Loading...
HomeMy WebLinkAbout6.4 Speed Studies CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: February 23, 1987 SUBJECT: Public Hearing: Speed Studies Regarding San Ramon Road, Hansen Drive, Betlen Drive, Tamarack Drive, Penn Drive, Dublin Blvd. , and Dougherty Road EXHIBITS ATTACHED: Report from TJKM RECOMMENDATION: 1) Open Public Hearing 2) Receive Staff presentation and public testimony 3) Question Staff and the public 4) Close Public Hearing and deliberate 5) Adopt survey results and direct Staff to install signage where needed. FINANCIAL STATEMENT: Approximately $500 to install the four speed limit signs recommended for locations on Hansen, Betlen, and Tamarack. DESCRIPTION: In recent meetings of the Dublin Traffic Safety Committee, one of the items of discussion has been speed limits and the problems encountered by the police department in issuing citations. The vehicle code sets a "prima facie" speed limit of 25 m.p.h. for residential streets that are less than 40 feet in width, have only one traffic lane in each direction, and have not more than one-half mile of uninterrupted length. The police department is entitled to use radar on these streets for the purpose of determining traffic speed for issuance of citations. Speed limits on streets that do not meet the above criteria must be justified by an engineering and traffic survey where enforcement involves the use of radar to measure the speed of the traffic. Some residential streets in Dublin are, in fact, over 40 feet in width and therefore had to be surveyed in order for the police department to use radar for enforcement of the 25 m.p.h. speed limit. These are Hansen Drive west of Amarillo, Betlen Drive west of Circle Way, Tamarack Drive east of Village Parkway, and Penn Drive north of King Way. In addition some non- residential streets were required to be surveyed because of changes in design or traffic control. These are Dougherty Road north of Amador Valley Blvd. , which was recently widened to four lanes; and Dublin Blvd. east of Sierra Court, which recently received a new traffic signal. It was also discovered that San Ramon Road north of Silvergate had not been surveyed as a part of any of the recent studies. The survey results are attached to this report. TJKM does not recommend changing any speed limits from those presently utilized. The speed limit on this section of Dougherty Road was 45 m.p.h. prior to reconstruction. It is currently posted as a 25 m.p.h. construction zone. The developer will be required to provide the 45 m.p.h. signage as part of the improvements. ITEM NO. lQ , 11 COPIES TO: TJKM Rafanelli & Nahas • 'BZW �^ —I _ 4637 Chabot Drive,Suite 214 Pleasanton Ca. 94566 (415)463-0611 MEMORANDUM DATE: February 17, 1987 TO: Lee Thompson, City Engineer FROM Ty Tekawa SUBJECT: Speed Study - Selected Streets Over 40' Wide This submittal supersedes the memorandum on the same subject dated February 3, 1987 For enforcement by radar, engineering and traffic studies are not needed for "local" streets and roads. One of the conditions defining a local street is that its width not be greater than 40 feet. The streets listed in Table I are local streets except that they are wider than 40 feet and have not had a speed study conducted on them within the last five years: (Dublin Boulevard and Dougherty Road are included in these studies only to determine the appropriate speed limit after recent street improvements.) The table is a summary of the data gathered during our radar spot speed survey. Our recommended speed limit is also shown. The computer-produced data sheets are attached. Also attached are criteria for speed studies. Following is an explanation for the recommended speed limits for each street section: San Ramon Road North of Silvergate Drive The posted speed limit southbound on San Ramon Road at Alcosta Boulevard is 40 miles per hour (mph). The speed limit northbound from Dublin Boulevard to Silvergate Drive is 35 mph. North of Silvergate Drive, the speed limit changes to 40 mph. Although the 85th percentile speed is 50 mph and there are no access points onto San Ramon Road except at public cross streets; the existing posted speed limit of 40 mph should be retained for the following reasons: San Ramon Road is a two-lane undivided road and has steep embankments on either side. The existing speed limit northbound from Dublin Boulevard to Silvergate Drive is 35 mph. This speed limit may need to be increased to 40 mph to make the entire street section from Dublin Boulevard to Alcosta Boulevard a uniform speed. The 5 mph differential between 35 mph and 40 mph should be avoided. Further, after San Ramon Road is widened, another speed survey along the entire length of San Ramon Road should be conducted. Hansen Drive West of Amarillo Road The posted speed limit is 25 mph. The development in the area is entirely single family residential. The road has several curves, parking is allowed along both sides, and there are numerous driveways. Except for its width, the street is a typical low volume residential street and for that reason, should remain at 25 mph. A 25 mph sign should be installed eastbound entering Hansen Drive near Silvergate Drive. Betfen Drive West of Circle Way There were no posted speed limits on Betlen Drive between Silvergate Drive and Hansen Drive. The development along the street is single family residential and parking is allowed on both sides of the street. There are numerous driveways along the street. PLEASANTON.SACRAMENTO FRESNO.CONCORD Mr. Lee Thompson -2- February 17, 1987 Except for its width (47 feet) Betlen Drive is a typical low volume residential street and a speed limit of 25 mph is appropriate. Signs should be posted at Silvergate Drive and at Hansen Drive. Tamarack Drive East of Village Parkway Tamarack Drive is posted for 25 mph eastbound from Village Parkway. There is no posted speed limit westbound from Brighton Drive. The street is striped for one lane of traffic in each direction. The surrounding development is single family residential and there is an elementary school situated about halfway between Village Parkway and Brighton Drive. There are several school crosswalks across Tamarack Drive Because of the residential nature of the area and the presence of the school fronting Tamarack Drive, the speed limit should remain 25 mph and a speed limit sign should be installed westbound from Brighton Drive. Penn Drive North of King Way Penn Drive is in a single family residential neighborhood. There is a school located on _ this street and several crosswalks have been painted across Penn Drive. There are numerous driveways and on-street parking is allowed. The speed limit should remain at 25 mph as posted. Dublin Boulevard East of Sierra Court Dublin Boulevard-.is posted for 35 mph. The speed survey was conducted to check speeds after the street improvements were completed near. Sierra Court. Because the critical speed westbound is 38 mph and because there is a school nearby, it is recommended that the speed limit near Sierra Court remain. at 35 mph to conform with the rest of Dublin Boulevard.- . Dougherty Road North of Amador Valley Boulevard The radar speed survey was conducted to determine the speed limit for the recently ,completed street improvements on Dougherty Road north of Amador Valley Boulevard to the north City limits. This section of roadway is now widened to four lanes. Both ends of the sections transition down to two lanes. North of the City limits, warning signs reading "ROUGH ROAD 25 MPH" are posted. South of Amador Valley Boulevard the posted speed limit is 35 mph. The new section of Dougherty Road has been posted for 25 mph and construction signs have also been installed with supplemental 25 mph signs. These V signs obviously have no effect on drivers since the recorded critical (85th percentile) speeds were 59 mph . - northbound and 53 mph southbound. Fiftieth percentile speeds are 45 mph northbound and 47 mph southbound. It is recommended that the section be posted 45 mph. This speed is an appropriate transition from the 35 mph limit south of Amador Valley V Boulevard. rhm Attachments 157-001M.10T TABLE I CITY OF DUBLIN • SUMMARY OF SPEED STUDY January 1987 Posted Speed Recommended Street (over 40' wide) Direction Limit 85th% 50% Speed San Ramon Road N/O Silvergate NB 40 50 45 40 SB 40 50 , 45 40 Hansen Drive W/O Amarillo EB - 32 27 25 NB . 25 35 28 25 Betlen Drive W/O Circle Way EB - 32 29 25 WB - 35 29 25 Tamarack Drive E/O Village Pkwy. EB 25 32 28 25 WB - 32 29 25 Penn Drive N/O King Way NB 25 32 27 25 SB 25 32 28 25 Dublin Blvd. E/O Sierra Court EB 35 40 35 35 WB 35 38 34 35 Dougherty Rd. N/O Amador Valley NB 25 59 45 45 SB 25 53 47 45 SPOT SPEED STUDY ANAL [S FOR THE CITY OF DUBLIN-"- LOCATION TAMARACK DR. E/O VILLAGE PKWY. DEVELOPMENT RESIDENTIAL DIRECTION EASTBOUND 50th PERCENTILE SPEED 28 DAY OF THE WEEK ' TUESDAY 85th PERCENTILE SPEED 32 DATE 1/20/87 10 MPH PACE SPEED 22 TO 31 TIME OF THE DAY 4:30-5:45 PM PERCENT IN PACE SPEED 80 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 19 TO 38 VEHICLES OBSERVED 105 SKEWNESS INDEX 1. 00 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) EVER OF TOT. PRCNT. 100% ••••••••••••-1 19 1 0. 95 . 0. 95 I 1 I I • . 1 I I I 20 1 0. 95 1. 90 I I I I • I I I ' I 21 0 0. 00 1. 90 I I I I • :I I I I 22 6 5. 71 7. 62 .90%• I-1--1-1-4-1-1-1-1 23 2 1. 90 . 9. 52 I I I I• I I I I 24 8 7. 62 17. 14 I I I I• I I • I I 25 8 7. 62 24. 76 I I I I• I I I I 26 14 13. 33 38. 10 80% I I I- • I 1 I I 27 11 10. 48 . 48. 57 i I I • I I I I 28 13 12. 38 60. 95 I 1 I • I I 29 9 8. 57 69. 52 I I I • I I II 30 7 6. 67 76. 19 70%. i. I I---• I I I I 31 7 6. 67 82. 86 1 I . I •1 1 I I I 32 3 2. 86 85. 71 i 1 I •t I I I I 33 - 5 4. 76 90. 48 I I I •1 . I I I I J4 3 2. 86 93. 33 60% I I I-•1 1 I I I 35. 2 1. 90 95. 24 I I I •I I I I I 36 4 3. 81 99. 05 I I I •I . I I I I 37 0 0. 00 99. 05 I 1 I •I . I I I I • 38 1 O. 95 100. 00 50% I 1 I--• I 1 I I 1 39 0 0. 00 100. 00 I I I •I I I I I 40 0 0. 00 .100. 00 . I I I • I I I I I•41 0 0. 00 100. 00 I I I • I I I 1 I 42 0 0. 00 . 100. 00 40% I . I J.--•-I I I-I-I 43 0 0. 00 100. 00 J I I - • 1 - 1 I I I 44 0 0. 00 100. 00 1 I I • J I I I 1 45 0 0. 00 100. 00 I ' 1 . I • I I 1 I 1 46 0 0. 00 100. 00 30% I I I--•-1 1 I I I 47 0 0. 00 100. 00 I I ' I • I 1 I I I 48 0 0. 00 100. 00 I I I • I •I I I I 49 " 0 0. 00 100. 00 I I - I • I I I I I 50 0 0. 00 100. 00 20% J-1-1-•-I1-1-1-1 51 0 0. 00 100. 00 I I I • I I I I I 52 0 0. 00 100. 00 J I I • - I • • I 1 I I _53 0 0. 00 100. 00 • . 1 I I • I I I I I 54 0 0. 00 100. 00 10% I I I-•-I I I I I 5J5 0 0. 00 100. 00 I I I• I • I I I I 56 0 0. 00 100. 00 I 1 I• • I I I I I 57 0 0. 00 100. 00 1 I I• I • . I I I I 58 0 0. 00 100. 00 0% L********-41 59 0 0. 00 . 100. 00 - 0 10 20 30 40 50 60 70 SPEED (MPH) SPOT SPEED STUDY ANAL ;S FOR THE CITY OF DUBLI, LOCATION TAMARACK DR. E/O VILLAGE PKWY. DEVELOPMENT RESIDENTIAL DIRECTION WESTBOUND 50th PERCENTILE SPEED 29 DAY OF THE WEEK TUESDAY . 85th PERCENTILE SPEED 32 DATE .1/20/87 10 MPH PACE SPEED 24 TO 33 TIME OF THE DAY 4:30-5:45 PM PERCENT IN PACE SPEED 88 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 18 TO 38 VEHICLES OBSERVED . 101 . SKEWNESS INDEX 0. 89 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% ••••••••••••--, 18 1 0. 99 0. 99 I I I I • I . I I I 19 . 0 0. 00 0. 99 . 1 I I I • 1 1 I I 20 1 0. 99 - 1. 98 I 1 I I• I 1 . I I 21 0 0. 00 1. 98 90% I ` 1 I I• I I I I 22 2 1. 98 3.'96 I I I • I I I 1 23 1 0. 99 4. 95 I 1 I • I 1 . I - 1 24 6 5. 94 10. 89- I I I • 1 1 I 1 25 2 1. 98 12. 87 80% I I I • I i I 1 26 8 7. 92 20. 79 I 1 I • I I 1 I 27 11 10. 89 31. 68 I 1 I • 1 . 1 I I 28 15 14. 85 46. 53 I . I I • 1 1 1 1 29 16 15. 84. 62. 38 70% I,-1-1-4,1-1-1-1--1 30 11 10. 89 73. 27 I I I •I I , 1 1 1 31 10 9. 90 83. 17 I I I •I I t 1 I 32 • 6 5. 94 89. 11 1 I 1 •1 1 1 I 1 33 4 3. 96 , 93. 07 60%. I I I-•I I I I I 34 3 2. 97 96. 04 i I I •I I 1 I I 35 3 2. 97 . 99. 01 I I I •I I 1 ` 36 0 0. 00 99. 01 I I I •I I I I I 37 0 0. 00- 99. 01 50% I I I-i t I I - I 1 38 1 0. 99 100. 00 I I 1 •I I I I 1 39 0 0. 00 100. 00 _ i I 1 . • I I I I 1 40 0 0. 00 100. 00 I I 1 • I I I I ` 41 0 0. 00 100. 00 40% I-1-L-1-•-1----1-1-1-1 42 - 0 . 0. 00 100. 00 I I 1 • I I I I 43 0 0. 00 100. 00 I' I I • I I I 1 1 44 0 0. 00 100. 00 I I I • I I I I 45 0 . 0. 00 100. 00 30% I t I-•-I 1 I I 1 46 0 0. 00 100. 00 t I I • I I I I `1 47 0 0. 00 100. 00 I I ' 1 • I I 1' I I • 48 0 0. 00 100. 00 . I I I • I I I I 49 0 0. 00 100. 00 20% I i I-•-I I 1" 1 I 50 0 0. 00 100. 00 1 1 I - I • I I I I . 1 51 0 0. 00 100. 00 I I I • I 1 I I 1 52 0 0. 00 100. 00 - I I I • I I i 1 I =7.. 0 0. 00. 100. 00 10% I-1---1-11)-i--1-1---I--1 54 0 0. 00 100.00 I I I• 1 1 1 I I 55 0 0. 00 100. 00 I I I• I I 1 I I 56 0 0. 00 100. 00 l I • I . . I I I I 57 0 0. 00 100. 00 0% L•••••••-• 58 0 0. 00 100. 00 0 10 20 30 40 50 60 - 70 SPEED . (MPH) SPOT SPEED STUDY ANAL, ;S FOR THE CITY OF DUBLIN LOCATION BETLEN DR.. W/O CIRCLE. WY. DEVELOPMENT •DIRECTION WESTBOUND 50th PERCENTILE SPEED 2 RESIDENTIA9 DAY OF THE WEEK WEDNESDAY 9 DATE 85th PERCENTILE SPEED 35 1/21/87 10 MPH PACE SPEED 26 TO 35 TIME OF THE DAY 1 :30-4:30 PM PERCENT IN PACE SPEED POSTED SPEED LIMIT 25 RANGE OF SPEEDS 79 VEHICLES OBSERVED 24 23 TO 39 SKEWNESS INDEX - 1. 25 . CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% 24 2 8. 33 8. 33 I I 1 - I .1 ( 1 I 8. 33 16. 67 i 1 I 1 •I I I I 25 - 0 0. 00 16. 67 I 1 1 1 . *1 . 1 1 26 1 4. 17 20. 83 --1--1---1-4,-1-1--1-1 1 90% I 27 1 4. 17 ` 25. 00 V I I I I • I 1 28 3 12. 50 37. 50 I I 1 1 s • 9 � I I ( 1 50 50. 00 1 1 ( ( • i I I 1 30 2 8. 33 58. 33 80%. I 1 1 1--•-I 1 31 1 4. 17 . 62. 50 I I 1 I ! * I L I I 32 1. 4. 17 66. 67 I I I l• • I ( I :` I 3 3 0 0. 00 66. 67 I 1 1 1 • 1 1 1 1 34 3 12. 50 79. 17 70% I-1--1-1--•--1--1-1-1 35 2 8. 33 87. 50 1 1 I - 1 '• I 1 I I 36 0 0. 00 87. 50._ 1 I 1 I• 1 1 1 1 37 1 4. 17 91. 67 I 1 1 I• I 38 0 0. 00 91. 67 60% ( 1 I 1 i I--+ti ! I I 39 8. 33 100. 00 l.. 1" ' 1 • I 40 0 0. 00 100. 00 1 1 I I • ! I I i 41 0 0. 00 100. 00 1 1 I • 42 0 0. 00 100. 00 50% I-1-1-7--4,-1--1--1--1 I. I 1 43 0 0. 00 100. 00 I 1 1 . •I . 1 1 44 0 0. 00 - 100. 00 1 I' 45 0. 0. 00 100. 00 I I. 1 *I I . 1 46 0 0. 00 100. 00 40%. I-1--1-01-1--1-----1--1 I I 47 0 . 0. 00 100. 00 I I I �I - `- i I 11 48 ' 0 0. 00 100. 00 1 1 1 •1 1 1 - 1 I 49 0 0. 00 100. 00 1 1 1 4.1 1 I i I 50 0 0. 00 100. 00 30% I I I--y I 1 51 0 0. 00 100. 00 - I I 1 I 1 i •( I I 1 .1 . 52 0 0. 00 100. 00 53 0 0. 00 100. 00 I I I * I 1 1 1 I 54 0 0. 00 100. 00 20% I-1-1--o-1---1--1 55 0 . 0. 00 100. 00 I I I i ( • I I 1 I I . 56 . 0 0. 00 100. 00 I 1 1 • 1 1 1 1 I .57 0 0. 00 100. 00 V i ( I • I •58 0 0. 00 100. 00 10% I -1-1-•-1-1-1-11 1 I 59 0 0. 00 100. 00 I I • I _ 1 • i i I I I _ 60 0,. . 0. 00 100. 00 1 I*. 1 1 61 0 0. 00 100. 00 1 I 1 I I I• I 1 1 i 1 62 0 0. 00 100. 00 . 0% 4,000000.04, 63 0 0. 00 100. 00 0 10 20 30 40 50 60 70 SPEED (MPH) SPOT SPEED. STUDY ANALYS FOR THE CITY OF DUBLIN �. LOCATION BETLEN DR. W/O CIRCLE WY. DEVELOPMENT RESIDENTIAL DIRECTION EASTBOUND 50th PERCENTILE SPEED 29 DAY OF THE WEEK WEDNESDAY 85th PERCENTILE SPEED- 32 DATE 1/21/87 10 MPH PACE SPEED 24 TO 33 TIME OF THE DAY 1 :30-4:30 PM PERCENT IN PACE SPEED 88 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 22 TO 43 VEHICLES OBSERVED 27 SKEWNESS INDEX 0. 73 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% 41••••••••/6--' 22 2 7. 41 7. 41 I 1 I I •••a• 1 I 1 23 0 0. 00 7. 41 I I I I• I 1 I I 24 1 3. 70 11. 11 I I I 1• I I I i 25 0 0. 00 11. 11 90'/• I I I !a I I ' I I 26 1 3. 70 14. 81 I I 1 1* ! I I 1 27 3 11. 11 25. 93 I I 1 lib 28 4 14. 81 40.74 I I 1 a I 1 I 1 29 3 11. 11 51. 85 80% I I i--a I 1 ! 1 30 1 3. 70 0 55. 56 1 I I . • I I 1 31 6 22. 22 77. 78 I I I • I . I 1 1 . 32 , 2 7. 41 85. 19 I 1 1 • 1 I 1 33 3 11. 11 . 96. 30 70% 1 I I-• I ! I I 34 0 0. 00 96. 30 I 1 . I . • I I 1 1 35 0 0. 00 . 96. 30 I I 1 . • . 1 1 I 36 0 0. 00 96. 30 I I I • 1 I I 1 37 0 0. 00 96. 30 60% I ----1----1----a----1 ----1----1----1 38 0 0. 00 96. 30 1 I I • I I I I 39 0. 0. 00 96. 30 . I I 1 a ! 1 I 1 40 0 0. 00 96. 30 I I I *I I I - I I 41 0 0. 00 96. 30 50% I I I--•i I I 1 I 42 0 . 0. 00 96. 30 1 . I 1 •1 I I 1 1 43 1 3. 70 100. 00 I I 1 •1 I I 1 1 44 0 0. 00 100. 00 I I 1. •1 1 I . 1 1 45 0 0. 00 . . 100. 00 40% I I I-a! I I I , 1 46 .0 0. 00 100. 00 I l 1 a 1 I 1' I I 47 0 0. 00 100. 00 ! I I • I I I I 1 48 0 0. 00 100. 00 1 1 i a I I I I I 49 0 0. 00 100. 00 30% i l' I-*-i I i ! 1 50 0 0. 00 100. 00 I 1 1 • 1 1 I I 1 51 . 0 0. 00 100. 00 1 1 1 • I 1 I - 1 - I 52 0 0. 00 100. 00 I 1 I • I 1 I I 1 53 0 0. 00 100. 00 '. '0% I-1-1-411-I-1-1-1-1- - 54 0 0. 00 100. 00 I I I .a 1 I I I 1 55 0 0. 00 100. 00 1 I I • I I 1 . 1 1 J6 0 0. 00 100. 00. I : . 1 I a I I . 1 I 1 57 0 0. 00 100. 00 10% I I 1-*-1 1 I I 1 58 0 0. 00 100. 00 I I I• I I I I I 59 --' 0 0. 00 100. 00 J I • I I I I 1 60 0 . 0. 00 100. 00 I I . a I I I 1 1 61 0 0. 00 100. 00 . 0% ea•aaaaaaa ' 62 0 0. 00 . 100. 00 0 10 20 .- 30 40 50 60 70 SPEED (MPH) { SPOT SPEED STUDY ANAL, {S FOR THE-CITY OF DUBLIN- LOCATION HANSEN D.R. W/O AMARILLO RD. DEVELOPMENT RESIDENTIAL - DIRECTION WESTBOUND 50th PERCENTILE SPEED 28 DAY OF THE WEEK TUESDAY - 85th PERCENTILE SPEED DATE 1/20/87 33 10 MPH PACE SPEED 24 TO 33 TIME OF THE DAY 1 : 15-4:25 PM PERCENT IN FACE SPEED - . 83 POSTED SPEED LIMIT 25 RANGE OF-SPEEDS 24 TO 49. VEHICLES OBSERVED 37 . SKEWNESS INDEX 1. 38 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH). BER' OF TOT, PRCNT. 100% r 24 3 8, 11 8. 1A ••+•••••-- .t I I t ••••••I 1 I 25 3 8. 11 16. 22_ , t F . I I • I I I .. . I 26 4 10. 81 • 27. 03 • I I 1 . I . • 27 6 16. 22 . 43. 24 90% I-I-1-I-•-t I I .I 28 6 16. 22 59. 46 I I I 1 • . t .1 I 1 - �S 1 . 2. 70 62. 16 t I I I • -. I I I " I 30 3 8. 11 70. 27 - - . 1 . I ' I ' -1• ' I . 31 2 . 5. 41. .7 5. 68 80% 1 I I- t• 1 I I I 32 1 2. 70 78. 38 . I I I 1• I 1 I t 33 2 5. 41 83. 78 • I • I I . • I • I I I 34 - • 0 . 0. 00 83. 78 , 1 I - I - • 1 I • I . I 35 2 - 5. 41 , 89. 19 . 70% I I I--* 1 I I I 36 1 2. 70 91. 89 I . 1 1 .•I I A I . I 37 2 5. 41 97. 30 I I . 1 •I " I I " . 1 1 38 • 0 0. 00 97. 30 • I . I I id , I -I I 39 0 0. 00 97. 30 . 60% I I I-•1 1 I i I 40 0 0. 00 - •97. 30 I I t • I , - , I ' I t I 41 . 0 0. 00 . 97. 30 I I I • - 1 . 1 1 1 1 42 0 0. 00 97. 30 • 1 1 I . • t ' I I 1 . - 43 0 0. 00 97. 30 - 50% 1 i I-•-I 1 44 0 0. 00 97. 30 I i 1 . 1 I 1 I 45 0 0. 00 97. 30 I I I • L I I 1 I • 46 0 ' 0. 00 97. 30 ' • i - I 1• • I I 1 I I - 47 0 , 0. 00 97. 30 40% I----1---71--*-1 i t I I 48 0 0. 00 97. 30 • I I - I • I -f 49 1 ' 2. 70 100.'00 I `. - I I I 1 � • I I _ I " I I . 50 -0- 0. 00 100. 00 I I . I • I I I I I . 51 0 . 0. 00 - 100. 00 30% I-----1----1---*-I i i I I - 52 0 0. 00 100. 00 i I I . • I , t I . A - I 53 0 0. 00. . 100. 00 I t . . " I • ' I • V. . I . • 1 I 54 0 . 0. 00 100. 00 .I I I •• 1 . . ' I I 1 I 55 0 0. 00 . 100. 00 20% I i I-•-I - I I ! I • 56 0 0. 00 100. 00 I I t • I I .1 • I . I 57 0 . 0. 00 100. 00 I I . I • I 1 i . I 1 .58 0 0. 00 100. 00 • I I - I • 1 I I I • I 59 0 0. 00 100. 00 10%. I-1-----I-•-1 I 1 i I 60 0 0. 00. • 100. 00 I I . 1 • I I I I I 61 0• - 0. 00 100. 00 t I I• I I I 1 • I - 62 0 . 0. 00 ' 100. 00 . I I , I.• - 1 . I .1 ., I . - 1 , 63 ' 0 0. 00 100. 00 .0% L••••••••••• 1 64 0 0. 00 100. 00 0 10 - 20 30 40 50 60 70 SPEED (MPH) - . • • SPOT SPEED STUDY ANAL) B FOR THE CITY OF DUBLIN. LOCATION HANSEN DR. W/O AMARILLO RD. DEVELOPMENT RESIDENTIAL DIRECTION EASTBOUND 50th PERCENTILE SPEED 27 OF THE WEEK . TUESDAY 85th PERCENTILE SPEED 32 DATE 1/20/87 - 10 MPH PACE SPEED . 22 TO 31 TIME OF THE DAY 1 : 15-4:25 PM PERCENT IN PACE SPEED 84 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 22T0 40 VEHICLES OBSERVED 50 SKEWNESS INDEX 1. 27 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL: (MPH) BER OF TOT. PRCNT. 100% , ••••••••••••__-i 22 3 6. 00 6. 00 1 I I i . •" *i I t 23 3 6. 00 12. 00 " I 1 I 1 •• t - . I I I 24 5 10. 00 22. 00 - - t I I I• 1 1 1 1 25 1) 4. 00 ' 26. 00 90% I . I " I 1• I _ I I 1 26 6 12. 00 38. 00 t I . 1 I• 1 " 1 I I 27 7 14. 00 52. 00 1. I I - I• 1 1 I I 28 . ' 7 14. 00 66. 00 I' l I • 1 1 I 1 29- 3. 6. 00 72. 00 80% 1 I I-• I I-I--I 30 4 8. 00 80. 00 '1 I 1 •1 1 I 11 31 2 4. 00 84. 00. 1 I I •1 I " I 32 - 1 2. 00 86. 00 I I I •I I I 1 I 33 1 2. 00 88. 00 . 70% I I " I--•I1-1-1-1 34 3 6. 00 94. 00 I t ' t ..1" I I I 1 35 1 2. 00 96. 00 I ' I I •I 1 1 ' ' 1 1 36 0 0. 00 96. 00 " I ' I I • 1 1 I 1 1 37 1 2. 00 98. 00 60% I I .I---•-I i I " I I 38 0 0. 00 98. 00 t I I • I 1 I I I. 39 0 0. 00 98. 00 1 ' I . 1 " • I I I I 1 40 1 2. 00 100. 00 I t I • I 1 1 . ' 1 1 41 0 ' 0. 00 100. 00 50% I I 1--•-1 I t I 1 42 . 0 . 0. 00 100. 00 i 1 , I • I 1 . I I 1 43 0 0. 00 " 100. 00 I" I I • I I 1 II. 44 0 - 0. 00 100. 00 I I . 1 • I t I I 1 45 0 0. 00 " 100. 00 40% I-I-1-s-1-1-1-1-1 46 0 0. 00 100. 00 I 1 1 • 1 I I I 1 47 0 0. 00 100. 00 1 " I 1 • 1 1 I I 1 48 0 0. 00 100. 00 1 I I • I ' 1 1 1 1 49 0 0. 00 100. 00 ' 30% I I - I--•-I I 1 1 I 50 0 0. 00 100. 00 I I I • I I 1 I 1 51 . 0 0. 00 100. 00 I 1 1 • t " ' .1 . I I 1 ' 52 0 0. 00 100. 00 I . 1 1 • 1 1 1 53 0 0. 00 100. 00 1 20% I t I• t I I I I 54 0 0. 00 .100. 00 1 ' 1 'I• 1 1 1 1 1 55 0 0. 00 100. 00 1 I I• I 1 I 1 . 1 .56 0 0. 00 100. 00 I I 1• t I I I i 57 0 . 0. 00 . 100..00 . 10%. I ' I 1• 1 l I i 1 58 0 0. 00 100. 00 1 I I• I I 1 1 1 59 Qt, 0. e0 - 100. 00 1 I I• I I I ' 1 1 60 0 0. 00 100. 00 I I '•. " I 1 1 1 I 61 0 0. 00 100. 00 0% I-•••••••••• 62 0 0. 00 100. 00 0 10 20 30 40 50 60 " 70 SPEED (MPH) , • SPOT SPEED STUDY ANAL' 3 FOR.THE CITY OF DUBLIN' LOCATION SAN RAMON 600' N/0 SILVERGATE DEVELOPMENT RURAL/RES. DIRECTION SOUTHBOUND 50th PERCENTILE SPEED. 45" DAY OF THE WEEK THURSDAY . ; 85th PERCENTILE SPEED 50 DATE 1/22/87 10 MPH PACE SPEED 41 TO 50 TIME OF THE DAY . 9:30-10:30 AM " PERCENT IN PACE SPEED 76 POSTED SPEED LIMIT 40 . . RANGE OF SPEEDS 36 TO 55 VEHICLES OBSERVED 107 SKEWNESS INDEX 1. 00 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% , ••••••••i 36 2 1.,87 1. 87 . I I 1 I 1 I• I 1 ' 37 3 2. 80 _ 4. 67 , I 1 1 - 1 1 • I I 38 1 0. 93 5. 61 i 1 I 1 1 •. I I 39 3 2. 80 8. 41 - 90'/. I I 1 I 1--0 I 1 ' 40 3 2. 80 11. 21 I' 1 I 1 1 • 41 10 9. 35 20. 56 - 1 I ` I I I •I I 1 42 8 7. 48 28. 04 I. I 1 I I •I 11 43 11 10. 28 38. 32 80% -1-1-1--I-•I i i 44 12 11. 21 49. 53 1 I I 1 I • 1 .. 1 45 9 8. 41 57. 94 I I I I I • 1 I . -1 46 12 11. 21 69. 16 1 1 . I I I • I 1 47. 8 7. 48 76. 64 70% I 1 I - I 1-•-I _ 48 4 3. 74 . 80. 37 I I I I I • 1 I I 49 2 1. 87 82. 24 I I I 1 1 • I I 1 50 - 6 5. 61 87. 85 I 1 . I I I • I . I 1 51 7 6. 54 . 94. 39 60% I--1-1--1-1-40-1-1-1 52 3 2. 80 97. 20 I 1 _ I 1 . 1 . 1 I 53 0 0. 00 97. 20 . I 1 I I 1 • 54 2 1. 87 99. 07 I I I I 1 • 1 II 55 1 0. 93 100'. 00 50% - i I . I I I-•-1 I 1 56 0 . 0. 00 100. 00 . I I 1 I I• 1 I I 57 . 0 0. 00 - 100. 00 i 1 .- . 1 1 . I• I I 1 58 0 O. 00 100. 00 . I I' I I. I• I I I 59 0 0. 00 100. 00 . .40%. I I I I I• I 1 I 60 0 0. 00 . . 100. 00 1 I I I I• I 1 1 61 0 . 0. 00 100. 00 i I V 1 I I• I " I I 62 0 0. 00 100. 00 I I I 1 I • 63 0 0. 00 - 100. 00 30% I I I I I• i I - I 64 0 , 0. 00 100. 00 I I I. I. I• I 1 " 65 0 0. 00 100. 00 1. I - I' I • - 1 . 1 1 66 0 0. 00 . 100. 00 I I I I • 1 67 . 0 0. 00 100. 00 20% I . 1 I I-• I 1 I . 68 0 0. 00 - . 100. 00 1 . 1 I I • I I 1 69 0 0. 00 100. 00 1. 1 I I. • I I I 70 0 0. 00 100. 00 ' I I I , I • 1 I 1 71 ' . 0. 0. 00 100. 00 10% l I - I I--+t I I 1 72 0 0. 00 100. 00 I I - I I •I I 1 I 73 0 0. 00 100. 00 - I. I I I. " •I I - 1 74 0 0. 00. 100. 00 . I . I I 1 • 1 I I 1 75 0 0. 00 100. 00. 0% L.o•••••••••••••••y, , 76 0 . 0. 00 100. 00 0 10 20 30 40 50 6.0 70 SPEED , (MPH) SPOT SPEED STUDY ANAL' S FOR ;THE CITY OF DUBLIN LOCATION SAN RAMON. 600' N/0 SILVERGATE DEVELOPMENT RURAL/RES. •DIRECTION NORTHBOUND 50th PERCENTILE SPEED 45 DAY OF THE WEEK THURSDAY .85th PERCENTILE SPEED 50 DATE 1/22/87 10 MPH PACE SPEED 41 TO 50 TIME OF THE DAY 9:30-10:30 AM PERCENT IN PACE SPEED 79 POSTED SPEED LIMIT 4.0 RANGE OF SPEEDS 33 TO 56 VEHICLES OBSERVED 106 SKEWNESS INDEX 1. 08 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% , ***ooh*, 33 1 0. 94. 0. 94 I I I I I 1 • I I 34 0 0. 00 0. 94 I I I I I I • 1 35 1 0. 94 1. 89 I I I I I I• I 1 36 1 0. 94 2. 83 - 90% 1 i I I I I• 1 1 37 0 0. 00 2. 83 I 1 1 I 1 • I I 38 2 1. 89 4. 72 I I 1 I 1 • I 1 39 3 2. 83 7. 55 I I I 1 I • 1 I 40 1 0. 94 8. 49 80% I----1----1----1----1---01 ----1----1 41 2 1. 89 10. 36 I I I I - 1 •I • I .1 42 6 5. 66 16. 04 I I I. I I • •I 1 I 43 15 14. 15 30. 19 I 1 I I I •i I I 44 9 8. 49 • 38. 68 70% I----1----1----1----1---101----1----1 45 15 14. 15 52. 63 • I 1 I I I . •1 I I 46 7 6. 60 59. 43 1 I I I I • i I I 47 • 8 7. 55 66. 98 I I I 1 I • I I 1 48 4 3. 77 70. 75 60% I I I I I-.-I I I 49 12 11. 32 82. 08 I 1 I I I • I• I I 50 6 5. 66 . 87. 74 I I I I I • I II 51 2 1. 89 89. 62 I I I I 1 • I - - I . 1 52 6 5. 66 95. 28 50% I----I----I----I----1-0--I ----I----1 53 1 0. 94 96. 23 I I I • I I • I I I 54 0 0. 00 96. 23 I I I . • 1 1 • I- I 1 55 2 • 1. 89 98. 11 I I I I 101 II 56 2 1. 89 100. 00 40% I I - 1 I-1-•-I-I-I J7 0 -0. 00 100. 00 1 I I I I • I I I 58 0 0. 00 100. 00 • I I - 1 I I • I I 59 0 0. 00 100. 00 I 1 I I I • I 1 1 60 0 0. 00 100. 00 30% I I - I I i-•-1 I I 61 0 0. 00 100. 00 I I I 1 1• I I I 62 • 0 0. 00 100. 00 I 1 I I I • I I I 63 0 0. 00 100. 00 I 1 I I I• I 'I I 64 0 0. 00 100. 00 20% I I I I I• I I 1 65 0 0. 00 100. 00 I I I I I• I I 1 66 0 0. 00 100. 00 1 I I '- I I• 1 I 1 67 0 0. 00 100. 00 - I I I I I• ' I I • 1 • 66 0 0. 00 100. 00 10% I • I I I 1• i I 1 69 0 • 0. 00 100. 00 i I • 1 1 • I I I 70 0 0. 00 100. 00 I I I I 01 I I I 71 0 0. 00 100. 00 I I I I 001 I I 1 72 0 0. 00 100. 00 0% L-•0.0•••••••000•-• , 73 0 0. 00 100. 00 0 10 20 30 40 50 - 60 70 SPEED (MPH) SPOT SPEED STUDY ANALY: FAR THE CITY OF DUBLIN LOCATION PENN DR. N/O KING WY. DEVELOPMENT RES IDENT I AL DIRECTION SOUTHBOUND 50th PERCENTILE SPEED . 28 DAY OF THE WEEK WEDNESDAY 85th PERCENTILE SPEED 32 DATE 1/21/87 10 MPH PACE SPEED 23 TO 32 OF THE DAY 11 :00-12: 10 PM PERCENT IN PACE SPEED 84 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 17 TO 38 VEHICLES OBSERVED 50 SKEWNESS INDEX ' 1.20 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. - PRCNT. 100% ► ***•******_- 17 1 2. 00 2. 00 ' I I I I •I I t I 18 0 0. 00 2. 00 I I: I 1 • I 1 1 1 19 0 0. 00 2. 00 I 1 1 I • I . 1 I t 20 1 2. 00 . 4. 00 90% I I I I•-4d►-I I I I . 21 0, 0. 00 4. 00 I I 1 I• I I 1 22 1 2. 00 - 6. 00 I I I 1 • 1 I 1 1 23 0 0. 00 .6. 00 t I 1 t• I I . I " I 24 3 6. 00 12. 00 80% I-1-1-140-1-1--1---1 25 9 18. 00 30. 00 I - I 1 • I 1 1 26 2 4. 00 34.00 I I I • I I 1 I 27 4 8. 00 42. 00 I . 1 I • - t 1 I 28 5 . 10. 00 52. 00 70% I I . I- I I I I 29 2 4. 00 56. 00 1 1 , I • I . 1 1 t 30 7 14. 00 70. 00. I I I • I 1 1 I 31 - 5 10. 00 80. 00 I - 1 1 - • I 1 1 1 32 5 10. 00 90. 00 50%. I I I-* I 1 1 I 33 0 0. 00 90. 00 I 1 I • 1 1 1 I 34 2 4. 00 94. 00 I I I. . • I 1 I 1 35 0 0. 00 94. 00 I I I *I 1 I I 1 36 1 2. 00 96. 00 50%. I I I- •1 I - . I ) 1 37 . 1 _ 2. 00 98. 00 I 1 1 •t 1 I 1 1 38 1 2. 00 100. 00 1 1 I •I 1 I I I 39 0 0. 00 100. 00 I 1 1 •1 1 1 1 1 40 0 0. 00 100. 00 40% t--1---1-•-1-1-1-1-1 - 41 0 0. 00 100. 00 1 I I , • 1 I 1 1 1 42 0 0. 00 100. 00 t . I I • I . I I " 1 43• 0 0. 00 100. 00 I I . I • 1 1 I 1 I 44 0 0. 00 100. 00 30% I .-I-1-0-1-1-1-1-1 • 45 0 0. 00 . 100. 00 I 1 I • I t 1 1 46 0 0. 00 100. 00 I I I • I 1 I 1 1- 47 0 0. 00 100. 00 I I I • 1 I I I I 48 0 0. 00 100. 00 20% I-1-1-•-1-1-1-1---1 49 0 0. 00 100. 00 1 I 1 • I 1 _ I I I 50 0 0. 00 100. 00 I I I • 1 I I •t •51 0 0. 00 100. 00 - I 1 I • I I ' I 1 I 52 0 0. 00 100. 00 10% _ t-1-1-•-1--1---1-1--1 53 0 0. 00 100. 00 I I I -• I I I 1 1 54 0• 0. 00 100. 00 I I 1** I 1 I I 1 55 0 0. 00 100. 00 I 1 *• I I 1 I 1 56 0 0. 00 100. 00 0% '-••*••••• , 57 0 0. 00 100. 00 0 10 20 30 40 50 60 70 • : SPEED • (MPH) - - SPOT SPEED STUDY ANAL S FOR THE CITY OF DUBLI1,_ LOCATION PENN DR. N/O KING WY. DEVELOPMENT RESIDENTIAL DIRECTION NORTHBOUND 50th. PERCENTILE SPEED 27 DAY OF THE WEEK WEDNESDAY , ' . 85th PERCENTILE SPEED 32 DATE 1/21/87 10 MPH PACE SPEED 23 TO 32 TIME OF THE DAY 11 :00-12: 10 PM PERCENT IN PACE SPEED 90 POSTED SPEED LIMIT 25 RANGE OF SPEEDS 23 TO 41 VEHICLES OBSERVED 54 SKEWNESS INDEX , 1. 33 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% , ■•••••••••••-1 23 • 9. 26 9. 26 I I I I •• ' I I I 24 • 5. 56 14. 81. I I I I • 1 1 I I 25 4 7. 41 22. 22 I I I I • I I I I 26 4 7. 41 29. 63 90%. i I----1----le I 1 I I 27 11 20. 37 50. 00 . ' i I I . I• I I I 1 28 8 14. 81 64. 81 I I' ' I I• I 1 1 1 29 2 3. 70 68.52 I I I . I• I I - I I 30 4 7. 41 75. 93 80% I I I--• I I 1 I 31 4 7. 41 ' 83. 33 I I I • I ' 1 I 1 32 4 7. 41 90. 74 I 1 I • I I 1 33 1 1. 85 . 92. 59 i I I • 1 . I 1 1 34 0 0. 00 ' 92. 59 70% I 1 I--• I I I I 35 1 1. 85 94. 44 - 1 ' I ' I • 1 I I 1 36 2 3. 70 ' 98. 15 I 1 I •1' I - 1 I I 37. . 0 0. 00 98. 15 i I I •I I I I 38 0 0. 00 98. 15 60%. i--I-1-4b1--1-1----1-1 39 0 0. 00 98. 15 I I I •I I 1 I 1 40 ' . 0 0. 00 98. 15 I 1 I •I 1 I I 1 41 1 1. 85 100. 00 I . 1 I •I 1 I 1 1 42 0 0. 00 100. 00 . 50%• i-1---1-61--1-1-1-1 43 ' 0 0. 00 100. 00 I 1 I • I ' l I I 1 44 0 0. 00 100. 00 I I I • I 1 1 1' I 45 0 0. 00 . 100. 00 I I I • 1 . 1 I 1 I 46 0 0. 00 100. 00 40% 1-1--1--41-1-1-1-1-1 47. 0 0. 00 100. 00 I I 'I • I I I I I 48 0 0. 00 100. 00 I I . I 0 I I I ' I 1 49 ' 0 0. 00 100. 00 I I I • I ' I 1 1 I 50 0 0. 00 100. 00 30% I I 1-•-1 1 I I 1 51 0 0. 00 100. 00 I I I • 1 'I I 1 1 52 0 0. 00 ' 100. 00 ' I 1 ' 1 • I 1 I . 1 I 53 0 0. 00 100. 00 I I I • I I ` 1 1 I 54 0- 0. 00 100. 00 20% 1 I -1-•-1-1-1-----1---1 55 0 0. 00 100. 00 I I I • 56 0 - 0. 00 100. 00 ' i. ° I I • 1 1 1 1 1 _57 0 0. 00 100. 00 I I 1 • I I I 1 I 58 0 0. 00 100. 00 10% I 1 I-•-i I 1 I 1 59 .0 0. 00 100. 00 I I I • 1 I I 1 1 60 0, 0. 00 100. 00 I ` 1 ' 1• 1 1 I .. I I 61 0 0. 00 100. 00 I 1 I• I I I 1 I 62 0 0. 00 100. 00 0% 1-••••••••••• 63 0 0. 00 100. 00 0 10 20 30 40 50 _ 60 70 SPEED (MPH) , SPOT SPEED STUDY ANALY 3 FOR THE CITY OF DUBLIN` LOCATION DUBLIN BLVD. 300' E/0 SIERRA CT DEVELOPMENT BUSINESS DIRECTION WESTBOUND .50th PERCENTILE SPEED 34 DAY OF THE WEEK THURSDAY 85th PERCENTILE SPEED 38 DATE 1/22/87 10 MPH PACE SPEED 30 TO 39 , TIME OF THE DAY 1 :50-3:00 PM PERCENT IN PACE SPEED 72 POSTED SPEED LIMIT 35 RANGE OF SPEEDS 20 TO 45 VEHICLES OBSERVED 103 SKEWNESS INDEX 0. 80 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% •••••••••---1 20 1 0. 97 0. 97 I 'I ,1 I I• I I 1 21 0 0. 00 0. 97 1 I I 1 • I 1 1 22 . 2 1. 94 2. 91 • 1 I I 1 •I I I 1 23 1 0. 97 3. 88 90% I I I 1-• I I I I. 24 1 0. 97 4. 85 I. I . _ 1 I • 1 I I I 25 - 5 4. 85 9. 71 I • I 11 • 1 I I 1 26 . 3 . .2. 91' 12. 62 I 1 1 1 . 1 I 1 1 27 2 1. 94 . 14. 56 80% 1-1--1--1--•-i-1-1-1 28 4 3. 88 18. 45 1 I I I • ' I- 1 I 1 29 1 0. 97 19. 42 I 1 I I • 1 I 1 1 30 5 4. 85 24. 27 I I. 1 1 • I I 1 I 31 9 8. 74 33. 01 70% I I I I-4-I I 1 32 7 . 6. 80 39. 81 I 1 1 I .•, I . I 1 I 33 8 7. 77 47. 57 . I ' - 1 I 1 • I I . I - .34 9 8. 74 56. 31 I 1 . 1 I • I 1 1 1 35 7 6. 80 63. 11 60/ - ! I I I-•-I I I I 36 6 5. 83 - 68. 93 I 1 1 1 • 1 1 1 37 11 . 10. 68 79. 61 I • I 1 - I• I . 1 I 38 . 10 9. 71. 89. 32 I I I I• I I . I - 39 3 2. 91 92. 23 50%. I I. I 1• i I 40 2 1. 94 94. 17 I 1 I - I• 1 1 . I 41 4 3. 88 98. 06 I 1 I I• 1 I I 42 0 0. 00 98. 06 I I 1 . I• 43 1 0. 97 99. 03 .40% I i I 1 f+ 1 I 1 1 44 • 0 0. 00 • 99. 03 I I 'I • • . I 1 I I 45 1 0. 97 100. 00 I I - I • ' I 1 I 46 0 '_ 0. 00 100. 00 I - 1 1 :. • 1 1' I I 47 - 0 0. 00. 100. 00 30%. i I `..I--•----I----1 I I 48 0 0. 00 100. 00 . I 1 1 • - I 1 I I 49 0 0. 00 100. 00 1. I 1 • • 'I 1 I - I 50 0 0. 00 100. 00 I I I •I I I ' 1 I 51 - 0 0. 00 100. 00 20% I I 1--•I 1 1 1 I =,:l.4 0 0. 00 100. 00 I I I 4.I I I I I 53 . 0 0. 00 100. 00 I I 1 • 1 1 1 1 I 54 0 0. 00 100. 00 - I I 1 • I I • I I - - 1 55 0 0. 00 100. 00 10% I I I-•-I I I I I 56 0 0. 00 100. 00 I 1 - I • I I 1 I 1 57 0" 0. 00 100. 00 I 1 - I • • .1 I 1 I 1 58 0 0. 0O 100. 00 I_ I I• I - 1 1 1 1 59 0 0. 00 100. 00 0% L••••••••-• r 60 0 0. 00 100. 00 0 . 10 20 30 40- .50 - 60 - 70 SPEED (MPH) SPOT SPEED STUDY. ANAL) B FOR THE CITY OF DUBLIP_ _ LOCATION DUBLIN BLVD. 300' E/0 SIERRA CT DEVELOPMENT BUSINESS DIRECTION EASTBOUND 50th PERCENTILE SPEED 35' DAY OF THE WEEK THURSDAY 85th. PERCENTILE SPEED 40 DATE 1/22/87 10 MPH PACE SPEED 29 TO 38 TIME OF THE DAY 1 :50-3:00 PM PERCENT IN PACE SPEED 76 POSTED SPEED LIMIT 35 RANGE OF SPEEDS. 27 TO 47 VEHICLES OBSERVED 101 . SKEWNESS INDEX 1. 20 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100% •••••••••••, 27 1 0. 99 0. 99 . 1 1 I . I . I • I . 1 - 1 28 2 1. 98 2. 97 I . I 1 I 1 • I . . I 1 29 5 4. 95 7. 92 I 1 I I I • I ' 1 1 30 2 1. 98 9. 90 90% I I ' _ I . I - 1• i t 31 3 2. 97 12. 87 I 1 1 I I• I , I 1 32 7 ' 6. 93 19. 80 = I 1 1 , 1 • . I 1 33 9 8. 91 28. 71 I 1 I 1 • I 34 . 9 8. 91 37. 62 ' 80% I-1-1-1-401-1-H-1 35 15 .14. 85 52. 48 I 1 : 1 1 401 1 1 t 36 13 12. 87 . 65. 35 I' 1 I I •1 ' 1 - - 37 , 9 . 8. 91 74. 26 I 1 1 1 • I I I I 38 5 4. 95 79. 21 70% I-1-1-1-40-1-1-1-1 39 3 2: 97 82. 18 I I I I • 1 1 I 40 4 3. 96 . 86. 14 I 1 I I • 1 1 t I 41. 1 0. 99 87. 13 I I I I : • I 1 , 'II 42: 4 3. 96 . 91. 09 60% I--1--1-1-40-1-1-1-1 43 1 0. 99 92. 08 I 1 I I • I I . 1 I 44 2. 97 . 95. 05 I I ' 1 1 • 1 1 1 1 45 1 ' 0. 99 96. 04 I I I I • 1 I . I I . 46 1 O. 99 . 97. 03 50'%. I I I I--•-I I ' I I 47 3 .. 2. 97 100. 00 ' I I 1 I • I 48 0 0. 00 100. 00 I I ' 1 1 • t I I I 49 . 0 0. 00 100. 00 I I 1 ' I' • I - 1. 1 1 50 0 0. 00 100. 00 40% I 1 . 1 I-e-t . 1 1 I 51 0 0. 00 100. 00 I I 1 I • I I ` 1 1 52 0 0. 00 100. 00` I I 1 1 • I 1 ' I I 53 0 0. 00 100. 00 . I I 1 . let I 1 1 54 0 0. 00 100. 00 30% 1-1--1-1-•---1-1-1-1 55 0 0. 00 100. 00 I 1 I 1 • . I 1 I 'I 56 0 0. 00 100. 00 I I 1 I• 1 1 I . 1. 57 0 0. 00 100. 00 I , I . I I• 1 I 1 I 58 0 0.'00 100. 00 20% 1 I ' I t• I 1 I 1 59 0 0. 00 . 100. 00 I I 1 1• 1 1 1 1 60 0 ' 0. 00 100. 00 I . I 1 I• - 1 1 ' I 1 .61 0 0. 00 . 100. 00 1 I I I • I 1 I 1 62 0 ' 0. 00 100. 00 ' ' 10% I --1-1--0-1-1-1---1 63 0 0. 00 100. 00 t I 1 • ' I I I 1 64 . 0 0. 00 100. 00 - I I I ' •I 1 I _ 1 I 65 0 . 0. 00 100. 00 I 1 ' 1 •I 1 1 I. 1 66 0 0. 00 ' 100. 00 0% `♦•••••••41•*•-• l 67 0 0. 00 100. 00 0 10 20 30 40 50 .60 70 SPEED (MPH) SPOT .SPEED STUDY ANF 31S FOR THE CITY OF DUBL LOCATION DOUGHERTY N/0 AMADOR VLY. DEVELOPMENT RURAL/RES. DIRECTION NORTHBOUND 50th. PERCENTILE SPEED 45 DAY OF THE WEEK THURSDAY '85th PERCENTILE SPEED 50 DATE 1/15/87 10 MPH PACE SPEED 41 TO 50 TIME OF THE DAY 12:25-1 :25 PM PERCENT IN PACE SPEED 76 POSTED -SPEED LIMIT UNMARKED RANGE OF SPEEDS 35 TO 61 VEHICLES OBSERVED 50 SKEWNESS INDEX 1. 18 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER OF TOT. PRCNT. 100'/. ••••, 35 2 4. 00 4. 00 I I 1 I 1 I • 1 36 0 0. 00 4. 00 t I 1 - 1 I 1 ••I I 37 1 2. 00 6. 00 1 I . 1 I I I • 1 1 38 1 2. 00 8. 00 90% I - 1 I I I 1••-I 1 39 2 4. 00 12. 00 I .1 I I I • t 40 1 2. 00 14. 00 i 1 1 I- 1 • I 1 41 2 4. 00 18. 00 I - I I I I • 1 1 42 6 12. 00 30. 00 80% 1-1--1-1-1--0--1-1 43 5 10. 00 40. 00 1 1 1 I I • 44 2 4. 00. 44. 00 1 I I - I I • 45 6 12. 00 56. 00 - I I 1 1 1 •I 1 1 46 3 6. 00 62. 00 `70% .I-1--1-1-1-401--1-1 47 3 6. 00 68. 00 1 I - 1 I 1 *1 1 1 . 48 3 6. 00 74. 00 1 t t I I • I I 1 49 3 6. 00 80. 00 I 1 I I I • 1- 50 5 10. 00 90. 00 60% I I I I I-*-t I I 51 0 0. 00. 90. 00 I I I 1 I • I 1 1 0 0. 00 90. 00 t 1 1 1 I • 1 1 1 53 0 0. 00 90.00 1 I 1 I I • „1 - 1 1 54 0 0. 00 90. 00 50% 1 I t I I-•-I I 55 2 4. 00 - - 94. 00 I I 1 1 1 • _ 1 1 56 0 . 0. 00 94. 00 t I 1 I I • - 57 1 2. 00 96. 00 I 1 1. - 1 1 • I I 1 58 0 0. 00 96. 00 40% I I t - I I-•-I I I 59 1 2. 00 98. 00 I 1 I I I• 60 0 0. 00 98. 00 .1 I I I 1• I I 1 _ 61 1 2. 00 100. 00 I 1 1 1 • 1• 1 1 1 62 0 0. 00 100. 00 30% I ' I I t I• I I 1 63 0 0. 00 100. 00 .1 I I I t• I 1 - 1 64 0 0. 00 100. 00 • : I I . • I I 1• I 1 1 65 0 0. 00 100. 00 I 1 . I I I• 1 I 1 66 0 0. 00 100. 00 20%: I I. t I I• I I 67 - 0 0. 00 1.00. 00 I 1 I I 1• 1 I I 68 0 0. 00 100. 00 I t I 1 • I - • I I 69 0 0. 00 100. 00 - I I I I • I I I 70 0 0. 00 100. 00 10% I I I I---* I I I I 71 0 ' 0. 00 , 100. 00 I I I . I . •I 1 - I 1 72 - „ 0 0. 00 100. 00 1 I I 1 •• I I 73 0 . 0. 00 100. 00 I - I I I • I I . I I 74 0 .0. 00 100. 00 . 0% '-••••••••••••••••• 1 75 0 O. 00 100. 00 0 10 20 . 30 40 50 60. 70 SPEED (MPH) SPOT SPEED STUDYAN1 EIS FOR THE CITY OF DU£cl. LOCATION DOUGHERTY N/O AMADOR VLY.. DEVELOPMENT RURAL/RES. SOUTHBOUND 50th PERCENTILE. SPEED 47 DAY OF THE WEEK THURSDAY '85th PERCENTILE SPEED 53 DATE 1/15/87 10 MPH PACE SPEED 41 TO 50 TIME OF THE DAY 12:25-1 :25 PM PERCENT IN PACE SPEED 64 POSTED SPEED LIMIT UNMARKED RANGE OF SPEEDS 30 TO 62 VEHICLES OBSERVED 59 SKEWNESS INDEX 1. 06 CUMULATIVE SPEED CURVE SPEED NUM- PERCNT. CUMUL. (MPH) BER . OF TOT. PRCNT. 100% , ••••, 30 1 1. 69 1. 69 I 1 1 1 1 1 • 31 1 - 1. 69 3. 39 t I I I I I •I t 32 0 0. 00 3. 39 . I 1 1 1 1 I ** I I 33 1 1. 6.9 5. 08 90% I I I I I 1-•-1 ' 1 34 0 0. 00 5. 08 I : I I ' I 1 I• I 35 1 1. 69 6. 78 t I I I I I• I 36 0 0. 00 6. 78 I I I I I • 37 0 0. 00 6. 78 80% 1 1 I t I---* I I 38 . 0 0. 00 6. 78 I I I I I • I 1 39 1 1. 69 8. 47 I 1 I 1 I • I 1 40 2 . 3. 39 11. 86 I I I I . I •I I I 41 2 3. 39 15. 25 . 70% 1----1----I I I---* 1 ----I I 42 4 6. 78 22. 03 1 I I . I I . •I I I 43 4 6. 78 28. 81 - - I I I I I • I I I 44 4 . 6. 78 35. 59 . 1 I I I 1 • II I 45 6 10. 17 45. 76. 60% I I I I I-•-1 I I 46 2 3. 39 49. 15 I I ,. I I I • I I .I ' 47 6 10. 17 59. 32 I I ® 1 I t • I 48 5 8. 47 67. 80 1 I . 1 I I • I I 1 49 0 0. 00 67. 80 50% 1 I I I----I--*-I I I 50- 5 8. 47 76. 27 I. 1 I I I • I I . . t 51 1 1. 69 77. 97 - I . I - I t I • 1 =.:-.. 4 6. 78 . 84. 75 t 1 I I .I. • 1 I I 53 1 1. 69 - 86. 44 40% . I----1----1 I I---•-I I 54 2 3. 39 , 89. 83 t I I I I -• I I 55 1 . 1. 69 91. 53 I . I I I I • 1 . I. I 56 1 1. 69 93. 22 t - I I I I• I I I . 57 0 0. 00 93. 22 30% I I I I I •---I ----1 I 58 0 0. 00 93. 22 I I I I I• I: 1 I 59 0 0. 00 93. 22 I I I I . I• . I t I 60 2 3. 39 96. 61 I I I I I• I t I 61 1 1._69 98. 31 20% I I. I I--* I----I ----1 62 1 1. 69 100. 00 1 I I . I • I I I 63 0 0. 00, 100. 00 I I I I • I I 1 64 0 0. 00 100. 00 I I t - 'I • 1 I I 65 0 0. 00 100. 00 10% I I I--I----• I I I t 66 0 0. 00 100. 00 1 • I I -I ** I I I - 67 0 0. 00 100. 00 I - I I . I • 1 . 68 0 0. 00 100. 00 I I • I •• I I .1 69 0 0. 00 100. 00 . 0% 1-40 ■•••••••••••• 70 0 0. 00 100. 00 0 10 20 - 30 40 50 60 70 SPEED (MPH)