19 ~ ~ 82 AGENDA STATEMENT
PARKS AND COMMUNITY SERVICES COMMISSION
~~L/FORNl~ MEETING DATE: January 22, 2008
SUBJEC'T: Stagecoach Park Play Equipment Proposal
Report by IZosemary A[ex, Parks & Faci[ities Development
Coordinator
ATTACHMENTS: 1) Photographs of Existing Play Area
2) Proposed Play Equipment - Site Plan and 3-D Rendering from
Ross Recreation Equipment Company
RECOMMENDATION: 1) Receive Staff Presentation;
2) Receive Public Comments; and
3) Recommend Approval of Play Equipment to City Council.
FINANCIAL STATEMENT: Authorized Budget to Purchase and Install Equipment: $89,500
DESCRIP'TION: In Fiscal Year 2000/01 the City completed an audit of all oC the
existing play areas within the City parks. The report evaluated the conformance of the City's play
structures with current safety and accessibility guidelines. Based on the conditions found at each facility,
it was determined that the play equipment at Stagecoach Park was in need of replacement. The 2007/08
Capital Improvement Program includes funds for the replacement of play equipment at Stagecoach Park.
In December 2007, Staff distributed a Request for Proposals (RFP). The RPP sought information from
qualified play equipment representatives on play equipment components to replace the existing system.
One proposal with two options was submitted from Ross Recreation Equipment Company by the January
8, 2008 deadline. Ross Recreation has previously provided play equipment to the City at the following
park locations:
1) Shannon Park
2) Dublin Sports Grounds
3) Bray Commons
4) Alamo Creek Park
5) Mape Park
Staff is seeking input from the Parks and Community Services Commission on a preferrcd alternative that
will be recommended for City Council approval. ln order to assist with the decision-making, the table on
the Following page provides a comparison of the amount and variety for the proposed play equipment.
C'nPTEs TO: Ross Iieereation Equipment Company
ITEM NO.: 8.3
G:\PARKS COMMISSION\AGNDS"I'M"I12008U-22 Play Equipment.UOC
Varicty of Play Ross Option #1 Ross Option #2 Ross Option #1 Ross Option #2
Com onents 2-5 Year Olds 2-5 Year Olds 5-12 Year Olds 5-12 Year Olds
Climbers - Im roves coordination, bod awareness and challen e
Wiggle Ladder Loop Arch Conical Climber Conical Climber
Vertical Ladder Vertical Ladder
Loop Pole Sky Rail Climber
Block Climber Summit Climber
Total 1 1 4 4
Overhead Elements - Im roves u cr bod and arm stren th as wcll as ri coordination
Chinning Bar
Total 1 0 0 0
Slides
32" Double Poly 48" Double Poly 56" Tunnel Slide 72" Spyro Slide
Slide Wave Slide
32" Slide Winder
Total 2 1 1 1
Pancls - Social Pla Elements
Pilot Panel Driver Panel Table Panel 70o Panel
Chimes Panel Zoo Panel House Panel Store Front Panel
Match 4 Panel Slant Window
Storefront Panel Periscope Panel
Pilot Panel
Pla Structure Seat
'Ibtal 2 4 6 2
Total 0 0 0 0
S rin To s
Total Swin s 2 2 Z Z _
1'otal 1 1 2 1
13ridgcs/
Crawl Tubes -
'Total 9 9 15 10
All Play
Elements
Proposal Cost Summary:
The proposals submitted provide a fixed cost for play equipment and wood fiber surfacing along with an
estimated cost for installation if done by the vendor. The table below indicates the cost breakdown for
equipment, estimate for installation (as provided by the manufacturer) and a projected total cost.
Equipment Installation Total
Ross Recreation Equipment Proposal 1 $51,521.34 $34,465.00 $85,98634
Proposal2 $49,639.28 $34,875.00 $84,514.28
As has been done with past play equipment projects, installation of the play equipment will be completed
under a separate contract and is expected to commence in late-Spring 2008.
RECOMMF.NDATION: Staff recommends that the Parks and Community Services Commission take
the Pollowing action: 1) receive presentation; 2) receive public comments; and 3) select preferred option
far recommendation to the City Council.