HomeMy WebLinkAbout4.10 Bid Sidewalk & Ramp Install~~~~ OF Dp~~~ - ~ i9~~;~~z STAFF REPORT ~ : C I T Y C L E R K ~` ~ ~ DUBLIN CITY COUNCIL File # ^~O^~-~~ ~'~LiFOR~~ - DATE: April 19, 2011 , TO: Honorable Mayor and City Councilmembers FROM: Joni Pattillo, City Manager SUBJE . Award of Bid - Contract No. 11-02, Fiscal Year 2010-2011 Annual Sidewalk . Safety Repair Program and .Curb Ramp Installation. . Prepared By: Ananthan Kanagasundaram, Assistant Civil Engineer EXECUTIVE SUMMARY: On March 15, 2011, the City Council authorized Staff to solicit bids for Contract No. 11-02, Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program and~ Curb Ramp Installation. The scope of improvements will cover two separate Capital Improvement Projects: 1) the Annual Sidewalk Safety Repair Program (CIP No. 949102) and 2) The Americans with Disabilities Act (ADA) Transition Plan (CIP No. 939102). Included in these projects are improvements adjacent to Dublin High School and Frederiksen Elementary School. The projects adjacent to the schools have been developed in partnership with the School District. The City received a total of six bids for the work and the City Council will consider awarding the bid to the lowest bidder. FINANCIAL IMPACT: The total budgeted for the two projects is $243,440 (Annual Sidewalk Repair equals $193,790 and Americans with Disabilities Act (ADA) Transition Plan $49,650). The project budgets include $44,890 allocated for design, inspection, and project coordination. The remaining $198,550 was budgeted for improvements. The funding sources include the General Fund and Measure B Bike and Pedestrian Funds. Included in the General Fund appropriation is a $35,000 contribution from the Dublin Unified School District for the reconstruction of sidewalks next to Dublin High School and $30,000 from a Risk Management Grant is being allocated to the ADA Project. The total costs submitted by the low bidder result in budgetary savings for the Sidewalk Repair~ Project, and the ADA Project requires additional funding. It is proposed to transfer the necessary funds from the Sidewalk Project to the ADA project. Even after the transfer of funds the Annual Sidewalk project will have sufficient funding to identify additional repair locations that present a safety hazard based on the funding and unit prices. The total amount of the lowest responsible base bid presented by Weber Tractor Service is $150,137.32: Including a 10% contingency would increase the total maximum contract to $165,151.05. Staff is also seeking approval for the City Manager to approve change orders for additional work using the unit prices from the low bid provided the total appropriated for improvement costs is not exceeded. ~ Page 1 of 4 ITEIV9 NO. 9•'~ RECOIVIfUIEIVDATION: Staff recommends that the City Council: 1. Adopt the Resolution awarding Contract No. 11-02, Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp Installation to Weber Tractor Service. 2. Authorize the City Manager to approve a potential Change Order in an amount not to exceed $33,399.02 ($10,047.68 General Fund for general sidewalk repairs and $23,351.34 Measure B Funds for Dublin High School frontage improvements) for the installation of additional sidewalk replacement locations based on unit prices in the contract awarded and subject fo restrictions on grant funding. 3. Approve budget change which will transfer in the amount of $15,824 appropriated for improve nts in the Annual Sidewalk Repair Project (No. 949102) to the Americans with Disabili s Act (ADA) ransition Plan Project (No. 939102). ~ ~~ ' ~ Submitted By Reviewed By Rev By ublic Works Director Administrative Services Director Assistant City Manager DESCRIPTION: Staff solicited bids based on a scope of work that will encompass two separate Capital Projects. Annual Sidewalk Safety Project Description The Annual Sidewalk Safety Repair Program (remove and replace) repairs sidewalk offsets of 3/4-inch or more that may pose a tripping hazard. The remove and replace process is used in locations where the offset is more significant or where tree roots are causing the offset. This procedure requires the removal of the existing sidewalk and, in the case of root problems, removal of the tree roots, and then replacement of the concrete sidewalk. - While maintenance of sidewalks and other frontage improvements is legally the responsibility of the adjacent private property owner, the City Council has adopted a City-funded sidewalk repair program on a year-by-year basis since 1983. The City~Council extended funding for the City repair project for an additional year in the Fiscal Year 2010-11 budget. On October 5, 2010 the City Council approved a cooperative agreement with Dublin Unified School District to incorporate sidewalk improvements along the frontage of Dublin High School as part of the annual Sidewalk Repair Project. The School District provided $35,000 in funding which was allocated as $12,600 for Design, $6,700 for inspection and project management and $15,700 for improvements. The City Council appropriated additional $70,000 from Measure B Bike / Pedestrian funds to fully fund the additional improvements. Page 2 of 4 Americans with Disabilities Act (ADA) Transition Plan Project Description This project provides for a phased implementation of the recommended improvements listed in the City's ADA Transition Plan 2006-2007 update. Improvements in the current year adopted Capital Improvement Program were originally focused on pedestrian curb ramps. .On September 21, 2010 the.City Council amended the scope of the project to make use of an ABAG PLAN risk management grant. The proposed improvements were identified in cooperation with the Dublin Unified School District to address deficiencies at the Frederiksen Elementary School entrance (Tamarack Drive / Burton Drive). This included the upgrade of curb ramps, relocation of drainage inlet outside of crosswalk, and replace non-compliant driveway. The grant funds allocated to this project were $30,000. Bids Received A total of 6 bids were received for this project (Attachment 1). The low bid of $150,137.32 was submitted by Weber Tractor Service. Staff has reviewed the bid results, checked references, necessary licenses, and recommends that the City Council adopt the Resolution awarding Contract No. 11-02; Fiscal Year 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp lnstallation to Weber Tractor as the lowest responsive bidder (Attachment 2). Funding For Improvements To Be Constructed As previously noted this agreement will fund improvements identified in two separate Capital Projects. In addition within these projects there are sub-projects associated with the two school projects discussed above. A summary of the funding available for the improvements proposed to be constructed by Weber Tractor Service has been prepared (see Attachment 3"Improvement Budget and Low Bid Comparison"). The budgeted funds avaifable for improvements in the ADA Project are $47,850 and the cost of the improvements (including a 10% contingency) totals $63,673.94. There is available funding budgeted in the Sidewalk Project which Staff has recommended be transferred to the ADA Project (see Budget Change - Attachment 4). In the Sidewalk project the.re are additional funds remaining for improvements. Staff will identify the sites and locations for the curb ramps and sidewalk repairs, and will then confirm the cost with the contractor based on the low bid prices. This will provide flexibility to add additional locations or adjust the areas replaced based on additional review in the field. The funds available include $10,047.68 in General Fund appropriations which can be used city wide and $23,351.34 in Measure B Bike / Pedestrian funds which were specifically appropriated for use adjacenf to the Dublin High School frontage. Included in the recommendation is a request to authorize the City Manager to approve a Change Order in an amount not to exceed $33,399.02 to cover any authorized additional work. Staff expects the project will begin in May 9, 2011 and should be completed by June 30, 2011. This project will repair approximately 150 sidewalk locations that are unsafe or may pose a tripping hazard. Page 3 of 4 NOTIGIMG REQUIRE111iEMTS/PUBLIC OUTEtEACH: None ATTACHMENTS: . 1. Bid Results 2. Resolution of Award 3. Improvement Budget and Low Bid Comparison 4. Budget Change G:\CIP\SIDEWALK~2010-2011 Wgenda Statement Award of Bid - Final.doc ~ Page 4 of 4 ~ ~ ~~ y n~ x- r~~ ~ 1 z` y~ ~ SUMMARY OF BID RESULTS - April 4, 2009 I Pg. 1 of 2 CONTRACT 11-02, 2010-2011 SIDEWALK SAFETY REPAIR PROGRAM WEBER TRACTOR SVC SPOSETO ENG. ROSAS BROTHERS BID ITEM ITEM DESCRIPTION UNIT OF MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Sidewalk (Remove & Replace) SF 4,146 $ 6.42 $ 26,617.32 ~ $ 8.40 $ 34,826.40 $ 9.75 $ 40,423:50 2 Sawcut concrete LF 1,144 $ 3.50 $ 4,004.00 $ 3.70 $ 4,232.80 $ 2.50 $ 2,860.00 3 Curb/Gutter (Remove & Replace) LF 60 $ 62.00 $ 3,720.00 $ 34.00 $ 2,040.00 $ 35.00 $ 2,100.00 4 AC Paving (Remove & Replace) LF 60 $ 20.50 $ 1,230.00 $ 9.90 $ 594.00 $ 8.00 $ 480.00 5 Pedestrian Curb Ramp (CD-105) EA 12 $ 2,150.00 $ 25,800.00 $ 2,295.00 $ 27;540.00 $ 2,000.00 $ 24,000.00 FREDERIKSEN ELEMENTARY ~ REMOVAL 6 Sawcut Concrete LF 175 $ 3.50 $ 612.50 $ 3.70 $ 647.50 $ 2.50• $ 437.50 7 Sidewalk Removal SF 660 $ 1.50 $ 990.00 $ 1.85 $ 1,221.00 $ 3.00 $ 1,980.00 8 Curb & Gutter Removal LF 119 $ 6.25 $ 743.75 $ 8.00 $ 952.00 $ 10.00 $ 1,190.00 9 6" Vertical Curb LF 35 $ 12.74 $ 445.90 $ 8.00 $ 280.00 $ 10.00 $ 350.00 10 AC Removal SF 302 $ 4.00 $ 1,208.00 $ 2.50 $ 755.00 $ 2.00 $ 604.00 11 Demo Top of Existing Inlet Structure LS 1 $ 388.00 $ 388.00 $ 900.00 $ 900.00 $ 3,500.00 $ 3,500.00 INSTALL 12 Standard Curb Ramp ' LS ~ 1 $ 2,900.00 $ 2,900.00 $ 1,200.00 $ 1,200.00 $ 1,500.00 $ 1,500.00 13 Curb Return Ramps EA 2 $ 552.00 $ 1,104.00 $ 1,600.00 $ 3,200.00 $ 1,700.00 $ 3,400.00 14 Curb/Gutter (w/front of ramps/driveway) LF 123 $ 26.05 $ 3,204.15 $ 30.00 $ 3,690.00 $ 24.00 $ 2,952.00 15 Asphalt Plug SF 217 $ 16.50 $ 3,580.50 * $ 9.00 $ 1,953.00 $ 6.00 $ 1,302.00 16 Sidewalk SF 541 $ 5.50 $ 2,975.50 $ 7.00 $ 3,787.00 $ 6.50 $ 3,516.50 17 Driveway LF 88 $ 81.00 $ 7,128.00 $ 18.00 $ 1,584.00 $ 96.00 $ 8,448.00 18 Vertical Curb LF 33 $ 39.70 $ 1,310.10 $ 38.00 $ 1,254.00 $ 20.00 $ 660.00 19 (3'x7.5') Truncated Domes at Driveway EA 2 $ 900.00 $ 1,800.00 $ 700.00 $ 1,400.00 * $ 650.00 $ 1,300.00 20 Modify/Rebid Existing Storm Drain Inlet LS 1 $ 1,020.00 $ 1,020.00 $ 5,100.00 $ 5,100.00 $10,000.00 $ 10,000.00 21 New Inlet LS 1 $ 2,675.00 $ 2,675.00 $ 3,200.00 $ 3,200.00 $ 4,008.00 $ 4,008.00 DUBLIN HIGH SCHOOL REMOVAL • 22 Curb & Gutter • LF 462 $ 6.25 $ 2,887.50 $ 8.00 $ 3,696.00 $ 9.00 $ 4,158.00 23 Sidewaik SF 2,130 $ 1.50 $ 3,195.00 $ 1.90 $ 4,047.00 $ 2.75 $ 5,857.50 24 Sawcut LF 462 $ 3.50 $ 1,617.00 $ 3.70 $ 1,709.40 $ 1.50 $ 693.00 25 AC Removal . SF 565 $ 4.00 $ 2,260.00 $. 1.90 $ 1,073.50 $ 2.00 $ 1,130.00 INSTALL 26 Curb & Gutter SF 462 $ 26.05 $ 12,035.10 $ 23.00 $ 10,626.00 $ 22.00 $ 10,164.00 27 Sidewalk LF 1,925 $ 5.50 $ 10,587.50 $ 7.00 .$ 13,475.00 $ 6.00 $ 11,550.00 28 AC Plug LF ' 565 $ 16.50 $ 9,322.50 $ 7.00 $ 3,955.00 $ 6.00 $ 3,390.00 29 Curb Ramp LF 1. $ 2,700.00 $ 2,700.00 $ 1,600.00 $ 1,600.00 $ 1,800.00 $ 1,800.00 30 NewTreeWells SF 12 $ 350.00 $ 4,200.00 $ 265.00 $ 3,180.00 $ 200.00 $ 2,400.00 31 Curb Painting LF 620 $ 5.00 $ 3,100.00 $ 4.30 $ 2,666.00 $ 5.00 $ 3,100.00 32 (3'x7.5') Truncated Domes near Drivewy LF 4 $ 900.00 $ 3,600.00 $ 970.00 $ 3,880.00 $ 650.00 $ 2,600.00 33 Irrigation Sleeves (5 If each) LF 12 . $ 98.00 $ 1,176.00 $ 50.00 ~$ 600.00 . $ 60.00 $ 720.00 TOTAL: $ 150,137.32 * $ 150,864.60 ' $ 162,574.00 * Amount corrected after verification of calculation 1 ~ ~'' \ ~ Pg. 2 of 2 FBD VANGUARD SUAREZ & MUNOZ JJR CONSTRUCTION BID ITEM ITEM DESCRIPTION UNIT OF MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Sidewalk (Remove & Replace) SF 4,146 $ 10.95 $ 45,398.70 $ 8.00 $ 33,168.00 ~ $ 12.45 $ 51,617.70 2 Sawcut concrete LF 1,144 $ 4.00 $ 4,576.00 $ 2.25 $ 2,574.00 $ 6.35 $ 7,264.40 3 Curb/Gutter (Remove & Replace) LF 60 $ 64.00 $ 3,840.00 $ 50.00 $ 3,000.00 $ 49.80 $ 2,988.00 4 AC Paving (Remove & Replace) LF 60 $ 16.00 $ 960.00 $ 15.00 $ 900.00 $ 20.75 $ 1,245.00 5 Pedestrian Curb Ramp (CD-105) EA 12 $ 2,605.00 $ 31,260.00 $ 2,700.00 $ 32,400.00 $ 3,105.00 $ 37,260.00 FREDERIKSEN ELEMENTARY REMOVAL 6 Sawcut Concrete LF 175 $ 4.00 $ 700.00 $ 3.50 $ 612.50 $ 6.35 $ 1,111.25 7 Sidewalk Removal SF 660 $ 4.00 $ 2,640.00 $ 4.00 $ 2,640.00 $ 5.45 $ 3,597.00 8 Curb & Gutter Removal LF 119 $ 10.00 $ 1,190.00 $ 15.00 ~ $ 1,785.00 $ 22.80 $ 2,713.20 9 6" Vertical Curb LF 35 $ 10.00 $ 350.00 $ 20.00 $ 700.00 $ 35.00 $ 1,225.00 10 AC Removal SF 302 $ 3.00 $ 906.00 $ 5.00 $ 1,510.00 $ 4.00 $ 1,208.00 11 Demo Top of Existing Inlet Structure LF 1 $ 300.00 $ 300.00 $ 2,500.00 $ 2,500.00 $ 1,000.00 $ 1,000.00 INSTALL ~ 12 Standard Curb Ramp LS 1 $ 2,300.00 $ 2,300.00 $ 3,000.00 $ 3,000.00 $ 2,500.00 $ 2,500.00 13 Curb Return Ramps EA 2 $ 2,300.00 $ 4,600.00 $ 2,000.00 $ 4,000.00 $ 2,100.00 $ 4,200.00 14 Curb/Gutter (w/front of ramps/driveway) LF 123 $ 50.00 $ 6,150.00 $ 35.00 $ 4,305.00 $ 27.00 $ 3,321.00 15 Asphalt Plug SF 217 $ 16.00 $ 3,472.00 $ 15.00 $ 3,255.00 $ 7.25 $ 1,573.25 16 Sidewalk • SF 541 $ 7.00 $ 3,787.00 $ 7.00 $ 3,787.00 $ 7.00 $ 3,787.00 17 Driveway LF 88 $ 8.00 $ 704.00 $ 100.00 $ 8,800.00 $ 9.00 $ 792.00 * 18 Vertical Curb LF 33 $ 30.00 $ 990.00 $ 18.00 $ 594.00 $ 35.00 $ 1,155.00 19 (3'x7.5') Truncated Domes at Driyeway EA 2 $ 400.00 $. 800.00 $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 20 Modify/Rebld Existing Storm Drain Inlet LS 1 $ 1,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 1,000.00 $ 1,000.00 21 New Inlet LS ' 1 $ 2,100.00 $ 2,100.00 $ 1,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 DUBLIN HIGH SCHOOL REMOVAL 22 Curb & Gutter LF 462 $ 10.00 $ 4,620.00 $ 15.00 $ 6,930.00, $ 22.80 $ 10,533.60 23 Sidewalk SF 2,130 $ 4.00 $ 8,520.00 $ 4.50 $ 9,585.00 $ 5.45 $ 11,608.50 24 Sawcut LF 462 $ 3.00 $ 1,386:00 $ 3.50 $ 1,617.00 $ 6.35 $ 2,933.70 25 AC Removal SF 565 $ 3.00 $ 1,695.00 $ 4:00 $ 2,260.00 $ 4.00 $ 2,260.00 INSTALL 26 Curb & Gutter SF 462 $ 28.00 $ 12,936.00 $ 33.00 $ 15,246.00 $ 27.00 $ 12,474.00 27 Sidewalk LF 1,925 $ 6.00 $ 11,550.00 $ 6.50 $ 12,512.50 $ 7.00 $ 13,475.00 28 AC Plug LF 565 $ 10.00 $ 5,650.00 $ 5.00 $ 2,825.00 $ 7.25 $ 4,096.25 29 Curb Ramp LF 1 $ 2,300.00 $ 2,300.00 $ 1,800.00 $ 1,800.00 $ 2,500.00 $ 2,500.00 30 New Tree Wells SF 12 $~ 200.00 $ 2,400.00 $. 250.00 $ 3,000.00 $ 300.00 $ 3;600.00. 31 , Curb Painting LF 620 $ 2.00 $ 1,240.00 $ 0.80 $ 496.00 $ 3.30 $ 2,046.00 32 (3'x7.5') Truncated Domes near Drivewy LF 4 $ 400.00 $ 1,600.00 $ 1,000:00 $ 4,000.00 $ 500.00 $ 2,000.00 33 Irrigation Sleeves (5 If each) LF 12 $ 20.00 $ 240.00 $ 50.00 $ 600.00 $ 50.00 $ 600.00 TOTAL: ' $ 172,160.70 $ 177,902.00 $ 201,184.85 " ~ * Amount corrected after verification of calculation ~ ~ ~ ~ / ~ RESOLUTION NO. - 11 A RESOLUTION OF TI~E CITY COUNCIL OF THE CITY OF DUBLIN X!C X X ~F X X X iF ' AWARDING CONTRAC'~' 1~T0. 11-02, 2010-2011 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM AND CURB RAMP INSTALLATION TO _ WEBER TRACTOR SERVICE WHEREAS, the City of Dublin did on April 4, 2011, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. ll-02, 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, authorized by the City Council on March 15, 2011, which Plans, Specifications, and Modifications are hereby expressly referred to far a description of said work and for all particulars relative to the proceedings under the reques"t for bids; and WHEREAS, said bids were submitted to the Public Warks Director, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the ~City of Dublin does hereby award Contract No. 11-02, 2010-2011 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, to the lowest responsible bidder therefor, to wit, Weber Tractor Service, at a bid of One Hundred-Fifty Thousand, One Hundred, Thirty Seven Dollars, and Thirty Two Cents ($150,137.32), the particulars of which bid are on file in the offiee of the Public Works Director. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 19th day of April, 2011, by the following vote: AYES: NOES: ABSENT: ABSTAIN: • ATTEST: City Clerk G:\C[P\SIDEWALK~2010-20ll\Resolution of A~vard.DOC Mayor ATTACHMENT 2 i ~ IMPROVEMENT BUDGET AND LOW BID COMPARISON Annual Sidewalk Safety Repair Program (CIP No. 949102) The Americans with Disabilities Act (ADA) Transition Plan (CIP No. 939102) Presented April 19, 2011 Based on Proposed Agreement with Weber Tractor Service Project Funding Budget For Low Bid With . Source Improvements Contingency Sidewalk Safetv Repair (949102) Annual.Sidewalk Safety Base Bid General Fund $80,700 $ 35,571.32 Annual Repair Contingency 10% General Fund Included 3,557.00 Additional Locations General Fund Included 10,047.68 Dublin High School Improvements General Fund Included 15,700.00 Budget Transfer to ADA Project General Fund 1( 5,824) Sub-Total General Fund $ 64,876 $ 64,876.00 Bike/Pedestrian Funds Dublin High School (DHS) Improvement Measure B $70,000 $ 40,980.60 DHS Contingency - Measure B 5,668.06 Additional Repairs Adjacent DHS Measure B 23,351.34 Sub-Total Measure B Fund ~ $ 70,000 $ 70,000.00 TOTAL SIDEWALK PROJECT ' IMPROVEMENTS (Net of Transfer of $134,876 $134,876 Budget To ADA Project and Allowance For Additional Work) ADA Transition Plan / Curb Ramps ` (939102) Annual ADA Project Base Bid General Fund $ 47,850 $ 25,800.00 Improvements Fredericksen School General Fund 32,085.40 Contingency 10% General Fund 5,788.54 Budget Transfer from Sidewalk Project General Fund 15 824 TOTAL ADA PROJECT $ 63,674 $63,673.94 IMPROVEMENTS (Net of Transfer of Budget From Sidewalk Pro'ect) COMBINED IMPROVEMENT TOTAL TWO PROJECTS $198,550 $198,549.94 G:\CIP\SIDEWALK~2010-20ll~Finance Breakdown for Improvements.doc Attachment 3 CITI( OF DUBLIN ~UDGET CF~ANGE FORIVI FY 2010 / 201'E New~-Appropriations (City Councii Approval Required): From Unappropriated Reserves (*) (General Fand: Innovations ~ New Opportunities) From Idew Revenues X Other 3 _DECRE~-SE BUd,GET ACCOUIVT , 4 AM_~OUNT~~~' ~AICREA~SE~BEJDG~ A~CCQUhdT~ ~ ~,.~ANlOU„NT ~;~~~,~~ YVame: EXPENSE - GENERAL Plame: EXPENSE - GENERAL FUND - Sidewalk Safety Project - FUND - ADA Transition Plan Improvements - Project - Improvements Proj # 949102.9400.9401.1001 15,824 Proj # 939102.9400.9401.1001 $15,824 GL Account # 3400.9401.73103 GL Account # 3300.9301.73103 ~ REASON FOR BUDGET CHANGE ENTRY: As presented to the City Council on April 19, 2011, after receiving proposals for an Energy Audit an additional appropriation is required. A project budget was es~ablished at $40,000 prior to soliciting proposals in December 2010. The total cost based on the recommended vendor is $55,000 requiring an additional appropriation. The General Fund has a reserve designated for Innovations and New Opportunities; which would be reduced to reflect this appropriation. Fin Mgr/ASD: ~~ D"ate: y f 3 ~~ Sia ture City Manager: ~~ • ~~'-~c~.~Y.t~ CHANGE FORM # Budget Transfers: __ From Budgeted Contingent Reserve (1001.1901.81101) Within Same Depaitment Activity __ Between Departments (City Council Approval Required) 5 ~ Date: ~~3 ~ ~ ~ j As_Approved at he C~ty Council Meeting;,on~ ; ~ , k ~ ~~ ~ ~~~ ~ ° ~ Date ' ~t/19/201~1 : .._ .... ., ~.. ~'~ .. .,._... ~`w ....._ .:,~ ... ~.__, _a. s __~ . ~__~.. ._,~._ Mayor: Signature Date: Posted By: Date: ~: ~„dger ~~~,~s~3_zo,o_„~8_a_f9_„_~rP s;d~.a~~ ~~A ~o.,~a~~.da ATTAC H M E N T 4