Loading...
HomeMy WebLinkAbout8.3, StagecoachParkPlayEquipmentProposal pF D G• n ti 19 ~ ~ 82 AGENDA STATEMENT PARKS AND COMMUNITY SERVICES COMMISSION ~~L/FORNl~ MEETING DATE: January 22, 2008 SUBJEC'T: Stagecoach Park Play Equipment Proposal Report by IZosemary A[ex, Parks & Faci[ities Development Coordinator ATTACHMENTS: 1) Photographs of Existing Play Area 2) Proposed Play Equipment - Site Plan and 3-D Rendering from Ross Recreation Equipment Company RECOMMENDATION: 1) Receive Staff Presentation; 2) Receive Public Comments; and 3) Recommend Approval of Play Equipment to City Council. FINANCIAL STATEMENT: Authorized Budget to Purchase and Install Equipment: $89,500 DESCRIP'TION: In Fiscal Year 2000/01 the City completed an audit of all oC the existing play areas within the City parks. The report evaluated the conformance of the City's play structures with current safety and accessibility guidelines. Based on the conditions found at each facility, it was determined that the play equipment at Stagecoach Park was in need of replacement. The 2007/08 Capital Improvement Program includes funds for the replacement of play equipment at Stagecoach Park. In December 2007, Staff distributed a Request for Proposals (RFP). The RPP sought information from qualified play equipment representatives on play equipment components to replace the existing system. One proposal with two options was submitted from Ross Recreation Equipment Company by the January 8, 2008 deadline. Ross Recreation has previously provided play equipment to the City at the following park locations: 1) Shannon Park 2) Dublin Sports Grounds 3) Bray Commons 4) Alamo Creek Park 5) Mape Park Staff is seeking input from the Parks and Community Services Commission on a preferrcd alternative that will be recommended for City Council approval. ln order to assist with the decision-making, the table on the Following page provides a comparison of the amount and variety for the proposed play equipment. C'nPTEs TO: Ross Iieereation Equipment Company ITEM NO.: 8.3 G:\PARKS COMMISSION\AGNDS"I'M"I12008U-22 Play Equipment.UOC Varicty of Play Ross Option #1 Ross Option #2 Ross Option #1 Ross Option #2 Com onents 2-5 Year Olds 2-5 Year Olds 5-12 Year Olds 5-12 Year Olds Climbers - Im roves coordination, bod awareness and challen e Wiggle Ladder Loop Arch Conical Climber Conical Climber Vertical Ladder Vertical Ladder Loop Pole Sky Rail Climber Block Climber Summit Climber Total 1 1 4 4 Overhead Elements - Im roves u cr bod and arm stren th as wcll as ri coordination Chinning Bar Total 1 0 0 0 Slides 32" Double Poly 48" Double Poly 56" Tunnel Slide 72" Spyro Slide Slide Wave Slide 32" Slide Winder Total 2 1 1 1 Pancls - Social Pla Elements Pilot Panel Driver Panel Table Panel 70o Panel Chimes Panel Zoo Panel House Panel Store Front Panel Match 4 Panel Slant Window Storefront Panel Periscope Panel Pilot Panel Pla Structure Seat 'Ibtal 2 4 6 2 Total 0 0 0 0 S rin To s Total Swin s 2 2 Z Z _ 1'otal 1 1 2 1 13ridgcs/ Crawl Tubes - 'Total 9 9 15 10 All Play Elements Proposal Cost Summary: The proposals submitted provide a fixed cost for play equipment and wood fiber surfacing along with an estimated cost for installation if done by the vendor. The table below indicates the cost breakdown for equipment, estimate for installation (as provided by the manufacturer) and a projected total cost. Equipment Installation Total Ross Recreation Equipment Proposal 1 $51,521.34 $34,465.00 $85,98634 Proposal2 $49,639.28 $34,875.00 $84,514.28 As has been done with past play equipment projects, installation of the play equipment will be completed under a separate contract and is expected to commence in late-Spring 2008. RECOMMF.NDATION: Staff recommends that the Parks and Community Services Commission take the Pollowing action: 1) receive presentation; 2) receive public comments; and 3) select preferred option far recommendation to the City Council. 2of2