Loading...
HomeMy WebLinkAboutReso 106-00 MCE Pub Wks SvcsRESOLUTION NO. 106 - 00 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AMENDMENT TO AGREEMENT WITH MCE CORPORATION FOR PUBLIC WORKS MAINTENANCE SERVICES WHEREAS, on June 24, 1999, the City Council approved an agreement with MCE Corporation for Public Works Maintenance Services; and WltEREAS, said agreement provided a detailed scope of work and labor rates for Fiscal Year 1999-2000; and WHEREAS, MCE Corporation is requesting a cost of living increase in labor, vehicle, and subcontract rates for Fiscal Year 2000-2001; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the amendment to the agreement with MCE Corporation attached hereto as "Exhibit A", with an effective date of July 1, 2000. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the amendment. PASSED, APPROVED AND ADOPTED this 20th day of June, 2000. AYES: Councilmembers Howard, McCormick, Zika, Vice Mayor Lockhart and Mayor Houston . NOES: None ABSENT: None ABSTAIN: None ATTES~ K2/G/6-20-OO/reso-mce.doc (Item 4.14) C :\contract~maint~resoamnd 'Mayor EX~IIlIT "A" OF RESOLUTION AMENDMENT TO AGREEMENT BETWEEN CITY OF DUBLIN AND MCE CORPORATION FOR PUBLIC WORKS MAINTENANCE SERVICES WH]EREAS, on June 24, 1999, the City of Dublin (hereinafter referred to as "CITY" and MCE Corporation (hereinafter referred to as "CONTRACTOR") entered into an agreement to provide Public Works Maintenance Services to CITY (hereinafter referred to as "AGREEMENT); and WHEREAS, said AGREEMENT provided a rate schedule for Fiscal Year 1999-2000; and WI--IEREAS, MCE Corporation has requested a cost of living increase in labor, vehicle, and subcontract rates for Fiscal Year 2000-2001; NOW, THEREFORE, the parties hereto agree as follows: Section 1. Exhibit B, "Payment Schedule," of the Agreement shall be amended by replacing Attachment 1 in the current Agreement with Attachment 1 of this Amendment, said Attachment 1 being identified as "Exhibit B Payment Schedule 2000-2001." 2000. Section 2. Said revision in Exhibit B "Payment Schedule" shall be effective as of July 1, Section 3. The term of agreement shall be extended until June 30, 2001. CITY OF DUBLIN MCE CORPORATION President ATTEST: ._~. Citf C~ ~' ~,._ - ATTEST: Secretary g:lconzractImce~amndrnr2 -, EXHIBIT B PAYMENT SCHEDULE FISCAL YEAR 2000-2001 (Following three pages) UNIT PRICES The following activities shall be completed at the Unit Prices indicated. The unit prices are inclusive of all labor, materials, equipment, overhead and management fees. ACTIVITY / SUB-ACTIVITY BEDDING WEED CONTROL · Streets & Parks 2000-2001 UNIT PRICE $ 228.44 per Acre per Mo. CHEMICAL WEED CONTROL R.O.W. $ 107.64 perAcre TURF MAINTENANCE Fertilize Only Turf · Ail Parks Except Civic Center $ 89.23 per Acre Broadleaf Spraying Turf · All Parks Except Civic Center $ 76.65 per Acre Fertilize / Broadleaf Turf · All Streets · Civic Center Aeration Turf · Streets & Fire Station · Ail Other Parks Mow Turf · Streets, Fire Station, Stagecoach Park · All Other Parks $ 134.48 perAcre $ 168.24 perAcre $ 370.76 perAcre $ 47.84 perAcre $ 72.11 per Acre $ 48.07 perAcre Edging Turf · Streets Parks TREE MAINTENANCE · Tree Pruning o 0"- 4" Class 1 o 4"- 8" Class 1 o 8"- 16" Class 2 o Over 16" Fungus Spraying $ . 16.83 per MLF $ 14.42 per MLF 20.70 per Tree 33.35 per Tree 66.70 per Tree By Bid 5.04 per Tree Page 3 of 5 DUBLIN, CITY OF - EXHIBIT El, PG 1-3 - 2000-2001 - 6/7/00 (CONT MGMT - X) G: Ti~E AND MATERIALS RATES The following rates shall be applied to work performed by the Contractor which is not specified in Section B (Unit Prices). At all times the Contractor shall strive to utilize the most cost effective elements possible to complete a project. Appropriate overhead and management fees are included in the labor and equipment rates listed below. DESCRIPTION OVERTIME HOLIDAY HOURLY HOURLY HOURLY RATES RATES RATES LABOR RATES Dublin Crew Maintenance Superintendent Landscape Foreperson Landscape Leadperson Landscape Laborer I Landscape Laborer II Landscape Laborer III Landscape Laborer IV 46.30 $ ' 69.45 $ 92.60 35.50 53.25 71.00 31.70 47.55 63.40 29.80 44.70 59.60 25.30 37.95 50.60 20.30 30.45 40.60 15.20 22.80 30.40 MCE Crew Superintendent Loader/Backhoe Operator Asphalt Paver Operator Roller Operator Truck Driver 8-12 C.Y. Truck Driver 4-6 C.Y. Truck Driver 3 C.Y. Transit Cement Finisher Laborer Foreman Laborer I Laborer I! Laborer III DESCRIPTION EQU1PMENT RATES Dublin Crew -~-- * Flatbed Dump · Pickup Chain Saw Brush Cutter 68.00 $ 102.00$ 136.00 66.44 99.66 132.88 66.44 99.66 132.88 64.20 96.30 128.40 54.22 81.33 108.44 53.74 80.61 107.48 53.25 79.88 106.50 53.00 79.50 106.00 48.30 72.45 96.60 47.50 71.25 95.00 46.90 70.35 93.80 46.75 70.13 93.50 EQUIP. COST HOURLY RATE 8.15 6.85 5.25 4.60 Page 4 of 5 DESCRIPTION EQUIPMENT RATES (CONTINUED) Power Blower Power Hedge Trimmer Trailer- Small (8') Power Washer Electric Welder Portable Generator Water Trailer Utility Cart EQUIP. COST HOURLY RATE $ 1.90 3.20 2.35 11.70 6.5O 5.25 9.10 3.65 MCE Crew Large Asphalt Paver Asphalt Paver Backhoe Loader Roller-Vibratory 5-8 Tons Roller-Vibratory 3-5 Tons Dump Truck 8-12 C.Y. Dump Truck 4-6 C.Y. Transit Truck 3 C.Y. 'Saw Truck Pickup Crew Cab Pickup Concrete Saw-Self Propelled Concrete Saw- Small Air Compressor Bitumal Pot Vibra Plate Wacker Power Berm Machine 62.50 46.90 40.65 37.50 34.40 31.25 37.50 34.40 34.40 18.75 12.50 11.25 25.00 6.25 18.75 11.25 10.00 10.00 18.75 OVERHEAD AND MANAGEMENT FEES Applied to Subcontract Work .and Material Costs 10 percent * NOTE: Dublin Flatbed and Pickup rates include cost of two way radios and hand tools. Page 5 of 5 DUBLIN, CITY OF - EXHIBIT B, PG 4-5 - 2000-2001 (627100) (CONT MGMT - X)