HomeMy WebLinkAbout4.17 Dublin Blvd Imprv AICTTY CLERK
FILE # 0600-35
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: June 20, 2000
SUBJECT:
Acceptance of Work - Contract No. 99-06, Dublin Boulevard
Improvements in the Vicinity of Hansen Drive
Report Prepared by: Lee S. Thompson, Public Works Director
ATTACHMENTS:
None
RECOMMENDATION:
Accept improvements under Contract No. 99-06 and authorize the
release of retention after 35 days if there are no subcontractor
claims.
FINANCIAL STATEMENT:
FY 99-00 Budget
Engineering/Design/Inspection
Surveying/Testing
Construction
Miscellaneous
Estimated Actual
$ 60,200.00 $ 43,500.00
$ 34,200.00 $ 13,921.00
$ 513,280.00 $ 505,336.00
$ 800.00 $ 669.00
TOTAL: $ 608,480.00 $ 563,426.00
This project is funded through Traffic Impact Fees (Fund 300).
DESCRIPTION: At the meeting of July 20, 1999, the Dublin City Council awarded Contract
No. 99-06, Dublin Boulevard Improvements in the vicinity of Hansen Drive, to Bay Cities Paving &
Grading, Inc. This project is Phase 1 of the widening of Dublin Boulevard from two to four lanes
between Silvergate Drive and Hansen Drive, and the realigning of Dublin/Silvergate to a more
conventional "T" intersection.
The Phase 1 project included the installation of a traffic signal at the intersection of Dublin Boulevard
and Hansen Drive, widening approximately 520 feet of Dublin Boulevard west of Hansen Drive, and
modifying a driveway south of this intersection to align with Hansen Drive.
The City Engineer has reviewed the work on the project and has determined that the work is complete.
Staff recommends that the City Council accept the improvements and authorize the release of retention
after 35 days if there are no subcontractor claims.
g Amiscproj\dublin-hansenXAS Acceptance
COPIES TO: Bay Cities Paving & Grading
ITEM NO.