HomeMy WebLinkAboutReso 120-97 SDR SantaRitaCommRESOLUTION NO. 120 - 97
A RESOLUTION OF ~ CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING PA 97-003, SANTA RITA COMMERCIAL CENTER, PHASE TWO,
SITE DEVELOPMENT REVIEW FOR THE RETAIL AND ENTERTAINMENT VILLAGE
PORTION OF THE HACIENDA CROSSINGS ENTERTAINMENT CENTER
WHEREAS, Opus Southwest has requested approval of Site Development Review for the Retail
and Entertainment Village portion of Hacienda Crossings; and
WHEREAS, the Planned Development that was approved for this site requires that the
application for Site Development Review be approved by the City Council at a public meeting; and
WHEREAS, the Site Development Review for the site is a component of the Santa Rita
Commercial Center Project. That project is within the scope of the Eastern Dublin Specific Plan and
General Plan Amendment, for which a Program EIR was certified (SCH 91103064). A Mitigated
Negative Declaration (SCH 94113020) has been approved for the Santa Rita Commercial Center Project.
That Mitigated Negative Declaration together with the Program EIR adequately describes the total
project for the purposes of CEQA; and
WHEREAS, there have not been any identified changes in the Santa Rita Commercial Center
(now known as Hacienda Crossings) Project or in the circumstances under which the Santa Rita
Commercial Center Project is to be undertaken or any new information which requires revisions to the
Mitigated Negative Declaration or to the Program EIR; and
WHEREAS, the City Council held a public meeting on said application on October 7, 1997; and
WHEREAS, proper notice of said public meeting and a ten day public review period was given in
all respects as required by law; and
WHEREAS, the staff report was submitted recommending the City Council approve the Site
Development Review application subject to Conditions of Approval prepared by Staff; and
WHEREAS, the City Council did hear and use their independent judgment and considered all said
reports, recommendations and testimony hereinabove set forth.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby find
that:
Ao
The approval of this application (PA 97-003) is consistent with the intent/purpose of
Section 8-95.0 (Site Development Review) of the Zoning Ordinance.
Bo
The approval of this application, as conditioned, complies with the policies of the General
Plan, with the Eastern Dublin Specific Plan and with Planned Development Regulations
for PA 94-001 which would allow a retail entertainment center as a permitted use at this
location.
The approval of this application, as conditioned, is consistent with the design review '
requirements in the Eastern Dublin Specific Plan and the City of Dublin Zoning Ordinance
as in effect prior to the adoption'of Ordinance 20-97.
Do
The approval of this application, as conditioned, is in conformance with the Mitigation
Monitoring Program for the Santa Pdta Commercial Center Project Mitigated Negative
Declaration.
Eo
The approval of this application, as conditioned, is in conformance with regional
transportation and growth management plans.
Fo
The approval of this application, as conditioned, is in the best interests of the public health,
safety and general welfare as the development is consistent with all laws and ordinances
and implements the Eastern Dublin Specific Plan.
The proposed site development, including site layout, vehicular access, circulation and
parking, setbacks, height, walls, public safety and similar elements, as conditioned, has
been designed to provide a desirable environment for the development.
Architectural considerations, including the character, scale and quality of the design, the
architectural relationship with the site and other buildings, signs, building materials and
colors, screening of exterior appurtenances, exterior lighting and similar elements have
been incorporated into the project and as conditions of approval in order to insure
compatibility of this development with the development's design concept or-theme and the
character of adjacent buildings and uses.
Landscape considerations, including the locations, type, size, color, texture and coverage
of plant materials, provisions and similar elements have been considered to insure visual
relief and an attractive environment for the public.
BE IT FURTHER RESOLVED THAT THE Dublin City Council does hereby approves PA 97-
003, Site Development Review for the Retail and Entertainment Village Portion of the Hacienda
Crossings Entertainment Center, as generally depicted by materials labeled Exhibit 1 of the Staff'Report,
as well as the color elevations, displays, model, perspectives and material board, stamped approved and
on file with the Dublin Planning Department, subject to the following conditions:
CONDITIONS OF APPROVAL:
Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of
building permits and shall be subject to Planning Department review and approval. The following codes
represent those departments/agencies responsible for monitoring compliance of the conditions of
approval. [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City
Attorney, [FEXl] Finance, [FI Alameda County Fire Department, [DSR] Dublin San Ramon Services
District, [CO] Alameda County Department of Environmental Health, [Z7] Zone Seven.
2
N CONDITION TEXT RESPON WHEN MATRIX
O REQ. INDEX
AGENCY
GENERAL CONDITIONS
1 Except as specifically modified elsewhere, PA 97-003 PL Ongoing
Santa Rita Commercial Center Site Development
Review is approved for the construction of 305,000
sq.ft, of the retail and Entertainment Village portion of
the Hacienda Crossing Center. This approval shall
generally conform to the plans labeled Exhibit 1,
consisting of 17 sheets, prepared by SGPA Architects,
Gates and Associates, Landscape Architects, dated
received September 23, 1997, and a color a material
board dated received by the Planning Department on
August 4, 1997, and stamped'approved.
2 The Applicant is responsible for those Conditions of PL Ongoing
Approval of Resolution No. 6-95 for PA 94001, the
Santa Rita Commercial Center Planned Development
Rezone; those obligations of the Development
Agreement Between the City of Dublin and Homart
Development Co. and Surplus Property Authority of the
County of Alameda for the Tri-Valley Crossings
Project/Santa Rita Commercial Center, adopted by
Ordinance No. 3-95 for which the Applicant is
responsible; the Conditions of Approval of PA97-003,
Phase I, Regal Theater Site Development Review,
where applicable; the Conditions of Approval of
Resolution No. 3-95 (of the Planning Director) and
Resolution No. 4-97 (of the Community Development
Director for PA Nos. 95-013 and 97-003 approving
Tentative Parcel Map 6879 and 7116, and any
amendments thereto relating to zoning regulations, ,
subdivision, and improvement of the property.
3 The Applicant is responsible for complying with all PL Ongoing
applicable mitigation measures of the Santa Rita
Commercial Center Project Mitigation Monitoring Plan
approved by the City Council on January 23, 1995,
relating to the subdivision and associated
improvements of the project site.
4 Minor modifications to location and size of buildings on PL Ongoing
the site plan may be approved by the Community
Development Director. Modifications that improve the
quality of materials may be approved by the Community
Development Director. Modifications to overall design
concepts and/or reduction in quality of materials may
be made by the City Council.
3
N CONDITION TEXT RESPON WHEN MATRIX
O REQ. INDEX
. AGENCY
5 The Applicant shall comply with all applicable B BLDG
regulations and requirements of the Uniform Building
Code and the State of California, Title 24 provisions.
6 The Applicant shall comply with all applicable City ofPL, PW, PM &
Dublin Site Development Review Standard Conditions, PO BLDG
City of Dublin Public Works Typical Conditions of
Approval for Subdivisions, and City of Dublin Non-
Residential Security Requirements. In the event of
conflict between any of these conditions and the .
attached conditions, these Conditions shall prevail.
(Exhibit 4 to the Staff Report).
7 Approval of this Site Development Review shall be valid PL Ongoing
for one year, until October 7, 1998. If construction has
not commenced by that time, this approval shall be null
and void. The approval period for the Site
Development Review may be extended six (6)
additional months (Applicant must submit a written
request for the extension prior to the expiration date of
the permit) by the Community Development Director
upon the determination that the conditions of approval
remain adequate to assure that the above stated
findings of approval will continue to be met.
8 The permit shall be revocable for cause in accordance PL Ongoing
with Section 8-90.3 of the Dublin Zoning Ordinance.
Any violation of the terms or conditions of this Site
Development Review approval may be subject to the
issuance of a citation.
9 Prior to the issuance of building permit all applicable B, PL, BLDG 45-59,
fees shall be paid. These fees shall include, but not be ADM 119,
limited to, those fees required by City Ordinances such 286, 165
as Traffic Impact Fees, Traffic impact fees to reimburse
Pleasanton for freeway interchanges, Noise Fees,
Public Facilities Fees, School impact fees, Fire impact
fees, Affordable housing in-lieu fees, Specific plan
implementation fees, or any other that may be adopted.
The Tri-Valley Transportation Council is presently
studying the development of a Regional Transportation
Impact Fee. If this fee is adopted by the City of Dublin,
or incorporated into Dublin's Eastern Dublin Traffic
Impact Fee prior to building permits being issued, then
the unissued building permits shall be subject to the
new or revised fee. The present City of Dublin TIF will
be calculated at the time of issuance of Building permit.
In addition, all fees required by DSRSD, DRFA or its
successor, Zone 7, shall be paid in accordance with
4
N ' CONDITION TEXT RESPON WHEN MATRIX
O REQ. INDEX
AGENCY
those Agencies' ordinances and regulations. If the ..
development agreement approved for this project
conflicts with this condition, the development
agreement shall prevail.
10 The Developer shall comply with applicable Alameda F, PW, Ongoing 8, 18,
County Fire Department, Public Works Department, PO, Z7, 20, 120,
Dublin Police Service, Alameda County Flood Control DSR, PL 122,
District Zone 7 and Dublin San Ramon Services District 138, 155
requirements or as determined based on specific
characteristics of the theater. Prior to the issuance of
building permits applicant shall provide documentation
that all such requirements have been met.
SIGNAGE
"11 Any signage on the site shall be in accordance with an PL Ongoing
approved Master Sign Program.
UTILITIES
12 The retail uses shall institute a solid waste recyclingAdm Ongoing 103
program.
13 City Staff shall review and approve a utility siting plan PW, PL GRAD
showing that transformers and service boxes are
placed outside of public view where possible and/or
screened.
14 Building plans shall include water efficient fixtures to B BLDG 125
City standards.
PARKING
15. All parking shall conform generally to the plans shown PW, PL BLDG
on Exhibit 1. Prior to issuance of building permit a
detailed parking plan shall be submitted. Public
parking spaces shall be double-striped with 4-inch wide
stripes set approximately 2 feet apart as shown on the
"Typical Parking Striping Detail" available in the
Planning Department. Handicapped, visitor,
employee and compact parking spaces shall be
apprOpriately identified on the pavement and
designated on the parking plan. The Developer shall
provide a minimum one foot wide raised curb or
equivalent on landscape fingers and islands adjacent to
parking stalls. All landscape planters within the
parking area shall maintain a five foot curb radius to
facilitate vehicular maneuvering.
16. The parking area south of M11 and adjacent pad F9 PL, PW BLDG
shall be reviewed by staff to ensure that adequate
driving aisles, maneuvering and landscaping is
provided at the Southeast property line with Auto
Nation. Revised parking and landscape plans shall
detail how that area will be handled.
5
N CONDITION TEXT RESPON WHEN MAT'RIX'
O REQ. INDEX
AGENCY
17. A bus stop will be provided for the complex. The PW, PL BLDG
ultimate location shall be as designated by LAVTA but
it is expected to be at the east-west road adjoining the
retail area to the north of the theater. Interim bus
stop(s) may be provided near the theater as approved
by the Public Works Director/City Engineer. Bus stops
will require special pavement design to accommodate
the heavier loads. The location of any temporary and
permanent bus stops shall be shown on the detailed
parking plan.
18. Bicycle parking shall be provided near all building PL, PW BLDG
entries
ARCHITECTURE
19 All ducts, meters, air conditioning equipment and otherPL, B BLDG
mechanical equipment that is on-site or roof mounted
shall be screened from view of all public rights of way.
A screening plan shall be submitted for review and
approval by the Community Development Director and
Building Official prior to approval of Building Permit.
Said screening plan shall show that all ducts, meters,
air conditioning equipment and other mechanical and
utility equipment shall be effectively screened from view
with materials architecturally compatible with the
materials of the structure.
20 All trash enclosure areas shall be constructed with roof PW, PL BLDG
coverage on concrete pads. Drainage for trash
enclosure areas shall not tie into DSRSD sanitary
sewer lines.
21 At the time of tenant improvement, staff will review the PL, B BLDG 279
location and design of the trash/service area. Such (Tenant
review will include location, size, and screening. Trash Improv.)
enclosures shall provide for collection and sorting of
petrucible solid waste as well as source separated
rec¥clable materials.
22 All masonry walls, including screen walls shall have PL, B BLDG
masonry caps instead of metal.
23 The Dublin Boulevard screening wall shall be revised toPL, PW BLDG.
be substantially consistent in material, color and design
as the wall to on the north side of Dublin Boulevard.
Accent features at the pilasters as well as neon lighting
and accent colors at the entries to the project will be
considered by Staff at the time of submittal of final
plans.
24 Neon elements on fins and/or other accent features PL BLDG
shall be included in the final building plans in the
Entertainment Village (buildings F3, F5, F6 and F7)
6
~ N' CONDITION TEXT RESPON WHEN MATRIX
O REQ. INDEX
AGENCY
25 The interior elevations of the Entertainment Village PL BLDG
shall generally be storefront-type, pedestrian-oriented
designs, with a minimal use of solid walls. Any murals
or art work shall be approved by City Staff for
compatibility with the overall design and intent of the
Entertainment Village Area.
26 Tenants in the Entertainment Village area at Buildings PL BLDG
F3 and F7 that exceed 3,500 sq.ft, in leasable area,
may incorporate design elements that vary from the
standard design of the Village around the primary
building entry and along the secondary frontage facing
the parking area. This area shall not exceed 1/3 of the
frontage (excluding tower areas from measurement,
i.e., measured on the same building plane) where the
design variation is to occur. The design variation on
the primary elevation shall be limited to around the
entry area. The design shall be reviewed for
consistency, compatibility with the overall concept of
the village area and other accent features, i.e. corner
tower elements.
27 The boulder focal point in the Entertainment Village PL BLDG
may be redesigned and replaced with public art. Any
public art replacement shall be approved by the City
Council.
PUBLIC WORKS:
28 All proposed bus stops and turnouts, on-site and off- PW GRAD
site, shall be constructed with Portland Cement
Concrete.
29 On-site northbound lanes exiting onto Dublin Boulevard PW GRAD
shall align with lanes intersecting Dublin Boulevard to
the north.
30 The existing traffic signals at all entrances to the project PW OCC
site shall be modified by adding on-site detector loops
for outbound traffic.
31 The southeast portion of the property falls within a PW GRAD
designated flood zone. Grading plans shall be designed
to provide finished floor elevations one (1) foot above
the designated flood elevation.
32 Parking areas designed with sump conditions adjacent PW GRAD
to curbs shall have both curb and grate inlets at the Iow
point.
33 Analysis of the on-site storm drainage shall evaluate a~W GRAD
100 year storm event in order to establish minimum
floor elevations.
7
N CONDITION TEXTIRESPON WHEN I MATRIX
O i REQ. I INDEX
i AGENCY
PUBLIC SAFETY
34 A final pedestrian circulation plan shall be submitted for PL, PW BLDG
approval when the site plan for the Center has been
finalized.
35 Construction of the project shall be conducted in such a PL BLDG
manner as to prevent potential conflicts with pedestrian
and vehicular traffic.
36 Prior to delivery of combustible materials, the required F, DSR, BLDG
water storage and pressure shall be available at the B
site to the satisfaction of Alameda County Fire.
Developer should nOte that the present interim water
system is capable of providing a maximum of 3,500
gallons per minute of fire flow to the site.
37 During construction, access shall be provided to all F, PW BLDG
areas of the site, completely around structures. The
access road shall be 20 feet wide compacted 95%
paved roadway or equivalent.
38 During construction combustible or flammable waste F Ongoing
materials or rubbish of any kind shall be permitted on
any yard, vacant lot or open space.
39 Applicant shall work with the Dublin Police Department PO, PL Ongoing
to provide, if possible, office space within the
Entertainment Village area.
40 The project developer shall submit to the Dublin PolicePO, B OCC
Department for approval a Master Security Plan for the
entire commercial center. This Master Security Plan
shall be submitted at least 6 weeks prior to occupancy
of the first structure for review and approval. The
Security Plan shall address at a minimum the following
issues: Required periodic review of the approved
Master Security Plan during the first year after
construction and then as an annual review of this plan
thereafter, the separation of responsibilities between
the City of Dublin Police and private security personnel,
physical security measures, parking lot security,
appropriate interior and exterior lighting, etc.
41 A construction security plan shall be prepared prior toPL, PO BLDG
issuance of building permit of this phase of the
development.
42 Seatwall surfaces shall be designed to discourage PL, PO BLDG
rollerblade users.
43 The Developer and/or Property Owner shall keep the PL, PO BLDG &
site clear of graffiti vandalism on a regular and Ongoing
continuous basis at all times. Graffiti resistant paints
for the structures and film for windows or glass should
be used. Any graffiti appearing on the building shall be
8
N" CONDITION TEXT RESPON WHEN MATRIX
O REQ. INDEX
AGENCY
removed within one week from notice by the City of the
problem.
44 Permits shall be required for oversized and/or PW, B Ongoing 268
overweight construction loads coming to and leaving
the site. If soil is to be imported or exported from the
site, a haul route plan shall be submitted to the City for
review and approval. All construction traffic may be
subject to specific routing as determined by the Public
Works Director, in order to minimize construction
interference with regional non-project traffic movement.
45 Exterior lighting shall be provided and shall be of a PW, PO, BLDG
design and placement so as not to cause glare onto PL
adjoining properties or onto adjacent roads. Lighting
used after daylight hours shall be adequate to provide
for security needs (1.5 foot candles). Exterior lighting
shall be provided around the entire perimeter of the
buildings to provide %vash" security lighting of
doorways. Lighting shall be required at each exit door.
Neon lighting does not satisfy this requirement.
LANDSCAPING
46. A final detailed Landscape and Irrigation Plan (at 1 inch PL, DSR, BLDG.
= 20 feet or larger), along with a cost estimate of thePW
work and materials proposed, shall be submitted for
review and approval by the Planning Department.
Landscape and Irrigation Plans shall be signed by a
licensed landscape architect. Final landscape plans
shall indicate the common and botanical names,
container size, growth rate and number of each plant
and all other requirements listed in the Planned
Development Zoning District for the site. Landscaping
shall be chosen for its compatibility with recycled water.
Landscape and irrigation plans shall provide for a
recycled water system.
47. The final landscape plan shall include trees along the PL, PW BLDG
south elevation of M-11 to soften the building wall.
Additionally, south of the entry aisle off of Auto Nation
Drive at M-11, a landscaped buffer area shall be
provided along the east property line to the Caltrans
right of way. The purpose of this landscaped area is
to provide an attractive buffer between the two uses.
48. The Applicant shall complete and submit to the Dublin PL BLDG
Planning Department the Standard Plant Material,
Irrigation and Maintenance Agreement.
9
~) ' CONDITION TEXT IRESPON WHEN IMATRIX
. REQ. INDEX
;AGENCY
MISCELLANEOUS: ~
49. Known water wells filed-with Zone 7 and without a Z7, PW GRAD
document of intent of future use are to be destroyed
prior to any demolition or construction activity in
accordance with a well destruction permit obtained from
Zone 7.
50. The Developer and/or Alameda County shall map the PW, Z7 CCC
extent and depth of overland flood flows from Tassajara
Creek in the event of the 100 year flood. The
Developer shall mitigate the potential for flooding of
buildings should they be affected. Mitigation may
include raising the height of the west berm along
Tassajara Creek, flood proofing buildings or providing
an overflow into the storm drainage system at the
south-west corner of the project. Mitigation shall be
completed prior to final inspection of the first building.
51. The use of any temporary construction fencing shall bePW, B BLDG
made subject to the review and approval of the Public
Works Director and the Building Official.
52. Prior to opening for business, each business shall FIN CCC
provide a list to the City of the number, type and salary
level of employees for the business in order for the City
to implement the required housing and employment
monitoring system required by the Eastern Dublin
Specific Plan.
53. To apply for building permits, the Applicant shall submit B, PL BLDG
six (9) sets of construction plans to the Building
Department for plan check. Each set of plans shall
have attached an annotated copy of these Conditions
of Approval. The notations shall clearly indicate how all
Conditions of Approval will be complied with.
Construction plans will not be accepted without the
annotated conditions attached to each set of plans.
The Applicant will be responsible for obtaining the
approvals of all participating non-City agencies prior to
the issuance of building permits.
54. Use of Herbicides or rodenticides should only be used PW, B Ongoing 221
in consultation with review by a biologist to ensure
. sensitive species are not at risk.
55. Prior to the issuance of building permits for the project, PL, PW, BLDG 289
Phase I (and if necessary Phase II) environmental siteB
assessments shall be made available to the Community
Development Director, with appropriate documentation
that all recommended remediation actions have been
completed.
10
'N' CONDITION TEXT i RESPON i WHEN MATRIX
I i
O i ~ REQ. INDEX
. AGE'NCY~
56. Measures shall be taken to contain all construction B, PW Ong~3ing
debris, trash and materials on-site until disposal off-site
can be arranged. The Applicant shall keep adjoining
public streets and properties free and clean of project
dirt, mud, and materials during the construction period.
The Applicant shall be responsible for corrective
measures at no expense to the City of Dublin.
57. A structural control, such as an oil/water separator, PW, B BLDG
sand filter, or approved equal, may be required to be
installed, on site, to intercept and pre-treat storm water
prior to discharging to the storm drain system. The
design, location, and a maintenance schedule must be
submitted to the Director of Public Works/City Engineer
for review and approval prior to the issuance of a
building permit.
58. The yellow accent color (tusk tusk) shown on the rear PL, B BLDG
elevations of the buildings along Dublin Boulevard shall
be changed to swiss coffee.
PASSED, APPROVED AND ADOPTED this 7th day of October, 1997.
AYES:
Councilmembers Barnes, Burton, Howard, Lockhart and Mayor Houston
NOES: None
AB SENT: None
ABSTAIN: None
~ity ~lerk L
G:~PA97-003~.~'es2