HomeMy WebLinkAbout4.05 Civic Cntr Roof CITY CLERK File # 0600-35 AGEN DA STATEMENT CITY COUNCIL MEETING DATE: August 1, 2000 SUBJECT: Award of Bid- Contract 00-10 Civic Center Roof Repair, Phase 2 Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Budget Change Form 2) Resolution RECOMMENDATION: 1) FINANCIAL STATEMENT: Budgeted for construction: Bids receiv, ed: B.U.R. Services: American Services Approve additional appropriation in the amount of $28,825. · Adopt resolution awarding bid to B.U.R. Services $74,000 $93,475 $98,104 An additional appropriation is needed in order to award the contract. Staff is recommending that a t 0% contingency be provided, for a total revised construction budget of $102,825. The additional appropriation needed would therefore be $28,825. Sufficient funds are available in the Building Replacement Fund to pay this additional cost. DESCRIPTION: On July 5th, the City Council authorized Staff to solicit bids for Coniract 00-10 Civic Center R.oofRepair Phase 2. This is the second phase/of the re-roof project that was begun in 1998-99. Re-roof of the Police Wing was originally scheduled for the 1999-2000 fiscal year but was postponed to avoid a conflict with the expansion project. Two bids were received. The low bidder is B.U.R. Services with a bid of $93,475. The low bid is approximately $20,000 higher than funds budgeted for construct ion. Staff contacted B.U.R. Services for an explanation of the cost differential per square foot of roof between this bid and the previous contract and was advised that B.U.R. has experienced increases in both material and labor costs. The labor increase has been in the 15% to 20% range for comp'etent roofers. Since the Police Wing continues to leak, and the roof work needs to be completed before winter, Staff is recommending that the City Council approve an additional appropriation from unallocated reserves and award the contract to the low bidder. A 10% contingency has been included in the recommended budget change. B.U.R. Services performed the re-roof work on the previo u.s (Administrative Wing) contract; the work was satisfactory and completed within the allotted time. Staff recommends that the City Council approve an additional appropriation in the amount of $28,825 and adopt the resolution aWarding Contract 00-10 to B.U.R. Services. COPIES TO: Bidders ITEM NO. R:\miscproj\ccroof~pdwin~\a~stawrd CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New' Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activin, From New Revenues Between Departments (City Council Approval Required) Other DECREASE BUDGET ACCOUNT AMOUNT INCREASE BUDGET ACCOUNT A_MOUNT Namc: Name: Civic Center Roof Repair Phase 2 (Building Replacement Fund) $28,825.00 Account #: Account #: 832-93930-750-050 Name: Nmne: Account #: Account #: Name: Name: Accouut fi: Account #: Nmne: Name: Account #: Account #: Name: Name: A¢.conn! #: Account #: Fin M~r/ASD: Date: Signature REASON FOR BUDG17,T CHANGE ENTRY: Low [>id Jbr this Capital Improvement Project is over the approved construction budget. This budget change reques! includes a 10% contingency. City Manager: Date: Signature As Approved at the City Council Meeting Date: Mayor: 1_ ate. Signature Posted By: RESOLUTION NO. -00 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 00-10 CIVIC CENTER RE-ROOF, PHASE 2 TO B.U.R. SERVICES. WHEREAS, the City of Dublin did, on July 25, 2000, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications £or Contract 00-10, Civic Center Re-Roof, Phase 2, authorized by the City Council on July 5, 2000, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particnlars relative to the proceedings lander the request for bids; and WHEREAS, said bids were sub~rdtted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dubtin Contract 00-10 to the lowest responsible bidder therefor, to wit B.U.R. Services, with a bid of Ninety Three Thousand Four Hundred Seventy Five Dollars ($93,475), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 1st day of August,. 2000. AYES: NOES: ABSENT: ABSTAINING: ATTEST: Mayor City Clerk g: '.miscprojlccroofiresoawrd