Loading...
HomeMy WebLinkAbout8.1 Attch 3 ResoTM7950 RESOLUTION NO. 10 - xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING VESTING TENTATIVE SUBDIVISION MAP 7950 FOR THE NIELSEN PROPERTY RESIDENTIAL PROJECT (6407 TASSAJARA ROAD - APN 985-0002-009-02) PA 07-057 WHEREAS, Robert Nielsen submitted applications to permit the development of up to 36 residential units on approximately 10.0 acres at 6407 Tassajara Road. The project includes applications for General Plan and Eastern Dublin Specific Plan amendments to modify the land use designation from Rural Residential/ Agriculture to Single Family Residential and to reduce the width of on-site streets; a Planned Development Rezone with a related Stage 1 Development Plan Amendment and Stage 2 Development Plan, and Vesting Tentative Subdivision Map 7950. The applications are collectively known as the "ProjecY"; and WHEREAS, the parcel map proposes to subdivide the property into 34 residential lots with associated improvements; and WHEREAS, the State of California Subdivision Map Act and the adopted City of Dublin Subdivision Regulations require that no real property may be divided into five or more parcels for purpose of sale, lease or financing, unless a Tentative Subdivision Map is acted upon, and a Final Map is approved consistent with the Subdivision Map Act and City of Dublin Subdivision Regulations; and WHEREAS, the Applicant/Developer has submitted a complete application for a Vesting Tentative Subdivision Map dated April 27, 2010, on file in the Community Development Department, Planning Division; and WHEREAS, the City prepared a Draft Supplemental Environmental Impact Report (DSEIR) dated January 2009 for the proposed Project that reflected the City's independent judgment and analysis of the potential environmental impacts of the Project beyond those analyzed in the Eastern Dublin EIR. The DSEIR confirmed that many aspects of the Project were within the scope of the Eastern Dublin program and that the certified Eastern Dublin EIR adequately described these aspects of the Project for CEQA purposes; and WHEREAS, comments received on the DSEIR were reviewed and responded to, and the FSEIR was prepared; and WHEREAS, a Staff Report, dated April 27, 2010 and incorporated herein by reference, described and analyzed the Project, including the Vesting Tentative Subdivision Map, and the related Final Supplemental Environmental Impact Report (FSEIR) for the Planning Commission; and WHEREAS, the Planning Commission held a properly noticed public hearing on the Project, including the proposed Vesting Tentative Subdivision Map, on April 27, 2010 at which time all interested parties had the opportunity to be heard; and ATTACHMENT3 WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted to the Planning Commission recommending approval of Vesting Tentative Subdivision Map 7950 subject to the conditions prepared by Staff; and WHEREAS, on April 27, 2010, the Planning Commission adopted Resolution 10-XXX recommending that the City Council certify the FSEIR for the project, which Resolution is incorporated herein by reference and available for review at City Hall during normal business hours; and WHEREAS, the Planning Commission considered the FSEIR and prior related environmental documents, and all above-referenced reports, recommendations, and testimony to evaluate the Project. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part of this resolution, and that the Planning Commission does hereby find: A. Vesting Tentative Subdivision Map 7950 is consistent with the intent of applicable subdivision regulations and related ordinances. B. The design or improvements of Vesting Tentative Subdivision Map 7950 is consistent with the City's General Plan policies as they apply to the subject property in that on , 2010 the City Council adopted Resolution No. -10, approving an amendment to the Dublin General Plan and Eastern Dublin Specific Plan to permit the development of up to 36 units on the Nielsen Property. Once the amendments were approved, the project became consistent with both the General Plan and the Eastern Dublin Specific Plan C. Vesting Tentative Subdivision Map 7950 is consistent with the Planned Development Zoning District in which it is located, as approved via City Council Ordinance xx-xx, and is therefore consistent with the City of Dublin Zoning Ordinance. D. The Project site is physically suitable for the type and intensity of the subdivision being proposed in that the project has been designed in a manner where the 34 lots are arranged on two cul-de-sacs to work with the natural grade of the hilly site and the plan utilizes terraces and stepping the houses up the slope. Lots have been designed to fit the topography of the site by stepping up the slope and to reduce the need for exterior retaining walls. E. Vesting Tentative Subdivision Map 7950 will not adversely affect the health or safety of persons residing or working in the vicinity or be detrimental to the public health, safety and welfare because the Project will comply with all applicable development regulations and standards and will implement all mitigation measures in the Project FSEIR and all applicable mitigation measures in the prior EIR. 2 F. The design of the subdivision will not conflict with easements acquired by the public at large, or access through or use of property within the proposed subdivision. The City Engineer has reviewed the Vesting Tentative Subdivision Map and title report and has not found any conflicting easements of this nature. NOW, THEREFORE BE IT FURTHER RESOLVED that the Planning Commission hereby conditionally approves PA 07-057, Vesting Tentative Subdivision Map 7950, to subdivide ± 10.9 acres of land into 34 residential lots with associated improvements. Vesting Tentative Subdivision Map 7950, prepared by MacKay & Somps, attached as Exhibit A to this Resolution, except as specifically modified by the Conditions of Approval contained below. CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the approval of the Final Parcel Map, and shall be subject to City Engineer and the Director of Community Development review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval: [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City Attorney, [PCS] Parks and Community Services, [F] City of Dublin Fire, and [DSR] Dublin San Ramon Services District. NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED GENERAL CONDITIONS 1. General. The Developer shall comply with the Subdivision Map PW Ongoing Act, the City of Dublin Subdivision, Zoning, and Grading Ordinances, the City of Dublin Public Works Standards and Policies, and all building and fire codes and ordinances in effect at the time of buildin ermit. 2. Effective Date/Validity. This Vesting Tentative Subdivision Map PL Ongoing approval is contingent upon certification of the Supplemental Environmental Impact Report and approval of the related General Plan Amendment, Eastern Dublin Specific Plan Amendment, and Planned Development Rezone with a related Stage 1 Development Plan Amendment and Stage 2 Development Plan. If the above approvals are not granted, this Vesting Tentative Subdivision Map a roval shall become null and void. 3. Clarifications and Changes to the Conditions. In the event that PW Ongoing there needs to be clarification to these Conditions of Approval, the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The Director of Community Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Developer to fulfill needed im rovements or miti ations resultin from im acts of this ro'ect. 4. Electronic File. Developer shall provide the Public Works PW Ongoing Department a digital vectorized file of the "master" files for the project when the Final Map has been approved. The digital vectorized files shall be in AutoCAD 14 or higher drawing format. Drawing units shall be decimal with the precision of the Final Map. All objects and entities in layers shall be colored by layer and named in En lish. All submitted drawin s shall use the Global 3 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. 5. Hold Harmless/Indemnification. The Developer shall defend, PW Ongoing indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City related to this project to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or roceedin s 6. Fees. The Developer shall pay all applicable fees in effect at the PW Zone 7 and time of building permit issuance including, but not limited to, Public Facilities Planning fees, Building fees, Dublin San Ramon Services District In-Lieu Fees fees, Public Facilities fees, Dublin Unified School District School Due Prior to Impact fees, Public Works Traffic Impact fees, Alameda County Filing Each Fire Services fees; Noise Mitigation fees, Inclusionary Housing In- Final Map; Lieu fees; Alameda County Flood and Water Conservation District Other Fees (Zone 7) Drainage and Water Connection fees; and any other fees Required with as noted in the Development Agreement. Issuance of Building Permits 7. Substantial Conformance. The Final Map shall be substantially in PW Ongoing conformance with Vesting Tentative Subdivision Map 7950 unless otherwise modified b the conditions contained herein. 8. Conditions of Approval. A copy of the Conditions of Approval PW Ongoing which has been annotated how each condition is satisfied shall be included with the submittals to the Public Works Department for the review of the Final Map and improvements plans. The notations shall clearly indicate how all Conditions of Approval will be complied with, and where they are located on the plans. Submittals will not be acce ted without the annotated conditions. 9. Map Expiration. The Vesting Tentative Subdivision Map shall PW Ongoing have that life determined by the Subdivision Map Act, including but not limited to Section 66452.6. 10. Submittal. All submittals of plans and Final Maps shall comply with PW Ongoing the requirements of the "City of Dublin Public Works Department Improvement Plan Submittal Requirements", and the "City of Dublin Im rovement Plan Review Check LisY". 11. Easements. All rights-of-way and easement dedications required PW Ongoing b the Tentative Ma shall be shown on the Final Ma . PUBLIC WORKS CONDITIONS 12. General Public Works Conditions of Approval: Developer shall PW Ongoing comply with the City of Dublin General Public Works Conditions of A roval for Tract 7950 contained below unless s ecificall 4 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED modified b these Conditions of A roval. 13. Development Agreement: A Development Agreement between PW Final Map the Cit of Dublin and the Develo er shall be recorded. 14. Street Lighting Maintenance Assessment District: The PW Final Map Developer shall request the area to be annexed into the Citywide Street Lighting Maintenance Assessment District and shall provide an exhibits re uired for the annexation. 15. Ownership and Maintenance of Improvements: Ownership, PW Final Map and dedications on final map, and maintenance of street right-of-ways, Ongoing common area parcels, and open space areas shall be by the City of Dublin, the Homeowner's Association, and the individual homeowners, as shown in Sheet PD2-4 of Exhibit A. 16. Landscape Features within Public Right of Way. The PW Final Map Developer shall enter into an "Agreement for Long Term Encroachments" with the City to allow the HOA to maintain the landscape and decorative features within public Right of Way including frontage & median landscaping, decorative pavements and special features (i.e., walls, portals, benches, etc.) as generally shown on the Ownership and Maintenance Plan. The Agreement shall identify the ownership of the special features and maintenance responsibilities. The Homeowner's Association will be responsible for maintaining the surface of all decorative pavements including restoration required as the result of utility re airs. 17. Covenants, Conditions and Restrictions (CC&Rs). A PW Final Map Homeowners Association shall be formed by recordation of a declaration of Covenants, Conditions, and Restrictions to govern use and maintenance of the landscape features within the public right of way contained in the Agreement for Long Term Encroachments and the frontage landscaping along Tassajara Road and interior streets. Said declaration shall set forth the Association name, bylaws, rules and regulations. The CC&Rs shall ensure that there is adequate provision for the maintenance, in good repair and on a regular basis, of the landscaping & irrigation, decorative pavements, median islands, fences, walls, drainage, lighting, signs and other related improvements. The CC&Rs shall also contain all other items required by these conditions. The Developer shall submit a copy of the CC&R document to the City for review and a roval. 18. Public Streets: Developer shall construct street improvements PW Approval of and offer for dedication to the City of Dublin the rights of way for Improvements Tassajara Road and interior streets as shown on the Tentative Plans or Final Ma , to the satisfaction of the Cit En ineer. Map 19. Acoustic Study: An acoustic study is needed to determine the PW Approval of need for additional sound mitigation measures along Tassajara Improvements Road. Plans or Final Ma 20. Water Quality Pond Modifications: The existing drainage system PW Approval of in Silvera Ranch Drive shall be modified so that a high flow bypass Improvements line is installed between Tassajara Raod and the existing outfall Plans or Final into the Silvera Ranch ond. Low flows 0.2"/hr from both Nielsen Map 5 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED Ranch and Silvera Ranch shall be directed into the pond, with high flows from both developments directed into the bypass line. A hydrodynamic separator shall be installed on the pond outfall line between the outfall and the high/ low flow diversion structure, so that flows from both developments are directed into the separator prior entering the pond. Improvements shall be completed outside of the existing pond. The Silvera Ranch Homeowner's Association shall be advised of the modifications in advance of final approval of the improvement plans. In the event that the existing pond cannot be utilized for treating the Nielsen Ranch runoff, a pond shall be provided on Lot 1 in lieu of a residence. 21. Tassajara Road Frontage Improvements: Tassajara Road shall PW Approval of be improved to provide frontage improvements (curb and gutter, Improvements sidewalk, 20' of pavement, lighting, and landscaping) on the east Plans or Final side of the road along the Nielsen Ranch frontage. In addition, the Map existing pavement on the road shall be removed and an additional 14' of pavement shall be installed adjacent to the frontage improvements. This pavement shall be striped as a southbound travel lane with a 2' shoulder. Eastern Dublin Traffic Impact Fee (EDTIF) Section 1 credits will be given for these improvements as outlined in the 2004 EDTIF U date or subse uent u dates. 22. Tassajara Road Retaining Walls: The retaining walls along PW Approval of Tassajara Road shall be redesigned to eliminate or soften the Improvements right-angle bends in the walls near the cellular site. Plans or Final Ma 23. Street "A" Median Island: The final street improvement design PW Approval of shall include a shorter median island in Street "A" in order to Improvements provide an acceptable transition for southbound vehicles prior to Plans or Final the arkin s ace in front of Lot 1. Map 24. Sidewalk/ Driveway Design: The 4.5' wide sidewalks shall be PW Approval of widened by 6" at the driveways to accommodate an ADA-compliant Improvements driveway conforming to City Standard Dwg. No. CD-111. Plans or Final Ma -Final Ma 25. Lot 27-28 Parking: The final design shall include a detailed layout PW Approval of for the parking spaces serving Lots 27 and 28, to ensure that Improvements vehicles can access and leave the parking spaces. Plans or Final Ma 26. Dublin Boulevard/ Dougherty Road Intersection Contribution: PW Final Map The developer shall pay a fair share portion of the funding deficiency between the cost of the Dublin/ Dougherty Intersection Improvements and available funding. The payment shall be due with the filing of the final map. The amount of the deficiency, if any, shall be the amount of the deficiency as determined or estimated by the Director of Public Works at the time the map is filed. The fair share portion has been determined to be 0.1036% Section 2 EDTIF credits will be rovided for this a ment. 27. Fallon Road/ I-580 Interchange Improvement Contribution: The PW Final Map developer shall pay a fair share portion of costs advanced by the Lin Family for improvements to the Fallon Road/ I-580 Interchange. The a ment will be a able at the time of filin each final ma , 6 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED and shall be prorated based on the percentage of total residential units included in each map. The developer's fair share has been determined to be 0.1469% of the total funds advanced by the Lin Famil . Section 2 EDTIF credits will be rovided for this a ment. 28. Santa Rita Road/ I-580 Interchange 5 Eastbound Offramp PW Final Map Lane: The developer shall be responsible for payment of a fair share portion of the costs associated with adding a 5'" eastbound offramp lane at the Santa Rita Road/ I-580 Interchange, as required in the Fallon Village Traffic Study/ DEIR. The payment will be payable at the time of filing each final map, and shall be prorated based on the percentage of total units included in each map. The fair share has been determined to be 0.1036%. In the event that the EDTIF has been updated to include this improvement at time of filing a final map, the payment will not be required if the developer agrees in writing prior to the filing of the final ma to a the u dated EDTIF. 29. Central Parkway at Hacienda Drive, Second Westbound Left PW Issuance of Turn Lane: The developer shall be responsible for payment of a Building fair share portion of the costs associated with adding a 2nd Permits westbound left turn lane on Central Parkway at Hacienda Drive. This improvement is included in the current EDTIF, and this obligation may be satisfied through the payment of EDTIF fees, provided the EDTIF has not been amended to eliminate this im rovement at the time of a ment. 30. Traffic Impact Fees: The developer shall be responsible for PW Issuance of payment of the Eastern Dublin Traffic Impact Fee (Sections 1 and Building 2), the Eastern Dublin I-580 Interchange Fee, and the Tri-Valley Permits Transportation Development Fee. Fees will be payable at issuance of buildin ermits. 31. Eastern Dublin Traffic Impact Fee Minimum Payment: The PW Issuance of developer shall be responsible for payment of a minimum portion Building of the Eastern Dublin Traffic Impact Fee in cash. The cash Permits payment shall be 11 % for Section 1 and 25% for Section 2, or as may have been modified by City Council action at the time of building permit issuance. These minimum cash payment shall be in addition to any other payment noted in these conditions and may not be offset b fee credits. 32. Remedial Grading Plan: The grading plan shall include a PW Final Map remedial grading plan prepared by the project geotechnical consultant, outlining area of slide repair, benches, keyways, overexcavation at cut-fill transitions, subdrains, and other recommendations of the consultant. The remedial grading plan will be subject to review and approval by the City's own geotechnical consultant. PUBLIC WORKS GENERAL CONDITIONS OF APPROVAL FOR TRACT 7950 33. The Developer shall comply with the Subdivision Map Act, the City PW Ongoing of Dublin Subdivision, and Grading Ordinances, the City of Dublin Public Works Standards and Policies, and all building and fire codes and ordinances in effect at the time of building permit. All ublic im rovements constructed b Develo er and to be 7 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED dedicated to the City are hereby identified as "public works" under Labor Code section 1771. Accordingly, Developer, in constructing such improvements, shall comply with the Prevailing Wage Law Labor Code. Sects. 1720 and followin . 34. The Developer shall defend, indemnify, and hold harmless the City PW Ongoing of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City related to this project (Tract 7586) to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or roceedin s. AGREEMENTS AND BONDS 35. The Developer shall enter into a Tract Improvement Agreement PW Final Map with the City for all public improvements including any required offsite storm drainage or roadway improvements that are needed to serve the Tract that have not been bonded with another Tract Im rovement A reement. 36. The Developer shall provide performance (100%), and labor & PW Final Map material (100%) securities to guarantee the tract improvements, approved by the City Engineer, prior to execution of the Tract Improvement Agreement and approval of the Final Map. (Note: Upon acceptance of the improvements, the performance security may be replaced with a maintenance bond that is 25% of the value of the erformance securit . FEES 37. The Developer shall dedicate parkland or pay in-lieu fees in the PW Final Map amounts and at the times set forth in City of Dublin Resolution No. 60-99, or in any resolution revising these amounts, and as implemented by the Administrative Guidelines adopted by Resolution 195-99. PERMITS 38. Developer shall obtain an Encroachment Permit from the Public PW Prior to Start of Works Department for all construction activity within the public Work right-of-way of any street where the City has accepted the improvements. The encroachment permit may require surety for slurry seal and restriping. At the discretion of the City Engineer an encroachment for work specifically included in an Improvement A reement ma not be re uired. 39. Developer shall obtain a Grading / Sitework Permit from the Public PW Prior to Start of Works Department for all grading and private site improvements Work that serves more that one lot or residential condominium unit. 40. Developer shall obtain all permits required by other agencies PW Prior to Start of includin , but not limited to Alameda Count Flood Control and Work 8 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED Water Conservation District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans and provide copies of the permits to the Public Works De artment. SUBMITTALS 41. All submittals of plans and Final Maps shall comply with the PW Prior to requirements of the "City of Dublin Public Works Department Approval of Improvement Plan Submittal Requirements", and the "City of Improvement Dublin Improvement Plan Review Check LisY". Plans or Final Ma 42. The Developer will be responsible for submittals and reviews to PW Prior to obtain the approvals of all participating non-City agencies. The Approval of Alameda County Fire Department and the Dublin San Ramon Improvement Services District shall approve and sign the Improvement Plans. Plans or Final Ma 43. Developer shall submit a Geotechnical Report, which includes PW Prior to street pavement sections and grading recommendations. Approval of Improvement Plans, Grading Plans, or Final Ma 44. Developer shall provide the Public Works Department a digital PW Prior to vectorized file of the "master" files for the project when the Final Acceptance of Map has been approved. Digital raster copies are not acceptable. Improvements The digital vectorized files shall be in AutoCAD 14 or higher and Release of drawing format. Drawing units shall be decimal with the precision Bonds of the Final Map. All objects and entities in layers shall be colored by layer and named in English. All submitted drawings shall use the Global Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. FINAL MAP 45. The Final Map shall be substantially in accordance with the PW Final Map Tentative Map approved with this application, unless otherwise modified by these conditions. Multiple final maps may be filed in phases, provided that each phase is consistent with the tentative map, that phasing progresses in an orderly and logical manner, and adequate infrastructure is installed with each phase to serve that phase as a stand-alone project that is not dependent upon future hasin for infrastructure. 46. All rights-of-way and easement dedications required by the PW Final Map Tentative Map including the Public Service Easement shall be shown on the Final Ma . 47. Street names shall be assigned to each public/private street PW Final Map pursuant to Municipal Code Chapter 7.08. The approved street names shall be indicated on the Final Ma . 48. The Final Map shall include the street monuments to be set in all PW Monuments to public streets. be Shown on Final Map and Installed Prior to Acceptance of 9 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED Im rovements EASEMENTS 49. The Developer shall obtain abandonment from all applicable public PW Prior to agencies of existing easements and right of ways within the Approval of development that will no longer be used. Improvement Plans or Appropriate Final Ma 50. The Developer shall acquire easements, and/or obtain rights-of- PW Prior to entry from the adjacent property owners for any improvements on Approval of their property. The easements and/or rights-of-entry shall be in Improvement writing and copies furnished to the City Engineer. Plans or Appropriate Final Ma GRADING 51. The Grading Plan shall be in conformance with the PW Prior to recommendations of the Geotechnical Report, the approved Approval of Tentative Map and/or Site Development Review, and the City Grading Plans design standards & ordinances. In case of conflict between the soil or Issuance of engineer's recommendations and City ordinances, the City Grading Engineer shall determine which shall apply. Permits, and On oin 52. A detailed Erosion Control Plan shall be included with the Grading PW Prior to Plan approval. The plan shall include detailed design, location, and Approval of maintenance criteria of all erosion and sedimentation control Grading Plans measures. or Issuance of Grading Permits, and On oin 53. Tiebacks or structural fabric for retaining walls shall not cross PW Prior to property lines, or shall be located a minimum of 2' below the Approval of finished grade of the upper lot. Grading Plans or Issuance of Grading Permits, and On oin 54. Bank slopes along public streets shall be no steeper than 3:1 PW Prior to unless shown otherwise on the Tentative Map Grading Plan Approval of exhibits. The toe of any slope along public streets shall be one Grading Plans foot back of walkway. The top of any slope along public streets or Issuance of shall be three feet back of walkway. Minor exception may be made Grading in the above slope design criteria to meet unforeseen design Permits, and constraints sub'ect to the a roval of the Cit En ineer. On oin IMPROVEMENTS 55. The public improvements shall be constructed generally as shown PW Prior to on the Tentative Map and/or Site Development Review. However, Approval of the approval of the Tentative Map and/or Site Development Review Improvement is not an approval of the specific design of the drainage, sanitary Plans or Start sewer, water, and street improvements. of Construction, and On oin 10 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED 56. All public improvements shall conform to the City of Dublin PW Prior to Standard Plans and design requirements and as approved by the Approval of City Engineer. Improvement Plans or Start of Construction, and On oin 57. Public streets shall be at a minimum 1% slope with minimum gutter PW Prior to flow of 0.7% around bumpouts. Private streets and alleys shall be Approval of at minimum 0.5% slope. Improvement Plans or Start of Construction, and On oin 58. Curb Returns on the internal public streets curb returns shall be PW Prior to 30-foot radius. Approval of Improvement Plans or Start of Construction, and On oin 59. Any decorative pavers installed within City right-of-way shall be PW Prior to done to the satisfaction of the City Engineer. Where decorative Approval of paving is installed at signalized intersections, pre-formed traffic Improvement signal loops shall put under the decorative pavement. All turn lane Plans or Start stripes, stop bars and crosswalks shall be delineated with concrete of bands or color pavers to the satisfaction of the City Engineer Construction, Maintenance costs of the decorative paving shall be the and Ongoing res onsibilit of the Homeowners Association 60. The Developer shall install all traffic signs and pavement marking PW Prior to as required by the City Engineer. Occupancy of Units or Acceptance of Im rovements 61. Street light standards and luminaries shall be designed and PW Prior to installed per approval of the City Engineer. The maximum voltage Occupancy of drop for streetlights is 5%. Units or Acceptance of Im rovements 62. All new traffic signals shall be interconnected with other new PW Prior to signals within the development and to the existing City traffic signal Occupancy of system by hard wire. Units or Acceptance of Im rovements 63. The Developer shall construct bus stops and shelters at the PW Prior to locations designated and approved by the LAVTA and the City Occupancy of Engineer, if these occur along the frontage of the property. The Units or Developer shall pay the cost of procuring and installing these Acceptance of im rovements. Im rovements 64. Developer shall construct all potable and recycled water and PW Prior to sanita sewer facilities re uired to serve the ro'ect in accordance Occu anc of 11 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED with DSRSD master plans, standards, specifications and Units or requirements. Acceptance of Im rovements 65. Fire hydrant locations shall be approved by the Alameda County PW Prior to Fire Department. A raised reflector blue traffic marker shall be Occupancy of installed in the street opposite each hydrant. Units or Acceptance of Im rovements 66. The Developer shall furnish and install street name signs for the PW Prior to project to the satisfaction of the City Engineer. Occupancy of Units or Acceptance of Im rovements 67. Developer shall construct gas, electric, cable TV and PW Prior to communication improvements within the fronting streets and as Occupancy of necessary to serve the project and the future adjacent parcels as Units or approved by the City Engineer and the various Public Utility Acceptance of a encies. Im rovements 68. All electrical, gas, telephone, and Cable TV utilities, shall be PW Prior to underground in accordance with the City policies and ordinances. Occupancy of All utilities shall be located and provided within public utility Units or easements and sized to meet utility company standards. Acceptance of Im rovements 69. All utility vaults, boxes and structures, unless specifically approved PW Prior to otherwise by the City Engineer, shall be underground and placed in Occupancy of landscape areas and screened from public view. Prior to Joint Units or Trench Plan approval, landscape drawings shall be submitted to Acceptance of the City showing the location of all utility vaults, boxes and Improvements structures and adjacent landscape features and plantings. The Joint Trench Plans shall be signed by the City Engineer prior to construction of the joint trench im rovements. CONSTRUCTION 70. The Erosion Control Plan shall be implemented between October PW Ongoing as 15th and April 15th unless otherwise allowed in writing by the City Needed Engineer. The Developer will be responsible for maintaining erosion and sediment control measures for one year following the Cit 's acce tance of the subdivision im rovements. 71. If archaeological materials are encountered during construction, PW Ongoing as construction within 100 feet of these materials shall be halted until Needed a professional Archaeologist who is certified by the Society of California Archaeology (SCA) or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. 72. Construction activities, including the maintenance and warming of PW Ongoing as equipment, shall be limited to Monday through Friday, and non-City Needed holidays, between the hours of 7:30 a.m. and 5:30 p.m. except as otherwise approved by the City Engineer. Extended hours or Saturday work will be considered by the City Engineer on a case- b -case basis. 73. Developer shall prepare a Construction Traffic and Construction PW Prior to Start of 12 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED Noise Management Plan that identifies measures to be taken to Construction; minimize the impacts of construction traffic and construction noise Implementation on surrounding developed properties. The plan shall include hours Ongoing as of construction operation, use of mufflers on construction Needed equipment, speed limit for construction traffic, haul routes, and identify a noise monitor. These specific traffic and noise management measures shall be included in the project plans and s ecifications. 74. Developer shall prepare a plan for construction traffic interface with PW Prior to Start of public traffic on any existing public street. Construction traffic and Construction; parking may be subject to specific requirements by the City Implementation Engineer. Ongoing as Needed 75. The Developer shall be responsible for controlling any rodent, PW Ongoing mos uito, or other est roblem due to construction activities. 76. The Developer shall be responsible for watering or other dust- PW Prior to Start of palliative measures to control dust as conditions warrant or as Construction; directed by the City Engineer. Implementation Ongoing as Needed 77. The Developer shall provide the Public Works Department with a PW Prior to letter from a registered civil engineer or surveyor stating that the Issuance of building pads have been graded to within 0.1 feet of the grades Building shown on the approved Grading Plans, and that the top & toe of Permits or banks and retaining walls are at the locations shown on the Acceptance of a roved Gradin Plans. Im rovements NPDES 78. Prior to any clearing or grading, the Developer shall provide the PW Prior to Start of City evidence that a Notice of Intent (NOI) has been sent to the Any California State Water Resources Control Board per the Construction requirements of the NPDES. A copy of the Storm Water Pollution Activities Prevention Plan (SWPPP) shall be provided to the Public Works De artment and be ke t at the construction site. 79. The Storm Water Pollution Prevention Plan (SWPPP) shall identify PW SWPPP to be the Best Management Practices (BMPs) appropriate to the project Prepared Prior construction activities. The SWPPP shall include the erosion to Approval of control measures in accordance with the regulations outlined in the Improvement most current version of the ABAG Erosion and Sediment Control Plans: Handbook or State Construction Best Management Practices Implementation Handbook. The Developer is responsible for ensuring that all Prior to Start of contractors implement all storm water pollution prevention Construction measures in the SWPPP. and Ongoing as Needed 80. The Homeowner's Association shall enter into an agreement with PW Prior to First the City of Dublin that guarantees the perpetual maintenance Final Map; obligation for the vegetated swales on Lot 34 and Parcel Modify as D(maintenance of the hydrodynamic separator shall be by the needed with City). Said agreement is required pursuant to Provision C.3.e.ii of Successive RWQCB Order R2-2003-0021 for the issuance of the Alameda Maps Countywide NPDES municipal storm water permit. Said permit re uires the Cit to rovide verification and assurance that all 13 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED treatment devices will be ro erl o erated and maintained. FIRE PREVENTION 81. The project will need to comply with the applicable Building and Fire Prior to permit Fire Codes. Site and Building plans shall be provided for review issuance and a roval b the Fire De artment. 82. Fire Access. Access roads, turnarounds, pullouts, and fire Fire Ongoing operation areas are Fire Lanes and shall be maintained clear and free of obstructions, includin the arkin of vehicles. 83. Entrances. Entrances to job sites shall not be blocked, including Fire Ongoing after hours, other than by approved gates/barriers that provide for emer enc access. 84. Site Utilities. Site utilities that would require the access road to be Fire Ongoing dug up or made impassible shall be installed prior to combustible construction commencin . 85. Fire access is required to be approved all-weather access. Fire On oin 86. Hydrants & Fire Flows. Show the location of any on-site fire Fire Prior to permit hydrants and any fire hydrants that are along the property frontage issuance as well as the closest hydrants to each side of the property that are located along the access roads that serves this property. Provide a letter from DSRSD indicating what the available fire flow is to this ro ert . Dublin San Ramon Services District 87. All mains shall be sized to provide sufficient capacity to DSR Prior to accommodate future flow demands in addition to each approval of development project's demand. Layout and sizing of mains shall Improvement be in conformance with DSRSD utilit master lannin . Plans 88. Sewers shall be designed to operate by gravity flow to DSRSD's DSR Prior to existing sanitary sewer system. Pumping of sewage is approval of discouraged and may only be allowed under extreme improvement circumstances following a case by case review with DSRSD staff. Plans Any pumping station will require specific review and approval by DSRSD of preliminary design reports, design criteria, and final plans and specifications. The DSRSD reserves the right to require payment of present worth 20 year maintenance costs as well as other conditions within a separate agreement with the applicant for an ro'ect that re uires a um in station. 89. Domestic and fire protection waterline systems for Tracts or DSR Prior to Commercial Developments shall be designed to be looped or approval of interconnected to avoid dead end sections in accordance with improvement requirements of the DSRSD Standard Specifications and sound Plans en ineerin ractice. 90. DSRSD policy requires public water and sewer lines to be located DSR Prior to in public streets rather than in off-street locations to the fullest approval of extent possible. If unavoidable, then public sewer or water Improvement easements must be established over the alignment of each public Plans sewer or water line in an off-street or private street location to rovide access for future maintenance and/or re lacement. 91. Prior to approval by the City of a grading permit or a site DSR Prior to development permit, the locations and widths of all proposed approval of easement dedications for water and sewer lines shall be submitted Improvement to and a roved b DSRSD. Plans 14 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED 92. All easement dedications for DSRSD facilities shall be by separate DSR Prior to instrument irrevocably offered to DSRSD or by offer of dedication approval of on the Final Map. Improvement Plans 93. Prior to approval by the City for Recordation, the Final Map shall DSR Recordation of be submitted to and approved by DSRSD for easement locations, Final Map widths, and restrictions. 94. Prior to issuance by the City of any Building Permit or Construction DSR Prior to Permit by the Dublin San Ramon Services District, whichever Issuance of comes first, all utility connection fees including DSRSD and Zone Building 7, plan checking fees, inspection fees, connection fees, and fees Permits associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules established in the DSRSD Code. 95. Prior to issuance by the City of any Building Permit or Construction DSR Prior to Permit by the Dublin San Ramon Services District, whichever Issuance of comes first, all improvement plans for DSRSD facilities shall be Building signed by the District Engineer. Each drawing of improvement Permits plans shall contain a signature block for the District Engineer indicating approval of the sanitary sewer or water facilities shown. Prior to approval by the District Engineer, the applicant shall pay all required DSRSD fees, and provide an engineer's estimate of construction costs for the sewer and water systems, a perFormance bond, a one-year maintenance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The applicant shall allow at least 15 working days for final improvement drawing review b DSRSD before si nature b the District En ineer. 96. No sewer line or waterline construction shall be permitted unless DSR Prior to the proper utility construction permit has been issued by DSRSD. approval of A construction permit will only be issued after all of the items in Improvement Condition No. 9 have been satisfied. Plans 97. The applicant shall hold DSRSD, its Board of Directors, DSR Prior to commissions, employees, and agents of DSRSD harmless and Issuance of indemnify and defend the same from any litigation, claims, or fines Building resultin from the construction and com letion of the ro'ect. Permits 98. Improvement plans shall include recycled water improvements as DSR Prior to required by DSRSD. Services for landscape irrigation shall approval of connect to recycled water mains. Applicant must obtain a copy of Improvement the DSRSD Recycled Water Use Guidelines and conform to the Plans re uirements therein. 99. A utility plan showing routing of improvements and demolition of DSR Prior to existing utilities. Zone 7 Turnout and DSRSD Fluoride Storage approval of Facility shall be shown on final plans Improvement Plans 100. Due to a change in the planned use, a Public Facilities Planning DSR Prior to Agreement shall be entered into between the property owner and approval of DSRSD, which may include the completion of a service analysis to Improvement determine how potable water service, recycled water service, and Plans sanitary sewer service will be provided to the proposed develo ment in addition to an effects the chan e in land use will 15 NO. CONDITION TEXT RESP. WHEN AGENCY REQUIRED have on existin and future facilities. PASSED, APPROVED, AND ADOPTED this 27th day of April, 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: Planning Manager GAPAA2007\07-057 Nielsen\PC M[g 427.10\DRAFTS\PC Att 4- Reso TMAP.DOC 16