HomeMy WebLinkAboutReso 106-00 MCE Pub Wks SvcsRESOLUTION NO. 106 - 00
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AMENDMENT TO AGREEMENT WITH MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WHEREAS, on June 24, 1999, the City Council approved an agreement with MCE Corporation
for Public Works Maintenance Services; and
WltEREAS, said agreement provided a detailed scope of work and labor rates for Fiscal Year
1999-2000; and
WHEREAS, MCE Corporation is requesting a cost of living increase in labor, vehicle, and
subcontract rates for Fiscal Year 2000-2001;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby
approve the amendment to the agreement with MCE Corporation attached hereto as "Exhibit A", with an
effective date of July 1, 2000.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment.
PASSED, APPROVED AND ADOPTED this 20th day of June, 2000.
AYES:
Councilmembers Howard, McCormick, Zika, Vice Mayor Lockhart and Mayor
Houston .
NOES: None
ABSENT: None
ABSTAIN: None
ATTES~
K2/G/6-20-OO/reso-mce.doc (Item 4.14)
C :\contract~maint~resoamnd
'Mayor
EX~IIlIT "A" OF RESOLUTION
AMENDMENT TO AGREEMENT BETWEEN
CITY OF DUBLIN AND MCE CORPORATION
FOR PUBLIC WORKS MAINTENANCE SERVICES
WH]EREAS, on June 24, 1999, the City of Dublin (hereinafter referred to as "CITY" and
MCE Corporation (hereinafter referred to as "CONTRACTOR") entered into an agreement to provide Public
Works Maintenance Services to CITY (hereinafter referred to as "AGREEMENT); and
WHEREAS, said AGREEMENT provided a rate schedule for Fiscal Year 1999-2000; and
WI--IEREAS, MCE Corporation has requested a cost of living increase in labor, vehicle, and
subcontract rates for Fiscal Year 2000-2001;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1. Exhibit B, "Payment Schedule," of the Agreement shall be amended by
replacing Attachment 1 in the current Agreement with Attachment 1 of this Amendment, said Attachment 1
being identified as "Exhibit B Payment Schedule 2000-2001."
2000.
Section 2.
Said revision in Exhibit B "Payment Schedule" shall be effective as of July 1,
Section 3. The term of agreement shall be extended until June 30, 2001.
CITY OF DUBLIN
MCE CORPORATION
President
ATTEST: ._~.
Citf C~ ~' ~,._ -
ATTEST:
Secretary
g:lconzractImce~amndrnr2 -,
EXHIBIT B
PAYMENT SCHEDULE
FISCAL YEAR 2000-2001
(Following three pages)
UNIT PRICES
The following activities shall be completed at the Unit Prices indicated. The unit prices
are inclusive of all labor, materials, equipment, overhead and management fees.
ACTIVITY / SUB-ACTIVITY
BEDDING WEED CONTROL
· Streets & Parks
2000-2001
UNIT PRICE
$ 228.44 per Acre per Mo.
CHEMICAL WEED CONTROL R.O.W.
$ 107.64 perAcre
TURF MAINTENANCE
Fertilize Only Turf
· Ail Parks Except Civic Center
$ 89.23 per Acre
Broadleaf Spraying Turf
· All Parks Except Civic Center
$ 76.65 per Acre
Fertilize / Broadleaf Turf
· All Streets
· Civic Center
Aeration Turf
· Streets & Fire Station
· Ail Other Parks
Mow Turf
· Streets, Fire Station, Stagecoach Park
· All Other Parks
$ 134.48 perAcre
$ 168.24 perAcre
$ 370.76 perAcre
$ 47.84 perAcre
$ 72.11 per Acre
$ 48.07 perAcre
Edging Turf
· Streets
Parks
TREE MAINTENANCE
· Tree Pruning
o 0"- 4" Class 1
o 4"- 8" Class 1
o 8"- 16" Class 2
o Over 16"
Fungus Spraying
$ . 16.83 per MLF
$ 14.42 per MLF
20.70 per Tree
33.35 per Tree
66.70 per Tree
By Bid
5.04 per Tree
Page 3 of 5
DUBLIN, CITY OF - EXHIBIT El, PG 1-3 - 2000-2001 - 6/7/00 (CONT MGMT - X)
G: Ti~E AND MATERIALS RATES
The following rates shall be applied to work performed by the Contractor which
is not specified in Section B (Unit Prices). At all times the Contractor shall
strive to utilize the most cost effective elements possible to complete a project.
Appropriate overhead and management fees are included in the labor and
equipment rates listed below.
DESCRIPTION
OVERTIME HOLIDAY
HOURLY HOURLY HOURLY
RATES RATES RATES
LABOR RATES
Dublin Crew
Maintenance Superintendent
Landscape Foreperson
Landscape Leadperson
Landscape Laborer I
Landscape Laborer II
Landscape Laborer III
Landscape Laborer IV
46.30 $ ' 69.45 $ 92.60
35.50 53.25 71.00
31.70 47.55 63.40
29.80 44.70 59.60
25.30 37.95 50.60
20.30 30.45 40.60
15.20 22.80 30.40
MCE
Crew
Superintendent
Loader/Backhoe Operator
Asphalt Paver Operator
Roller Operator
Truck Driver 8-12 C.Y.
Truck Driver 4-6 C.Y.
Truck Driver 3 C.Y. Transit
Cement Finisher
Laborer Foreman
Laborer I
Laborer I!
Laborer III
DESCRIPTION
EQU1PMENT RATES
Dublin Crew
-~-- * Flatbed Dump
· Pickup
Chain Saw
Brush Cutter
68.00 $ 102.00$ 136.00
66.44 99.66 132.88
66.44 99.66 132.88
64.20 96.30 128.40
54.22 81.33 108.44
53.74 80.61 107.48
53.25 79.88 106.50
53.00 79.50 106.00
48.30 72.45 96.60
47.50 71.25 95.00
46.90 70.35 93.80
46.75 70.13 93.50
EQUIP.
COST
HOURLY
RATE
8.15
6.85
5.25
4.60
Page 4 of 5
DESCRIPTION
EQUIPMENT RATES (CONTINUED)
Power Blower
Power Hedge Trimmer
Trailer- Small (8')
Power Washer
Electric Welder
Portable Generator
Water Trailer
Utility Cart
EQUIP.
COST
HOURLY
RATE
$ 1.90
3.20
2.35
11.70
6.5O
5.25
9.10
3.65
MCE Crew
Large Asphalt Paver
Asphalt Paver
Backhoe
Loader
Roller-Vibratory 5-8 Tons
Roller-Vibratory 3-5 Tons
Dump Truck 8-12 C.Y.
Dump Truck 4-6 C.Y.
Transit Truck 3 C.Y.
'Saw Truck
Pickup Crew Cab
Pickup
Concrete Saw-Self Propelled
Concrete Saw- Small
Air Compressor
Bitumal Pot
Vibra Plate
Wacker
Power Berm Machine
62.50
46.90
40.65
37.50
34.40
31.25
37.50
34.40
34.40
18.75
12.50
11.25
25.00
6.25
18.75
11.25
10.00
10.00
18.75
OVERHEAD AND MANAGEMENT FEES
Applied to Subcontract Work .and
Material Costs
10 percent
* NOTE:
Dublin Flatbed and Pickup rates include cost of two way radios and hand tools.
Page 5 of 5
DUBLIN, CITY OF - EXHIBIT B, PG 4-5 - 2000-2001 (627100) (CONT MGMT - X)