Loading...
HomeMy WebLinkAboutPCReso 95-29 PA95-016 HansenRch SDRRESOLUTION NO. 95-029 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING PA 95-016 HANSEN HILLS SITE DEVELOPMENT REVIEW REQUEST FOR THE FIRST PHASE (UNITS 1 - 72) FOR THE HANSEN HILLS PROJECT WHEREAS, California Pacific Homes requests approval of a Site Development Review to conform to Phase I of Tentative Map 5766 Hansen Hills as amended. A Conditional Use Permit approval is also requested to modify General Provision Nos. 1, 3.8, and 24 of city Council Resolution No. 129-89 which established General Provisions for PA 89-062, Hansen Hills Planned Development Prezoning and to supersede the modification to that condition made by Condition No. I of Planning Commission Resolution No. 92-013. The proposed modifications would: 1) permit the replacement of landscape plans to allow landscaping modifications conforming to changes in the site plans and the requirements of the City dated August 9, 1989 prepared by David L. Gates and Associates with plans dated June 26, 1995 prepared by the same firm; 2) permit the replacement of building plans to allow the up-sizing of single-family units within the project and depicting single-family units dated May 22, 1989, prepared by Bassenian Lagoni Architects with plans dated May 9, 1995, prepared by the same firm; 3) to delete specific references to dwelling units in Condition 3.B. relating to Rear Yard setbacks; and 4) change the expiration date in Condition 24 to reflect the Initial Term of the Development Agreement (March 26, 2000); and WHEREAS, the Planning Commission held a public hearing on said application on August 21, 1995; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, the application has been reviewed in accordance with the provisions of the California Environmental Quality Act (CEQA): A Negative Declaration was prepared pursuant to the State CEQA Guidelines, and the City of Dublin Environmental Guidelines for PA 91-096 which had a project description and impacts identical to those of this proposal, PA 95-016. The City finds that there have not been any identified changes in the Hansen Hills Project or in the circumstances under which the Hansen Hills Project is to be undertaken. The City also finds that there is no new information which requires revisions to the Negative Declaration adopted for PA 91-096. A Notice of Determination will be filed stating that the project will not have a significant effect on the environment; and WHEREAS, the staff report was submitted recommending the Planning Commission approve the Site Development Review subject to Conditions of Approval prepared by Staff; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby find that: The provisions of Section 8-95.0 through 8-95.100, Site Development Review, of the Zoning Ordinance are complied with. Consistent with Section 8-95.0, this application, as modified by the Conditions of Approval, will promote orderly, attractive and harmonious development, recognize environmental limitations on development; stabilize land values and investments; and promote the general welfare by preventing establishment of uses or erection of structures having qualities which would not meet the specific intent clauses or performance standards set forth in the Zoning Ordinance and which are not consistent with their environmental setting. The use will not be contrary to the specific intent clauses or performance standards established for the district in which it is to be located. General site considerations, including site layout, orientation, and the location of buildings, vehicular access, circulation and parking, setbacks, height, public safety and similar elements have been designed to provide a desirable environment for the development. General architectural considerations, as modified by the Conditions of Approval, including the character, scale and quality of the design, the architectural relationship with the site and other buildings, building materials and colors, site and other buildings, building materials and colors, screening of exterior appurtenances, exterior lighting, and similar elements have been incorporated into the project in order to ensure compatibility of this development with its design concept and the character of adjacent buildings and uses. The site is physically suitable for the proposed development in that the site is indicated to be geologically satisfactory for the type of development proposed in locations as shown and the site is in a good location regarding public services and facilities. The approval of the Site Development Review will be consistent with the Dublin General Plan. NOW, THEREFORE, BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby conditionally approve PA 95-016 Hansen Hills Site Development Review application as generally depicted by materials labeled Exhibit A, consisting of 1) a Site Plan for Phase I consisting of 2 sheets prepared by Adams Streeter dated received June 28, 1995; 2) Landscape Plans for Phase I consisting of sheets L-1 through L-6 dated received June 26, 1995; 3) plans prepared by Bassenian Lagoni Architects consisting of floor plans and elevation plans on 12 sheets dated received May 9, 1995; 4) Grading Plans for Phase 1 prepared by Adams Streeter on 15 sheets dated received June 28, 1995 (in Planning Department files); and 2 5) the Open Space/Landscape Management Specifications for Hansen Hills prepared by David L. Gates and Associates dated received June 29, 1990, (in Planning Department files) stamped approved and on file with the Dublin Planning Department, subject to the approval of the related Conditional Use Permit and to the following Conditions: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to issuance of building permits or establishment of use, and shall be subiect to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL] Planning. lB| Building, [PO] Police. |PW| Public Works, |ADM| Administration/City Attorney, [FIN| Finance. IF1 Doughertv Reaional Fire Authority. [DSR! Dublin San Ramon Services District, Alameda County [CO]. Alameda County Flood Control & Water Conservation District [Zone 7]. GENERAL This approval is for PA 95-016 Site Development Review to conform to Phase I (units I - 72 of 180 units) of Tentative Map 5766 Hansen Hills as shown on Exhibit A. Except as specifically modified elsewhere in these Conditions, development shall generally be consistent with Exhibit A· [PW, PL]. Except as specifically modified in these Conditions, development shall conform to the Conditions of Approval established by: City Council Resolution Nos. 20-89 and 21-89, approved on February 27, 1989, pertaining to PA 87-045 Hansen Hills General Plan Amendment and Mitigation Monitoring Program for the EIR; City Council Resolution Nos. 128-89, 129-89, and 130-89, approved by the City Council on November 27, 1989, pertaining to PA 89-062 Hansen Hills Tentative Map, Prezoning, Annexation and Mitigation Monitoring Program for the Mitigated Negative Declaration; Ordinances 5-92 and 4-95 approved by the City Council on February 24, 1992, and March 13, 1995 pertaining to the Development Agreement for Hansen Hills; and City Council Resolution 23-95 adopted by the City Council on February 27, 1995 pertaining to PA 94-054 Tentative Map Amendment to Tentative Map 5766, Phase I; and Ordinance 4-95 amending the Hansen Hills Development Agreement adopted by the City Council on March 13, 1995. PA 92-014 is hereby superseded. [PL] This Site Development Review approval PA 95-016 Hansen Hills is valid until March 26, 2000, unless said term is otherwise terminated, modified or extended by circumstances set forth in the Development Agreement for Hansen Hills in which case said termination, modification or extension shall apply to PA 95-016. Failure to exercise the approval or to make substantial construction progress in accord with an approved building permit for the project will cause the permit to become null and void· [PL] Documents establishing the project Homeowner's Association or other vehicle acceptable to the City shall be filed in final form to the City for review and approval by the City Attorney and the Planning Director a minimum of 30 days prior to the request for occupancy of any units in this project. [ADM, PL] Except as may be specifically provided for within the General Provisions for PA 89-062, development shall comply with the City of Dublin Residential Security requirements (Attachment 4) and with the City of Dublin Site Development Review Standard Conditions (Attachment 5). [PO, PL, BI The Applicant/Developer shall comply with the "Typical Public Works Conditions of Approval for Subdivisions" (Attachment 6). [PW] The Applicant/Developer shall comply with applicable Dougherty Regional Fire Authority, Public Works Department, Dublin Police Service, Alameda County Flood control District Zone 7 and Dublin San Ramon Services District requirements. Prior to issuance of building permits or the installation of any improvements related to this project, the Applicant/Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. [F, PW, PO, Z7, DSR, PL] PHASED OCCUPANCY PLAN If occupancy is requested to occur in phases, then all physical improvements within each phase shall be required to be completed prior to occupancy of units within that phase except for items specifically excluded in an approved Phased Occupancy Plan, or minor hand work items, approved by the Planning Department. The Phased Occupancy Plan shall be submitted for Planning Director review and approval a minimum of 45 days prior to the request for occupancy of any unit covered by said Phased Occupancy Plan. No individual unit shall be occupied until the adjoining area is finished, safe, accessible, provided with all reasonable expected services and amenities, and completely separated from remaining additional construction activity. [PL, B] If a Phased Occupancy Plan is proposed for this project, it shall include provisions for, and indicate timing of the phased development of the Fire Buffer Zone, eight foot wide Hiking Trail, 12 foot wide Access Road on the North side of Martin Canyon Creek, Fire Accesses, Open Space Access Drives, and the installation of street trees along Inspiration Drive, subject to review and approval of the Planning Director, Public Works Director and the Dougherty Regional Fire Authority. [PL, PW, F] 10. Prior to the sale of any unit within a phase, the Applicant/Developer shall obtain a written acknowledgment (secured from the individual property owner) acknowledging the continuance of construction activity within the unoccupied phases of the project. The written acknowledgment shall include a statement that the property owner has reviewed and understands the phasing plan and the associated Conditions of Approval. Said acknowledgment is subject to City Attorney review and approval. The Applicant/Developer shall keep a copy of said written acknowledgment on file and shall submit the original signed and notarized acknowledgment to the Planning Department within three (3) days upon request of the Planning Director. If the Applicant/Developer fails to comply, the Planning Director may require the submittal of the written 4 acknowledgment prior to release of occupancy of any future units and/or future phases. [PL, ADM, BI 11. At the time of occupancy, access roads must comply with the following: [F] a. 1-25 units occupied - one public access road is required. b. 26-74 units occupied - one public access road and one emergency access road are required. FENCIN6 12. Prior to occupancy the Applicant/Developer shall install fencing as shown on the Landscape Plan. Construction/installation of common/shared fences, with a standard height of six (6) feet (except in those locations where Section 8-60.55 of the Zoning Ordinance requires lower fence heights) for all side and rear yards shall be the responsibility of the Applicant/Developer. Fencing installed by the Applicant/Developer at the bottom or top of slopes higher than ten (10) feet, and/or fences of rear yards with high visibility from adjoining down slope areas, may be designed with an open mesh material (as shown on the Landscape Plan) or other appropriate view fencing, subject to review and approval by the Planning Director. [PW, PL] 13. Applicant/Developer shall be responsible for installing temporary fencing around areas undergoing construction, subject to review and approval of the Public Works Director and Planning Director. [PW, PL] 14. Fencing placed at the top of banks/slopes shall be provided with a minimum one foot level area on both sides, in order to facilitate maintenance by the property owners. [PW, PL] OPEN SPACE/LANDSCAPING 15. The Applicant/Developer shall, prior to occupancy or according to the requirements of the Phased Occupancy Plan, whichever is first, submit for Planning Director and Dougherty Regional Fire Authority review and approval a Final Landscape and Irrigation Plan, with general conformance to the Landscape Plan (Exhibit A) prepared by David L. Gates and Associates, dated received June 26, 1995, consisting of sheets L-1 through L- 6. Plans shall indicate the general plant palette proposed including the number of plants, a description of the type of plants, their rate of growth, size in 3-5 years, mature size, container size at time of planting, both common and botanical names, and indicate planting and staking details (all trees shall be double staked). The Final Landscape and Irrigation Plan shall also include, but not be limited to, the following items: a. The Fire Buffer Zone and Open Space Access Drives shall be clearly identified around the perimeter of the residential development situated adjacent to undeveloped open space land. Said zone and access drives shall be installed prior to occupancy of any adjacent residential units (if a Phased Occupancy Plan is approved, installation shall occur prior to release of occupancy of units within the phase), and shall be maintained by the Homeowner's Association or other vehicle acceptable to the City of this project, to the satisfaction of the Dougherty Regional Fire Authority. [F, PL] b. Street tree varieties of a minimum 15 gallon size shall be planted along all street frontages as shown on the Landscaping Plan and shall be placed at least five feet from the back of the sidewalk. Exact tree locations and varieties shall be reviewed and approved by the Planning Director. Trees planted within, or adjacent to, sidewalks or curbs shall be submitted to the Planning Department for review and approval by the Planning Director and the Public Works Director. [PL, PW] c. Landscaping at street intersections shall be such that sight distance is not obstructed. Except for trees, landscaping shall not be higher than 30 inches above the curb in these areas. [PW, PL] d. Land designated as Open Space (non-residential) on the Landscape Plan shall be clearly identified. This Open Space area shall be permanently restricted to Open Space use by recorded deed restriction, subject to review and approval of the City Attorney and the Planning Director. [ADM, PL] e. In riparian corridor areas impacted by residential development, three new trees of at least 15 gallon size shall be provided to mitigate the loss of each existing tree over 10 inches in diameter. If coast live oaks and big leaf maple plantings are utilized, then the minimum size may be reduced to 5 gallons. Said trees may be distributed as generally depicted on the Landscape Plan. Only those trees over 10 inches in diameter removed during construction of the access road on the north side of Martin Canyon Creek may be replaced with seedling revegetation. All plans for additional tree planting in the riparian corridor areas shall be subject to review and approval by Alameda County Flood Control District Zone 7. [PL, Z7] f. Identified slope areas with a gradient steeper than three-foot horizontal to one-foot vertical created in conjunction with this project with the resultant slope height in excess of seven feet shall be planted with 15-gallon sized Open Space trees. Plantin§ ratio to be observed shall be a minimum of one tree per one thousand square feet of slope area (this is not in addition to the trees supplied by the 3:1 mitigation). Said Open Space Trees shall be planted as generally depicted on the Landscape Plan (Exhibit A) and shall be planted prior to release of occupancy of any units within that phase. The Applicant/Developer shall work with the adjacent property owners (behind lots 30-35) to ensure that existing views are maintained to the fullest extent possible. The final location of the Open Space Trees shall be subject to review and approval of the Public Works Director and the Planning Director. Open Space Trees on slope areas within the common open areas shall be irrigated and maintained by the Applicant/Developer until the ownership/maintenance of the common open areas is assumed by the Homeowner's Association or other vehicle acceptable to the City. Irrigation of trees within individual lots shall be by separate 6 irrigation systems, the maintenance of which shall be the responsibility of the future individual property owners. [PL, PW] g. The ~Open Space/Landscape Management Specifications for Hansen Hill" prepared by David L. Gates and Associates, dated received June 29, 1990 (Exhibit A) shall be revised to reflect this site plan in substantial conformity with TM 5766 as revised in all maps mentioned in the document, and to delete references to annual plants. [PL] h. Use fire-resistant or drought tolerant plant varieties in the plant palette. [F] 16. Prior to release of occupancy, a Screening Plan shall be developed to provide separation between the rear-yard patio and window areas of Lots 1-4 and the adjacent deck areas to the north (existing Kaufman and Broad homes) and shall be subject to Planning Director review and approval. [PL] 17. Open Space and Landscape Management and Maintenance programs for Open Space areas established through the subdivision and Planned Development District shall generally conform to the 'Open Space/Landscape Management Specifications for Hansen Hill" prepared by David L. Gates and Associates, dated received June 29, 1990 as revised (Exhibit A). [PW, PL] 18. Prior to the issuance of building and/or grading permit, significant, visually important trees and tree clusters shall be tagged in the field for protection, subject to Public Works Director and Planning Director approval. A cyclone, or other appropriate fence shall be erected around the dripline of these marked trees to ensure their protection throughout the grading and construction activity, subject to review and approval of the Public Works Director and the Planning Director. [PW, PL] 19. Prior to the issuance of building permits, the Applicant/Developer shall submit a certified arborist report for the pruning of any trees. A certified arborist shall perform the pruning of trees and shall clean up the ground of all deadwood and debris, to keep this material from getting into the watercourse, subject to the review and approval of the Public Works Director. [PW, PL] 20. Transformers, irrigation control boxes, backflow devices, valves, and the like shall be enclosed in vaults, fencing and/or painted out and landscaped, as determined acceptable to the Planning Director. Location of these items shall be indicated on the Final Landscape Plans. [PL] 21. The Applicant/Developer shall sign and submit a copy of the City of Dublin Standard Plant, Material, Irrigation System and Maintenance Agreement (Attachment 7) prior to the occupancy of any units. [PL] 22. The Applicant/Developer shall ensure that the Final Landscaping and Irrigation Plan conforms to the City's Water Efficient Landscape Ordinance. [PL] 23. A monitoring program shall be developed requiring the Homeowners' Association or other vehicle acceptable to the City to continually evaluate the success of the planting and implement additional planting measures or replant when necessary if planting fails. [PW, PL] 24. Maintenance of common areas including ornamental landscaping, graded slopes, erosion control plantings and drainage, erosion and sediment control improvements, retaining walls, and landslide repair improvements shall be to the satisfaction of the Director of Public Works and be the responsibility of the Applicant/Developer during construction stages, and until final improvements are accepted by the City, and the performance guarantee required is released; thereafter, maintenance shall be to the satisfaction of the Director of Public Works and be the responsibility of a Homeowner's Association or other vehicle acceptable to the City, which automatically collects maintenance assessments from each owner and makes the assessments a personal obligation of each owner and a lien against the assessed property. [PW] FIRE DISTRICT 25. Any locks which are placed on the gates or removable posts into the Fire Buffer Zone, Open Space Access Drives, the 8 foot wide Trail, and the 12 foot wide Access Road on the north side of Martin Canyon Creek must incorporate a ~Knox Lock", keyed to the Dougherty Regional Fire Authority's code, which allows the removal of any lock to allow access. IF] 26. All Fire Accesses shall have an unobstructed width of twenty feet, all-weather surfaces, and a 13' 6" vertical clearance. Twenty foot wide Fire Accesses shall be shown on the Final Landscaping and Irrigation Plan. IF] 27. The Applicant/Developer shall provide weed abatement before, during and after construction with the following guidelines: [F] a. Clear all weeds within 100 feet of combustible structures on uphill slopes. b. Clear all weeds within 30 feet of combustible structures downhill slopes. 28. The Homeowner's Association or other vehicle acceptable to the City shall be responsible for weed abatement within the above areas after occupancy of the last unit. IF] 29. Provide a landscape plan for wildland open space areas on the Final Landscaping and Irrigation Plan prior to issuance of building permits. Supply vegetation and fuel modifications, and/or buffer zones, and possible use of fire resistive or drought-tolerant varieties of plant life. IF] 30. Fire hydrants shall be installed at the locations approved by the Dougherty Regional Fire Authority in accordance with the standards in effect at the time of development. Raised 8 blue reflectorized traffic markers shall be epoxied to the center of the paved street opposite each hydrant. [F] 31. Improvement plans must be approved by the Dougherty Regional Fire Authority for their facilities as indicated by their signature on the title sheet. [F] 32. All materials and workmanship for fire hydrants, gated connections, and appurtenances thereto, necessary to provide water supply for fire protection, must be installed by the Applicant/Developer and conform to all requirements of the applicable provisions specified by the Dougherty Regional Fire Authority (DRFA). All such work will be subject to the joint field inspection of the Public Works Director and DRFA. [F] LIGHT AND GLARE 33. Exterior lighting shall be provided for stairwells, dwelling entrances and for address numbers, and shall be of a design and placement so as not to cause glare onto adjoining properties. Lighting used after daylight hours shall be adequate to provide for security needs. (Photometrics and lighting plans for the site shall be submitted to the Planning Department and Dublin Police Services for review and approval prior to the issuance of building permits). [PL, PO, B] 34. The use of reflective finishes on building exteriors is prohibited. In order to control the effects of glare within this subdivision, reflective glass shall not be used on all east facing windows. [PL] 35. A final color and materials palette prepared by the Applicant/Developer for review and approval by the Planning Director shall be submitted prior to foundation inspections of any of the units in this project. [PL, BI ARCHAEOLOGY 36. If, during construction, archaeological remains are encountered, construction in the vicinity shall be halted, an archaeologist consulted, and the City Planning Department notified. If, in the opinion of the archaeologist, the remains are significant, measures, as may be required by the Planning Director, shall be taken to protect them. [PL] TRASH/DEBRIS/DUST 37. Measures which meet the City of Dublin Clean Water Program and State Clean Water Permit shall be taken to contain all trash, construction debris, and materials on-site until disposal off-site can be arranged. The Applicant/Developer shall be responsible for corrective measures at no expense to the City of Dublin. [PW] 38. The Applicant/Developer shall keep adjoining public streets and driveways free and clean of project dirt, mud, materials and debris, and clean-up shall be made during the construction period, as determined by the Public Works Director. [PW] 9 GRADING AND DRAINAGE 39. No blasting shall occur in conjunction with the grading performed for this project without prior authorization being secured from the Public Works Director. [PW] 40. Written permission shall be obtained from the owner of Valley Christian Church (VCC) for grading on their site prior to approval of the grading plans by the City. Inspiration Drive within VCC grant of easement must be dedicated to the City prior to or at the same time as the final subdivision map is recorded. [PW] 41. Long-term maintenance of landslide repairs and unrepaired landslides in the open space shall be the responsibility of the Applicant/Developer or Homeowner's Association or other vehicle acceptable to the City and incorporated in the CC&R's. [PW] 42. No drainage shall be directed over a slope, except at the end of culs-de-sac where ~Overland Storm Drain Easements" have been provided for emergency release of storm waters. [PW]. 43. All cut and fill slopes shall be contoured to appear natural and blend with the existing natural contours to the satisfaction of the Public Works Director and Planning Director. [PW, PL] .4.! The Applicant/Developer and/or his representatives shall secure all necessary permits for work including, but not limited to, grading, encroachment, Fish and Game Department, Corps. of Engineers and State water quality permits and show proof of it to the City of Dublin, Department of Public Works. [PW] 45. Grading within the designated open space area shall be limited to that grading which is necessary for construction of the roadways traversing the open space and any approved development, subject to review and approval of the Planning Director and Public Works Director. [PL, PW] IMPROVEMENTS 46. The design, location and materials utilized for project retaining walls shall be included as part of the Project improvement Plans, subject to review and approval by the Building Official and the Planning Director. [B, PL] 47. Inspiration Drive shall be renamed in order to avoid the confusion of having an intersection of Inspiration Drive and Inspiration Drive. [PL] 48. All sidewalks must be within City right-of-way or in a pedestrian easement. [PW] 49. Special paving or concrete paving in public streets may be allowed with the approval of the Director of Public Works. [PW] lO 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61, Silvergate Drive shall be re-striped at the new entrance to the development for turn lanes. [PW] Prior to occupancy of the 26th unit, Inspiration Drive (through Valley Christian Center) must be constructed and dedicated to the City of Dublin and connect via a constructed public street to Silvergate Drive. [PW] The fence along the north property line of the creek area must be replaced with a fence at the north side of the access road from the west side of Martin Canyon road easterly to the satisfaction of the Director of Public Works. [PW] The fire access roads must be designed, constructed, and gated to the satisfaction of the Director of Public Works. [PW] The landscaped median area shown at the Silvergate Drive entrance shall be owned by the City of Dublin, but maintained by the Applicant/Developer or the Homeowners Association or other vehicle acceptable to the City within this development. This median shall be installed to City of Dublin standards, including moisture barriers and subdrains. [PW] The Applicant/Developer shall submit to the City for filing three copies of the Amended Tentative Map for Phase I of the Hansen Hills project site which shows the site configuration and grading as shown on the Tentative Maps as approved by the City Council on February 27, 1995 (for Phase I). Prior to stamping and filing these plans, the Planning Director and the Director of Public Works shall determine whether these plans substantially comply with the plans approved by the City Council. [PL, PW] Manufactured slopes must be revegetated. [PW, PL] Ten-foot Public Utility Easements must be dedicated along all public streets except for a five foot Public Utility Easement on the west side of Inspiration Drive on the Valley Christian Center property. [PW] All building pad elevations must be above the lO0-year flood level. [PW] Any relocation of improvements or public facilities shall be accomplished at no expense to the City. [PW] Street light standards and luminaires shall be designed and installed per approval of the Director of Public Works. The maximum voltage drop for street lights is 3%. [PW] A registered civil engineer shall design all retaining walls over three feet in height (or over two feet in height with a surcharge) and a building permit shall be required for their construction. A maintenance/inspection program shall be implemented by the developer/homeowners' association or other vehicle acceptable to the City for the periodic inspection and maintenance of all retaining walls that could possibly affect the public right-of-way. [PW] 11 62. The Applicant/Developer shall furnish and install trail signs and street name signs, in accordance with the standards of the City of Dublin, bearing such names as are approved by the City. The subdivider shall furnish and install traffic safety signs in accordance with the standards of the City of Dublin. [PW] 63. All street dedications shall include maintenance easements at slopes. [PW] 64. All improvements within the Improvement Plans and Grading Plans, including curb, gutter, sidewalks, driveways, paving and utilities, must be constructed prior to occupancy in accordance with approved standards to the satisfaction of Public Works Director. [PW] MISCELLANEOUS 65. The Applicant/Developer shall provide unit address information to the satisfaction of DRFA, U.S. Postal Services, and City of Dublin Planning Department and Building Department. [PW] 66. Prior to final inspection of any unit, the Applicant/Developer shall submit a letter from the U.S. Postal Service to the Planning Department stating their satisfaction with the type and location of the mail receptacles to be provided. [PL] 67. This approval shall be revocable for cause in accordance with Section 8-90.3 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this approval shall be subject to citation. [PL] 68. To apply for building permits, the Applicant/Developer shall submit six (6) sets of construction plans and two (2) sets of Site Plans for Phase I to the Building Department for plan check. The plans shall have attached two annotated copies of the Appealable Action Letter. The notations shall clearly indicate how these Conditions of Approval will be complied with. Construction plans will not be accepted without the annotated Appealable Action Letter attached. The Applicant/Developer will be responsible for obtaining approvals of all participating non-City agencies prior to the issuance of building permits. [PL, BI PASSED, APPROVED AND ADOPTED this 21st day of August, 1995. AYES: NOES: ABSENT: ATTEST: Commissioners Geist, Jennings, Johnson, Lockhart and Zika NONE /51anning {~mmiss-i°~hairperson Planning Directo~,~ 12