Loading...
HomeMy WebLinkAbout8.3 Attch 4 ResoApprovingVestTRMap7667 RESOLUTION NO. 10 - xx A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING VESTING TENTATIVE TRACT MAP 7667 FOR DUBLIN TRANSIT CENTER SITE E-1 (ESPRIT AT DUBLIN STATION) LOCATED AT THE SOUTHEAST CORNER OF DUBLIN BOULEVARD AND IRON HORSE PARKWAY (APN 986-0034-011-00) PA 09-002 WHEREAS, the Applicant, D.R. Horton, Inc., has requested approval of Site Development Review for PA 09-002, Dublin Transit Center Site E-1, for the construction of a 105-unit townhouse community on approximately ±4.13 acres of land, located on a portion of Site E of the Dublin Transit Center, within the Eastern Dublin Specific Plan, at the southeast corner of Dublin Boulevard and Iron Horse Parkway; and WHEREAS, the project includes applications for a Planned Development Rezone with a related Stage 1 Development Plan Amendment and Stage 2 Development Plan, Site Development Review, and a Vesting Tentative Tract Map. The applications are collectively known as the "Project"; and WHEREAS, the tentative map proposes to subdivide the property into two parcels which will be further divided for condominium purposes; and WHEREAS, the State of California Subdivision Map Act and the adopted City of Dublin Subdivision Regulations require that no real property may be divided into five or more parcels for purpose of sale, lease or financing, unless a Tentative Subdivision Map is acted upon, and a Final Map is approved consistent with the Subdivision Map Act and City of Dublin Subdivision Regulations; and WHEREAS, the ApplicanUDeveloper has submitted a complete application for a Vesting Tentative Tract Map dated received March 5, 2010, on file in the Community Development Department, Planning Division; and WHEREAS, the California Environmental Quality Act (CEQA), together with the State guidelines and City environmental regulations require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and WHEREAS, pursuant to the California Environmental Quality Act, Staff has recommended that the project be found exempt from CEQA pursuant to Government Code section 65457 for residential projects that are consistent with a specific plan. The Project is within the scope of the Final Environmental Impact Report (EIR) for the Dublin Transit Center General Plan Amendment, Eastern Dublin Specific Plan Amendment, Stage 1 Planned Development Zoning, Tentative Parcel Map, and Development Agreement (SCH 2001120395) which was certified by City Council Resolution No. 215-02 dated November 19, 2002. This recommendation is based on a determination that there are no supplemental impacts that would require preparation of a Supplemental EIR; and ATTACHMENT 4 WHEREAS, a Staff Report, dated August 24, 2010 and incorporated herein by reference, described and analyzed the Project, including the Vesting Tentative Tract Map for the Planning Commission; and WHEREAS, the Planning Commission held a properly noticed public hearing on the Project, including the proposed Vesting Tentative Tract Map, on August 24, 2010 at which time all interested parties had the opportunity to be heard; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted to the Planning Commission recommending approval of Vesting Tentative Tract Map 7667 subject to the conditions prepared by Staff; and WHEREAS, the Planning Commission considered the CEQA exemption and prior related environmental documents, and all above-referenced reports, recommendations, and testimony to evaluate the Project. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made a part of this resolution, and that the Planning Commission does hereby find: 1. Vesting Tentative Tract Map 7667 is consistent with the intent of applicable subdivision regulations and related ordinances. 2. The design or improvements of Vesting Tentative Tract Map 7667 is consistent with the City's General Plan and Eastern Dublin Specific Plan policies as they apply to the subject property in that it is a subdivision for implementation of a residential community in an area designated for high-density, transit-oriented, residential development. 3. Vesting Tentative Tract Map 7667 is consistent with the Planned Development Zoning District Stage 1 Development Plan (as amended) approved as PA 00-013 for this project and is therefore consistent with the City of Dublin Zoning Ordinance. 4. The site is located adjacent to major roads on +4.1 gross acres of relatively flat topography and is, therefore, physically suitable for the type and density of development. 5. With the incorporation of mitigation measures from the Final Program EIR and subsequent addenda, the design of the subdivision will not cause environmental damage or substantially injure fish or wildlife or their habitat or cause public health concerns. 6. The design of the subdivision will not conflict with easements, acquired by the public at large, or access through or use of, property within the proposed subdivision. The City Engineer has reviewed the map and title report and has not found any conflicting easements of this nature. 7. Pursuant to the California Environmental Quality Act, the Planning Commission finds that the Project is exempt from CEQA pursuant to Government Code section 65457 because it is a residential project that is consistent with a specific plan for which an 2 EIR has been certified. The Project is within the scope of the Final Environmental Impact Report (EIR) for the Dublin Transit Center General Plan Amendment, Eastern Dublin Specific Plan Amendment, Stage 1 Planned Development Zoning, Tentative Parcel Map, and Development Agreement (SCH 2001120395) which was certified by City Council Resolution No. 215-02 dated November 19, 2002. The Planning Commission finds that no further environmental review under CEQA is required for the proposed Project because there is no substantial evidence in the record as a whole that any of the standards under CEQA section 21166 or CEQA Guidelines sections 15162 and 15163 for the preparation of a subsequent or supplemental EIR are met. NOW, THEREFORE BE IT FURTHER RESOLVED that the Planning Commission hereby conditionally approves PA 09-002, Vesting Tentative Tract Map 7667, to subdivide ± 4.13 acres into two lots to be further subdivided for condominium purposes. This approval shall conform generally to: the Vesting Tentative Tract Map 7667 prepared by BKF Engineers, dated received March 5, 2010 by the Planning Department, and consisting of seven (7) sheets, attached as Exhibit A to this Resolution, except as specifically modified by the Conditions of Approval contained below. CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the approval of the Final Parcel Map, and shall be subject to City Engineer and the Director of Community Development review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval: [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City Attorney, [PCS] Parks and Community Services, [F] City of Dublin Fire, and [DSR] Dublin San Ramon Services District. NO. CONDITION TEXT RESP. SOURCE AGENCY GENERAL CONDITIONS - Vestin Tentative Tract Ma 1. Compliance. The Developer shall comply with the PW Public Works Subdivision Map Act, the City of Dublin Subdivision, Zoning, and Grading Ordinances, the City of Dublin Public Works Standards and Policies, and all building and fire codes and ordinances. All public improvements constructed by Developer and to be dedicated to the City are hereby identified as "public works" under Labor Code section 1771. Accordingly, Developer, in constructing such improvements, shall comply with the Prevailing Wage Law (Labor Code. Sects. 1720 and followin 2. Effective DateNalidity. Vesting Tentative Tract Map 7667 PL Ongoing approval shall not be effective until the related PD-Planned Development rezoning including Stage 2 Development Plan, Site Development Review, and amended Development Agreement are approved by the City Council.. If the above approvals are not granted, this Vesting Tentative Tract Map a roval shall become null and void. 3. Fees. The Develo er shall a all a licable fees in effect at PW Zone 7 and 3 NO. CONDITION TEXT RESP. SOURCE AGENCY the time of building permit issuance including, but not limited Public to, Planning fees, Building fees, Dublin San Ramon Services Facilities In- District fees, Public Facilities fees, Dublin Unified School Lieu Fees District School Impact fees, Public Works Traffic Impact fees, Due Prior to Alameda County Fire Services fees; Noise Mitigation fees, Filing a Final Inclusionary Housing In-Lieu fees; Alameda County Flood Map; Other and Water Conservation District (Zone 7) Drainage and Fees Water Connection fees; and any other fees unless otherwise Required with directed in the Development Agreement. Issuance of Building Permits 4. Indemnification. The Developer shall defend, indemnify, PW Public Works and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City related to this project to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or roceedin s. 5. Clarifications and Changes to the Conditions. In the event PW Public Works that there needs to be clarification to these Conditions of Approval, the City Engineer has the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The City Engineer also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Developer to fulfill needed improvements or mitigations resulting from im acts of this ro'ect. 6. Tract Improvement Agreement. The Developer shall enter PW Public Works into a Tract Improvement Agreement with the City for all ublic im rovements re uired for the Tract. 7. Security. The Developer shall provide performance (100%), PW Public Works and labor & material (100%) securities to guarantee the tract improvements, approved by the City Engineer, prior to execution of the Tract Improvement Agreement and approval of the Final Map. (Note: Upon acceptance of the improvements, the performance security may be replaced with a one-year warranty bond that is 25% of the value of the erformance securit . 4 NO. CONDITION TEXT RESP. SOURCE AGENCY 8. Encroachment Permit. Developer shall obtain an PW Pubiic Works Encroachment Permit from the Public Works Department for all construction activity within the public right-of-way of any street where the City has accepted the improvements. The encroachment permit may require surety for slurry seal and restriping. At the discretion of the City Engineer an encroachment for work specifically included in an Im rovement A reement ma not be re uired. 9. Permits. Developer shall obtain all permits required by other PW Public Works agencies including, but not limited to Alameda County Flood Control and Water Conservation District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, Caltrans and provide co ies of the ermits to the Public Works De artment. 10. Submittals. The Developer will be responsible for submittals PW Public Works and reviews to obtain the approvals of all participating non- City agencies. The Alameda County Fire Department and the Dublin San Ramon Services District shall approve and sign the Im rovement Plans. 11. Electronic Copy. Developer shall provide the Public Works PW Public Works Department a digital vectorized file of the "master" files for the project when the Final Map has been approved. Digital raster copies are not acceptable. The digital vectorized files shall be in AutoCAD 14 or higher drawing format. Drawing units shall be decimal with the precision of the Final Map. All objects and entities in layers shall be colored by layer and named in English. All submitted drawings shall use the Global Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. 12. Final Map. The Final Map shall be substantially in PW Public Works accordance with the Tentative Map approved with this a lication, unless otherwise modified b these conditions. 13. Dedications. All rights-of-way and easement dedications PW Public Works required by the Tentative Map shall be shown on the Final Ma . 14. Abandonment. The Developer shall obtain abandonment PW Public Works from all applicable public agencies of existing easements and ri ht of wa s that will no lon er be used. 15. Grading Plan. The Grading Plan shall be in conformance PW Public Works with the recommendations of the Geotechnical Report, the approved Tentative Map and Site Development Review, and the Cit desi n standards & ordinances. 16. Erosion Control Plan. A detailed Erosion Control Plan shall PW Public Works be included with the Grading Plan approval. The plan shall include detailed design, location, and maintenance criteria of all erosion and sedimentation control measures. 17. Tiebacks. Tiebacks or structural fabric for retainin walls PW Public Works 5 NO. CONDITION TEXT RESP. SOURCE AGENCY shall not cross property lines unless specifically approved by the Cit En ineer. 18. Notice of Intent. Prior to any clearing or grading, the PW Public Works Developer shall provide the City evidence that a Notice of Intent (NOI) has been sent to the California State Water Resources Control Board per the requirements of the NPDES. A copy of the Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Public Works De artment and be ke t at the construction site. 19. SWPPP. The Storm Water Pollution Prevention Plan PW Public Works (SWPPP) shall identify the Best Management Practices (BMPs) appropriate to the project construction activities. The SWPPP shall include the erosion control measures in accordance with the regulations outlined in the most current version of the ABAG Erosion and Sediment Control Handbook or State Construction Best Management Practices Handbook. The Developer is responsible for ensuring that all contractors implement all storm water pollution prevention measures in the SWPPP. 20. Maintenance Agreement. The Homeowners' Association PW Public Works shall enter into an agreement with the City of Dublin that guarantees the perpetual maintenance obligation for all private storm water treatment measures installed as part of the project. Said agreement is required pursuant to Provision C.3.e.ii of RWQCB Order R2-2003-0021 for the issuance of the Alameda Countywide NPDES municipal storm water permit. Said permit requires the City to provide verification and assurance that all treatment devices will be properly o erated and maintained. GQNSTRUGTION 21. Erosion Control Plan. The Erosion Control Plan shall be PW Public Works implemented between October 15th and April 15th unless otherwise allowed in writing by the City Engineer. The Developer will be responsible for maintaining erosion and sediment control measures for one year following the City's acce tance of the subdivision im rovements. 22. Archeological Materials. If archaeological materials are PW Public Works encountered during construction, construction within 100 feet of these materials shall be halted until a professional Archaeologist who is certified by the Society of California Archaeology (SCA) or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. 23. Construction Hours. Construction activities, including the PW Public Works maintenance and warming of equipment, shall be limited to Monda throu h Frida , and non-Cit holida s, between the 6 NO. CONDITION TEXT RESP. SOURCE AGENCY hours of 7:30 a.m. and 5:30 p.m. except as otherwise a roved b the Cit En ineer. 24. Construction Noise Management Plan. Developer shall PW Public Works prepare a construction noise management plan that identifies measures to be taken to minimize construction noise on surrounding developed properties. Specific noise management measures shall be included in the project plans and s ecifications. 25. Construction Traffic. Developer shall prepare a plan for PW Public Works construction traffic interface with public traffic on any existing public street. Construction traffic and parking may be subject to s ecific re uirements b the Cit En ineer. 26. Rodents. The Developer shall be responsible for controlling PW Public Works any rodent, mosquito, or other pest problem due to construction activities. 27. Dust Control. The Developer shall be responsible for PW Public Works measures to control dust as conditions warrant or as directed b the Cit En ineer. PROJECT SPECIFIC 28. Public Facilities Fee. The developer shall pay a Public PW DA Facilities Fee in accordance with the terms of the project Development Agreement. The in-lieu land dedication portion of the fee will be due prior to the recording of the Final Map for Tract 7667. 29. Streetscape Design Standards. The streetscape design for PW Public Works Martinelli Drive, Iron Horse Parkway, Dublin Boulevard and Campus Drive shall be in accordance with the Streetscape Master Plan adopted as Ordinance No. 21-02 for the Dublin Transit Center Project, PA 00-013. In keeping with the streetscape design used for residential frontage throughout the Dublin Transit Center, the Campus Drive frontage shall contain landsca e islands in the arkin area. 30. Sidewalks: All public sidewalks shall have a 2% cross slope. PW Public Works The 2% cross slope shall be maintained for a minimum distance of one foot behind the sidewalks where there is landscaping, stairs, or pathway along the back of the sidewalk. Sidewalks shall be designed to maintain a 2% cross slope across all driveway entrances. The SE small plaza at the corner of Iron Horse Parkway and Dublin Blvd. may be graded to be less than 2% cross slope for an accessible plaza condition, however, all other sidewalk will meet 2% cross slo e re uirements. 31. Parking Restrictions. Developer shall designate no parking PW Public Works areas along Dublin Boulevard and Martinelli Drive and designate parking on Iron Horse Parkway and Campus Drive for 2-hour limit, 7 AM to 6 PM, Monda - Frida . 32. Loadin Areas. The Develo er shall make rovision for PW Public Works 7 NO. CONDITION TEXT RESP. SOURCE AGENCY loadin areas to the satisfaction of the Cit En ineer. 33. Dublin Boulevard Frontage: The Developer shall install a PW Public Works landscape six-foot wide planter and a six-foot wide walk the full len th of the roject fronta e alon Dublin Boulevard 34. Iron Horse Parkway: The Developer shall construct the PW Public Works project frontage improvements along the east frontage of Iron Horse Parkwa as enerall shown on the Tentative Ma . 35. Martinelli Way: The Developer shall construct the project PW Public Works frontage improvements along the north frontage of Martinelli Wa as enerall shown on the Tentative Ma . 36. Campus Drive: The Developer shall construct the PW Public Works improvements for the full width of Campus Drive, as shown on the Tentative Map, between Martinelli Way and Dublin Boulevard. Improvements to include frontage landscaping and sidewalk onl on the west side. 37. Dublin Boulevard Right Turn Lane: The Developer shall PW Public Works widen Dublin Boulevard to provide a right turn lane at Cam us Drive to the satisfaction of the Cit En ineer. 38. Traffic Signal: The Developer shall install the traffic signal PW Public Works at the Martinelli Way / Campus Drive intersection. The traffic signals shall be interconnected with other adjacent signals within the existin Cit traffic si nal s stem b hard wire. 39. Traffic Signing and Striping: The Developer shall install all PW Public Works traffic signs and pavement marking for the above roadway improvements to the satisfaction of the City Engineer. Campus Drive Parkway shall maintain one lane southbound and one lane northbound with a turn lane in the middle. 40. Martinelli Way Walkway: The Developer shall construct a PW Public Works temporary 5-foot wide, AC walkway along the south side of Martinelli Wa between Cam us Drive and Arnold Drive. 41. Phasing: All public improvements required by the PW Public Works Conditions of Approval for Tract 7667 must be constructed with the recording of the final map except that the adjacent public sidewalk and landscaping may be phased with the onsite im rovements on Lot 1 and Lot 2. 42. Water Quality Treatment: The CDS unit shown on the PW Public Works Tentative Map in Campus Drive north of Martinelli Way shall be installed in Campus Drive south of Martinelli Way. With the CDS unit south of Martinelli Way the bioretention filtration units (Filterra Units) shown onsite on the Tentative Map are not required to meet water quality treatment but may be installed in addition to the CDS at the Developer's option. The CDS unit in Campus Drive south of Martinelli Way will be within City right-of-way and treat drainage from the public streets and therefore will be owned and maintained by the Cit . 43. Construction Traffic and Parkin : All construction related PW Public Works . 8 NO. CONDITION TEXT RESP. SOURCE AGENCY parking shall be off street in an area provided by the Developer. Construction traffic and parking shall be provided in a manner approved by the City Engineer to minimize im act on Bart atrons. 44. Street Names. Any street names assigned to private streets PW Public Works shall be approved pursuant to Municipal Code Chapter 7.08. The approved street names shall be indicated on the Final Ma . 45. Public Art Easement. The Final Map shall show that a PL, PCS Chapter 8.58 Public Art Easement will be provided on the corner of Iron of the Horse Parkway and Dublin Boulevard (as shown on the Municipal ro'ect Site Plan . Code 46. Public Art. The Project shall comply with the Public Art PL, PCS Amended requirement in the Amended Development Agreement Development a roved b the Cit Council for the Pro'ect Agreement 47. Future Transit Center Development Disclosure. The PL Planning ApplicanUDeveloper shall create a stand-alone disclosure for all buyers noting that future development immediately adjacent to the Project Site is expected to be high-density commercial development in accordance with the Dublin Transit Center Sta e 1 Develo ment Plan. PASSED, APPROVED, AND ADOPTED this 24th day of August, 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: Planning Manager G:\PA#\2009\PA 09-002 Site E-1\PC 08 24 2010\PC Att 4- Reso TMAP.DOC 9