HomeMy WebLinkAboutReso 105-00 Zumwalt EngrRESOLUTION NO. 105 - 00
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT
WITH ZUMWALT ENGINEERING GROUP
WHEREAS, the City of Dublin, State of California, entered into an agreement with Zumwalt
Engineering Group on July 7, 1998 and subsequently extended said agreement to June 30, 2001; and
WHEREAS, Consultant has requested an adjustment of rates for Fiscal Year 2000-2001 which is
reasonable and commensurate with the Consumer Price Index rate of increase;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve the amendment to the agreement with Zumwalt Engineering Group, which is attached hereto as
"Exhibit A".
PASSED, APPROVED AND ADOPTED this 20t~ day of June, 2000.
AYES:
Councilmembers Howard, McCormick, Zika, Vice Mayor Lockhart and Mayor
Houston
NOES: None
AB SENT: None
ABSTAIN: None
ATTEST:
v, ~,_ ~y ~-~erk X,~
K2/G/6-20-00/reso-zumwalt.doc (Item 4.13)
Mayor
G~engrtzumwal\resoamendO0-OI
?J'3
cr. c.; ()
EXHIBIT "A" OF RESOLUTION -00
AMEND:MENT TO AGREE:MENT
BElWEEN CITY OF DUBLIN AND ZUMWALT ENGINEERlNGGROUP
FOR ENGINEERlNG SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY") and Zumwalt
Engineering Group (hereinafter referred to as "CONSULTANT"), entered into an agreement on July 7,
1998, to provide engineering services to CITY: and
WHEREAS, the City and the Consultant have ehiended the term of agreement for an
additional two years, terminating June 30,2001; and
WHEREAS, Consultant has requested an adjustment of rates for Fiscal Year 2000-2001;
NOW, THEREFORE, the parties hereto agree as follows:
Adiustment of Rates
The rate schedule attached hereto as Exhibit 1 shall be in effect for Fiscal Year 2000-2001.
The agreement shall have a not-to-exceed limit of$550,000 for Fiscal Year 2000-2001.
CITY OF DUBLIN
Mayor
ATTEST:
City Clerk
ZUMWALT ENGINEERING GROUP
James W. Zumwalt, Principal
Date:
"'" () 0
'3 c)~ rz
ZUMWALT ENGINEERING GROUP
2000-2001 CHARGE RATE FEE SCHEDULE
. The compensation of Zumwalt Engineering Group for work done wiII be on the basis of an hourly charge rate,
plus incurred expenses and will be the sum of all the items set forth below:
A. PERSONNEL SERVICES
PRINCIP AL
. SUPERVISING ENGINEER
SENIOR ENGINEER
ASSOCIA TE ENGINEER
ASSISTANT ENGINEER
FIELD REPRESENT A TIVE
TECHNICIAN/CAD OPERA TOR
CLERICAL / OFFICE SUPPORT
TWO-MAN SURVEY CREW
$ 126 HR
121 HR
111 HR
99 HR
84 HR
79 HR
74 HR
47 HR
168 HR
Rates for individuals may vary depending on the service perfanned.
EFFECTIVE THROUGH JUNE 30, 2001 AND SUBJECT TO REVISIONANNUALL Y
B. TRANSPORTATION EXPENSES
1. Thirty-five cents (0.35) per mile for use of vehicles. A minimum of six dollars ($6.00) per hour will
be charged for use of vehicles used for field inspection and supervision.
C. OUTSIDE SERVICES
1. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants,
professional, or technical firms engaged in connection with the order, plus 15% handling charge.
D. MISCELLANEOUS EXPENSES
1. The invoice cost of materials, supplies, reproduction work, and other services procured by Zumwalt
Engineering Group from outside sources, plus a handling charge of 15%. All out-of-pocket expenses
not included in Items A, Band C will be included in this category.
( c)..,q
ZUMWALT ENGINEERING GROUP
MUNICIPAL STAFF AUGMENTATION
2000-2001 CHARGE RATE FEE SCHEDULE
The compensation of Zumwalt Engineering Group for work done will be on the basis of an hourly charge rate,
plus incurred expenses and will be the sum of all the items set forth below:
A. MUNICIPAL STAFF AUGMENTATION SERVICES
PRINCIP AL
SENIOR ENGINEER
PROJECT ENGINEER/SURVEYOR
ASSOCIA TE ENGINEER
SENIOR DESIGNER
STAFF ENGINEER
FIELD REPRESENT A TIVE
CAD DESIGNER
TECHNICIAN/CAD OPERA TOR
CLERICAL / OFFICE SUPPORT
$ 97 HR
92 HR
87 HR
81 HR
81 HR
70 HR
70 HR
70 HR
52 HR
42 HR
EFFECTIVE THROUGH JUNE 30, 2001 AND SUBJECT TO REVISION ANNUALLY
B. TRANSPORTATION EXPENSES
1. Thirty-five cents (0.35) per mile for use of vehicles. A minimum of six dollars ($6.00) per hour will
be charged for use of vehicles used for field inspection and supervision.
C. OUTSIDE SERVICES
1. Invoice cost of services and expenses charged to Zumwalt Engineering Group by outside consultants,
professional, or technical firms engaged in connection with the order, plus 15% handling charge.
D. MISCELLANEOUS EXPENSES
1. The invoice cost of materials, supplies, reproduction work, and other services procured by Zumwalt
Engineering Group from outside sources, plus a handling charge of 15%. All out-of-pocket expenses
not included in Items A, Band C will be included in this category.
:~
5~&
-'
ZUMWALT ENGINEERING GROUP
f ebruary 11, 2000
Civil Engineering/Project Management
2680 Bishop Drive, Suite 150 . San Ramon, California 94583
Tel. (925) 830-5016 Fax (925) 830-5023 eO
RECE\\l ~
F t. B 115 'l.t\t\t\
pU6\"\C \NORKS
Mr. Lee S, Thompson
Public \V orks Director
CITY OF DUBLIN
P.O. Box 2340
Dublin, CA 94568
Subject:
Proposed contract rates for fY2000!2001
Dear M1'. Thompson:
This letter is in response to your January 20, 2000 letter requesting our proposed contract rates for
fiscal Year 2000/2001, as well as any proposed contract, personnel or service level changes.
Attached herewith is our proposed 2000-2001 Charge Rate fee Schedule. This fee schedule applies to
design projects that are performed on a not-to-exceed basis. Also attached is our proposed 2000-2001
Municipal Staff Augmentation Charge Rate Fee Schedule. This schedule provides for special reduced
rates that apply to assignments in which we serve as an extension of City staff (staff augmentation) at
City offices or at our offices in San Ramon. for your information, all of our work to date during the
current fiscal year has been performed at the municipal staff augmentation rates.
Please note that both of these fee schedules include a rate increase ranging from 2.0 to 2.9 percent to
offset the increase in the cost of providing services including the retainage and training of qualified
personnel.
furthermore, we propose to provide the City with the same personnel and services level as we are
currently providing. However, to accommodate staffs recent refinements to the City plan checking
process, Mark Lander will be the point of contact in lieu of A.D. Dopson. A.D. will continue to
perform plan checking services at our office in San Ramon as requested by your staff under the
supervision of M1'. Lander, P.E. Thank you for the opportunity to provide you this information for the
planning of the forthcoming year. I look forvvard to discussing this information with you at your
meeting on February 17,2000:
Very truly yours,
ZUMWi\L T ENGINEERING GROUP
A Caltfornia Corporation
~1.?ld:, ~J ;P?17/f/aer-
James W. Z~alt, P.E.
Principal
Attachments
il T: A (~~~~f:.:~ V;~\f1~-Z
'" 'J"-""~'" ..~-
;; ~ - :. "'~... -.. .
+~
6 c{:!
u
ZUMWALT ENGINEERING GROUP
Fiscal Year 2000-2001 Update
STANDARD RATES
1999-2000 2000-2001
CLASSIFICATION HOURS 1999-2000 TOTAL PROPOSED TOTAL TOTAL COST
TO DATE RATE COST RATE COST % CHANGE
Principal 0 $ 123.00 $ - $ 126.00 $ - 0%
SupervisinQ Enqineer 0 $ 118.00 $ - $ 121.00 $ - 0%
Senior EnQineer '0 $ 108.00 $ - $ 111.00 $ - 0%
Associate EnQineer 0 $ 97.00 $ - $ 99.00 $ - 0%
Assistant Enqineer 0 $ 82.00 $ - $ 84.00 $ - 0%
Field Representative 0 $ 77.00 $ - $ 79.00 $ - 0%
Technician/CAD Operator 0 $ 72.00 $ - $ 74.00 $ - 0%
Clerical/Office Support 0 $ 46.00 $ - $ 47.00 $ - 0%
Two-Man Survey Crew 0 $ 164.00 $ - $ 168.00 $ - 0%
CUMULATIVE EFFECT 0 $ - $ - 0%
MUNICIPAL STAFF AUGMENTATION RATES
1999-2000 2000-2001
CLP,SSIFICATION HOURS 1999-2000 TOTAL PROPOSED TOTAL TOTAL COST
TO DATE RATE COST RATE COST % CHANGE
Principal 0 $ 95.00 $ - $ 97.00 $ - 0.0%
Senior Enqineer 377 $ 90.00 $ 33,930.00 $ 92.00 $ 34.684.00 2.2%
Proiect Engineer/Survevor 0 $ 85.00 $ - $ 87.00 $ - 0.0%
Associate Engineer 227 $ 79.00 $ 17,933.00 $ 81.00 $ 18.387.00 2.5%
Senior Designer 1068 $ 79.00 $ 84,372.00 $ 81.00 $ 86,508.00 2.5%
Staff Engineer 11.5 $ 68.00 $ 782.00 $ 70.00 $ 805.00 2.9%
Field Representative 0 $ 68.00 $ - $ 70.00 $ - 0.0%
CAD Designer 105 $ 68.00 $ 7,140.00 $ 70.00 $ 7,350.00 2.9%
Technician/CAD Operator 28 $ 51.00 $ 1,428.00 $ 52.00 $ 1,456.00 2.0%
Clerical 309.5 $ 41.00 $ 12,689.50 $ 42.00 $ 12,999.00 2.4%
CUMULATIVE EFFECT 2126 $ 158,274.50 $ 162,189.00 2.5%
Admin/ZEG General/Budgets/Hours - Rate Increase Worksheet Dublin version ., 2/15/00
f =.,--!" g
~.,/
SUPPLEMENT TO
ZUMWALT ENGINEERING GROUP
MUNICIPAL STAFF AUGMENTATION
2000-2001 CHARGE RATE FEE SCHEDULE
Classification of Employees anticipated to provide services to the City of Dublin during the
2000-2001 Fiscal Year:
c Emplovee 1999-00 Classification .2000-2001 Classification
1. Zumwalt I Principal Principal
M. Lander Senior Engineer Senior Engineer
J. Enke Senior Engineer Senior Engineer
C VanKatwyk Project Engineer Project Engineer
I G. Antkowiak I Associate Engineer Associate Engineer
M. Coulson I Associate Engineer I Associate Engineer
M. Uzegbu Associate Engineer Associate Engineer
A.D. Dopson Senior Designer Senior Designer
M. Kaseman N/A Staff Engineer
L. Hernandez CAD Designer CAD Designer
Employees other than those listed above are available to the City upon request. Clerical staff support