HomeMy WebLinkAbout4.03 RepublicElectric02-18 CITY CLERK
File #
AGEN DA STATEMENT
CITY COUNCIL MEETING DATE: December 17, 2002
SUBJECT: Award of Bid, Traffic Signal Battery Backup Systems,
Contract 02-18
Report Prepared by: Lee S. Thompson, Public Works Director
ATTACHMENTS: 1) Bid Results
2) Resolution
RECOMMENDATIO~ ~dopt resolution awarding Contract 02-18 to Republic Electric
FINANCIAL STATEMENT:
Project Construction Budget: $132,300 (Battery Backup Capital Improvement Project)
$ 3,500 (Operating Budget - "Countdown" Pedestrian Signal
Heads for Dublin Blvd./Village Parkway)
$135,800 Total Budget
Potential Expenditures: $ 95,552 (Low Bid of $86,865, plus 10% contingency)
$ 7,386 (Purchase order for LED modules)
$102,938 Potential Expenditures
Potential Offsets: $ 22,400 (Grant from California Energy Commission for Battery
Backup Systems)
$ 1,500 (Approximate rebate from PG&E for LED modules
related to Programmed Visibility Signal Heads)
$ 23,900 Potential Offsets
See description below for additional information. The low bid received is within funds budgeted for
construction of this project.
DESCRIPTION: On November 5, 2002, the City Council authorized Staff to advertise
for bids for Contract 02-18, Traffic Signal Battery Backup Systems (BBS). Traffic signal battery backups
are a safety feature proposed for eight of the City's more heavily traveled intersections. These units will
allow the intersections to continue to operate for approximately two hours in the event of a power failure.
COPIES TO: Bidders .l __
ITEM NO.~~
g :h-rd scproj\bb s\ag st award ~
The eight intersections proposed to receive BBS units at this time are:
Dublin Boulevard/San Ramon Road
Dublin Boulevard/Regional Street
Dublin Boulevard/Village Parkway
Dublin Boulevard/Dougherty Road
Hacienda Drive/Hacienda Crossings
Dublin Boulevard/Tassajara Road
Amador Valley Boulevard/San Ramon Road
Amador Valley Boulevard/Village Parkway
The project also proposes to convert the existing BBS at Dublin Boulevard/Hacienda Drive fi.om flashing
red to full operation.
The funds budgeted for the project include installation of yellow light emitting diode (LED) modules and
full-LED pedestrian signals at all of the intersections that are to receive battery backup systems, as well
as replacement of several of the programmed visibility signal heads with standard LED signal heads.
Conversion to full LED will allow the signal to operate for a longer'period of time on the battery during
a power failure; some additional ongoing energy savings would be an added benefit.
As noted in the Financial Statement, Staff has issued a purchase order for spare LED modules and for the
special LED modules for the programmed visibility (PV) signal heads that will remain in place.
The cost of the battery backup systems is partially offset by a California Energy Commission grant in the
amount of $22,400. This grant funding has been approved. If delivered on time, the red and green LED
modules for programmed visibility (PV) heads may qualify for a small PG&E rebate of approximately
$1,500.
A total of 9 bids were received for this project. The low bidder is Republic Electric with a bid of $86,865.
The submitted bids have been reviewed and the low bidder's references checked.
Staff recommends that the City Council adopt the resolution awarding Contract 02-18 to the low bidder.
Page 2 of
BID RESULTS - TRAFFIC SIGNAL BATTERY BACKUP SYSTEMS, CONTRACT NO. 02-18
BID OPENING DATE - DECEMBER 3, 2002 I
ENGINEER'S ESTIMATE REPUBLIC ELECTRIC STEINY & CO. WINGARD ENGINEERING
BID UNIT
ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 New BBS EA 8 $ 5,980.00 $ 47,840.00 $ 5,400.00 $ 43,200.00 $ 5,225.00 $ 41,800.00 $ 6,400.00 $ 51,200.00
2 Modify BBS/ExternalCabinet EA 1 $ 3,450,00 $ 3,450.00 $ 2,000.00 $ 2,000.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00
3 12" YelIow LED EA 175 $ 155.25 $ 27,168.75 $ 115.00 $ 20,125.00 $ 165.00 $ 28,875.00 $ 125.00 $ 21,875.00
4 8" YelIow LED EA 19 $ 155.25 $ 2,949.75 $ 100.00 $ 1,900.00 $ 145.00 $ 2,755.00 $ 150.00 $ 2,850.00
5 LED PedestrianSignal EA 56 $ 276.00 $ 15,456.00 $ 215.00 $ 12,040.00 $ 310.00 $ 17,360.00 $ 275.00 $ 15,400.00
6 Countdown Ped EA 8 $ 437.00 $ 3,496.00 $ 450.00 $ 3,600.00 $ 400.00 $ 3,200.00 $ 450.00 $ 3,600.00
7 Item Deleted)
8 Convert PVHeadtoStandard EA 4 $ 1,495.00 $ 5,980.00 $ 1,000.00 $ 4,000.00 $ 700.00 $ 2,800.00 $ 1,200.00 $ 4,800.00
TOTAL BID: $106,340.50 $ 86,865.00 $ 99,290.00 $102,225.00
RICHARD HEAPS TENNYSON ELECTRIC CONTINENTAL ELEC.
BID UNIT
ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 New BBS EA 8 $ 5,738.00 $ 45,904.00 $ 8,050.00 $ 64,400.00 $ 8,360.00 $ 66,880.00'
2 Modify BBS/ExternalCabinet EA 1 $ 5,309.00 $ 5,309.00 $ 3,200.00 $ 3,200.00 $ 4,132.00 $ 4,132.00
3 12" YelIow LED EA 175 $ 142.00 $ 24,850.00 $ 133.00 $ 23,275.00 $ 166.00 $ 29,050.00
4 8" YelIow LED EA 19 $ 160.00 $ 3,040.00 $ 120.00 $ 2,280.00 $ 138.00 $ 2,622.00
5 LED PedestrianSignal EA 56 $ 265.00 $ 14,840.00 $ 330.00 $ 18,480.00 $ 285.00 $ 15,960.00
6 Countdown Ped EA 8 $ 490.00 $ 3,920.00 $ 495.00 $ 3,960.00 $ 463.00 $ 3,704.00
7 (Item Deleted)
8 Convert PV Head to Standard EA 4 $ 1,211.00 $ 4,844.00 $ 490.00 $ 1,960.00 $ 1,133.00 $ 4,532.00
TOTAL BID: $102,707.00 $117,555.00 $126,880.00
BROWN & FESLER NORTHERN ELECTRIC ST. FRANCIS ELECTRIC
BID UNIT
ITEM ITEM DESCRIPTION MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
1 New BBS EA 8 $ 9,322.00 $ 74j576.00 $ 6,675.00 $ 53,400.00 $ 8,540.00 $ 68,320.00
2 Modify BBS/ExternalCabinet EA 1 $ 5,189.00 $ 5,189.00 $ 3,100.00 $ 3,100.00 $ 3,870.00 $ 3,870.00
3 12" YelIow LED EA t75 $ 147.00 $ 25,725.00 $ 255.00 $ 44,625.00 $ 272.00 $ 47,600.00
4 8" YelIow LED EA 19 $ 141.00 $ 2,679~00 $ 250.00 $ 4,750.00 $ 688.00 $ 13,072.00
5 _ED PedestrianSignal EA 56 $ 283.00 $ 15,848.00 $ 375.00 $ 21,000.00 $ 317.00 $ 17,752.00
6 Countdown Ped EA 8 $ 461.00 $ 3,688.00 $ 525.00 $ 4,200.00 $ 520.00 $ 4,160.00
7 (Item Deleted)
8 Convert PVHeadtoStandard EA 4 $ 1,250.00 $ 5,000.00 $ 800.00 $ 3,200.00 $ 1,218.00 $ 4,872.00
TOTAL BID: . $132,705.00 $134,275.00 $159,646.00
Page 1
RESOLUTION NO. -02
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
AWARDING CONTRACT 02-18
TRAFFIC SIGNAL BATTERY BACKUP SYSTEMS
TO REPUBLIC ELECTRIC
WHEREAS, the City of Dublin didl on December 3, 2002, publicly open, examine,-and declare
all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for
Contract 02-18, Traffic Signal Battery Backup Systems, authorized by the City CoUncil on November 5,
2002, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of
said work and for all particulars relative to the proceedings Under the request for bids; and
WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid
hereinafter mentioned is the lowest and best bid for doing said work;
NOW, THEREFORE, BE IT RESOLVED that the City CoUncil of the City of Dublin does hereby
award City of Dublin Contract 02-18, Traffic Signal Battery Backup Systems, to the lowest responsible
bidder therefor, to wit Republic Electric, with a bid of Eighty Six Thousand Eight HUndred Sixty Five
Dollars ($86,865), the particulars of which bid are on file in the Office of the City Engineer.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement.
PASSED, APPROVED AND ADOPTED this 17th day of December, 2002.
AYES:
NOES:
ABSENT:
ABSTAINING:
Mayor
ATTEST:
City Clerk
g: Imiscprofibbs~resoawrd ,~ ~ f%~*~ ~ ~ ~' ~ ~ '~e~ ~ ' 3