HomeMy WebLinkAbout8.3 Attch 8 Reso Approving SDR&VestingTTM
RESOLUTION NO. 10- XX
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING SITE DEVELOPMENT REVIEW AND
VESTING TENTATIVE TRACT MAP 7929
FOR AVALON BAY COMMUNITIES, SITE C, DUBLIN TRANSIT CENTER
(APN 986-0054-005-02)
PA 06-060
WHEREAS, the Applicant, Avalon Bay Communities, submitted applications for an area of
approximately 7.21 acres known as Dublin Station, Site C within the Dublin Transit Center (PA 06-
060) and the Eastern Dublin Specific Plan Area; and
WHEREAS, the project site generally is located north of the East Dublin BART Station, east of
Iron Horse Trail, generally west of Iron Horse Parkway, and immediately south of Campbell Green
within the previously approved Dublin Transit Center; and
WHEREAS, the Dublin Transit Center project (PA 00-013) was approved by the City Council
on December 3, 2002, by Ordinance 21-02 adopting a PD-Stage 1 Planned Development. The Stage 1
Planned Development Rezone provided for various land uses including the development of 1,500
units; and
WHEREAS, the Applicant has applied for a Stage 1 Development Plan amendment and Stage
2 Development Plan in accordance with Dublin Zoning Ordinance, Section 8.32; and
WHEREAS, the Applicant has applied for Site Development Review and Vesting Tentative
Tract Map for 486 residential units, 11,582 square feet of retail/commercial use, leasing and amenity
space on Site C of Dublin Transit Center; and
WHEREAS, the complete application submitted is available and on file in the Community
Development Department; and
WHEREAS, the California Environmental Quality Act (CEQA), together with State Guidelines
and City Environmental Regulations require that certain projects be reviewed for environmental
impacts and that environmental documents be prepared; and
WHEREAS, Staff has recommended that the project be found exempt from CEQA pursuant to
Government Code section 65457 for residential projects that are consistent with a specific plan. The
Project proposes to transfer 78 units from Dublin Transit Center Site A and 3 units from Site B to Site
C. The sites are designated High Density Residential and have been planned for intensive urban
residential development in the General Plan and Eastern Dublin Specific Plan. The Project is within
the scope of the Final Environmental Impact Report for the Dublin Transit Center General Plan
Amendment, Eastern Dublin Specific Plan Amendment, Stage 1 Planned Development Zoning,
Tentative Parcel Map, and Development Agreement (SCH 2001120395) which was certified by City
Council Resolution No. 215-02 dated November 19, 2002. This recommendation is based on a
determination that there are no substantial changes to the project or its circumstances, and no
substantial new information that would require preparation of a Supplemental EIR; and
Page 1 of 23 ATTACHMENT 8
WHEREAS, the Planning Commission did hold a public hearing on said application for this
project on September 14, 2010; and
WHEREAS, proper notice of said public hearing was given in all respects as required by law;
and
WHEREAS, a Staff Report was submitted recommending that the Planning Commission
approve a Site Development Review and Vesting Tentative Tract Map subject to the findings and
conditions contained herein; and
WHEREAS, the Planning Commission did hear and use their independent judgment and
considered the Dublin Transit Center EIR, and all said reports, recommendations, and testimony
hereinabove set forth.
NOW, THEREFORE, BE IT RESOLVED THAT THE Planning Commission of the City of
Dublin does hereby make the following findings and determinations for the Site Development Review:
Site Development Review
A. The proposal is consistent with the purposes of this Chapter, with the General Plan and
with any applicable Specific Plans and design guidelines in that: The proposed site design
for the development of the Dublin Station project, as conditioned, is consistent with Chapter
8.104 of the Dublin Zoning Ordinance, complies with the policies of the General Plan, the
Eastern Dublin Specific Plan, the Stage 1 Planned Development zoning, the Stage 2
Development Plan, and with all other requirements of the Dublin Zoning Ordinance in that it
will create housing opportunities; establish ancillary retail/commercial development; and
allow for proper maintenance and emergency access.
B. The proposal is consistent with the provision of Title 8, Zoning Ordinance, Chapter 8.104,
Site Development Review of the Dublin Zoning Ordinance in that it provides a well
designed project in relation to BART, other development in the area, and the Campbell
Green.
C. The design of the project is appropriate to the City, the vicinity, surrounding properties, and
the lot on which the project is proposed because it is within the context of development in
the area; it is consistent with the Dublin Transit Center area development, and continues
with implementation of the plan adopted with Stage 1 Planned Development Rezone
Amendment by coordinating improvements, circulation, and housing opportunities with the
adjacent properties.
D. The subject site is physically suitable for the type and intensity of the approved
development because it provides high-density housing, continues the envisioned
development pattern for the Dublin Transit Center which is within the recommended density
for the site.
E. Impacts to the existing slopes and topography are addressed as the site is predominately
flat and drainage has been accommodated into an underground collection system and
conveyed away from the property.
F. Architectural considerations, including the character, scale and quality of the design, site
layouf, the architectural relationship wifh the site and other buildings, screening of unsighfly
Page 2 of 23
uses, lighting, building materials and colors, and similar elements result in a project that is
harmonious with its surroundings and compatible with other development in the vicinity,
have been incorporated into the project, and as conditions of approval, in order to ensure
compatibility with the design concept or theme and the character of adjacent buildings
within and adjacent to the project.
G. Landscape considerations, including the location, type, size, color, texture and coverage of
plant materials, and similar elements have been incorporated into the project to ensure
visual relief, adequate screening and an attractive environment for the public.
H. The site has been adequately designed to ensure proper circulation for bicyclists,
pedestrian, and automobiles.
BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby
approves the Site Development Review with the following conditions. This approval is based on
findings that the proposed Site Development Review is consistent with the Master Vesting Tentative
Tract Map, the Amended Stage 1 Planned Development Rezone for the Dublin Transit Center area,
Stage 2 Development Plan, General Plan, and Eastern Dublin Specific Plan. This approval shall
conform generally to the plans prepared by GGLO Architects, the Guzzardo Partnership, Inc., BKF
Engineers and IPD Parking Consultants, dated February 8, 2010, Avalon Dublin Station, Site C,
Stage 2 PD/SDR Submittal Avalon Bay Communities, Inc. to this Resolution, consisting of the
packages, sheets, booklets, and plans on file with the Community Development Department and the
ApplicanYs written statement.
CONDITIONS OF APPROVAL
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of
building permits, establishment of use, approval of final map or filing of parcel map, etc., and shall be
subject to Planning Division review and approval. The following codes represent those
departments/agencies responsible for monitoring compliance of the conditions of approval: [PL]
Planning; [B] Building; [PO] Police; [PW] Public Works; [ADM] Administration/City Attorney; [FIN]
Finance; [PCS] Parks and Community Services; [F] Dublin Fire Prevention; [DSR] Dublin San Ramon
Services District; [LDD] Livermore Dublin Disposal; [CO] Alameda County Department of
Environmental Health; [Zone 7] Alameda County Flood Control and Water Conservation District, Zone
7; [LAVTA] Livermore Amador Valley Transit Authority; and [CHS] California Department of Health
Services.
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to•
GENERAL - SITE DEVELOPMENT REVIEW
1. Approval. This Site Development Review approval for PL On-going Planning
Dublin Transit Center, Site C (Avalon Bay
Communities), PA 06-060, establishes the detailed
design concepts and regulations for the project.
Development pursuant to this Site Development Review
shall conform generally to the project plans submitted
by GGLO Architects, dated February 8, 2010, on file in
the Community Development Department, and other
lans, text, and dia rams relatin to this Site
Page 3 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
Development Review, unless modified by the
Conditions of Approval contained herein. The approval
of this Site Development Review is subject to the City
Council appr.oval of the Stage 1 Development Plan
Amendment and Sta e 2 Develo ment Plan.
2. Effective Date. This Site Development Review PL Approval of DMC
approval is contingent upon the approval of the related related 8.32.030.
Stage 1 and Stage 2 Planned Development zoning. If entitlements B
the Stage 1 and Stage 2 Planned Development zoning
is not approved this Site Development Review approval
shall become null and void.
3. Permit Expiration. Construction or use shall PL Two years DMC
commence within two (2) years of Permit approval or from permit 8.96.020.
the Permit shall lapse and become null and void. approval D
Commencement of construction or use means the
actual construction or use pursuant to the Permit
approval or, demonstrating substantial progress toward
commencing such construction or use. If there is a
dispute as to whether the Permit has expired, the City
may hold a noticed public hearing to determine the
matter. Such a determination may be processed
concurrently with revocation proceedings in appropriate
circumstances. If a Permit expires, a new application
must be made and processed according to the
re uirements of this Ordinance.
4. Time Extension. The original approving decision- PL Two years DMC
maker may, upon the ApplicanYs written request for an from permit 8.96.020.
extension of approval prior to expiration, and upon the approval E
determination that any Conditions of Approval remain
adequate to assure that applicable findings of approval
will continue to be met, grant a time extension of
approval for a period not to exceed six (6) months. All
time extension requests shall be noticed and a public
hearing or public meeting shall be held as required by
the articular Permit.
5. Permit Validity. This SDR approval shall be valid for PL On-going DMC
the remaining life of the approved structure so long as 8.96.020.
the operators of the subject property comply with the F
projecYs conditions of a roval.
6. Revocation of permit. The Site Development Review PL On-going DMC
approval shall be revocable for cause in accordance 8.96.020.
with Section 8.96.020.1 of the Dublin Zoning Ordinance. I
Any violation of the terms or conditions of this permit
shall be subject to citation.
7. Requirements and Standard Conditions. The Various Building Standard
Applicant/ Developer shall comply with applicable City Permit
of Dublin Fire Prevention Bureau, Dublin Public Works Issuance
Page 4 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
Department, Dublin Building Department, Dublin Police
Services, Alameda County Flood Control District Zone
7, Livermore Amador Valley Transit Authority, Alameda
County Public and Environmental Health, Dublin San
Ramon Services District and the California Department
of Health Services requirements and standard
conditions. Prior to issuance of building permits or the
installation of any improvements related to this project,
the Developer shall supply written statements from
each such agency or department to the Planning
Department, indicating that all applicable conditions
re uired have been or will be met.
8. Required Permits. Developer shall obtain all permits PW Building Standard
required by other agencies including, but not limited to Permit
Alameda County Flood Control and Water Conservation Issuance
District Zone 7, California Department of Fish and
Game, Army Corps of Engineers, Regional Water
Quality Control Board, Caltrans and provide copies of
the ermits to the Public Works De artment.
9. Fees. ApplicanUDeveloper shall pay all applicable fees Various Building Various
in effect at the time of building permit issuance, Permit
including, but not limited to, Planning fees, Building Issuance
fees, Traffic Impact Fees, TVTC fees, Dublin San
Ramon Services District fees, Public Facilities fees,
Dublin Unified School District School Impact fees, Fire
Facilities Impact fees, Alameda County Flood and
Water Conservation District (Zone 7) Drainage and
Water Connection fees; or any other fee that may be
ado ted and a licable.
10. Indemnification. The Developer shall defend, ADM Admin
indemnify, and hold harmless the City of Dublin and its /City
agents, officers, and employees from any claim, action, Attorney
or proceeding against the City of Dublin or its agents,
officers, or employees to attack, set aside, void, or
annul an approval of the City of Dublin or its advisory
agency, appeal board, Planning Commission, City
Council, Community Development Director, Zoning
Administrator, or any other department, committee, or
agency of the City related to this project to the extent
such actions are brought within the time period required
by Government Code Section 66499.37 or other
applicable law; provided, however, that The Developer's
duty to so defend, indemnify, and hold harmless shall
be subject to the City's promptly notifying The
Developer of any said claim, action, or proceeding and
the City's full cooperation in the defense of such actions
or proceedings.
Page 5 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
11. Clean-up. The ApplicanUDeveloper shall be PL On-going Planning
responsible for clean-up and disposal of project related
trash to maintain a safe, clean, and litter-free site.
12. Modifications. Modifications or changes to this Site PL On-going DMC
Development Review approval may be considered by 8.104.10
the Community Development Director if the 0
modifications or changes proposed comply with Section
8.104.100 of the Zonin Ordinance.
13. Controlling Activities. The ApplicanUDeveloper shall PL On-going
control all activities on the project site so as not to
create a nuisance to the existing or surrounding
businesses and residences.
14. Accessory/Temporary Structures. The use of any PL On-going DMC
accessory or temporary structures, such as storage 8.108
sheds or trailer/ container units used for storage or for
any other purposes, shall be subject to review and
approval b the Communit Development Director.
PROJECT SPECIFIC - SITE DEVELOPMENT REVIEW
15. Affordable Housing Agreement. The Applicant shall ADM, PL Issuance of DMC
enter into an affordable housing agreement (or a any Project 8.68
regulatory agreement or such other legal mechanism building
including but not limited to CC&R's, satisfactory to the permits
City Attorney) with the City to ensure that the affordable
units remain affordable for 55 years and that other
provisions of Chapter 8.68 of the Dublin Municipal Code
(the Inclusionary Zoning Regulations) are satisfied,
including provisions relating to priorities in the rental or
sale of affordable units as set forth in Section 8.68.050
of the Dublin Municipal Code. Such agreement (or
other legal mechanism including, but not limited to,
CC&R's) shall be recorded to ensure it has priority over
and is not subordinate to any other recorded document
affectin the ro ert.
16. Inclusionary Zoning Regulations. The Applicant shall ADM, PL On going DMC
comply with all provisions of Chapter 8.68, Inclusionary 8.68
Zoning Regulations of the Dublin Zoning Ordinance
except as modified by these conditions of approval
and/or an ado ted Develo ment A reement.
17. Inclusionary Zoning Requirements. The ApplicanU PL Through Ord.05-
Developer shall provide a minimum of 49 moderate Completion 03
income units. Unit affordability shall be between 80% and (Master
and 120% of the area median income. Affordable unit On going DA) and
types shall be equally dispersed with the same ratio as DMC
market rate units in accordance with the Inclusionary 8.68
Zoning Regulations. Any changes to the affordable
units must first be reviewed and approved by the
Director of Communit Develo ment.
Page 6 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
18. Mitigation Monitoring Program. The PL On-going Dublin
Applicant/Developer shall comply with the Dublin Transit
Transit Center EIR Mitigation Monitoring Program Center
including all mitigation measures, action programs, and EIR
implementation measures on file with the Community MMP
Development Department.
19. Sound Attenuation. The Applicant/Developer shall PL Prior to Dublin
submit a site specific acoustic report to be prepared by Issuance of Transit
qualified acoustical consultants. The acoustic report Building Center
shall include detailed identification of noise exposure Permits EIR
levels on the individual project site and a listing of Mitigation
specific measures to reduce both interior and exterior Monitorin
noise levels to normally acceptable levels including but g
not limited to glazing and ventilation systems, Program
construction of noise barriers and use of buildings to
shield noise.
20. Equipment Screening. All electrical and/or PL Through
mechanical equipment shall be screened from public Completion/
view. Any roof-mounted equipment shall be completely On-going
screened from view by materials architecturally
compatible with the building and to the satisfaction of
the Communit Develo ment Director.
21. Master Sign Program. A Master Sign Program shall PL Occupancy
be applied for and approved for all project related
signage including, but not limited to, community
identification signage, address signage, directional
signage, parking signage, speed limit signage, and
other si na e deemed necessa b the Cit .
22. Colors. The exterior paint colors of the buildings are PL Occupancy Planning
subject to City review and approval. The Applicant shall
paint a portion of the building the proposed color(s) for
review and approval by the Director of Community
Development prior to paintin the entire structure.
LANDSCAPING
23. Final Landscape and Irrigation Plans: Final PL Issuance of DMC
Landscape and Irrigation Plans prepared and stamped Building 8.72.030
by a State licensed landscape architect or registered Permits
engineer shall be submitted for review and approval by
the City Engineer and the Community Development
Director. Plans shall be generally consistent with the
Dublin Transit Center Planned Development Plan and
the preliminary landscape plan prepared by The
Guzzardo Partnership Inc., dated February 8, 2010,
except as modified by the Conditions listed below and
as required by the Community Development Director.
Page 7 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
24. Plant Species. Plant species shall be selected PL Planning
according to use, sun/shade location and space
available. The landscape plan should include plant
species that are not salt sensitive. Street trees shall be
hi h branchin and roduce minimal litter.
25. Landscaping at Street/Drive Aisle Intersections. PL Planning
Landscaping shall not obstruct the sight distance of
motorists, pedestrians, or bicyclists. Except for trees,
landscaping (and/or landscape structures such as
walls) at drive aisle intersections shall not be taller than
30 inches above the curb. Landscaping shall be kept at
a minimum height and fullness giving patrol officers and
the eneral ublic surveillance ca abilities of the area.
26. Lighting. The Applicant/Developer shall prepare a PL, PW, Planning
lighting isochart to the satisfaction of the City Engineer, PO
Director of Community Development, the City's
Consulting Landscape Architect and Dublin Police
Services. Lighting used after daylight hours shall be
ade uate to rovide for securit needs.
27. Street Lights and Trees. Maintain approximately 15' PL Planning
clearance between streetlights and street trees. Where
such clearance is not practical for design
considerations, trees shall be increased to 36" box
minimum to reduce the conflict between the lighting and
folia e.
28. Standard Plant Material, Irrigation and Maintenance PL Issuance of DMC
Agreement. The Applicant/Developer shall complete Building 8.72.050.
and submit to the Dublin Planning Department the Permits B
Standard Plant Material, Irrigation and Maintenance
A reement.
29. Landscaping. Applicant/Developer shall construct all PL Building Planning
landscaping within the site and along the project Permit
frontage. The on site landscaping shall be to the Issuance
satisfaction of the Director of Community Development.
The frontage landscaping, from the face of curb to the
right-of-way, shall be to the design in the Dublin Transit
Center Specific Plan. Street trees within the frontage
shall be a minimum 24" box, their exact tree locations
and varieties shall a roved b the Cit En ineer.
30. Plant Standards. All trees shall be 24" box minimum, PL Occupancy Planning
with at least 30% at 36" box or greater; all shrubs shall
be 5 allon minimum.
31. Maintenance of Landscaping. All landscaping PL On-going City of
materials within the public right-of-way shall be Dublin
maintained for 90 days and on-site landscaping shall be Standard
maintained in accordance with the "City of Dublin s Plant
Standards Plant Material, Irri ation S stem and Material,
Page 8 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
Maintenance AgreemenY' by the Developer after City- Irrigation
approved installation. This maintenance shall include System
weeding, the application of pre-emergent chemical and
applications, and the replacement of materials that die. Mainten.
Any proposed or modified landscaping to the site, Agrmnt
including the removal or replacement of trees, shall
require prior review and written approval from the
Community Development Director.
32. Water Efficient Landscaping Ordinance. The PL Building DMC
Applicant/ Developer shall submit written Permit 8.88
documentation to the Public Works Department (in the Issuance
form of a Landscape Documentation Package and other
required documents) that the development conforms to
the Cit 's Water Efficient Landsca in Ordinance.
PLANNING - SITE DEVELOPMENT REVIEW
33. Public Art Project. The Applicant/Developer shall PCS Prior to first Project
acquire and install a public art project with a value of at occupancy Specific
least $50,000 to be located in the median strip in
Campbell Lane adjacent to its intersection with Iron
Horse Parkway. Prior to final occupancy
Applicant/Developer shall complete and install the
public art. The public art project is subject to the
approval of the City Council upon recommendation by
the Herita e and Cultural Arts Commission.
PUBLIC WORKS - SITE DEVELOPMENT REVIEW
34. Tentative Map Conditions of Approval: All applicable PW Final Map Project
Conditions of Approval for Tentative Map for Tract 7929 Specific
shall apply to this Site Development Review. The Tract
7929 Map shall record prior to the issuance of a
Buildin Permit.
35. Grading / Sitework Permit: Developer shall obtain a PW Site Standard
Grading / Sitework Permit from the Public Works Construction
Department for all grading and private site
improvements. The Developer shall provide security to
guarantee the grading and improvements, in an amount
a roved b the Cit En ineer.
36. Parking Garage Access Gates: The geometric PW Garage Project
configuration and circulation for the gated entrances in Building Specific
the parking garages shall be designed to the permit
satisfaction of the City Engineer. The one-way drives
shall be a minimum 11 feet wide. The key access gate
shall be located so that at least one vehicle entering the
gate does not block traffic to or from the public area of
the ara e.
37. Public Parking: The retail parking and the guest PW Approval of Project
arkin shall be combined within the ublic arkin ara e S ecific
Page 9 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
area of the garage. The public area of the garage shall building
not designate or reserve parking stalls for any use permit
except that seven stalls in Garage C1 may be reserved
for rental office users during office hours. The public
parking areas in the garages shall be limited to a
maximum of 2-hour parking, 7AM-6PM, M-F. Up to six
spaces in Garage C2 may be limited to 30-minutes.
38. Guest Parking. The Developer shall operate the PW On-going Project
garage in a manner that allows guests to obtain access Specific
and ark in the u er levels of both ara es.
39. Parking Garage: The Parking garage shall meet the PW Approval of Project
following requirements: garage Specific
• The guest / retail parking stalls should be a building
minimum 9 feet wide and 18.5 feet deep. permit
Compact spaces shall not be used.
• Composite size parking stalls for the private
residential parking areas may be a minimum 8.5
feet wide and 18.5 feet deep. There shall be no
compact stalls if the composite stall dimensions
are used. Nine foot wide stalls shall be provided
where structural constraints allow without the lost
of parking stalls.
• All parking stalls next to walls or columns that
would interfere with opening the parked car doors
shall contain an additional two feet in width.
• All parking stalls next to columns that are within
two feet of the edge of the drive aisle shall contain
an additional two feet in width.
• The driveway aisle shall be a minimum 24 feet
wide.
• Parking stalls at 90 degrees to one another
should be two foot wider.
• There should be no obstruction within the 24 feet
back up area of a parking stall.
• There must be space to turn around at the end of
all dead end aisles. Turn around spaces shall be
a minimum 12 foot wide from the end of the drive
aisle.
• All parking stalls shall be delineated with a double
strip per the City standard drawings.
BUILDING
40. Building Codes and Ordinances: All project B Through Standard
construction shall conform to all building codes and Completion
ordinances in effect at the time of buildin ermit.
Page 10 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
41. Retaining Walls: All retaining walls over 30 inches in B Through Standard
height and in a walkway shall be provided with Completion
guardrails. All retaining walls over 24 inches with a
surcharge or 36 inches without a surcharge shall obtain
permits and inspections from the Building Division.
42. Phased Occupancy Plan: If occupancy is requested B Occupancy Standard
to occur in phases, then all physical improvements of any
within each phase shall be required to be completed affected
prior to occupancy of any buildings within that phase building
except for items specifically excluded in an approved
Phased Occupancy Plan, or minor handwork items,
approved by the Department of Community
Development. The Phased Occupancy Plan shall be
submitted to the Directors of Community Development
and Public Works for review and approval a minimum of
45 days prior to the request for occupancy of any
building covered by said Phased Occupancy Plan. Any
phasing shall provide for adequate vehicular access to
all parcels in each phase, and shall substantially
conform to the intent and purpose of the subdivision
approval. No individual building shall be occupied until
the adjoining area is finished, safe, accessible, and
provided with all reasonable expected services and
amenities, and separated from remaining additional
construction activity. Subject to approval of the Director
of Community Development, the completion of
landscaping may be deferred due to inclement weather
with the posting of a bond for the value of the deferred
landsca in and associated im rovements.
43. Building Permits: To apply for building permits, B Issuance of Standard
ApplicanUDeveloper shall submit seven (7) sets of Building
construction plans to the Building Division for plan Permits
check. Each set of plans shall have attached an
annotated copy of these Conditions of Approval. The
notations shall clearly indicate how all Conditions of
Approval will or have been complied with. Construction
plans will not be accepted without the annotated
resolutions attached to each set of plans.
Applicant/Developer will be responsible for obtaining
the approvals of all participation non-City agencies prior
to the issuance of buildin ermits.
44. Construction Drawings: Construction plans shall be B Issuance of Standard
fully dimensioned (including building elevations) building
accurately drawn (depicting all existing and proposed permits
conditions on site), and prepared and signed by a
California licensed Architect or Engineer. All structural
calculations shall be prepared and si ned by a
Page 11 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
California licensed Architect or Engineer. The site plan,
landscape plan and details shall be consistent with
each other.
45. Air Conditioning Units: Air conditioning units and B Occupancy Standard
ventilation ducts shall be screened from public view with of Unit
materials compatible to the main building. Units shall
be permanently installed on concrete pads or other non-
movable materials approved by the Building Official and
Director of Community Development. Air conditioning
units shall be located in accordance with the PD text.
46. Temporary Fencing: Temporary Construction fencing B Through Standard
shall be installed along perimeter of all work under Completion
construction.
47. Addressing B Issuance of Standard
a) Provide a site plan with the City of Dublin's building
address grid overlaid on the plans (1 to 30 permits
scale). Highlight all exterior door openings on
plans (front, rear, garage, etc.). (Prior to release
of addresses)
b) Provide plan for display of addresses. The
Building Official and Director of Community
Development shall approve plan prior to
issuance of the first building permit. (Prior to
permitting)
c) Address signage shall be provided as per the
Dublin Residential Security Code. (Occupancy
of any Unit)
d) Exterior address numbers shall be backlight and
be posted in such a way that they may be seen
from the street. (Prior to permit issuance, and
through completion).
e) An approved apartment unit-numbering plan
shall be incorporated into the construction
drawin s.
48. Engineer Observation: The Engineer of record shall B Final frame Standard
be retained to provide observation services for all inspection
components of the lateral and vertical design of the
building, including nailing, hold-downs, straps, shear,
roof diaphragm and structural frame of building. A
written report shall be submitted to the City Inspector
pflOf to schedulin the final frame inspection.
49. Foundation: Geotechnical Engineer for the soils report B Permit Standard
shall review and approve the foundation design. A issuance
letter shall be submitted to the Building Division on the
a roval.
50. Green Building: The Green Building checklist shall be B Issuance of Standard
included in the master lans. The checklist shall detail buildin
Page 12 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
what Green Points are being obtained and where the permit and
information is found within the master plans. (Prior to through
first permit). Prior to occupancy of any unit, the project completion
shall submit a completed checklist with appropriate
verification that all Green Points required by 7.94 of the
Dublin Munici al Code have been incor orated.
51. Cool Roofs: Flat roof areas shall have their roofing B Through Standard
material coated with light colored gravel or painted with Completion
light colored or reflective material designed for Cool
Roofs.
52. Electronic File: The applicanUdeveloper shall submit B Issuance of Standard
all building drawings and specifications for this project final
in an electronic format to the satisfaction of the Building occupancy
Official prior to the issuance of building permits.
Additionally, all revisions made to the building plans
during the project shall be incorporated into an "As
BuilY" electronic file and submitted prior to the issuance
of the final occu anc .
53. Construction trailer: Due to size and nature of the B Issuance of Standard
development, the applicant/developer in conjunction building
with the applicant/developer of the adjacent project on permit
Site E-1, shall provide a construction trailer will all hook
ups for use by City Inspection personnel during the time
of construction as determined necessary by the Building
Official. In the event that the City has their own
construction trailer, the applicant/developer shall
provide a site with appropriate hook ups in close
proximity to the project site to accommodate this trailer.
The applicant/developer shall cause the trailer to be
moved from its current location at the time necessary as
determined by the Building Official at the
ap licant/develo er's ex ense.
54. Copies of Approved Plans: Applicant shall provide B 30 days after Standard
City with 4 reduced (1/2 size) copies of the approved permit and
plan. each
revision
issuance
55. No Build Covenant: If section 506.2 Frontage B Issuance of Project
Increase, of the California Building Code, is used to building Specific
increase the area of a building. The owner shall file permit
with the Building Official a Covenant and Agreement
Regarding Maintenance of Yards for an Oversized
Building binding such owner, his heirs, and assignees,
to set aside the required yard as unobstructed space
having no improvements. After execution by the owner
and Building Official, such covenant shall be recorded
in the Alameda Count Recorder's Office, and shall
Page 13 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
continue in effect so long as an oversized building
remains or unless otherwise released by authority of the
Buildin Official.
56. Telecommunication: The Applicant shall comply with B Building Standard
ANSI/TIA.EIA-570-A Standards relating to Permit
telecommunications and the installation of data outlets Issuance
for high-speed internet access within individual
residential units.
57. Height of Building: B Permit Project
a) Designer shall dimension, on the elevations plan, issuance Specific
the overall height of the building to the highest and frame
point and the height as defined by the building inspection
code.
b) Developer / Contractor shall certify the height of
the buildings prior to first frame inspection in a
manner acce table to the Buildin Official.
FIRE
58. The project must comply with fire and building code F Issuance of Standard
requirements in effect at the time of submittal for building
buildin ermits. ermits
59. Fire Access must comply with Section 503.1.1 F Issuance of Standard
Exception 1. building
permits and
on- oin
60. Fire Access roadways on Demarcus, Campbell Green, F At Project
and Hamlet must be 20 foot wide with out parking. occupancy Specific
POLICE
61. The Applicant must adhere to Dublin security PD At Standard
requirements, which covers items such as lighting, occupancy
addressing, locks, and emergency telephone
installation within arkin structures.
62. Applicant shall work with police services to provide the PD At Standard
installation of mirrors in blind spots, stairwells, and occupancy
elevators, or other rooms, the trimming or removal of
landscaping, the installation of lighting in dark corridors
or walkin aths, and the like.
63. The lobby/mail rooms, amenities (e.g., gym), and PD Issuance of Standard
similar common areas shall employ the use of windows building
in place of solid walls so that residents and passersby permits
can witness activity within and without the facilities.
64. Restrooms that can accommodate more than one user PD At Standard
at a time (e.g., in the gym) shall have security lighting occupancy
and shall not have entryway doors that are lockable by
the users.
65. Shared amenities (e.g., gym, mail rooms) shall have PD At Standard
securit li htin . occupanc
Page 14 of 23
CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
66. Doors leading to corridors, mailrooms, trash rooms, PD At Standard
gym, business offices, elevator lobbies, stair cases, occupancy
shall have elongated window panels to facilitate
surveillance (minimum 6" x 18").
67. The fitness room shall have at least one full window on PD At Standard
each wall adjacent to the hallway and facing the exterior occupancy
of the buildin .
68. Signage: PD At Standard
o Doors within the parking structures shall have occupancy
signs for identification (e.g., "bike storage,"
"stairs," "electrical room," etc.)
o Within the residential buildings, all doors leading
to facilities, amenities, etc. shall have signs for
identification (e.g., "storage," "trash," "roof
access," etc.
69. Addressing - In addition to what is in the Dublin PD At Standard
Municipal Code Security Ordinance, we require: occupancy
o Address ranges of residential units shall be
posted on inside corridors
o Address ranges of residential units shall be
posted at All pedestrian points of entry (e.g.,
from parking structures, as well as from
sidewalks)
o Addressing shall not be blocked by landscaping
or architectural features, and shall have
adequate lighting to make them readable
o Address ranges shall be posted on the each
elevation of the residential buildings.
o The applicant shall work with the Addressing
Committee to provide address identification for
emer enc res onders.
70. Parking Garage: PD At Standard
o Parking garage shall be well lit, with garage occupancy
ceiling painted white to enhance brightness.
o Parking Garage must require keypad access for
residents and visitors (except for retail & rental
parking).
o Parking Garage must utilize remote access for
emergency personnel (e.g., Click-2-Enter)
o Radio access for Police and Fire communication
shall be provided
71. Construction Trailer: PD At Standard
o Must be addressed, with visibility at night occupancy
o Doors must have peephole or window
o Must be e ui ed with tele hone
Page 15 of 23
BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby
make the following findings and determinations regarding Master Vesting Tentative Tract Map 7929:
Vesting Tentative Tract Map
A. The proposed Vesting Tentative Tract Map is consistent with the intent of applicable
subdivision regulations and related ordinances.
B. The design and improvements of the proposed Vesting Tentative Tract Map is consistent
with the General Plan and the Eastern Dublin Specific Plan, as amended, as it relates to
the subject property in that it is a subdivision for implementation the Dublin Transit Center,
a community of various uses (including residential, commercial and campus office), in an
area designated for this type of development.
C. The proposed Vesting Tentative Tract Map is consistent with the Stage 1 and Stage 2
Planned Development zoning and is therefore consistent with the City of Dublin Zoning
Ordinance.
D. The properties created by the proposed Vesting Tentative Tract Map will have adequate
access to major constructed or planned improvements as part of the Dublin Transit Center
Master Plan and development in progress on surrounding and adjacent properties.
E. Project design, architecture, and concept have been integrated with topography of the
project site created by the proposed Vesting Tentative Tract Map to minimize overgrading
and extensive use of retaining walls. Therefore, the proposed subdivision is physically
suitable for the type and intensity of development proposed.
F. The Mitigation Monitoring program adopted with the Dublin Transit Center Environmental
Impact Report would be applicable as appropriate for addressing or mitigating any potential
environmental impacts identified.
G. The proposed Vesting Tentative Tract Map will not result in environmental damage or
substantially injure fish or wildlife or their habitat or cause public health concerns.
H. The design of the subdivision will not conflict with easements, acquired by the public at
large, or access through or use of property within the proposed subdivision. The City
Engineer has reviewed the maps and title report and has not found any conflicting
easements of this nature.
BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby
approves with conditions Vesting Tentative Tract Map 7929 for Dublin Station Site C. This approval
is based on findings that the Vesting Tentative Tract Map is consistent with the Site Development
Review, Stage 1 Planned Development Rezone amendment for the Dublin Transit Center, Stage 2
Development Plan, General Plan, and Eastern Dublin Specific Plan and is contingent upon the City
Council approval and effectiveness, of the Stage 2 Development Plan. This approval shall conform
generally to the plans prepared by BKF Engineers and the subconsultants labeled Exhibit A to this
Resolution, consisting of the packages, sheets, booklets, and plans dated February 8, 2010, and on
file with the Community Development Department and the ApplicanYs written statement.
Page 16 of 23
CONDITIONS OF APPROVAL:
Unless stated otherwise, all Conditions of Approval shall be comqlied with prior to the issuance of
buildinq permits or establishment of use, and shall be subiect to Planninq Department review and
approval. The followinq codes represent those deqartments/aqencies responsible for monitoriny
compliance of the conditions of approval. fPL.I Planninq, fBl Buildinq (POl Police fPWI Public
Works fADMI Administration/Citv Attornev, fFINI Finance, fF1 Alameda County Fire Deqartment
fDSRI Dublin San Ramon Services District, fC01 Alameda Countv Department of Environmental
Health, fZ71 Zone 7.
Na CONDITION TEXT Respon. When Source
Agency , Req'd.
Prior to•
PUBLIC WORKS VESTING TENTATIVE TRACT MAP 7929
72. Effective Date. This Vesting Tentative Tract Map PW Issuance of Standard
approval is contingent on City Council approval of the building
related Stage 1 Development Plan Amendment and permits
Sta e 2 Develo ment Plan.
73. Clarifications and Changes to the Conditions. In the PW Final Map Standard
event that there needs to be clarification to these approval
Conditions of Approval, the City Engineer has the
authority to clarify the intent of these Conditions of
Approval to the Developer without going to a public
hearing. The City Engineer also has the authority to
make minor modifications to these conditions without
going to a public hearing in order for the Developer to
fulfill needed improvements or mitigations resulting
from im acts of this ro'ect.
74. Development Agreement. The Developer shall meet PW Issuance of Standard
all applicable sections of the Master Development building EDSP
Agreement for the Dublin Transit Center adopted as permits
Ordinance No. 5-03. Section 6 of the Master
Development Agreement requires the Developer to
enter into a new Development Agreement specific to
the current project prior to the issuance of building
ermits.
75. Covenants, Conditions & Restrictions: A PW Issuance of Standard
Homeowners Association shall be formed by Building
recordation of a declaration of Covenants, Conditions & Permits
Restrictions to govern use and maintenance of
common areas and facilities. Said declaration shall set
forth the Association name, bylaws, rules and
regulations. The CC&Rs shall ensure that there is
adequate provisions for the maintenance, in good
repair and on a regular basis, of the landscaping,
irrigation, fences, gates, walls, drainage, lighting, sign,
building exteriors, parking areas, and other
improvements. The Developer shall submit a copy of
the CC&R documents to the City for review and
ap roval ursuant this condition.
Page 17 of 23
No. CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
76. Lot 4, PM 7929 (former Parcel 3, PM 7983) PW Final Map Project
easements: All utility, pedestrian and vehicle access Specific
easements on Lot 4 of PM 7929 shall benefit Parcels 1
& 2 of Tract 7525 in additional to Lots 1& 2 of PM
7929.
77. Lot 3, PM 7929 pedestrian access easement: A PW Final Map Project
Pedestrian access easements on Lot 3 of PM 7929 Specific
shall benefit Parcels 1& 2 of Tract 7525 in additional to
Lots 1& 2 of PM 7929.
78. Iron Horse Parkway and DeMarcus Boulevard PW Improvement Project
frontage improvements: The Developer shall plans Specific
construct the project frontage improvements, including
sidewalk and landscaping, along the east frontage of
DeMarcus Boulevard and the west frontage Iron Horse
Parkway as generally shown on the Tentative Map to
the satisfaction of the Cit En ineer.
79. Driveway Design: The entrances to both parking PW Improvement Project
structures from the public right of way shall be a plans Specific
modified driveway type entrance with 6-foot curb radius
where the curb height varies from 6 inches at the gutter
to zero at the sidewalk edge, the gutter continues
across the driveway, the sidewalk profile is maintained,
the sidewalk cross slope is 2% for a minimum 8-foot
width and there are no ramps.
80. Sidewalks and Frontage Grading. Sidewalks within PW Improvement Standard
the public right of way shall have a typical 2.0% cross plans
slope. The 2% cross slope shall be maintained for a
minimum distance of one foot behind the frontage
sidewalks where there is adjacent landscaping, stairs
or athwa .
81. Private Street Parking Restrictions. Parking on the PW Improvement Project
private streets shall have a maximum 2-hour parking Plans Specific
limit consistent with the days and time on the existing
rivate Hamlet Lane and Cam bell Green.
82. Loading Areas. The Developer shall make provisions PW Improvement Project
for providing loading areas on the DeMarcus Boulevard Plans Specific
and Iron Horse Parkway frontages as shown on the
Vesting Tract Map. These provisions may designate
three parking spaces on DeMarcus Boulevard and
three parking spaces on Iron Horse Parkway for
loadin onl on Saturda & Sunda s.
83. Campbell Green Median Landscape: Developer shall PW Improvement Project
landscape the Campbell Green median at the Iron Landscape Specific
Horse Parkwa entrance. Plans
84. Campbell Green Roadway: Developers shafl PW Improvement Project
construct the Campbell Green roadway on Lot 3 Plans Specific
formerl Parcel C of PM 7892 as enerall shown on
Page 18 of 23
No. CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to•
the Tentative Map with a 28-foot width.
85. Campbell Green: The Developer shall complete the PW Improvement Project
Campbell Green park improvements along the Plans Specific
southern frontage. This work includes completing the
improvements between the roadway curb and the
existing park improvements in the pop-out areas at
both ends, and removing the existing 6-foot wide
concrete walkway and reconstruction an 8-foot wide
concrete walkwa .
86. Hamlet Lane: Developers shall construct the Hamlet PW Improvement Project
Lane roadway on Lot 3 as generally shown on the Plans Specific
Tentative Map. The width shall be a minimum of 20-
feet wide for the travel way and 8-foot wide parking
s aces.
87. Grading Design: The grading shall be designed to the PW Grading Standard
satisfaction of the City Engineer so that if a storm drain Plans
inlet is blocked the overflow will not exceed the height
of the back of sidewalk.
88. Street Grades: The minimum street grade shall be PW Improvement Standard
0.7%. The City Engineer may approve 0.5% grades if Plans
needed to meet other desi n constraints.
89. Construction Traffic and Parking: All construction PW Grading Standard
related parking shall be off street in an area provided Plans
by the Developer. Construction traffic and parking shall
be provided in a manner approved by the City Engineer
to minimize impact on Bart atrons.
90. Pedestrian Access: Pedestrian access from Dublin PW Grading Project
Boulevard to the Bart station must be maintained at all Plans Specific
times on one side of both DeMarcus Boulevard and
Iron Horse Parkwa .
91. The Developer shall comply with the Subdivision Map PW On-going Standard
Act, the City of Dublin Subdivision, Zoning, and
Grading Ordinances, the City of Dublin Public Works
Standards and Policies, and all building and fire codes
and ordinances in effect at the time of building permit.
All public improvements constructed by Developer and
to be dedicated to the City are hereby identified as
"public works" under Labor Code section 1771.
Accordingly, Developer, in constructing such
improvements, shall comply with the Prevailing Wage
Law Labor Code. Sects. 1720 and followin
92. The Developer shall enter into a Tract Improvement PW Final Map Standard
Agreement with the City for all public improvements
required for the Tract. The Developer shall provide
performance (100%), and labor & material (100%)
securities to uarantee the tract im rovements,
Page 19 of 23
Na CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
approved by the City Engineer, prior to execution of the
Tract Improvement Agreement and approval of the
Final Map. (Note: Upon acceptance of the
improvements, the performance security may be
replaced with a maintenance bond that is 25% of the
value of the erformance securit .
93. The Developer shall pay a Public Facilities Fee in the PW/F Final Map Standard
amounts and at the times set forth in City of Dublin unless DA
Resolution No. 214-02, adopted by the City Council on allows
November 19, 2002, or in the amounts and at the times otherwise
set forth in any resolution revising the amount of the
Public Facilities Fee, as implemented by the
Administrative Guidelines adopted by Resolution 195-
99.
94. Developer shall obtain an Encroachment Permit from PW As needed Standard
the Public Works Department for all construction
activity within the public right-of-way of any street
where the City has accepted the improvements. The
encroachment permit may require surety for slurry seal
and restriping. At the discretion of the City Engineer an
encroachment for work specifically included in an
Im rovement A reement ma not be re uired
95. The Developer will be responsible for submittals and PW/ Improvement Standard
reviews to obtain the approvals of all participating non- DSRSD/ Plans
City agencies. The Alameda County Fire Department F
and the Dublin San Ramon Services District shall
approve and si n the Improvement Plans.
96. Developer shall provide the Public Works Department a PW Release of Standard
digital vectorized file of the "master" files for the project bonds
when the Final Map has been approved. Digital raster
copies are not acceptable. The digital vectorized files
shall be in AutoCAD 14 or higher drawing format.
Drawing units shall be decimal with the precision of the
Final Map. All objects and entities in layers shall be
colored by layer and named in English. All submitted
drawings shall use the Global Coordinate System of
USA, California, NAD 83 California State Plane, Zone
III, and U.S. foot.
97. All rights-of-way and easement dedications required by PW Final Map Standard
the Tentative Map including the Public Service
Easement shall be shown on the Final Ma .
98. Any street names assigned to private streets shall be PW/P/F Final Map Standard
approved pursuant to Municipal Code Chapter 7.08.
The approved street names shall be indicated on the
Final Ma .
99. The Developer shall obtain abandonment from all PW Issuance of Standard
a licable public a encies of existin easements and Buildin
Page 20 of 23
Na CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to•
right of ways that will no longer be used. Permits
100. The Grading Plan shall be in conformance with the PW Grading Standard
recommendations of the Geotechnical Report, the Plans
approved Tentative Map and/or Site Development
Review, and the City design standards & ordinances. In
case of conflict between the soil engineer's
recommendations and City ordinances, the City
En ineer shall determine which shall a I.
101. A detailed Erosion Control Plan shall be included with PW Grading Standard
the Grading Plan approval. The plan shall include Plans
detailed design, location, and maintenance criteria of
all erosion and sedimentation control measures.
102. The public improvements shall be constructed PW Improvement Standard
generally as shown on the Tentative Map and/or Site Plans
Development Review. However, the approval of the
Tentative Map and/or Site Development Review is not
an approval of the specific design of the drainage,
sanitary sewer, water, traffic circulation, and street
improvements.
103. All public improvements shall conform to the City of PW Improvement Standard
Dublin Standard Plans and design requirements and as Plans
a roved b the Cit En ineer.
DUBLIN SAN RAMON SERVICES DISTRICT DSRSD
104. Prior to issuance of any building permit, complete DSRSD Issuance of Standard
improvement plans shall be submitted to DSRSD that building
conform to #he requirements of the Dublin San Ramon permit
Services District Code, the DSRSD "Standard
Procedures, Specifications and Drawings for Design
and Installation of Water and Wastewater Facilities", all
applicable DSRSD Master Plans and all DSRSD
olicies.
105. All mains shall be sized to provide sufficient capacity to DSRSD Issuance of Standard
accommodate future flow demands in addition to each building
development projecYs demand. Layout and sizing of permits
mains shall be in conformance with DSRSD utility
master lannin .
106. Sewers shall be designed to operate by gravity flow to DSRSD Improvement Standard
DSRSD's existing sanitary sewer system. Pumping of Plans
sewage is discouraged and may only be allowed under
extreme circumstances following a case by case review
with DSRSD staff. Any pumping station will require
specific review and approval by DSRSD of preliminary
design reports, design criteria, and final plans and
specifications. The DSRSD reserves the right to
require payment of present worth 20 year maintenance
costs as well as other conditions within a se arate
Page 21 of 23
Na CONDITION TEXT Respon. When Source
Agency Req'd.
Prior to:
agreement with the applicant for any project that
re uires a um in station.
107. Domestic and fire protection waterline systems for DSRSD Improvement Standard
Tracts or Commercial Developments shall be designed Plans
to be looped or interconnected to avoid dead end
sections in accordance with requirements of the
DSRSD Standard Specifications and sound
en ineerin ractice.
108. DSRSD policy requires public water and sewer lines to DSRSD Improvement Standard
be located in public streets rather than in off-street Plans
locations to the fullest extent possible. If unavoidable,
then public sewer or water easements must be
established over the alignment of each public sewer or
water line in an off-street or private street location to
provide access for future maintenance and/or
re lacement.
109. Prior to approval by the City of a grading permit or a DSRSD Issuance of Standard
site development permit, the locations and widths of all grading
proposed easement dedications for water and sewer permit
lines shall be submitted to and approved by DSRSD.
110. All easement dedications for DSRSD facilities shall be DSRSD Issuance of Standard
by separate instrument irrevocably offered to DSRSD grading
or by offer of dedication on the Final Map. permit or
with final
ma
111. Prior to approval by the City for Recordation, the Final DSRSD Recordation Standard
Map shall be submitted to and approved by DSRSD for of final map
easement locations, widths, and restrictions.
112. Prior to issuance by the City of any Building Permit or DSRSD Recordation Standard
Construction Permit by the Dublin San Ramon Services of final map
District, whichever comes first, all utility connection
fees including DSRSD and Zone 7, plan checking fees,
inspection fees, connection fees, and fees associated
with a wastewater discharge permit shall be paid to
DSRSD in accordance with the rates and schedules
established in the DSRSD Code.
113. Prior to issuance by the Gity of any Building Permit or DSRSD Issuance of Standard
Construction Permit by the Dublin San Ramon Services building
District, whichever comes first, all improvement plans permit
for DSRSD facilities shall be signed by the District
Engineer. Each drawing of improvement plans shall
contain a signature block for the District Engineer
indicating approval of the sanitary sewer or water
facilities shown. Prior to approval by the District
Engineer, the applicant shall pay all required DSRSD
fees, and provide an engineer's estimate of
construction costs for the sewer and water s stems, a
Page 22 of 23
Na CONDITION TEXT Respon. When Source
Agency Req'd.
Prior#o:
performance bond, a one-year maintenance bond, and
a comprehensive general liability insurance policy in
the amounts and forms that are acceptable to DSRSD.
The applicant shall allow at least 15 working days for
final improvement drawing review by DSRSD before
si nature b the District En ineer.
114. No sewer line or waterline construction shall be DSRSD Issuance of Standard
permitted unless the proper utility construction permit utility
has been issued by DSRSD. A construction permit will construction
only be issued after all of the items in Condition No. 9 permit
have been satisfied.
115. The applicant shall hold DSRSD, its Board of Directors, DSRSD On-going Standard
commissions, employees, and agents of DSRSD
harmless and indemnify and defend the same from any
litigation, claims, or fines resulting from the construction
and com letion of the roject.
116. Improvement plans shall include recycled water DSRSD Improvement Standard
improvements as required by DSRSD. Services for Plans
landscape irrigation shall connect to recycled water
mains. Applicant must obtain a copy of the DSRSD
Recycled Wafer Use Guidelines and conform to the
requirements therein.
117. Potable mains, Recycled mains, sewer mains and their DSRSD Improvement Project
appurtenances shall be located in areas accessible for Plans specific
maintenance, repair and servicing at all times. The
Potable Water Main and Sewer Main located under the
Central Plaza on the south side of Lot 3 are not in
compliance with DSRSD Standard Design
Specifications and will need to be moved so that they
are not under the ermanent structures of the laza.
PASSED, APPROVED AND ADOPTED this 14th day of September 2010.
AYES:
NOES:
ABSENT:
ABSTAIN:
Planning Commission Chairperson
ATTEST:
Planning Manager
G:IPA#12006106-060 Dublin Transit Center Site CIPC Mtg 9.14.101pc reso approving sdr_vfm for dtc site c(2).DOC