HomeMy WebLinkAboutReso 30-10 I-580 Impvm Amend #3RESOLUTION NO. 30 - 10 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDMENT #3 TO THE AGREEMENT WITH S&C ENGINEERS, INC., TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE I-580/FALCON ROAD INTERCHANGE IMPROVEMENTS PROJECT WHEREAS, the City of Dublin entered into an Agreement with S&C Engineers, Inc., on August 1, 2006, to perform construction management services for the I-580/Fallon Road Interchange Improvement Project; and WHEREAS, S&C's scope of work is proposed to be inspection, contra initiated change c and construction requested by the contract amount work. ct administration, testing and surveying work expanded to include additional in conjunction with several City orders including work required by Caltrans due to change in field conditions of the westbound auxiliary lane between Fallon Road and Tassajara Road Alameda County Congestion Management Agency, and the not-to-exceed s proposed to be increased $377,565.64 to cover the cost of the additional NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve Amendment #3 to the Agreement with S&C Engineers, Inc. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Amendment to the Agreement, attached hereto as Exhibit A. PASSED, APPROVED AND ADOPTED this 2nd day of March, 2010, by the following vote AYES: Councilmembers Biddle, Hart, Hildenbrand, Scholz, and Mayor Sbranti NOES: None ABSENT: None ABSTAIN: None /~ I Mayor ATT T: ~~2t-~- City Clerk Reso No. 30-10, Adopted 3-2-10, Item 4.2 Page 1 of 1 ~ ~ 3~ EXHIBIT "A" OF RESOLUTION -10 AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND S&C ENGINEERS, INCORPORATED " FOR CONSTRUCTION MANAGEMENT SERVICES WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and S&C Engineers, Inc. (hereinafter referred to as "CONSULTANT"), entered into an agreement on August 1, 2006, to perform construction management services for the I-580/Fallon Road Interchange Improvement Project; and WHEREAS, the Scope of Work is proposed to be expanded to include additional inspection, contract administration, testing and surveying work in conjunction with several City initiated change orders including work required by Caltrans due to change in field conditions and construction of the westbound auxiliary lane between Fallon Road and Tassajara Road requested by the Alameda County Congestion Management Agency, and the not-to-exceed contract amount is proposed to be increased to cover the cost of the additional work; NOW, THEREFORE, the parties hereto agree as follows: Scope of Work Scope of Work shall be modified to include additional scope of work as described in Consultant's letter dated January 27, 2010 (attached). Not-To-Exceed The total cost for time-and-materials work under this amendment shall not exceed an additional $377,565.64 based on the attached cost breakdown. CITY OF DUBLIN ATTEST: City Clerk Joni Pattillo, City Manager Date: t"e .~ . I ~'-, 2 8 10 S&C ENGINEERS, INC. D / James E. Scott, President C:~Documents and SettingsUvlike ChanlDesktoplExhibit A -Amendment#3 March 2 2010.DOC EXHIBIT T.. iL... di-w.~l~ ~4i~r~ 'o~ 37 January 27, 2010 File No. 10405.020 Mr. Ferdinand Del Rosario Senior Civil Engineer City of Dublin 100 Civic Plaza Dublin, CA 94568 n S&G ENGINEERS, INC. RE: Consulting Services Agreement -Construction Management Services I-58O/Fallon Road Interchange Improvements Project Request for Amendment #3 Dear Mr. Del Rosario: S&C Engineers, Inc. is requesting an amendment to the agreement between the City of Dublin and S&C Engineers, Inc. to provide Construction Management Services for the I-580/Fallon Road Interchange Improvements Project. Unanticipated Caltrans requirements and change orders added cost and time to the construction contract. Additionally the Alameda County Congestion Management Agency (ACCMA) in conjunction with the City initiated change orders to construct a westbound auxiliary lane between Fallon Road and Tassajara Road and modify the alignment of the eastbound loop on-ramp. These changes required additional inspection, contract administration, testing and surveying work from S&C Engineers and our subconsultants. The change order work was in addition to the work anticipated in the original construction contract and S&C Engineers' original scope of services. S&C Engineers is requesting an amendment for $377,565.64 be approved by the City as compensation for the additional services. A breakdown of the additional compensation by agency is below. Dublin $ 195,121.82 Pleasanton $ 31,950.22 ACCMA $ 150,493.60 Total $ 377,565.64 Please find attached a detailed summary of the additional work and breakdown of the cost for inspection, contract administration, surveying and testing. If you have any questions regarding this request, please contact me at (510) 272-2970. Sincerely, James E. Scott, P.E. Project Manager Enclosures I i l BROADWAY ~ SUITE 300 OAKLAND, CALIFORNIA 94607 TEL 510.272.2970 FAX 510.272.2972 `~~37 Request for Amendment #3 I-580/Fallon Road Interchange Improvements Project City of Dublin Additional Scope of Work Construction Management Costs 1. Wildlife Exclusion Fence At the request of the City, S&C Engineers arranged for the installation of 51771ineaz feet of 3 foot high wire backed silt fence to serve as a Wildlife Exclusion Fence on the north side of the project. The fence was a conservation (mitigation) measure required by the US Fish and Wildlife Service to minimize the effects of Construction on the California tiger salamander, the red-legged frog and San Joaquin kit fox. The fence had to be installed prior to an October 15th deadline in order to keep California tiger salamanders and red-legged frogs from entering into the future construction area during the wet season. Failing to meet the October 15th deadline could have delayed the start of construction. S&C Cost 21 640.00 Pleasanton: $3,371.51 Total Cost $21,640.00 Dublin: 18 268.49 Total Cost $21,640.00 2. Wage Escalation (Amendment #2) The contract between the City and S&C Engineers, Inc. anticipated construction starting in November of 2006 and end in 2007. Due to unforeseen circumstances involving environmental permitting, the start of the construction was delayed until mid 2008 and the completion of construction is projected to be at the end of 2009. On February 19, 2008, the City Council authorized an hourly rate adjustment for 2008 and beyond (Amendment #2). The impact of the hourly rate adjustment for 2008 and beyond has not yet been reflected with a commensurate adjustment in authorized compensation. S&C Engineers has agreed to maintain 2008 rates throughout 2009 as requested by the City. S&C Cost $46,392.66 Pleasanton: $8,745.37 Survey Cost $4,544.72 Dublin: 47 386.67 Testing Cost $5,194.66 Total Cost $56,132.04 Total Cost $56,132.04 ~~~ 3. Construction Change Order Impacts 3a. Removal of Twin 1200 mm CIP pipes on WB Auxiliary Lane (CCO # 'n and Install 1050 mm Reinforced Concrete Pipe on WB Auxiliary lane (CCO # 9) During excavation for the roadway structural section of the westbound auxiliary lane two parallel 1200 mm cast-in-place (CIP) pipes were encountered. The 1200 mm CIP pipes were as much as two feet up into the planned structural section of the auxiliary lane. The Contractor was directed to pot hole some points to determine the location of the pipes so the designer and Caltrans could accurately assess the conflict. After several meetings with the designers and Caltrans, it was determined more detailed information was needed. Excavation of the soil above the pipes was performed to expose the pipes for the entire length where the pipes conflicted with the structural section. A 10 foot section of the pipes was demolished to determine the wall thickness of the pipes and if the pipes had any steel reinforcement. The information on the pipes was forwarded to Caltrans Hydraulics Department who confirmed the unreinforced pipes were not strong enough to sustain traffic loads. Caltrans required the twin 1200 mm pipes be removed. S&C Engineers' Resident Engineer coordinated with the designer, the Caltrans Hydraulics Department and the Caltrans Oversight Engineer to expedite a decision and implement the change. Change order #7 was issued to the Contractor to remove the 1200 mm CIP pipes and to backfill and compact the trench. As described the existing double 1200 mm CIP concrete pipe and drainage inlets were removed in the azeas where they conflicted with the new roadway structural section. Under CCO #9 300 meters of new 1050 mm reinforced concrete pipe (RCP) was installed outside the limits of the new roadway structural section and connected to an existing drainage system. Steel reinforcing was placed around the RCP. The trench containing the RCP and steel was backfilled with concrete. A 600mm wide section of Lean Concrete Base (LCB) and concrete backfill located between the pipe and the existing roadway was installed at the request of, and will be reimbursed by the Alameda County Congestion Management Agency. The concrete backfill and LCB are for the anticipated roadway construction of the future I-580 HOV/HOT Lane widening project. S&C Engineers' Resident Engineer worked with the designer, the Caltrans Hydraulics Department and the Caltrans Oversight Engineer to minimize the cost and schedule impacts to the City's construction project and to expedite and implement a solution. Construction Cost $338,872.81 S&C Cost $24,800.00 Pleasanton: $4,876.54 Survey Cost $4,500.00 Dublin: $25,423.46 Testing Cost 2 000.00 ACCMA: 1 000.00 Total Cost $31,300.00 Total Cost $31,300.00 to ~ 3`l 3b. Revise Fassework Traffic Opening (CCO's #32 & #36) The Contractor's progress on the project was impacted by a revision to the bridge falsework traffic opening requirements imposed by Caltrans. Shortly before the bridge falsework over I-580 was to be erected, Caltrans raised concerns regarding the configuration of the bridge falsework traffic opening, temporary K-rail and traffic striping. The bridge falsework traffic opening was already constructed according to the Caltrans approved construction staging plans. After six weeks of additional reviews and several meetings, Caltrans finally approved an alternative configuration for the bridge falsework traffic opening. During this six week period, the Contractor's work force was kept on site because all parties believed the response from Caltrans was imminent. The alternative bridge falsework opening configuration required completion of the pavement structural section on the eastbound loop on-ramp, restriping of the freeway, and shifting of temporary K-rail. (CCO #32) These changes took four weeks to plan, schedule, implement and construct. A negotiated settlement with the Contractor included a total of 64 working days adjustment to contract time. S&C Engineers' Resident Engineer and staff attended several meetings with the designer, the Caltrans design, Caltrans HQ Geometrician, the Caltrans Oversight Engineer and Caltrans management to facilitate a decision and implement the change. S&C Engineers staff also analyzed the Contractor's change order Cost proposal which was originally valued at more than $700,000. Along with City staff, S&C Engineers was able to negotiate the final value of the change order settlement down to $398,822.00 Construction Cost $460,831.57 Contract Time Adjustment 64 working days Pleasanton: $14,956.80 S&C Cost 96 000.00 Dublin: 81 043.20 Total Cost $96,000.00 Total Cost: $96,000.00 3c. Construct auxiliary lane, Fallon to Tassajara (CCO #39) & align EB loop on ramp (FR71V>) to accommodate future Fallon to Airway Aux Lane. (CCO #39b) Auxiliary Lane - CCO #39 In cooperation with the Alameda County Congestion Management Agency (ACCMA) the City agreed to construct an auxiliary lane on westbound I-580 between the Fallon Road Interchange and the Tassajara Road Interchange. Construction of the auxiliary lane will help alleviate traffic congestion on westbound I-580 and decrease travel times for Dublin residents who access westbound I-580 from Fallon Road and residents exiting from westbound I-580 to Tassajara Road. The City will be reimbursed for 100% of the cost of this change order from the Alameda County Congestion Management Agency. This change order has been reviewed and approved by Caltrans. Additional construction surveying is required to establish line and grade for the auxiliary lane and additional testing must be performed on the structural section. ~~ ~r Eastbound Loop On-Ramp - CCO #39B The Alameda County Congestion Management Agency (ACCMA) requested the City modify the existing EB loop on ramp to accommodate an upcoming auxiliary lane on eastbound I-580 between the Fallon Road Interchange and the Airway Interchange. These modifications should be incorporated into the City's project to avoid partially removing the roadway constructed under the City's contract just a few months after it was constructed. The City will be reimbursed 100% of the cost of this change order from the Alameda County Congestion Management Agency. The change order plans have been reviewed and approved by Caltrans. Additional construction surveying will be needed to establish line and grade for the auxiliary lane and additional testing will need to be performed on the structural section. Construction Cost S&C Cost Survey Cost Testing Cost Total Cost $1,500,000.00 estimated $119,463.60 $17,430.00 12 600.00 $149,493.60 ACCMA Cost: $149,493.60 3d. Central Parkway Tie-in, Extra Work North of the project at the Central Parkway intersection, the constructed but unopened section of new Fallon Road must be tied into the previously opened section of new Fallon Road prior to switching traffic on to the unopened section of Fallon Road. The change order to perform this work will have to be scoped with the City and the developer's Engineer and negotiated with the Contractor. Construction surveying will be performed by the developer's Engineer to establish line and grade for the auxiliary lane and additional testing will need to be performed on the structural section. Estimated Construction Cost .$ 200,000.00 S&C Cost $20,000.00 Dublin Cost: $23,000.00 Survey Cost $ 0.00 Testing Cost 3 000.00 Total Cost $23,000.00 8~ 37 Summary of Cost Increases due to Change Orders. 1. Wildlife Exclusion Fence $ 21,640.00 2. Wa a Escalation $ 56,132.04 3. Construction Chan a Order Im acts 3a. Removal of Twin 1200 mm CIP pipes on WB Auxiliary Lane (CCO # 7) and Insta111050 mm Reinforced Concrete Pipe on WB Auxilia lane CCO # 9 $ 31,300.00 3b. Revise Falsework Traffic O enin CCO's #32 & #36 $ 96,000.00 3c. Construct Auxiliary Lane, Fallon to Tassajara (CCO #39) & align EB loop on ramp (FR7M) to accommodate future Fallon to Airwa Auxilia Lane. CCO #39b $ 149,493.60 3d. Central Parkwa Tie-in $ 23,000.00 Total $ 377,565.64 Breakdown of Costs by Agency Dublin $ 195,121.82 Pleasanton $ 31,950.22 ACCMA $ 150,493.60 Total $ 377,565.64 :~; i ~~ ~ m ..+ d a O U O w w H O U d a+ N W N m m f0 t a d c ca t v Gj C C 0 0 O N N T O O O O O O 'd N ~~pp 00000 ((pp ~_ fAN Of 0000 O 01 •-O 00000 O ~ fC NCO.-~ ri N V1N wN N ~ y IA f9 fA N1A C l0 7 N C O ~ =j m d f0~ w N~ O 7~ L ~ y C Q ~ U ~ C ~ ? ~ ~ _d = ~ H~ cn YU ~ ~i F~ o m c of N 0 0 0 0 0 M O O O M Y9 ~ 0 0 0 ui 0 0 w 0 0 0 O O 0 L 0 g m w d a E 0 U O ++ .~ a O U N !0 E w N w Q E 14 C O a O 0 J m w ot~ N c J K Q m m M O U U rnncoo ~oooooo m V n N ~0 00000 fD ~ tf) ~ N~bfD 000 MM ~ pMp N ~D (A W ~ O f0 (O ~ O R O U7 tq O ~tO OD ~O Oi N 69 f7 V' n Of n ~ V/ W tli N W d! a N M C N N N 7 C ~ N d d t ,_ ~+ Nom[ O ~~ L O= .C N ~ ~ ~~ U ~ C NfA~ .~-• '~' Q O as .~ r $ E o~ ~ Y V ~ ~ '~ v ~ ~ ~ ~ d d d F°- c N ~ E o ~ m a~i ~ ~ 1~ U Q a rn ~c o c O o a 5 ~ E m O U c .~ E m rn ~ v b9 O O O N 1A 0 0 0 0 O 0 w 0 0 0 w O 0 o ~^ y N C ~ ro ~ M o ~~ EV ~ a~i o ,fl o c aNi o ~ ^~ E c a'm ~pU ~' U ~ E~iv > > M '~ V aaw