Loading...
HomeMy WebLinkAboutReso 108-98 EngSvc/ZumwaltRESOLUTION NO. 108 - 98 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDMENT TO AGREEMENT FOR ENGINEERING SERVICES WITH ZUMWALT ENGINEERING GROUP WHEREAS, the City Council of the City of Dublin approved an agreement for engineering services with Zumwalt Engineering Group, on May 20, 1997; and WHEREAS, said agreement was amended in March of 1998 to extend the term of agreement and increase the Not To Exceed limit; and WHEREAS, Zumwalt Engineering has proposed an adjustment of rates for Fiscal Year 1998-99; and WHEREAS, the term of agreement is proposed to be extended for an additional one-year period; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with Zumwalt Engineering Group, which is attached hereto as "Exhibit A." BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment. PASSED, APPROVED AND ADOPTED this7th day of July, 1998. AYES: Councilmembers Barnes, Burton, Howard, Lockhart and Mayor Houston NOES: None ABSENT: None ABSTAIN: None K:/G/7-7~98/resozum2. doc gSagenmisc~resozum2 EXItlBIT "A" OF RESOLUTION /0,~-98 FOR ENGINEERING SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Zumwalt Engineering Group (hereinafter referred to as "CON.SULTANT"), entered into an agreement on May 20, 1997, to provide engineering services to CITY: and WHEREAS, said agreement was amended in March of 1998; and WHEREAS, an adjustment of rates and extension of term are proposed; NOW, THEREFORE, the parties hereto agree as follows: Rate Schedule The schedule of rates for Fiscal Year i998-99 shall be as delineated in the attached Exhibit "A" (Standard Rates and Municipal Augmentation Rates). The total expenditure for these services for Fiscal Year 1998-99 shall not exceed $500,000. Extension of Term The term of the agreement shall be extended to coincide with the end of the 1998-99 Fiscal Year; i.e., until June 30, 1999. Ciry'C ;rk {] CITY OF DUBLIN ZUMWALT ENGINEERING GROUP James W. Zumwalt, Principal Date: ZUMWALT ENGINEERING GROUP CHARGE RATE FEE SCHEDULE FOR FISCAL YEAR 1998-99 The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and will be the sum of all the items set forth below: A. PERSONNEL SERVICES PRINCIPAL SUPERVISING ENGINEER SENIOR ENGIlqEER ASSOCIATE ENGINEER ASSISTA2xYr ENGINF~F.R FIELD REPRESENTATIVE TECHNICIAN / CAD OPERATOR CLERICAL / OFFICE SUPPORT TWO-MAN SURVEY CREW $120 HR 115 HR 105 HR 95 HR 80 HR 75 HR 70 HR 45 HR 160 HR Rates for individuals may vary depending on the service performed. EFFECTIVE THROUGH JUNE 30,1999 AND SUBJECT TO REVISION ANNUM_J.,Y TRANSPORTATION EXPENSES 1. Thirty-five cents (.35) per mile for use of vehicles. A minimum of six dollars ($6.00) per hour will be charged for use of vehicles carrying field equipment or used for field inspection and supervision. OUTSIDE SERVICES I. Invoice cost of services and expenses charged to Ztunwalt Engineering Group by outside consultants, professional, or technical t'n-ms engaged in connection with the order, plus 15% handling charge. D. MISCELLANEOUS EXPENSES The invoice cost of materials, supplies, reproduCtion work, and other services procured by Zumwalt Engineering Group fi.om outside sources, plus a handling charge of 15%. Ail out-of-pocket expenses not included in Items A, B and C will be included in this category. ZUMWALT ENGINEERING GROUP MUNICIPAL STAFF AUGMENTATION 1998-99 CHARGE RATE FEE SCHEDULE The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate, plus incurred expenses and will be the sum of all the items set forth below: A. MUNICIPAL STAFF AUGMENTATION SERVICES PRINCIPAL $ 93 HR SENIOR ENGINEER 88 HR PROJECT ENGINEER/SURVEYOR 83 HR ASSOCIATE ENGINEER 77 HR SENIOR DESIGNER 77 HR STAFF ENGINEER 66 HR FIELD REPRESENTATIVE 66 HR CAD DESIGNER 66 HR TECHNICIAN/CAD OPERATOR 50 HR CLERICAL / OFFICE SUPPORT 40 HR EFFECTIVE THROUGH JUNE 30, 1999 AND SUBJECT TO REVISION ANNUALLY TRANSPORTATION EXPENSES mded'o~ use-o, whicte~. A mkfimmu-of-six-dottars-($6:OO)-per-hourwitt-be 1. T-hi--e-centst.~-~j' "=' per --' ...... ' - -et~ar-gcd for-usc of'vehielca used-for~etd-inspeetion-~d-supeiMsion. (Deleted) OUTSIDE SERVICES I. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants, professional, or technical firms engaged in connection with the order, plus 15% handling charge. D. MISCELLANEOUS EXPENSES 1. The invoice cost of materials, supplies, reproduction work, and other services procured by Zumwalt Engineering Group fi.om outside sources, plus a handling charge of 15%. All out-of-pocket expenses not included in Items A, B and C will be included in this category.