Loading...
HomeMy WebLinkAboutReso 076-97 FirePermit/PlanFeesRESOLUTION NO. 76 - 97 A RESOLUTION OF THE CITY COIYNCIL OF THE CITY OF DUBLIN AMENDING RESOLUTION 96-84 ESTABLISHING FEES AND CHARGES FOR PUBLIC SERVICES BY ADDING EXHIBIT 9: FIRE PERMIT, PLAN REVIEW, INSPECTION AND SERVICE FEES WHEREAS, the City Council of the City of Dublin adopted Resolution No. 96-84, which establishes fees and charges for public services provided by the City of Dublin; and WHEREAS, effective July 1, 1997, the City of Dublin will provide fire protection, prevention and emergency response services, which services have previously been provided by the Dougherty Regional Fire Authority; and WHEREAS, the City of Dublin will provide all of these fire services through a contract with the Alameda County Fire Departmem (ACFD); and WHEREAS, on May 20, 1997, the City Council of the City of Dublin adopted Ordinance No. 12- 97, which adopted the Uniform Fire Code and prescribed regulations governing conditions hazardous to life and property in the City of Dublin; and WHEREAS, Ordinance 12-97 provided that the City Council may, by resolution, establish fees to deft-ay the City's reasonable costs for fire permits, Plan review and inspection services; and WHEREAS, on May 20, 1997, the City Council of the City of Dublin adopted Ordinance No. 13- 97, which established the weed abatement program, including the authority to charge private property owners for weed abatement if property owners do not, after proper notice, abate weeds themselves; and WHEREAS, the City Council may also establish fees to cover costs related to certain types of incident response, as well as duplication of fire reports and photographs and other fire related services; and WHEREAS, under the contract for fire services with ACFD, the City will compensate ACFD for all costs related to the provision of fire suppression, prevention, and emergency response services in the City of Dublin; and WHEREAS, ACFD has established fees which cover the cost of providing services for fire permits, plan review and inspection and other fire related services; and WHEREAS, it is appropriate for the City of Dublin to implement the ACFD fee schedule for these services. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby adopt EXIq~IT 9 - FIRE PERMIT, PLAN REVIEW, INSPECTION AND SERVICE FEES, as attached hereto and by reference made a part hereof, which shall be incorporated with Resolution No. 96-84 as mended. PASSED, APPROVED AND ADOPTED this 17th day of June, 1997. AYES: Councilmembers Barnes, Burton, Howard, Lockhart and Mayor Houston NOES: -~ None AB SENT: None _ ABSTAIN: None Mayor K2IGI6-17-971resofire.doc EXHIBIT 9 FIRE PERMIT, PLAN REVIEW, INSPECTION AND SERVICE FEES FIRE CODE PERMITS UFC Rate in Dollars* Article Aerosol Products 88 $80.00 Aircraft Refueling 24 $80.00 Aircraft Repair 24 $80.00 Automobile Wrecking Yards 34 $80.00 Bonfire/Open Burning** 11 $40.00 Bowling Alley/Pin Refinishing** 26 $40.00 Candles/Open Flame in Assembly 25 See places of ~sembly carnivals and Fairs 25 $80.00 Cellulose Nitrate Storage 27 $80.00 Combustible Fiber Storage 28 - $80.00 Compressed Gases 74 $40.00 CombUStible Materials Storage 11 $40.® Cryogenics 75 $80.00 Dry Cleaning Plants 36/79 $80.00 Dust Producing Operations 76 $80.00 Explosives 77 $40.00 Fire Hydrants and Water Control Valves 9 $40.00 Fireworks: Manufacturing 78 $80.00 Display - Setpiece** 78 $80.00 Display - Aerial** 78 $240.00 Sate - Permit 78 $80,00 plus amount per day open for business 78 $20.00 Flammable or Combustible Liquids Use and Storage of Class I, II and III: Inside Storage or Handling Room 79i $80.00 Storage Cabinet 79 $40.00 Aboveground Tank (1) 79 $80.00 Plus additional tanks (each) 79 $40.00 Underground Tanks (1) 79 $80.00 Plus additional tanks (each) 79 $40.00 Removal of Aboveground Tank** 79 $80.00 Plus additional tanks (each) 79 $40.00 Removal of Underground Tank** 79 $80.00 Plus additional tanks (each) 79 $40.00 Fruit Ripening 46 $40.00 Garage/Repair 29 $80.00 Ha~'ardous Materials Storage 80 $80.00 Hazardous Production Materials 51 $80.00 Highly TOxic Pesticides 80 $80.00 High Piled Combustible Storage 81 $80.00 Iunk Yards 34 $40.00 Liquefied Petroleum Gases: Use, Storage and Handling less than 1,999 gallons 82 $40.00 Use, Storage and Handling 2,000 or more gallons82 $80.00 Page 1 EXHIBIT 9 FIRE PERMIT, PLAN REVIEW, INSPECTION AND SERVICE FEES Liquid or Gas Fueled Equipment in Assembly 25 Lumberyard (> 100,000 board feet) 30 Magnesium Working 48 FIRE CODE PERMITS Mall, covered Matches (manufacture or bulk storage) UFC Article 35 80 Nitrate Film 33 Occupant Load Increase 12 Oil or Natural Gas Well 33 Open Flame Devices-Marinas 11 Organic Coatings 50 Ovens, Industrial Baking and Drying 62 iParade Floats** 11 Places of Assembly: Occupant Load - 50 to 299 25 Occupant Load - 300 or more 25 Pyrotechnical Special Effects Material 78i Radioactive Materials 80 RefiSgeration Equipment 63 Spraying and Dipping Operations 45 Tank Vehicles** 79 Tents or Air Supported Structures: 200 to 4, t99 square feet 32/ 4200 square feet or more ' 32 Tire Recapping 31 Waste Material Handling Plant 11/28 Welding and Cutting Operations 49I PLAN REVIEW AND INSPECTION Rate in Dollars* Building Construction-Commercial New Construction up to 5,000 square feet Rate in Dollars* New Construction in excess orS,000 square feet Tenant Improvement up to 5,000 square feet Tenant Improvement in excess of 5,000 square feet Building Construction-Residential Rate in Dollars* Custom Lot Water Supply Fire Access Fire Alarm Systems Rate in Dollars* Fire Alarm System Fire Alarm, highrise 4 or more stories plus amount per story in excess of 4 stories Fixed Fire Protection Systems Rate in Dollars* Halon System Hood and Duct System Medical Gas System Spray Booth (per booth) $80.00 $80.00 $40.00 $80.00 $40.00 $40.00 $40.00 $80.00 $40.O0 $8O.OO $SO.O0 $40.00 $8O.O0 $160.00 $8O.OO $80.00 $40.00 $40.00 $80.00 $40.00 $80.00 $80.00 $80.00 $80.00 $120.00 $240.00 $120.00 $240.00 $40.00 $80.00 $120.00 $200.00 $240.00 $40.00 $160.00 $120.00 $80.00 $120.00 Page 2 EXHIBIT 9 FIRE PERMIT, PLAN REVIEW, INSPECTION AND SERVICE FEES Fire Sprinkler Systems New Construction-Commercial Rate in Dollars* System with less than 20 heads $200.00 System with 21-99 heads $280,00 System with 100 or more heads $280.00 plus amount per head in excess of 100 $0.50 Fire Sprinkler Systems (continued) New Construction-Residential Rate in Dollars* NFPA 13D Sprinkler System - 1 st unit $240.00 $160.00 plus amount per each like unit NFPA 13R Sprinkler System - 1st unit $280.00 plus amount per each like unit - $120.00 NFPA 13 Sprinkler System - 1st unit $280.00 plus amount per each like unit $130.00 Rate in Dollars* Existing Construction - Commercial or Residential Tenant Improvement (drops only) with up to 20 heads Tenant Improvement (drops only) more than 20 heads plus amount per each head in excess of 20 Underground Water Supply Fire Inspections - Requested Self Inspection Program Annual notice of inspection (if additional services are required, this fee is deducted from related fees.) Miscellaneous Fees Duplication of fire related reports: Initial Page Additional Pages Photo (3x5) Photo (8x10) Weed Abatement Fees Abatement of weeds by contractor Incident Response Fees Response to Intentionally Caused Fires, Fires Caused by Negligence, Vehicle Incidents Caused by Driving Under the Influence of Alcohol and Hazardous Materials Incidents and Related Investigations $120.00 $200.00 $0.50 $200.00 $80.00 Ratein Dollars $11.00 Ratein Dollars $1.00 $0.10 $5.00 $10.00 Rate in Dollars* Direct contractor cost plus City inspection and administrative costs. Rate in Dollars* Actual cost of labor, materials and equipment, including administrative overhead. *The permit fee is an estimate based on the cost of basic service, including, but not limited to, office reviews and two (2) field inspections. The actual amount charged is based on the actual time spent. The plan review and inspection fee covers the cost of basic services, including, but not limited to, review and approval of plans, two (2) field inspections and consultant fee for construction plan,sprinkler plan and calculation review. Extra cost incurred due to system failure, unusual circumstances, excessive time required, missed appointments and personnel expense shall be billed at the rate of $80 per hour in 1/2 hour increments in addition to the basic service fee. **Fire permits that are not covered by an annual permit shall submit application for permit required for each occurrence. In addition to the fire permit, fireworks displays must have one engine company on standby during the event at the perimitee's expense. Event time includes 1/2 hour before and 1/2 hour after the actual display. Page 3