Loading...
HomeMy WebLinkAbout8.2 Attch 1 Reso ApprovingSDRCastelloo@Positano RESOLUTION NO. 10- XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING A SITE DEVELOPMENT REVIEW FOR CASTELLO AT POSITANO, FOR 101 SINGL.E FAMILY DETACHED RESIDENTIAL UNITS ON APPROXIMATELY 25.3 ACRES WITHIN TRACTS 7855, 8050 AND 8051 PLPA-2010-00044 WHEREAS, the Applicant, Braddock And Logan Services, Inc., has requested approval of a Site Deveiopment Review, PLPA-2010-00044 for 101 single family detached residences within Positano known as Castello at Positano; and WHEREAS, Castello at Positano is approximately 25.3 acres within Tracts 7855, 8050 and 8051 located north of Positano Parkway, northwest of La Strada Drive, west of Haggerty Court and east of Avelina Drive generally between Lattari Street on the east and Avellina Drive on the west; and WHEREAS, the proposed project is located within the Eastern Dublin Specific Plan and the Planned Development Zoning District, PA 05-038; and WHEREAS, on November 8, 2005, the Planning Commission adopted Resolution No. 05-61 approving Vesting Tentative Tract Map 7586; and WHEREAS, on December 13, 2005, the City Council adopted Ordinance No. 32-05 approving Planned Development (PD) Rezoning - Stage 1 Planned Development Zoning for the entire 1,134-acre Fallon Village (PA 04-040) and Ordinance 33-05 approving the Stage 2 Planned Development Plan and zoning for the 488-acre Braddock & Logan properties (PA 05- 038) now known as Positano; and WHEREAS, on December 6, 2005, the City Council adopted Resolution No. 222-05 regarding PA 04-040 and PA 05-038 certifying a Supplemental Environmental Impact Report (SEIR) (SCH #2005062010) to the Eastern Dublin EIR, a program EIR, initially certified by the City of Dublin in 1993 (SCH#91103064) and the Supplemental EIR for the Eastern Dublin Property Owners (EDPO) (SCH # 2001052114) certified in 2002 by Resolution 40-02; and WHEREAS, no further environmental review is required. There are no new impacts identified with this proposed project that are beyond those impacts studied in the Supplemental Environmental Impact Report; and WHEREAS, the 101 lots that comprise Castello at Positano are identified as Lots 1 through 23 of Tract 7855; Lots 22 and 23 of Tract 8051 and Lots 1 through 76 of Tract 8050 and WHEREAS, a complete application was submitted and is available and on file in the Community Development Department; and ATTACHMENT 1 WHEREAS, the Applicant has submitted project plans, including floor plans and elevations, dated received October 4, 2010, for a Site Development Review amendment relating to Castello at Positano; and WHEREAS, the Planning Commission did hold a public hearing on said application on October 12, 2010, for this project; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, a Staff Report was submitted recommending that the Planning Commission approve the Site Development Review; and WHEREAS, the Planning Commission did hear and use independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Dublin does hereby make the following findings and determinations regarding said proposed Site Development Review for 101 lots of Tracts 7855, 8050 and 8051 known as Castello at Positano: Site Development Review: A. The proposal is consistent with the purposes of Chapter 8.104 of the Zoning Ordinance, with the General Plan and any applicab/e Specific Plans and design guidelines because: 1) the project will not undermine the architectural character and scale of development in which the proposed project is to be located; 2) the project will provide a unique, varied and distinct housing opportunity; 3) the project is consistent with the General Plan and Eastern Dublin Specific Plan Land Use designation of Low Density Residential; and 4) the project complies with the development standards established in the Stage 2 Development Plan. B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance because: 1) the project contributes to orderly, attractive and harmonious site and structural development compatible with the existing site lay out and subdivision mapping and blends well with the surrounding properties; and 2) complies with the development regulations set forth in the Zoning Ordinance where applicable. C. The design of the project is appropriate to the City, the vicinity, surrounding properties and the lot in which the project is proposed: 1) the proposed project augments the architectural style offerings in the vicinity; 2) the size and mass of the proposed houses are consistent with the lot sizes and other residential developments in the surrounding area; 3) the proposed project will supply a unique and varied floor plan options allowing for two granny flat configurations and enhanced elevations on some of the corner lots; and 4) the proposed project will provide more design offerings contributing to a more "custom" look of the Positano development. D. The subject site is suitable for the type and intensity of the approved development because: 1) the lots have already been subdivided to conform with the General Plan, 2 Eastern Dublin Specific Plan and the Stage 1 and 2 Development Plans for this area; and 2) the proposed homes to be developed on the property meet all of the development standards established to regulate development in Fallon Village. E. Impacts to existing slopes and topographic features are addressed because: 1) the proposed project site is already subdivided, 2) the infrastructure is under construction including streets and utilities, 3) all grading is near completion, and 4) retaining walls will be constructed to establish the required lot size and building envelope. F. Architectural considerations including the character, scale and quality of the design, site /ay out, the architectural relationship with the site and other buildings, screening of unsightly uses, lighting, building materials and colors and similar e/ements result in a project that is harmonious with its surroundings and compatib/e with other deve/opments in the vicinity because: 1) the proposed houses will utilize 5 of the approved architectural style standards established in the Fallon Village Development Plan; 2) the materials referenced in the style guidelines will be utilized; 3) the homes when constructed will blend with and be similar to homes already being constructed in the general vicinity; and 4) the color and materials proposed are similar and complementary to colors and material being utilized on homes currently being constructed in the vicinity. G. Landscape considerations, including the location, type, size, color, texture and coverage of plant materials, and similar elements have been incorporated into the project to ensure visual relief, adequate screening and an attractive environment for the public because: 1) all perimeter landscaping, walls, fences and hardscape are proposed for construction in accordance with the master plan; and 2) the project front yard landscaping and sideyard fencing is consistent with other developments currently under construction in the vicinity and conforms with the requirements of the Stage 2 Development Plan. H. The site has been adequately designed fo ensure the proper circulation for bicyclist, pedestrians and automobiles because: 1) all infrastructure including streets, parkways, pathways, sidewalks, and streetlighting are proposed for construction in accordance with the master plan; and 2) development of this project will conform to the major improvements already installed allowing residents the safe and efficient use of these facilities. NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby approve the Site Development Review for the proposed project known as Castello at Positano (101 units), as shown on plans prepared by William Hezmalhalch Architects, Inc., Gates and Associates, and Mackay & Somps dated received October 4, 2010 subject to the conditions included below. CONDITIONS OF APPROVAL: Unless stated otherwise all Conditions of Approval shall be complied with prior to the issuance of buildinq permits or establishment of use and shall be subiect to Planning Department review and approval The followinp codes represent those departments/aqencies responsible for monitorinq compliance of the conditions of 3 approval. (PL.1 Planninq Bl Buildinq fP01 Police, fPWI Public Works [P&CSl Parks & Communitv Services (ADMI Administration/Citv Attornev, fFINI Finance, fFl Alameda Countv Fire Department, fDSRI Dublin San Ramon Services District, fC01 Alameda Countv Department of Environmental Health, [Z7] Zone 7. NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: PLANNING DEPARTMENT 1. Compliance with previous approvals: The Applicant PL On-going Standard shall comply with all Conditions of Approval for Vesting Tentative Tract 7586 as approved by the Planning Commission, Resolution No. 05-61 on November 8, 2005. 2. Permit Expiration: Approved use shall commence PL In Standard within two (2) years of Site Development Review (SDR) accordance approval, or the SDR shall lapse and become null and w/DA void. Commencement of use means the actual use pursuant to the approval, or demonstrating substantial progress toward commencing such use. If there is a dispute as to whether the SDR has expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a SDR expires, a new application must be made and processed according to the requirements of the Dublin Zonin Ordinance. 3. Required Permits. Applicant/Developer shall comply PL, PW Issuance of Standard with the City of Dublin Zoning Ordinance and obtain all Building necessary permits required by other agencies (Alameda Permits County Flood Control District Zone 7, California Department of Fish and Game, Army Corps of Engineers, Regional Water Quality Control Board, State Water Quality Control Board) and shall submit copies of the ermits to the Public Works De artment. 4. Requirements and Standard Conditions. The Various Issuance of Standard ApplicanUDeveloper shall comply with applicable Building Alameda County Fire, Dublin Public Works Department, Permits Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions re uired have been or will be met. 4 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 5. Modifications: The Community Development Director PL On-going Standard may consider modifications or changes to this Site Development Review approval if the modifications or changes proposed comply with Section 8.104.100 of the Zonin Ordinance. 6. Time Extension. The original approving decision-maker PL Two years Standard may, upon the ApplicanYs written request for an following extension of approval prior to expiration, and upon the approval determination that any Conditions of Approval remain date adequate to assure that applicable findings of approval will continue to be met, grant a time extension of approval for a period not to exceed six (6) months. All time extension requests shall be noticed and a public hearing or public meeting shall be held as required by the articular Permit. 7. Satellite Dishes: The Developer's Architect shall PL Issuance of Project prepare a plan for review and approval by the Director of building Specific Community Development and the Chief Building Official permit that provides a consistent and unobtrusive location for the placement of individual satellite dishes. Individual conduit will be run on the interior of the unit to the satellite location on the exterior of the home to limit the amount of exposed cable required to activate any satellite dish. It is preferred that where chimneys exist, the mounting of the dish be incorporated into the chimney. In instances where chimneys do not exist, then the plan shall show a common and consistent location for satellite dish placement to eliminate the over proliferation, haphazard and irre ular lacement. 8. Indemnification: The Developer shall defend, indemnify, PL, B In Standard and hold harmless the City of Dublin and its agents, accordance Condition officers, and employees from any claim, action, or w/govt code s(SC) proceeding against the City of Dublin or its agents, Section officers, or employees to attack, set aside, void, or annul 66499.37 an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that The Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying The Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or roceedin s. 5 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 9. Retaining Walls: The developer shall indicate on the PL Issuance of Project plot plans, with dimensions, the precise location of the building Specific point on the side yard retaining walls where the wall permit material will change from precision block (able to be stuccoed) to split face block. The intent of this condition is to assure that the entire portion of the wall visible to the street (from the perpendicular side-yard fence to the end of the wall closest to the street) is able to be enhanced with stucco material as required in the Planned Development Plan. Also, it is intended that the perpendicular side yard fence should be located at the transition point of the two block materials. No stucco wall face should occur behind the perpendicular side yard fence. Potential issues may arise in the field conditions which will be addressed on a case-by-case basis as directed by the Stage 1 and Stage 2 Planned Develo ment Plan. 10. Final building and site development plans shall be PL Issuance of Project reviewed and approved by the Community Development building Specific Department staff prior to the issuance of a building permit permit. All such plans shall insure: a. That standard residential security requirements as established by the Dublin Police Department are provided. b. That ramps, special parking spaces, signing, and other appropriate physical features for the handicapped, are provided throughout the site for all publicly used facilities. c. That continuous concrete curbing is provided for all parking stalls, if necessary. d. That exterior lighting of the building and site is not directed onto adjacent properties and the light source is shielded from direct offsite viewing. e. That all mechanical equipment, including air conditioning condensers, electrical and gas meters, is architecturally screened from view, and that electrical transformers are either underground or architecturally screened. f. That all vents, gutters, downspouts, flashings, etc., are painted to match the color of adjacent surface. g. That all materials and colors are to be as approved by the Dublin Community Development Department. Once constructed or installed, all im rovements are 6 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: to be maintained in accordance with the approved plans. Any changes, which affect the exterior character, shall be resubmitted to the Dublin Community Development Department for approval. h. That all exterior architectural elements visible from view and not detailed on the plans be finished in a style and in materials in harmony with the exterior of the building. All materials shall wrap to the inside corners and terminate at a perpendicular wall plane. i. That all other public agencies that require review of the project are supplied with copies of the final building and site plans and that compliance is obtained with at least their minimum Code requirements. 11. Final landscape plans, irrigation system plans, tree PL Issuance of Standard preservation techniques, and guarantees, shall be building reviewed and approved by the Dublin Planning permit Department prior to the issuance of the building permit. All such submittals shall insure: a. That plant material is utilized which will be capable of healthy growth within the given range of soil and climate. b. That proposed landscape screening is of a height and density so that it provides a positive visual impact within three years from the time of planting. c. That unless unusual circumstances prevail, at least 75% of the proposed trees on the site are a minimum of 15 gallons in size, and at least 50% of the proposed shrubs on the site are minimum of 5 gallons in size. d. That a plan for an automatic irrigation system be provided which assures that all plants get adequate water. In unusual circumstances, and if approved by Staff, a manual or quick coupler system may be used. e. That concrete curbing is to be used at the edges of all planters and paving surfaces where applicable. . f. That all cut and fill slopes conform to the master vesting tentative map and conditions detailed in the Site Development Review packet. g. That all cut and fill slopes graded and not constructed by September 1, of any given year, are hydroseeded with erennial or native rasses and flowers, and that 7 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: stock piles of loose soil existing on that date are hydroseeded in a similar manner. h. That the area under the drip line of all existing oaks, walnuts, etc., which are to be saved are fenced during construction and grading operations and no activity is permitted under them that will cause soil compaction or damage to the tree, if applicable. i. That a guarantee from the owners or contractors shall be required guaranteeing all shrubs and ground cover, all trees, and the irrigation system for one year. j. That a permanent maintenance agreement on all landscaping will be required from the owner insuring regular irrigation, fertilization and weed abatement, if applicable. 12. Plotting: The approved Site Development Review would PL Issuance of Project allow any of the three approved floor plans to be building Specific constructed on any of the lots within Castello, subject to permits limitations as follows: ¦ Any single floor plan may not exceed 40% of the subdivision. ¦ Individual floor plans may be placed next to each other. However, only two of the same individual floor plans may be plotted next to each other without being interrupted by a different floor plan. ¦ If two of the same individual floor plans are plotted next to each other, the same individual floor plan may not be plotted across the street from the two. ¦ In no case will the same architectural elevation or color scheme be allowed next to or across the street from each other, unless they are a different individual floor plan. 13. Public Art Project: If the project is required to comply P&CS Issuance of Project with Sections 8.58.05A and 8.58.05D of Chapter 8.58 building Specific (Public Art Program) of the Dublin Municipal Code then permits Zoning the Applicant/Developer has elected to pay an in-lieu fee Ord Chp in accordance with Chapter 8.58 of the Dublin Municipal $•5$ Code and shall comply with the Public Art Compliance Report submitted by ApplicanUDeveloper, dated August 31, 2010, and on file with the Planning Department. The value of the public art project is required to equal or exceed 0.5% of the building valuation (exclusive of land) for the ro'ect. The Buildin Official has determined that 8 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: the total building valuation of the project (exclusive of land) is $51,687,501.50. Therefore, ApplicanUDeveloper will pay a public art fee valued at a minimum amount of $258,437.51. Based on the current temporary suspension of Sections 8.58.050.A and 8.58.050.D established by Ordinance No. 06-09, if the project receives building permits on or before May 21, 2011, the re uirement of this condition shall be extin uished. 14. Revocation of permit. The permit shall be revocable for PL Ongoing Standard cause in accordance with Chapter 8.96 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this ermit shall be sub'ect to citation. rv. . 15. Developer shall obtain an Encroachment Permit from PW Construction Standard the Public Works Department for all construction activity within the public right-of-way of any street where the City has accepted the improvements. At the discretion of the City Engineer an encroachment for work specifically included in an Improvement Agreement may not be re uired. 16. Developer shall obtain a Grading / Sitework Permit from PW Construction Standard the Public Works Department for all private grading and site improvements. This will include any community walls or soundwalls installed as part of the project. Wall construction will be subject to plan review by the Public Works Department and the Building Division, and will be subject to s ecial ins ections durin construction. 17. Plot plans shall be submitted for review and approval by PW Building Standard the Public Works Department and the Community Permits Development Department prior to approval of building ermits. 18. Roof drainage shall be connected to a closed conduit, PW Tract impmt Standard discharging to a curb drain or connected to the storm agreement drain system. Concentrated flows will not be allowed to drain across ublic sidewalks 19. The Developer is responsible for ensuring that all PW During Standard contractors implement all storm water pollution prevention construction measures in the SWPPP. , a 7 . . ._..m Ps . . ; . . . 20. Building Codes and Ordinances: All project B Through Standard construction shall conform to all building codes and Completion ordinances in effect at the time of buildin ermit. 21. Retaining Walls: All retaining walls over 30 inches in B Through Standard height and in a walkway area shall be provided with completion uardrails. All retainin walls located on rivate ro ert, 9 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: over 24 inches, with a surcharge, or 36 inches without a surcharge, shall obtain permits and inspections from the Buildin Division. 22. Phased Occupancy Plan: If occupancy is requested to B Occupancy Standard occur in phases, then all physical improvements within of any each phase shail be required to be completed prior to affected occupancy of any buildings within that phase except for building items specifically excluded in an approved Phased Occupancy Plan, or minor handwork items, approved by the Community Development Department. The Phased Occupancy Plan shall be submitted to the Directors of Community Development and Public Works for review and approval a minimum of 45 days prior to the request for occupancy of any building covered by said Phased Occupancy Plan. Any phasing shall provide for adequate vehicular access to all parcels in each phase, and shall substantially conform to the intent and purpose of the subdivision approval. No individual building shall be occupied until the adjoining area is finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated from remaining additional construction activity. Subject to approval of the Community Development Director, the completion of landscaping may be deferred due to inclement weather with the posting of a bond for the value of the deferred landsca in and associated im rovements. 23. Building Permits: To apply for building permits, B Issuance of Standard Applicant/Developer shall submit eight (8) sets of building construction plans to the Building Division for plan check. permit Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non-City agencies prior to the issuance of building ermits. 24. Construction Drawings: Construction plans shall be B Issuance of Standard fully dimensioned (including building elevations) building accurately drawn (depicting all existing and proposed permit conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape lan and details shall be consistent with each other. 10 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 25. Air Conditioning Units: Air conditioning units and B Occupancy Standard ventilation ducts shall be screened from public view with of unit materials compatible to the main building and shall not be roof mounted. Units shall be permanently installed on concrete pads or other non-movable materials approved by the Building Official and Community Development Director. Air conditioning units shall be located such that each dwelling unit has one side yard with an unobstructed width of not less then 36 inches. Air conditioning units shall be located in accordance with the PD text. 26. Temporary Fencing: Temporary Construction fencing B Through Standard shall be installed along the perimeter of all work under completion construction. 27. Addressing: B Issuance of Standard a. Provide a site plan with the City of Dublin's address building grid overlaid on the plans (1 to 30 scale). Highlight all permit and exterior door openings on plans (front, rear, garage, through etc.). (Prior to release of addresses) completion b. Provide plan for display of addresses. The Building Official and Director of Community Development shall approve plan prior to issuance of the first building permit. (Prior to permitting) c. Addresses will be required on the front of the dwellings. Addresses are also required near the garage door opening if the opening is not on the same side of the dwelling as the front door. (Prior to permitting) d. Address signage shall be provided as per the Dublin Residential Security Code. (Occupancy of any Unit). e. Provide a site plan with the approved addresses in 1 to 400 scale prior to approval or release of the project addresses. (Prior to permitting) f. Exterior address numbers shall be backlight and be posted in such a way that they can be seen from the street. 28. Engineer Observation: The Engineer of record shall be B Scheduling Standard retained to provide observation services for all the final components of the lateral and vertical design of the frame building, including nailing, hold downs, straps, shear, roof inspection diaphragm and structural frame of building. A written report shall be submitted to the City Inspector prior to scheduling the final frame inspection. NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: 29. Foundation: Geotechnical Engineer for the soils report B Through Standard shall review and approve the foundation design. A letter completion shall be submitted to the Building Division on the a roval. 30. Green Building: Green Building measures as detailed B Through Standard may be adjusted prior to master plan check application completion submittal with prior approval from the City's Green Building Official. Provided that the design of the project complies with the City of Dublin's Green Building Ordinance and State Law as applicable. In addition, all changes shall be reflected in the Master Plans. (Through Completion) The Green Building checklist shall be included in the master plans. The checklist shall detail what Green Points are being obtained and where the information is found within the master plans. (Prior to first permit) Prior to each unit final, the project shall submit a completed checklist with appropriate verification that all Green Points required by 7.94 of the Dublin Municipal Code have been incorporated. (Through Completion) Homeowner Manual - if Applicant takes advantage of this point the Manual shall be submitted to the Green Building Official for review or a third party reviewer with the results submitted to the City. (Through Completion) Landscape plans shall be submitted to the Green Building Official for review. Prior to approval of the landscape plans by the City of Dublin. Developer may choose self-certification or certification by a third party as permitted by the Dublin Municipal Code. Applicant shall inform the Green Building Official of method of certification prior to release of the first permit in each subdivision / nei hborhood. 31. Electronic File: The ApplicanUDeveloper shall submit all B Issuance of Standard building drawings and specifications for this project in an building electronic format to the satisfaction of the Building Official permit prior to the issuance of building permits. Additionally, all revisions made to the building plans during the project shall be incorporated into an "As Built" electronic file and submitted prior to the issuance of the final occupancy. 32. Clean u. The A IicanUDevelo er shall be res onsible PL Ongoing Standard 12 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: for clean up and disposal of project related trash and for maintainin a clean, litter-free site. 33. Controlling Activities. The Applicant /Developer shall PO, PL Ongoing Standard control all activities on the project site so as not to create a nuisance to the surroundin residences. 34. Noise/Nuisances. No loudspeakers or amplified music PO, PL Ongoing Standard shall be permitted to project or be placed outside of the residential buildin s durin construction. 35. Accessory Structures. The use of any accessory PL, B, F Ongoing Standard structures, such as storage sheds or trailer/container units used for storage or for any other purpose during construction, shall not be allowed on the site at any time unless a Temporary Use Permit is applied for and a roved. 36. Removal of Obstructions. Applicant/Developer shall PW Issuance of Standard remove all trees including major root systems and other Occupancy obstructions from buitding sites that are necessary for Permits public improvements or for public safety as directed by the soils en ineer and Public Works Director. 37. Utility Siting Plan. The ApplicanbDeveloper shall PW, PL Issuance of Standard provide a final Utility Siting Plan showing that Grading transformers and service boxes are placed outside of Permits public view where possible and/or screened to the satisfaction of the Community Development Director and Public Works Director. Applicant/Developer shall place all utility infrastructures underground including electric, telecommunications, cable TV, and gas in accordance with standards enforced by the appropriate utility agency. Utility plans showing the location of all proposed utilities shall be reviewed and approved by the City En ineer/Public Works Director rior to installation. ~ c-ey . . . . . :€.e~. ~ .~:.r ~.`..e, _ .',a .e . , . , sI.> e~~, s ~ @cce e . 38. Security During Construction. PO, B, During Standard a. Fencing - The perimeter of the construction site shall PW construction be fenced and locked at all times when workers are not present. All construction activities shall be confined to within the fenced area. Construction materials and/or equipment shall not be operated or stored outside of the fenced area or within the public right-of-way unless approved in advance by the Public Works Director. b. Address Sign - A temporary address sign of sufficient size and color contrast to be seen during night time hours with existing street lighting is to be posted on the perimeter street adjacent to construction activities. 13 NO. Agency When Source CONDITIONS OF APPROVAL Required, Prior to: c. Emergency Contact - Prior to any phase of construction, ApplicanUDeveloper will file with the Dublin Police Department an Emergency Contact Business Card that will provide 24-hour phone contact numbers of persons responsible for the construction site. d. Materials & Tools - Good security practices shall be followed with respect to storage of building materials and tools at the construction site. e. Security lighting and patrols shall be employed as necessary. 39. Graffiti. The ApplicanUDeveloper shall keep the site clear PO, PL Ongoing Standard of graffiti on a regular and continuous basis and at all times. Graffiti resistant materials should be used. 40. Fees. The Developer shall pay all applicable fees in PW Zone 7 and Standard effect at the time of building permit issuance including, Parkland In- but not limited to, Planning fees, Building fees, Dubiin Lieu Fees San Ramon Services District fees, Public Facilities fees, Due Prior to Dublin Unified School District School Impact fees, Public Filing Each Works Traffic Impact fees, City of Dublin Fire Services Final Map; fees, Noise Mitigation fees, Inclusionary Housing In-Lieu Other Fees fees, Alameda County Flood and Water Conservation Required District (Zone 7) Drainage and Water Connection fees, with and any other fees either in effect at the time and/or as Issuance of noted in the Development Agreement. Building Permits PASSED, APPROVED AND ADOPTED this 12th day of October, 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Planning Commissioner Chair ATTEST: Acting Planning Manager G:IPA#120101PLPA-2010-00044 Braddock and Logan - Castello @ Positano SDRIPCReso SDR. doc 14