisting of'20o2 apartment units and related improvements on approximately 5.7 acres of land
generally located on the west side of Dougherty Road north of the former Southern Pacific
Railroad tracks (APNs 941-0007-001-02 & 941-0007-002-00); and
WHEREAS, a completed application for Site Development Review is available and on file
in the Dublin Planning Department; and
WHEREAS, a Mitigated Negative Declaration has been prepared for this project with the
finding that with the implementation of mitigation measures contained in the Initial Study, there
will be no significant environmental impacts; and
WHEREAS, the Planning Commission did hold a public hearing on said application on
May 26, 1998; and
WHEREAS, proper notice of said hearing was given in all respects as required by law; and
WHEREAS, a Staff Report was submitted recommending that the Planning Commission
approve the Planned Development Rezone subject to conditions prepared by Staff; and
WHEREAS, the Planning Commission did hear and use their independent judgment and
considered all said reports, recommendations and testimony hereinabove set forth.
NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission
does hereby make the following findings and determinations regarding said proposed Site
Development Review:
1. Approval of this application (PA 98-010) is consistent with the intent and purpose
of applicable provisions of the Dublin Zoning Ordinance.
2. The approval of this application, as conditioned, will comply with the policies of
the General Plan applicable to the Medium Density Residential land use category, since it will
allow development within the density range allowed under the Medium Density Residential Land
Use Designation of the General Plan.
3. The approval of this application, as conditioned, will comply with the proposed
Planned Development Regulations for the project, which will allow for residential development
at this location.
4. The approval of this application, as conditioned, is consistent with the design
review requirements contained in the Dublin Zoning Ordinance.
5. The approval of this application, as conditioned, is in conformance with regional
transportation and growth management plans.
6. The approval of this application, as conditioned, will not adversely affect the
health or safety of persons residing or working in the vicinity or be detrimental to the public
health, safety and general as the development is consistent with all laws and ordinances of the
City of Dublin and implements the General Plan, as proposed for amendment.
7. The proposed site development, including site layout, vehicular access, circulation
and parking, setbacks, height, walls, public safety and similar elements, as conditioned, has been
designed to provide a desirable environment for the development.
8. The subject site is physically suitable for the type and intensity of the approved
development.
Impacts to views are addressed, no view will be interrupted.
10. Impacts to existing slopes and topographic features are addressed as no slopes or
topographic features exist on this site.
11. Architectural considerations, including the character, scale and quality of the
design, the architectural relationship with the site and other buildings have been incorporated into
the project and as Conditions of Approval in order to ensure compatibility of this development
with the development's design concept and character of surrounding uses.
12. Landscape considerations, including the location, type, size and coverage of plant
materials and similar elements have been considered to ensure visual relief and screening of
potentially negative elements.
2
NOW, THEREFORE BE IT FURTHER RESOLVED THAT THE Dublin Planning
Commission hereby conditionally approves a Site Development Review application as generally
depicted by materials labeled Exhibit A, stamped "approved" and on file in the Dublin Planning
Department, which includes a Site Plan and Elevations prepared by Thomas P. Cox, Architect,
dated Received April 14, 1998, and a Conceptual Landscape Plan prepared by Don Rose and
Associates dated received April 14, 1998, and a Preliminary Grading and Utility Plan, prepared
by Ruggeri-Jensen and Associates, dated received April 14, 1998, for PA 98-010, Park Sierra
Apartments, which constitute regulations for the use and improvements of an 8.9 acre parcel
generally described as APN 941-0007-001-02 & 941-0007-002-00. The following conditions of
approval are attached to this approval:
CONDITIONS OF APPROVAL
Unless otherwise stated, all Conditions of Approval shall be complied with prior to final
occupancy of any building and shall be subject to Planning Department review and approval. The
following codes represent those departments/agencies responsible for monitoring compliance
with the Conditions of Approval: [PL] Planning, [B] Building, [PO] Police, [PW] Public Works,
[ADM] Administration/City Attorney, [FIN] Finance, [PCS] Parks and Community Services, [F]
Fire, [DSR] Dublin San Ramon Services District, [CO] Alameda County Flood Control and
water Conservation District Zone 7.
The following abbreviations apply in the "When Required" column: BP/Building Permit;
IMPROV/Engineering Improvement plans; On-going/Throughout project; GR/Grading Permit;
CON/Construction, OCC/Occupancy
General Conditions
1 Approval of the Site Development Review is valid for one PL On-going
(1) year, until May 26, 1999. If construction has not
commenced by that time, this approval shall be null and
void.-The approval period may be extended for six (6)
additional months by submitting a written request for
extension prior to the expiration date to the Community
Development Director. Any extension will be based on a
determination that the conditions of approval remain
adequate to assure that the stated findings of approval will
continue to be met.
2 The Developer shall comply with all applicable City of PL On-going
Dublin Development Site Review Standard Conditions
and City of Dublin Residential Security requirements.
3 The Developer shall sign and submit a copy of the City of PL OCC
Dublin Standard Plan, Material and Maintenance
Agreement prior to the occupancy of any unit.
4 All transformers, irrigation control boxes, backflow PL BP
devices, valves, and similar appurtenances shall be
enclosed in vaults, fencing and/or painted out or
landscaped, as determined acceptable by the Community
Development Director. The location of these items shall
be indicated on the final landscape plans
5 The Developer shall comply with all mitigation measures PL On-going
adopted as part of the Mitigated Negative Declaration for
this project as well as the Mitigation Monitoring and
Reporting Plan.
6 The Developer shall comply with all applicable Fire PL On-going
Department, Public Works Department, Police Service,
Alameda County Flood Control District 7 and Dublin San
Ramon Services District requirements. Prior to the
issuance of building permits or the installation of any
improvements related to this project, the Developer shall
supply written statements from each such agency or
department to the Planning Department, indicating that all
applicable conditions required have or will be met.
7 The developer shall defend, indemnify and hold harmless PL On-going
the City of Dublin and its agents, officers and employees
from any claim, action, or proceeding to attack, set aside,
void, annul, an approval of the City of Dublin or its
advisory agency, appeal board, Planning Commission,
City Council, Community Development Director, Zoning
Administrator, or any other department, committee or
agency of the City concerning the proposed development;
provided, however, that the developer's duty to defend,
indemnify, hold harmless shall be subject to the City's
promptly notifying the permittee of any claim, action or
proceeding and the City's full action or proceedings.
8 This permit shall be revocable for cause in accordance PL On-going
with applicable sections of the Dublin Zoning Ordinance.
Any violation of the term or conditions of this Site
Development Review may be subject to the issuance of a
citation.
9 The developer shall provide all units with cable TV and PL BP
telephone connections.
10 To apply for building permits, the Developer shall submit B BP
six (6) sets of construction plans to the Building
Department for plan check. Each set of plans shall have
attached an annotated copy of these Conditions of
Approval. The notations shall clearly indicate how all
Conditions of Approval will or have been complied with.
Construction plans will not be accepted without the
annotated resolutions attached to each set of plans. The
Developer will be responsible for obtaining the approvals
of all participating non-City agencies prior to the issuance
of building permits.
11 If occupancy is requested to occur in phases, then all PL BP
physical improvements within each phase shall be
required to be completed prior to the occupancy of units
within that phase, except for items specifically excluded
in an approved Phased Occupancy Plan, or minor hand
work items, approved by the Planning Department. A
Phased Occupancy Plan shall be submitted for
Community Development Director review and approval a
minimum of 45 days prior to the request for occupancy of
any unit covered by said Phased Occupancy Plan. Any
phasing shall provide for adequate vehicular access to all
buildings in each phase and shall substantially conform
with intent and approval of the Site Development Review
approval. No individual building shall be occupied until
the adjoining area is finished, safe, accessible, provided
with all reasonably expected services and amenities and
separated from remaining construction activity. Subject to
the approval of the Community Development Director,
the completion of landscaping may be deferred due to
inclement weather with the posting of a bond for the
value of the deferred landscaping and associated
improvements.
12 The Developer shall have a special rental/lease disclosure PL BP
with the wording approved by the Planning Department.
The disclosure form will be used as a required disclosure
for future tenants indicating the presence of possible
hazards. The disclosure statement shall describe:
A. The presence of a high pressure underground
petroleum pipeline north of the site;
B. Phased development with continued construction
activity until project completion may cause noise and
dust.
13 A final lighting plan shall be submitted to the City for PL, PO, PW BP
approval, demonstrating that the entire area will be
adequately illuminated. Photometrics and lighting plans
for the site shall be submitted to the Planning and Police
Departments for review and approval prior to issuance of
building permits,
I 14
I All wall and fence heights shall be designed to ensure
clear vision at all street intersections to the satisfaction of
the Director of Public Works
PW
BP
Prior to the final occupancy of any unit, the unit shall
meet minimum health, design and safety standards,
including but not limited to the following:
A. The project entrance and all interior roadways and
driveways shall be complete to allow for safe traffic
movement to and from residential units.
B. All traffic signing and striping shall be in place.
C. All street lights and interior access and parking area
lighting shall be energized and functioning. [PW]
D. All repairs to street, curb, gutter and sidewalk which
may create a hazard shall be required or any non-hazard
repair shall be complete or bonded for. [PW]
E. Back-lit illuminated house address numbers shall be
provided. [PL, F]
F. Final site grading shall be approved by the Department
of Public Works. [B]
G. All sewer clean-outs, water meter boxes and other
utility boxes shall be set to grade, to the approval of the
Director of Public Works. [PW]
H. Dwellings shall have received all necessary
inspections and have final approval by the Building
Department to allow occupancy. [B]
I. All fire hydrants in streets providing access to the
homes shall be operable to Public Works and Fire
Department satisfaction. [PW, FI
J. All mail-box units shall be located at back of curb.
K. Exterior lighting shall be provided for stairwells and
dwelling entrances and shall be of a type and placement
so as not to cause glare on to adjoining properties or the
Iron Horse Trail. [B, PL]
L. Lighting used after daylight hours shall be adequate to
provide for security needs.
PW
PW
PW
PW
PL, B
B, PW
PW, B
B,F
PW, F
B, PL
B, PL
B, PL, P
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
OCC
16 The provisions of the City's Inclusionary House PL BP
Ordinance shall be satisfied through approval of an
Inclusionary Housing Agreement per applicable
provisions of the Dublin Zoning Ordinance prior to
issuance of building permits. If fees are to be paid, they
shall be paid prior to issuance of building permits.
17 Final building plans shall include details of proposed PL GR
trash enclosures in terms of design, materials and colors.
These items shall be approved by the Planning
Department.
18 The project shall comply with all parking provisions of PL BP
the Dublin Zoning Ordinance, including providing a 25 ft.
back up space has been provided behind garages
underneath residences
19 Automatic garage door openers shall be provided for all PL, B OCC
garage units and shall be of a "roll up" type. Garage doors
shall not intrude into public rights-of-way or parking
areas.
20 A final landscape plan shall be approved by the City's PL BP
Landscape Architect, including planting and irrigation
components. The developer shall pay a deposit to the
Planning Department to have landscape plans checked.
Fees
21 Prior to the issuance of building permits, the Developer PL, B, PW BP
shall comply with and/or pay all applicable connection
fees and development fees (plus annual increases) in
effect at the time of building permit issuance. This
includes but is not limited to traffic impact fees, regional
traffic impact fees, inclusionary housing requirements and
building permit fees. The traffic fee for the project is,
based on the project traffic study.
22 To implement the General Plan Implementing Policy PCS BP
2.1.3 (c), he developer shall fund a study to update the
"Public Facilities fee Justification Study" (Study),
prepared by Recht Hausrauth & Associated dated March
7, 1996, to include the project within the development
projections used in the Study and to recalculate the
amount of the City's adopted Public Facilities Fee
(Citywide) to include the project. The developer shall pay
the Public Facilities Fee in the amounts and times set
forth in City of Dublin resolution No. 32-96, or in the
amounts and at the times set forth in any resolution
revising the amount of Public facilities fee.
22a The project developer shall pay an in lieu fee for B FM
neighborhood parks in accordance, pursuant to and at the
times specified in the City's Quimby Act Ordinance,
Chapter 9.28 of the Dublin Municipal Code.
23 Prior to issuance of building permits, the Developer shall B BP
pay fees as required in the agreement between the Shea
Properties and Dublin Unified School District to mitigate
all impacts to the District as a result of this project.
24 Prior to the issuance by the City of any building permit, DSR BP
all utility connection fees, plan checking fees, inspection
fees, permit fees and fees associated with a wastewater
discharge permit shall be paid to DSRSD in accord with
the rates and schedules established in the DSRSD Code.
No sewer line or water line construction shall be
permitted unless the proper utility construction permit has
been issued by DSRSD. A construction permit will only
be issued after all of the items referenced in this condition
have been satisfied.
Public Works: Engineering improvements noted below
shall be constructed prior to occupancy of any unit,
unless an exception is granted by the City Engineer
25 The developer shall construct the face of curb of all PW BP
parking spaces a minimum of 3' from the proposed fence
line or retaining wall to provide sufficient room for the
required 2' vehicle overhang in a parking stall.
26 The developer shall construct a fire access gate PW, F OCC
sufficiently large to accommodate a fire truck turning
north or south onto the existing fire access road along
Alamo Creek.
27 The developer shall comply with current ADA and Title PW, B OCC
24 requirements by installing 5 additional handicap
parking spaces, with one space being van accessible.
28 Project construction drawings and documents, including PW OCC
the site plan, grading and utility plan, the locations of
transformers and the site joint trench that will service the
site with electricity, telephone and CATV. All new
utilities, connections and vaults shall be undergrounded.
All above ground boxes, transformers and water backflow
preventers shall be screened.
29 In addition to these Conditions of Approval, the PW GR, BP,
developer shall conform with the City of Dublin Standard OCC
Conditions of Approval, revised March, 1998.
l0
30 The developer shall maintain City-required bonds for all PW OCC
proposed improvements specified in the site conditions
during and for one year following completion of
construction. The Labor and Materials Bond shall be
released after the City's acceptance of improvements. The
Performance Bond shall be released one year after the
acceptance of improvements and after all defects have
been repaired. The developer, with the approval of the
Director of Public Works, has the option of providing a
Maintenance Bond in the amount of 25% of improvement
costs. This will serve instead of the Faithful Performance
Bond. Prior to release of the Faithful Performance Bond
or the Maintenance Bond, all improvements and
landscaping shall be installed and established per
approved plans, and a declaration by the project civil
engineer shall be submitted that the finished graded
building pads are within 0.1 (plus/minus) feet in elevation
of those shown on approved plans.
31 The developer shall remove any easements now on the PW GR
site, and not to be part of the proposed utility and street
improvements, shall be abandoned and removed prior to
approval of the Final Parcel Map.
32 Layout and design of the parking lot striping, drive aisles PW BP
and sidewalks shall be configured to maximize safety,
circulation, convenience and site design per City of
Dublin Parking Standards. Detailed dimensioned plans
shall be approved by the Director of Public Works prior
to issuance of building permits.
Mapping/Dedications
33 The Developer shall prepare a Parcel Map dividing the
proposed project from the Dublin Housing Authority
parcel for approval by the City and recordation in
Alameda County.
34 The developer shall stripe the centerline of the access PW OCC
road from the Phase I project driveway entrance to the
project gate to the satisfaction of the Director of Public
Works.
35 The Developer shall dedicate on a Parcel Map to the City PW FPM
of Dublin a minimum 20' maintenance/emergency vehicle
access easement (EVAE) from the existing EVAE located
next to the east top of bank of Alamo Creek drainage
channel to the existing EVAE located in the entrance
driveway and Dougherty Road per City of Dublin and
Alameda County Fire Department requirements..
36 If necessary, the developer shall dedicate a drainage PW OCC
easement to the adjacent northerly parcel (Dublin
Housing Authority) for the collection and transport of
surface drainage to the creek. The project drainage system
shall be designed and constructed to accommodate the
existing water surface flows from the northerly property
that naturally drain into the project property.
37 The developer shall comply with all applicable City of PW GR, BP,
Dublin Standard Public Works Conditions of Approval OCC
for Subdivision, In the event of a conflict between the
Public Works Typical Conditions for Subdivisions and
these Conditions, these Conditions shall prevail.
38 The subdivision shall meet or perform all of the PW OCC
requirements of the Subdivision Map Act, the City of
Dublin Subdivision Ordinance and Conditions of
Approval of the Phase I project not fully constructed.
Drainage
39 The developer shall show on the construction documents PW OCC
that the lowest pad elevations are a minimum of one (1)
foot above the 100-year flood plain.
40 Overall drainage patterns shall not be changed by PW OCC
construction of the project. Final pipe sizes, slopes,
depths and similar specifications shall be based on final
design calculations and are subject to the approval of the
Director of Public Works.
41 The Developer's project engineer shall submit for City PW GR
review a drainage study to determine that existing
drainage facilities and the new storm drain system can
adequately accommodate storm water runoff from the
project. The Developer shall comply with all mitigation
measures as required by the Director of Public Works to
correct any deficiencies in the existing storm drain line
and outfall.
12
42 The Developer may be required to remove the existing PW GR
storm drain outfall located in Alamo Creek and fill in
with soil and rip-rap to the satisfaction of the Director of
Public Works and shall obtain, if necessary, permits from
Alameda County, Zone 7, and the California Department
of Fish and Game. In lieu of the above, incorporate the
outfall into proposed site storm drain system
43 The Developer shall prepare improvement plans in accord
with the latest City of Dublin Improvement Plan
Checklist prepared and filed with the City of Dublin
Public Works Department.
Utilities
44 The Developer shall construct all utilities to the project, PW GR
including, but not limited to domestic fresh water,
sanitary sewer, electricity, telephone, cable television and
other such required utility services as may be deemed
necessary by the Director of Public Works to provide for
development of the subject site, to the requirements and
specifications of the agency having jurisdiction.
45 The Developer shall underground all utilities to the PW BP
project unless specifically exempted by the Director of
Public Works. The developer shall remove all existing
overhead utilities within the project and construct them
underground.
46 The Developer shall comply with all Alameda County PW BP
Flood Control and water Conservation District-Zone 7
Flood Control requirements and applicable fees.
47 The type, location and brightness of street lights shall be PW On-going
reviewed and approved prior to construction by the
Director of Public Works,.
48 The developer shall grade the project in accordance with PW GR
the City of Dublin Grading Ordinance and State and
Regional Water Control Boards standards.
49 All fire hydrants shall be constructed to City and Alameda PW, F BP
County Fire Department standards. The developer shall
comply with applicable Alameda County Fire
Department, City of Dublin Public Works department,
Dublin Police Service, Alameda County Flood Control
District Zone 7 and Dublin-San Ramon Services District
requirements.
13
50 The Developer shall receive proper clearances from the PW GR
pipeline owner to construct proposed sewer and water
lines which would cross the high pressure gas line. The
project engineer shall verify that the sewer line can cross
under or over the high pressure gas line.
51 Pedestrian and bicycle access shall be provided from the PW OCC
apartment complex to Dougherty Road. This access shall
comply with ADA standards. The access may be provided
along the adjacent Iron Horse Trail which will require a
pathway connection from the complex to the trail.
52 Lighting shall be provided along the entrance road. PW OCC
53 The connection of Road "A" to the trail on the east bank PW OCC
of Alamo Creek shall be revised to prevent non-
emergency vehicle entry from Road "A" onto the trail.
Reflectors shall be installed on the gates of the fence to
prevent vehicles on Road "A" from driving over the path
and into the creek. Pedestrian and bicycle access to the
trail shall be provided separate from the EVAE access
gate.
54 The Alamo Creek path shall be extended southerly from PW OCC
Road "A" to connect with the portion of the trail being
installed by Park Sierra apartments phase I. Adequate
right-of-way of the path shall be dedicated to the City.
55 Landscaping shall be installed along the north side of the PW, PL OCC
Iron Horse Trail from Alamo Creek to Dougherty Road.
The final design of plantings and irrigation shall be
approved by the Community Development Director and
Director of Public Works.
56 The final design of the intersection of the entrance road PW OCC
with the Park Sierra Apartments Phase I entrance and the
Iron Horse Trail shall include speed bumps and be
approved by the Director of Public Works.
57 Condition 57 deleted
58 The abandoned railroad bridge over Alamo Creek shall be PW OCC
reconditioned per Park Sierra Phase I. These
improvements, if not completed as part of Phase I, shall
be completed prior to issuance of a certificate of
occupancy for Phase II.
14
59 Dougherty Road and access improvements required as PW OCC
part of Phase I, shall be completed by Phase II, is not
complete under Phase I prior to issuance of occupancy
permits for Phase II. Improvements include, but are not
limited to construction of southbound right turn lane, a
pedestrian refuge island and connecting Iron Horse Trail
improvements, construction of Scarlett Drive entrance
(entrance road for Phase I), restriping the pavement to
provide a northbound left turn lane and installation of a
traffic signal. In addition, right-of-way shall be dedicated
to the City of Dublin over the Scarlett Drive extension to
provide access to the Phase II entrance road from
Dougherty Road. The developer shall post a bond
covering all improvements prior to the issuance of
building permits.
60 Adequate parking shall be provided at the gated entry to PW, P OCC
the apartments to allow vehicles not entering the site to
avoid blocking the driveway.
61 The developer is responsible for the payment of Traffic PW, F BP
Impact Fees prior to issuance of building permits,
Fire Department
62 DSRSD standard steamer (1-4-1/2" and 1-2-1/2" outlet) F BP
fire hydrants are required. Fire hydrant locations shall be
marked in the filed by installing "blue dot" markers
adjacent to the hydrant, 6" off-center from the middle of
the street.
63 Fire apparatus roadways shall extend within 150-ft. of the F On-going
most remote exterior wall of any building.
64 Fire apparatus roadways must have a minimum F OCC
unobstructed width of 20 feet and an unobstructed vertical
clearance of at least 13 feet, 6 inches. Roadways under 36
feet in width shall be posted with signs and shall have red
curbs painted with labels on one side; roadways under 28
feet in width shall be posted with signs and shall have red
curbs painted with labels on both sides of the street as
follows: "NO STOPPING FIRE LANE-CVC 22500.1."
65 Fire apparatus roadways shall be capable of supporting F BP
the imposed weight of fire apparatus and must be
provided with an all weather driving surface. Only paved
surfaces are considered all weather driving surfaces.
66 Maximum grade for fire apparatus roadway is 20%. F BP
Grooved concrete or rough asphalt shall be provided for
grades over 15%.
67 Fire apparatus roadways in excess of 150 in length shall F BP
make provision for approved apparatus turn around.
68 Fire apparatus roadways must be installed and fire F BP
hydrants in service prior to the commencement of
combustible framing. Prior to commencement of framing,
the Fire Department shall be contacted to schedule an
inspection of roadways and hydrants.
69 A weed abatement program shall be provided before, F On-going
during and after construction for vegetation within 10 feet
from combustible construction and 30 feet from street and
property lines.
70 Prior to issuance of a building permit, a full set of F BP
building plans must be submitted to the Fire Department,
Fire Prevention Bureau, for review and approval.
71 All construction equipment, machinery and devices with F On-going
internal combustion engines shall be equipped with
approved spark arrestors while operating in the project
area. This condition shall be added to construction
specifications.
72 Approved building numbers and/or addresses shall be F OCC
placed on new buildings. Addresses shall be plainly
visible and legible from the street or fronting property.
Said numbers shall contrast with their background.
73 Approved spark arrestors shall be installed on each F BP
chimney, flue/vent used for fireplaces and heating
appliances in which solid or liquid fuel is used. This
condition shall be added to construction specifications.
74 Approved smoke detectors shall be installed per current F BP
UBC standards. This condition shall be added to
construction specifications.
75 Any and all gates to Fire Department accessways shall F OCC
have a minimum of 12 foot clear, unobstructed linear
width and a clear vertical height of 13 feet, 6 inches. All
locking devices shall provide for Fire Department
emergency access. Gate plans shall be approved by the
Fire Prevention Division prior to construction.
76 For buildings 35 feet and over in height above natural F BP
grade, the required access roadway shall be a minimum of
26 feet in width and shall be positioned parallel to at least
one entire side of the building and shall be located with a
minimum of 15 feet and a maximum of 25 feet from the
building
77 Adjacent to fire hydrants, access roadways shall be a F BP
minimum of 28 feet in width at least 20 feet in both
directions from the fire hydrant.
78 An approved automatic fire sprinkler system shall be F BP
installed throughout. Sprinkler systems serving more than
100 heads shall be monitored by an approved central
station, U.L. listed and certified for fire alarms
monitoring. A copy of the U.L. listing must be provided
to the Fire Department. Sprinkler plans, specifications and
calculations shall be submitted to the Fire Department
prior to installation. A separate review fee will be
collected for this purpose.
79 Prior to installation, plans and specifications for the F BP
underground fire service line shall be submitted to the
Fire Department for approval.
Police Services
80 Signs at the joint project entry with the Phase I P, PW OCC
development shall be approved by the Police Services
Department to minimize vehicular conflicts
81 Speed humps or other speed control devices shall be P, PW OCC
installed along the private drive to minimize excess speed.
82 The developer shall comply with applicable City P, B OCC
residential security requirements.
83 If feasible, doors to storage areas and water heaters shall P, B OCC
be secured with a 1-inch deadbolt lock and high security
strike plate secured with minimum of 2 three inch screws.
84 Entry gates to the site shall be designed for emergency P OCC
access per Police Services approval.
85 Gated pedestrian entries shall be self closing and self P OCC
locking.
86 The perimeter security fence shall be a minimum of 6 feet P OCC
in height above finished grade.
87 The Developer and/or property manager shall keep the P On-going
site and all improvements clear of graffiti vandalism on a
regular and continuous basis. Graffiti resistant paints and
materials should be used.
88 An easy-to-read lighted directory and map shall be posted P OCC
at all vehicle entrances.
89 Unit markers and addresses shall be lighted at night P OCC
90 Exterior lighting shall be provided around the perimeter P OCC
of the buildings and within parking areas. A final lighting
plan shall be approved by Dublin Police Services.
17
91 Open space parking on the north east side of the complex P BP
may be vulnerable to anyone coming over the wall and
barrier plants shall be selected to prevent access at this
point.
DSRSD
92 Prior to the issuance of building permits, complete DSR BP
improvements shall be submitted to DSRSD confirming
with the requirements of the DSRSD Code, "Standard
Procedures, Specifications and Drawings for Design and
Installation of Water and Wastewater Facilities," all
applicable DSRSD Master Plans and DSRSD policies.
93 All mains shall be sized to provide sufficient capacity to DSR BP
accommodate future flow demands in addition to each
development project's demand. Layout and sizing of
mains shall be in accord with DSRSD utility master
planning.
94 Sewers shall be designed to operate by gravity flow to DSR BP
DSRSD's existing sanitary sewer system. Pumping of
sewage is discouraged and may be allowed under extreme
circumstances following a case-by-case review with
DSRSD. Any pumping station shall require specific
review and approval by DSRSD of preliminary design
reports, design criteria and final plans and specifications.
The DSRSD reserves the right to require payment of
present worth 20~year maintenance costs as well another
conditions within a separate agreement with the applicant
for any project that requires a pumping station.
95 Domestic and fire protection waterline systems shall be DSR BP
designed to be looped or interconnected to avoid dead-
end sections in accord with the requirements of the
DSRSD Standard Specifications and sound engineering
practices.
96 DSRSD policy requires public water and sewer lines to be DSR GR
located in public streets to the fullest extent possible. If
unavoidable, public water or sewer easements must be
established to provide for future maintenance and/or
replacement.
97 Prior to approval by the City of a grading permit or a site DSR GR
development permit, the locations and widths of all
proposed easement dedications for water and sewer lines
shall be submitted to and approved by DSRSD.
98 All easement dedications for DSRSD facilities shall be by DSR GR
separate instrument irrevocably offered to DSRSD or by
offer of dedication on a Final Map.
99 Prior to issuance of a building permit, all utility DSR BP
connection fees, inspection fees, permit fees and fees
associated with a wastewater discharge permit shall be
paid to DSRSD in accord with the rates and scheduled
established in the DSRSD Code.
100 Prior to issuance of a building permit, all improvement DSR BP
plans of DSRSD facilities shall be signed by the District
Engineer. Prior to DSRSD approval, the developer shall
pay all DSRSD fees, and provide an estimate of
construction costs for water and sewer systems, a
performance bond, a one-year maintenance bond, and a
comprehensive general liability insurance policy in the
amounts and forms acceptable to DSRSD. Fifteen
working days are required for DSRSD approval.
101 No sewer or water line construction shall be permitted DSR GR
unless the proper utility construction permit has been
issued by DSRSD. A construction permit will only be
issued after all other items have been satisfied.
102 The developer shall hold DSRSD, its Board of Directors, DSR On-going
commissions, employees, and agents of DSRSD harmless
and indemnify and defend same from any litigation,
claims, or fines resulting from the construction and
completion of the project.
103 The project is located within the Potable water Use area DSR GR
of the District. The Board of Directors is considering
enactment of a Recycled Water Use Zone Ordinance
which may call for the installation of a recycled water
irrigation systems to allow for the future use of recycled
water for approved landscape irrigation demands for new
development within the potable water service area of the
District. Recycled water will be available in the future, s
described in DERWA San Ramon Valley Recycled Water
Facility Plan. Enactment of the proposed Use ordinance is
anticipated prior to approval of this project by the City of
Dublin. Upon its enactment, and unless specifically
exempted by the District Engineer, compliance with the
Recycled Water Use Ordinance, as may be amended or
superseded, is required.
An irrigation water service to connect to off-site recycled
water mains shall be installed to the property line to allow
for the connection when recycled water is available. This
development shall be equipped to use recycled water for
irrigation. The recycled water irrigation system shall be
designed to conform with District standards and
specifications as described in the Standard Specification
Addendum.
104 The applicant an City's cooperation is requested to DSR, PL GR
establish a recycled water easement within the project
access road of Dougherty Road for future installation of
recycled water pipeline improvements.
Zone 7
105 The Developer shall relocate the Zone 7 24-inch ZONE 7 GR
Dougherty Road water pipeline per Zone 7 standards.
This shall include dedicating a 20-foot wide easement to
the District for the construction, operation and
maintenance of the relocated waterline.
106 Final construction plans shall indicate which existing ZONE 7 GR
improvements shall remain
107 A minimum 20-foot setback shall be provided from top of ZONE 7 GR
bank of Alamo Creek to the project property line.
2O
108 The proposed project storm drain system shall be ZONE 7 GR
designed so as to avoid transfer of storm water runoff
between drainage basins
109 An erosion control plan shall be prepared by the ZONE 7 GR
developer to minimize further erosion near the existing
outfall from the proposed 36-inch drainage pipe. All
repairs and improvements to the outfall structure shall be
approved by Zone 7.
110 The developer's engineer shall provide a section to the ZONE 7 GR
District indicating slope, the access road, v-ditch, wall,
property line and building(s) closest to Alamo Creek.
112 No over bank flow shall be permitted from the proposed ZONE 7 On-going
development
PASSED, APPROVED and ADOPTED this 26th day of May, 1998.
AYES:
NOES:
ABSENT:
Cm. Jennings, Johnson, Hughes, and Musser
Cm. Oravetz
91 an~n-il~g-C o ~-mi-s~r~ Chhirper~n
Community Development Director
2q