HomeMy WebLinkAbout8.1 PLPA 2010-00054 Regional Street Project SDR
O~~~ OF Dp~l f~
STAFF REPORT
1 82 PLANNING COMMISSION
IFOR
DATE: January 4, 2011
TO: Planning Commission
SUBJECT: PUBLIC HEARING: PLPA-2010-00054 Site Development Review for
the Regional Street Retail project at 7117 Regional Street
Report prepared by Kristi Bascom, Principal Planner
EXECUTIVE SUMMARY:
The Applicant has requested Site Development Review approval to make exterior changes to an
85,280 square foot retail building at 7117 Regional Street and to make associated site
improvements.
RECOMMENDATION:
Staff recommends that the Planning Commission: 1) Receive Staff presentation; 2) Open the
public hearing; 3) Take testimony from the Applicant and the public; 4) Close the public hearing
and deliberate; and 5) Adopt a Resolution approving Site Development Review for the Regional
Street Retail project, which includes the remodel of an existing 85,280 square foot retail building
and associated site improvements at 7117 Regional Street.
V-V1 s)-; 6
Submitted By viewed By
Principal Planner Planning Manager
COPIES TO: Applicant
File
ITEM NO.: •
Page 1 of 7
C:IUserslkristiBlAppDatalLocaAMicrosoftll4rindowslTemporaryIntemet Files10LK2F211PCSR 01 04 2011.doc
DESCRIPTION: Figure 1: Project Site
The project site is located at
7117 Regional Street near the
intersection of Dublin Boulevard 4 x
and Regional Street.
The 9-acre ~-~a
site contains an existing 85,280
, -
square foot retail building that is Target
currently vacant. It was
previously home to Mervyn's s
department store. Access to
the site is provided from multiple
driveways on both Dublin
Boulevard and Regional Street.
The parcel is part of a larger 4
s + ~t Toys-R-Us
shopping center comprised of
KMA
multiple parcels and multiple
owners. The project site is
depicted in Figure 1.
The project site has a General A` Project Site ;
Plan Land Use Designation of
Retail/Office and is located in the C-1 (Retail Commercial) Zoning District.
The subject building was originally constructed in 1972, before Dublin was incorporated as a
City. Alameda County approved the original development of the project site, which is in a
shopping center comprised of other retail and service uses including a drug store/pharmacy, two
banks, a grocery store, gas station, recycling center, and several smaller retail/service
establishments.
In order to permit exterior alterations to the building and the associated site improvements, Site
Development Review approval is required. The proposed project includes exterior modifications
to the 85,280 square foot building, improvements to the parking areas adjacent to the building,
and the installation of new landscaping throughout the project site. The project also includes the
installation of new landscaping on the adjacent property at 7151 Regional Street, which is a
separate parcel that contains a 7,500 square foot retail building currently occupied by Aaron
Brothers Art & Framing. No exterior modifications are proposed to the building at 7151 Regional
Street. Both properties have the same ownership.
Background
This project was reviewed by the Planning Commission at a public hearing on December 14,
2010. At the meeting, the Planning Commission expressed concerns about the project's
compatibility with the forthcoming Downtown Dublin Specific Plan and the project phasing that
was described by the Applicant. The Planning Commission voted 2-1 (with 2 Commissioners
absent) to continue the item and directed the Applicant to enhance the building architecture and
add pedestrian amenities to the site such as more robust pedestrian connections. The Planning
Commission continued the item to a date uncertain.
Staff met with the property developer and architect after the Planning Commission meeting and
discussed ideas to address the direction received. The Applicant submitted revised plans on
December 22, 2010 that included a different type of tree species in the parking lot that would
2of7
provide more shade over time, an enhanced pedestrian pathway between the Dublin Boulevard
building entry to the street, additional landscaping against the building, a new trellis element on
the corner of the building, and new architectural metal screens with light sconces on both the
Dublin Boulevard and Regional Street building elevations. The revised building elevations, site
plan, and landscape plan are shown in the Project Plan set, included as Exhibit-A to Attachment
1 to this Staff Report.
ANALYSIS:
Building Design
The building is currently designed for use by one single tenant, and it has building entries facing
Dublin Boulevard, Regional Street, and one entry facing Aaron Brothers and CVS Pharmacy.
The proposed project will divide the building into two tenant spaces. Tenant Space A (proposed
to be occupied by Sports Authority) will be comprised of approximately 45,500 square feet and
will have the main entry facing Dublin Boulevard. Tenant A will also have a faux (non-
functioning) entry feature facing Regional Street that will have a fixed storefront with graphic
display windows instead of functioning doors. The space for Tenant B will be approximately
39,780 square feet, and Tenant B will have two entry doors: one facing Regional Street and
one facing Aaron Brothers.
With the exception of the new entries and the interior demising wall to divide the space into two,
the main building structure is not changing. On the exterior, of the building, the canopies that
covered the three entries into the Mervyn's store are being removed, but the rock fagade is
remaining on the building.
New building entry elements have been designed to include materials that are compatible with
the existing rock finish, but that also include more a modern, streamlined design. Since Tenant
A has already been identified, the modifications to this portion of the building are highly tailored
to Sports Authority. The building entry, windows graphics, and roof screens are intended to
mimic the look of a sports stadium, and the materials and colors support that design. The
building entry (facing Dublin Boulevard) and graphic window panels (facing Regional Street) are
highlighted by simulated goal post trusses on brick bases, shoulder elements in brick and metal,
and curved metal screens on the roof to conceal roof top equipment. Materials include CMU
blocks in three brick-like colors, ribbed silver and red architectural metal panels, aluminum
storefront windows with a clear anodized finish, and black decorative metal supports.
Along both the Dublin- Boulevard and Regional Street elevations, light sconces and six foot
square architectural perforated metal screens have been added to the building facades to break
up the long building walls and add shade and shadow. The metal screens will be framed,
painted black to match the decorative metal supports of the entry elements, and powder-coated
for durability. The light sconces match the fixtures that are shown on either side of the building
entries, and the spacing pattern of the fixtures will be the same along the length of the two
elevations.
Tenant B has not been identified, so no tenant-specific design elements are proposed, but the
Applicant has presented a building entry design that is coordinated and compatible with Tenant
A without being duplicative. The Tenant B entry features consist of a bold, up-sloping entry
canopy with supporting trusses, flanking angled pylons, and brick shoulder elements. Painted
metal grid panels are affixed to the building parapet to screen existing roof top equipment. The
same three CMU block colors are repeated, the same ribbed silver architectural metal panel is
used, and the two building entry elements include a silver metallic awning with painted supports.
3 of 7
Sheets A2, A3, M1, and M2 of the Project Plan Set (Exhibit A to Attachment 1) detail the
building elevations, colors, and materials.
The existing structure consists of tilt up concrete panels with exposed rock as a finished surface.
This finish will remain except in areas where the existing entry canopies will be removed. The
removal will reveal smooth concrete panels without the rock finish. The wall area between the
two entry features facing Regional Street will be patched, treated with horizontal and vertical
reveals, resurfaced with cement plaster, and painted to match with the rock finish on the rest of
the building. Condition of Approval No. 11 in the attached Resolution (Attachment 1) states that
the paint color of the new wall shall be field tested to ensure a good match between the new
wall color and the rock finish on the remainder of the building. If a suitable color match is not
found, the Applicant will need to work with Staff on a solution.
Another design element that has been added to the project since the Planning Commission's
review on December 14, 2010 is a new trellis element at the southwest corner of the building.
The trellis columns are proposed to be constructed of the same CMU blocks in the same brick-
like colors that are being used in the building entries with a metal overhead trellis. This feature
will add depth and material variation to the corner element and help tie the two building facades
together better.
Project Phasing
The project is proposed to be constructed in two phases. Phase 1 includes all of the site and
landscaping improvements shown on Sheets Al and L-1 of the Project Plan Set (Exhibit A to
Attachment 1) the exterior building modifications for Tenant A, Sports Authority, and the interim
improvements for the rest of the building as shown on Sheet A2. Phase 2 includes the exterior
building modifications for Tenant B, which are shown on Sheet A3. Phase 2 involves the
removal of the interim improvements for this tenant space and the finishing of the building
exterior. Condition of Approval No. 16 in the attached Resolution (Attachment 1) describes the
phasing of the project and what improvements are required at certain times.
Site Enhancements
In addition to updating the building with new materials and entry elements, there are several
modifications proposed for the site including new and rehabilitated landscaping and improved
site circulation. At the entry to Sports Authority, the Applicant is proposing an enhanced
pedestrian plaza with bollards, trash receptacles, a bench, bicycle rack, and decorative paving.
An enhanced pedestrian pathway is being provided from Dublin Boulevard to the Sports
Authority building entry. The pedestrian pathway will be 12 feet wide, have decorative paving, a
-landscaped edge, and will run diagonally from the sidewalk at Dublin Boulevard through to the
building entry plaza. This pedestrian walkway provides a strong connection between the
building and the street.
The parking field between Sports Authority and Dublin Boulevard is proposed to be reconfigured
with new angled parking and the parking field also includes new landscape planters and
decorative paving. Throughout the parking field on this 9-acre parcel, all of the landscape is
proposed to be refreshed with additional plantings (if the existing trees are healthy) or replaced
with new trees, shrubs, and groundcover. Chinese Pistache trees are proposed for the parking
lot landscaping, a change from the Crape Myrtle trees originally proposed. Other landscaping
changes include several new landscape planters at the base of the building along both the
Regional Street and Dublin Boulevard frontages, which are proposed to contain English Oaks,
shrubs, and groundcover. Sheet L-1 in the Project Plan Set (Exhibit A to Attachment 1) details
the site planting plan and Sheet Al details the parking lot striping modifications and pedestrian
amenities.
4 of 7
Overall, the changes made to the Project Plans based on the direction provided by the Planning
Commission have resulted in more articulated building facades and an enhanced site plan that
includes stronger pedestrian elements and amenities.
A Resolution recommending Site Development Review approval is included as Attachment 1 to
this Staff Report. Conditions of Approval have been placed on the project to ensure that all new.
construction complies with applicable Building and Fire codes as well as local ordinances.
Consistency with the Downtown Dublin Specific Plan
Although the Downtown Dublin Specific Plan (DDSP) has not yet been approved by the City
Council, the revised project is in conformance with many of the design guidelines of the DDSP,
including, but not limited to, the following:
Section 4.4.1 General Building Design
Buildings located near major street intersections should be treated as "signature"
buildings and should include unique design features (e.g. towers) and prominent corner
entrances, plazas and enhanced design which is oriented towards the street.
Section 4.4.2 Building Articulation
Providing prominent entrances that are recessed/protruding or include towers or other
distinct architectural features
• Breaking up large smooth surfaces with expression lines, reveals, or changes in texture
and color.
Section 4.4.3 Building Materials and Colors
A variety of high-quality, durable building materials and colors should be provided to
create interesting and attractive building designs and avoid monotony.
Section 4.4.5 Anchor Frontages
Primary building entrances should be highlighted and serve as the prominent building
feature with elements such as (but not limited to) recessed or protruding entries, tower
elements, different materials/colors, decorative or display windows, shade structures or
galleries, and special paving and landscaping.
The project has an entry plaza facing Dublin Boulevard with landscaped planter areas and a
wide, landscaped pedestrian pathway that connects the building to the street. The project
includes unique design features while still retaining elements of the building that make it
consistent with other buildings in the shopping center. The building provides prominent entries
with distinctive architectural features, contains multiple materials, textures, and colors to break
up the building mass, and the building includes bold colors as accents to the base building
materials and colors, which are more muted and natural.
ENVIRONMENTAL REVIEW:
The California Environmental Quality Act (CEQA), together with the State Guidelines and City
Environmental Regulations require that certain projects be reviewed for environmental impacts
and when applicable, environmental documents prepared. For this project, Staff recommends
that the project be found exempt from the California Environmental Quality Act (CEQA) in
accordance with Section 15301 (Minor alterations to existing facilities involving little or no
expansion). The project involves no expansion of the existing commercial building, but includes
only architectural modifications and minor site enhancements.
5of7
CONSISTENCY WITH THE GENERAL PLAN AND ZONING ORDINANCE:
The project site is designated Retail/Office in the General Plan. The project has been reviewed
for compliance with policies contained in the Community Design and Sustainability Element of
the General Plan, including those related to building and site design, gathering and open spaces
areas, and parking and circulation.
The project site is located in C-1 (Retail Commercial) Zoning District. The project is consistent
with Development Regulations for this zoning district as described in Chapter 8.36 of the Zoning
Ordinance, including maximum building height and required setbacks.
The project is also consistent with the development standards and design guidelines of the
proposed Downtown Dublin Specific Plan, as noted above. The Specific Plan is scheduled to
be reviewed and adopted by the City Council in early 2011.
REVIEW BY APPLICABLE DEPARTMENT AND AGENCIES:
The Building Division, Fire Prevention Bureau, Public Works Department, Dublin Police
Services, and Dublin San Ramon Services District have reviewed the project and provided
Conditions of Approval where appropriate to ensure that the project is established in compliance
with all local ordinances and regulations.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
In accordance with State law, a Public Notice was mailed to all property owners and occupants
within 300-feet of the proposed project. The Public. Notice was also published in the Valley
Times and posted at several locations throughout the City. To date, the City has received no
comments from surrounding property owners regarding the Project. A copy of this Staff Report
was provided to the Applicant.
ATTACHMENTS: 1) Resolution approving Site Development Review for the Regional
Street Retail project, which includes the remodel of an existing
85,280 square foot retail building and associated site improvements
at 7117 Regional Street, with the Project Plans attached as Exhibit
A.
6 of 7
GENERAL INFORMATION:
APPLICANT/: Galen Grant, Flynn, Craig & Grant Architects, 301 Hartz
Avenue, Suite 213, Danville, CA 94526
PROPERTY OWNER: David Wollenberg, Regional Street LLC, c/o The Cortona
Corporation, 800 El Camino Real, Suite 175, Menlo Park, CA
94025
LOCATION: 7117 Regional Street
ASSESSORS PARCEL
NUMBER: 941-0305-017-02 and 941-0305-017-01
GENERAL PLAN
LAND USE DESIGNATION: Retail/Office
SPECIFIC PLAN
LAND USE DESIGNATION: N/A
SURROUNDING USES:
LOCATION ZONING GENERAL PLAN LAND USE CURRENT USE OF
PROPERTY
North C-1 Retail/Office Commercial/Shopping Center
South PD Retail/Office Commercial/Shopping Center
East PD Retail/Office Commercial/Shopping Center
West C-1 Retail/Office Commercial/Shopping Center